Chaelong Lee's Portfolio

Page 1






6


01 Bundang Contemporary Art Center

Art Museum

Ajou Univ. 5th grade 1st term 2015.03 ~ 2015.06 Personal Work Location : Gumi-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea Site Area : 28,990m2 Floor Area Ratio : 12,671m2 (43%) Building Coverage Ratio : 6,708m2 (24%) Building Scale : 1 Basement Floor , 3 Floors Parking lot : 279 lots (12 lots for disabled)

7


8


9


10


11



13


14


15


16


17


18


19


20


21


22


23


24


02 National Vocational School Vocational school

Ajou Univ. 4th grade 2nd term 2013.09 ~ 2013.12 Personal Work Location : Bojeon-dong, Yongin-si, Gyeonggi-do, Korea Site Area : 5900m2 Floor Area Ratio : 12960m2 (219%) Building Coverage Ratio : 4320m2 (73%) Building Scale : 1 Basement, 3 Floors

25



27




30


31


32


33


34


35


36


37



39


40


03 Re-Formation of the Relationship Boutique hotel for Professional woman

Junglim Archtecture awards for student 2012 2012.01 ~ 2012.02 Team Work (Non-prize) Location : Sinsa-dong, Gwanak-gu, Seoul, Korea Site Area : 442m2 Floor Area Ratio : 1,035m2 (234%) Building Coverage Ratio : 244m2 (55%) Building Scale : 1 Basement Floor , 11 Floors Parking lot : 35 lots (4 lots for disabled)

41


42


43


44


45


46


47




50



52


04 Intimate and Touching - place

Office Building

Ajou Univ. 4th grade 1st term 2013.03 ~ 2013.06 Personal Work Location : Sampyung-dong, Bundang-gu, Sungnam-si, Gyunggi-do, Korea Site Area : 11543m2 Floor Area Ratio : 69258m2 (600%) Building Coverage Ratio : 6925m2 (60%) Building Scale : 3 Basement Floors , 19 Floors Parking lot : 600 lots (16 lots for disabled)

53



55


56


57


58


59




62


63



65


66


67


68


05 Double-faced dwelling life Housing complex

Ajou Univ. 3rd grade 2nd term 2012.11 ~ 2012.12 Personal Work Location : Sampyung-dong, Bundang-gu, Sungnam-si, Gyunggi-do, Korea Site Area : 20,991m2 Floor Area Ratio : 5,408m2 (25%) Building Coverage Ratio : 2 (60%) Building Scale : 1 Basement Floors , 8 Floors

69


70


71


72


73


74


75



77


78


79


80


81


82


06 Latent Possibility

Building extension

Ajou Univ. 3rd grade 2nd term 2012.09 ~ 2012.10 Personal Work Location : Wonchwon-dong, Yeongtong-gu, Suwon-si, Gyeonggi-do, Korea Site Area : 512m2 Floor Area Ratio : 817m2 (159%) Building Coverage Ratio : 499m2 (97%) Building Scale : 2 Floors

83


84


85


86


87


88


89


90


91


92


07 Brick & Timber system Extra work

Ajou Univ. 3rd grade 2nd term 2012.11 ~ 2012.12 Team Work Brick fragment : 488 fragments Timber fragment : 35 fragments Brick material : Plaster Timber material : Bass wood

93


94


95


96


97


98


99


100


08 W-Pavilion

Extra work

2012 aDLab+ Summer workshop 2012.08 ~ 2012.09 Team work Location : Gangdong Art Center, Sangil-dong, Gangdong-gu, Seoul, Korea Structure : Dimension lumber (2X2) Unit : 3 Units Layer : 30 Layers wood fragment : 849 fragments

101


102


103


104


105


106


107


108


09 Appendix Exchange student program Talent donation Student initiated track Architectural trip Favorites . . .

109


110


111


112


113


114


115


116


117


118


119


120


121


122


123


124


125


126


127


128


129


Copyright â“’ 2015. Chaelong Lee. Portfolio all rights reserved.

Neither part of this publication may be reproduced, distributed or transmitted in any form by any means including photocopying, other electronic or mechanical metods without the prior written permission of the editor.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.