SONY LEAP STORE LOS ANGELES, CA Sony approached Chandler to engineer, manufacture, install, and manage two mock-up
Project Type
stores and one final pilot store within a ten week timeline. Sony was looking for a partner
Retail Brand Store
to help redefine their retail stores. Klein Dytham architecture (KDa) provided Chandler with rough architectural dimensions and concepts. For the project, Chandler created a complete modular fixture package of over 65 pieces and over a dozen different fixture designs. To Date: Sony went onto build 9 additional Sony Leap stores using this store design. From this, Chandler and Sony have developed a strong partnership, resulting in multiple retail projects.
Architect KDa Voorhees, NJ Chandler Services Design, Engineering, Manufacturing, Project Management, Logistics
SONY LEAP STORE
STORE EXTERIOR
SONY LEAP STORE
STORE INTERIOR
SONY LEAP STORE
STORE INTERIOR
SONY LEAP STORE
INTERIOR RENDER
SONY LEAP STORE
STORE INTERIOR
SONY LEAP STORE
ZONE 1 - CONTENT WALL
SONY LEAP STORE
ZONE 1 - CONTENT WALL RENDERS
SONY LEAP STORE
ZONE 2 - FURNITURE PACKAGE
SONY LEAP STORE
ZONE 2 - FURNITURE PACKAGE; STORAGE & DRAWERS
SONY LEAP STORE
ZONE 3 - ACCESSORY WALL; ENGINEER DRAWINGS
SONY LEAP STORE
ZONE 3 - ACCESSORY WALL; FINAL IN STORE
SONY LEAP STORE
MINI MOCK-UP STORE
SONY LEAP STORE
FULL SIZE MOCK-UP AT LOCATION
SONY LEAP STORE
STORE INTERIOR
SONY LEAP STORE
STORE INTERIOR
SONY LEAP STORE
STORE INTERIOR
SONY LEAP STORE, Project Outcomes
AWARD WINNING RETAIL STORE
Sony Leap Store project is a testament to Chandler’s in-house
2012 ARE Design Award Sony Leap Store Los Angeles, CA
efficiencies. Chandler’s design and engineering group worked
PARTNER FOR MULTIPLE RETAIL ENVIRONMENTS
with our manufacturing team to provide a complete mini
Multiple retail locations and store-in-store builds with Best Buy
store prototype and full size prototype within 4 weeks to gain
RETAIL SUCCESS
approval for the design concepts. This accelerated timeline
Sony went on to build 9 additional Sony Leap Stores using this flagship store design
was needed to meet the full project timeline of 10-weeks. Sony went on to build additional full scale stores and refresh existing stores with sections of the modular displays.