Proposed 4-storey Building for Juan R. Liwag Memorial School

Page 1

MMM BUILDERS Mendoza, Claire Frances Miranda, Chanen Jeane Mojedo, Camil


MMM BUILDERS

Table of Contents

1. MMM Builders About Us

2. Juan R. Liwag Memorial High School

Background of the Project

3. Project Overview 4. Technical Plans Floor Plans Perspective Building Section

5. Schedule of the Project and Project Cost

2


MMM BUILDERS

MMM BUILDERS MMM Builders is a company founded in 2018. The company was founded by Claire Frances Mendoza, Chanen Jeane Miranda, and Camil Mojedo. They are graduates of Bachelor of Science in Construction Engineering and Management at Mapua University-Intramuros, Batch 2018. The three ladies who are the company's founders have been good friends since their first year, as there are only a few students in that program. The idea of building a construction firm started in one of their courses during their 4th year as BSCEM students. The course CEM181P-2, CEM Project 1 where they are asked to create a construction project. The founder was fond of the idea of starting a firm where they could showcase all their learnings in their course that specializes in Construction and Engineering Management. There are only a few schools in the Philippines that offer BSCEM as an undergraduate program.

The MMM Builders' mission is to provide clients and customers with the highest level of service and compete in the construction market. Furthermore, they want to showcase their expertise in construction and engineering management. The company aims to build and maintain a good relationship with the customers. The company's vision is to create highquality infrastructures using the best-suited methodology for delivering construction projects. Infrastructures that are both aesthetically and safe for the people who will utilize the structure. The company's success through the years has been due to its employees' dedication to excellent work, providing customer service that exceeds expectations, and a safety program that has led to millions of dollars of zero-accident hours. Since day one, honesty and open communication have empowered MMM Builders' workforce, which shows in our work.

Source: www.re-thinkingthefuture.com/rtf-fresh-perspectives/

3


MMM BUILDERS

JUAN R LIWAG MEMORIAL HIGH SCHOOL School is an essential type of structure as it will be a facility that will be used by many people, especially students, teachers, and other personnel. It changed its name in 1946 to its present name in 1984. Juan R Liwag Memorial High School serves students from Gapan City's adjacent communities, such as San Leonardo, San Isidro Jaen, and others. As a result, the JRLMHS is the largest public secondary school in Gapan, Nueva Ecija. Currently, the school implements a K-12 basic education program. The school offers junior and senior high school. They offer courses such as Science. Technology, Engineering, and Mathematics (STEM) strand, Accountancy, Business, and Management (ABM) strand, and Humanities and Social Science (HumSS) under the Academic track as well as Technical-Vocational-Livelihood (TVL) track and Arts and Design track for its senior high school program. (Source: edukasyon.ph) Due to the pandemic that started last year, 2020, most institutes and universities worldwide stopped their face-to-face classes to prevent the further spread of the virus. 4


MMM BUILDERS

PROPOSED 4-STOREY ADDITIONAL BUILDING FOR JUAN R. LIWAG MEMORIAL HIGH SCHOOL

MMM Builders will build the proposed 4-storey additional building for Juan R. Liwag Memorial High School. The MMM Builders will take the construction project to make the plan into reality. Due to the pandemic that started last year, 2020, most institutes and universities worldwide stopped their face-to-face classes to prevent the further spread of the virus. In the new normal people are required to have a one-meter distance from each other. This circumstance gives us an idea to create a school building that composes things students and other school personnel need, especially in this time of covid. These include facilities that check the temperature of the people who will enter the building, classrooms that provide social distancing chairs, and rooms where students and other personnel can disinfect. The significance of this project is mainly to avoid the spreading of the virus inside the building and protect each person, especially the students who will enter the school, without fear of getting the virus and provide an additional facility to the school so that it can cater the new normal. This project aims to provide a facility for the students that could cater to the new normal protocols due to the COVID-19 pandemic. Provide adequate space for additional laboratories, library, faculty rooms, and classrooms for students and professors. And provide a safe environment for the students. Currently, there are only limited laboratories in the school. The new building provides more laboratories for its students. Moreover, the school has a gym and open area, and the auditorium is a close space where they can hold indoor events. With its vast amount of students, an enormous library facility can help to cater to more students. The scope of this project is to construct an additional building for Juan R. Liwag Memorial High School. A total of 5,000 sqm is vacant near the school; however, the project team and the school administration agree to use 1,000 sqm for the additional 4-storey building composed of laboratories, library, faculty rooms, and classrooms. In line with the project's construction, the company will provide project documentation such as site development plan, vicinity, location plan, floor plans, perspective, elevations, building sections, project schedule, estimated bill of quantities, and materials. 5


MMM BUILDERS

6


MMM BUILDERS

TECHNICAL PLANS FOR PROPOSED 4-STOREY ADDITIONAL BUILDING FOR JUAN R LIWAG MEMORIAL HIGH SCOOL

TECHNICAL TECHNICALPLANS PLANSFOR FORPROPOSED PROPOSED4-STOREY 4-STOREYADDITIONAL ADDITIONAL BUILDING BUILDINGFOR FORJUAN JUANRRLIWAG LIWAGMEMORIAL MEMORIALHIGH HIGHSCOOL SCOOL The The4-storey 4-storeybuildings buildingsare areconsist consistof offaculty facultyrooms, rooms,library, library,classrooms, classrooms,computer computerrooms, rooms, and andlaboratory. laboratory.The Thetechnical technicalplans plansprovided providedthe thesite sitedevelopment developmentplan, plan,location locationplan, plan,11stst-4-4thth floor floorplan, plan,and andthe theSouth-East South-EastIsometric Isometricperspective. perspective.

7


MM BUILDERS

FRONT FRONTELEVATION ELEVATIONAND ANDREAR REARELEVATION ELEVATION

Below Beloware arethe theproposed proposedfront frontelevation elevationand andrear rearelevation elevationof ofthe theproposed proposed4-storey 4-storeyadditional additional building buildingfor forthe theJuan JuanR. R.Liwag LiwagMemorial MemorialHigh HighSchool. School.The Thebuilding buildinghas hasseveral severalwindows windowsfor forthe the school schoolbuilding buildingto toensure ensureaalot lotof ofnatural naturallight lightcan canenter enterthe thebuilding. building.Since Sincethe thelocation locationof ofthe the building buildingisisaaprovince, province,this thiscan canhelp helpfor forthe theventilation ventilationand andfresh freshair. air.

8


MMM BUILDERS

SCHEDULE OF THE PROJECT AND PROJECT COST The project started last August 2021. Since the project is quite extensive and there is only a limited workforce, due to the COVID-19 restrictions and cost constraints, the project is expected to be completed at the end of January 2024. The 4storey building will be launched after 2-3 months of its construction.

General

Site Works

Requirements

Structural

Masonry and

Works

Architectural Partitions

₱ 805,348.26

₱ 550,097.59

₱ 9,858,254.27

₱ 560,420.74

Plumbing

Electrical

Architectural

Total Cost of

Works

Works

Works

the Project

₱ 81,406.00

₱ 252,174.26

₱ 1,659,255.78 ₱ 13,766,956.90

9


MMM BUILDERS

Source: www. rmg-engineers.com/

“Investment in infrastructure is a long term requirement for growth and a long term factor that will make growth sustainable” - Chandra Kochhar

Source: https://medium.com/@makbuildings

10


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.