Thesis Report Full

Page 1

Re-Grounding

reinterpretation of ground, datum and mass Thesis Report Calvin Chan


B


“Re-Grounding”

reinterpretation of ground, datum and mass Thesis Report Master of Architecture 2011- 2012 University of Hong Kong

The artificial ground has been “thickened” by means of shifting datum defined by building code. The ever-shifting datum continuously disengages itself from the idea of “ground”. Programs are interiorized. Open spaces are rendered as leftover spaces. Is it possible to imagine an alternate scenario: by reinterpreting datum, the “thickened ground” is also a device to induce intimate spatial relationship between ground and building mass?

i


ii


Content Photographic Research

1

Case Study

3

First Jury

8

Building Type

9

Thesis Statement

Thickened Ground

20

Scale Comparison

24

Site Selection

28

Urban Slope

30

Thickened Ground at site

32

Second Jury

36

Site Analysis

37

Unfolded Journey

50

Program

52

Multiple Ground

54

Multiple Ground Plan

56

Reshaped Urban Space

58

Alternate Future

60

Documentation

62

Third Jury

76

Final Jury

77

Acknowledgements

78

Bibliography

79

iii


Central

Mid Levels

Kwun Tong

Building Plinth on Slopes


A Research on Urban Slope High Rise Buildings How do high rise buildings reshape the ground to situate themselves on urban slopes? In some cases, the building plinth’s volume in itself is already equivalent to a building in the neighborhood. What is the driving factor behind this phenomenon? Is the plinth a genuine representation of what needs to be built?

13.2 m

55.4 m

1


Building Mass

Case Study

Axonometric studies aims to decode the ingredients of high rises on urban slopes.

Structure Existing Topography Program Space

2


Palm Court Year of Completion: Lcoation: Site Area: Ground Level Differeence:

1964 Mid-Levels 1,674 m2 18 m

3


Tai Hong Court Year of Completion: Lcoation: Site Area: Ground Level Differeence:

4

1965 Kwun Tong 2,469 m2 26 m


Eastland Heights Year of Completion: Lcoation: Site Area: Ground Level Differeence:

1976 Kowloon Tong 1,451 m2 15 m

5


Comfort Gardens Year of Completion: Lcoation: Site Area: Ground Level Differeence:

6

1974 North Point 2,084 m2 20 m


Leighton Hill Year of Completion: Lcoation: Site Area: Ground Level Differeence:

2002 Happy Valley 43,143 m2 30 m

7


First Jury Date: Panel Members:

1.

February 8th, 2012 Alan Smart, Koon Wee

Synopsis of Presentation

The need to develop on hilly topography is a recurring issue for Hong Kong. With the concern of over-reclamation, as well as a lack of flatland in urban areas, it is not difficult to find buildings sitting on a variety of artificial platforms on slopes. Axonometric case studies shown as examples In the above examples GROUND is considered a separate entity from the building MASS. While in these examples GROUND has a variety of spatial properties, meaning it is not a SURFACE but rather a VOLUME. GROUND is no longer simply a plane for the building to sit on. There exists other types where GROUND and MASS forms an inseparable relationship yet to be explored.

2.

Synopsis of Reviewers’ Comments

3.

Response

KW: Could document Archetypes worldwide with the color-coding of the diagrams and their relationship with the code. KW: Should understand how a slope is reshaped in engineering terms KW: Should revise the criteria in catergorizing types into terms more commonly understood

Need a critical understanding about influence of building code on building types. Need a way to revise the catalog to include more useful information. (e.g. level difference/ buidling code/ engineering technique)


Construction

cut and fill

build atop

Ground/ Access

Building Type

To understand the physical, circulatory and programmatic composition of the plinth, four criteria is set up to evaluate each case study.

single continuous

multiple continuous

single discontinuous

multiple discontinuous

In-between

structure

road

program

Program

carpark

recreation

9


Building Type vs Building Code For ease of implementing the code, there is always absolute reference regarded as the “Principal Datum” for any development in Hong Kong. What is the relationship between this “ground” with the accessible ground?

Accessible Ground -17.9 m

10

-17.9 m

Principal Datum (from the lower access)


cut and fill

single continuous

structure

carpark

Hillview Garden

Site Boundary

1963 7.7 m -17.9 m

Site Boundary

Year of Completion: Ground Elevation: Principal Datum:

Accessible Ground

Principal Datum -17.9 m (from the lower access)

-17.9 m

11


build atop

single continuous

structure

carpark

Tai Hong Court Year of Completion: Ground Elevation: Principal Datum:

-17.6 m

12

1969 8.0 m -17.6 m

-17.6 m


build atop

single continuous

road

carpark

Palm Court Year of Completion: Ground Elevation: Principal Datum:

1964 13.2 m 0.0 m

0.0 m

0.0 m

13


build atop

single discontinuous

road

carpark

Broadview Terrace Year of Completion: Ground Elevation: Principal Datum:

1977 8.3 m 0.0 m

0.0 m

14

0.0 m


cut and fill

single discontinuous

program

recreation

Hilltop Gardens Year of Completion: Ground Elevation: Principal Datum:

1990 24.7 m +7.0 m

+7.0 m

+7.0 m

15m non-domestic podium

...for the non-domestic part of a composite building,on a class A, B or C site may, whatever the height of the building, exceed the permitted percentage site coverage to a height not exceeding 15 m above ground level.

Building (Planning)Regulations section20(3)

15


build atop

multiple discontinuous

Leighton Hill Year of Completion: Ground Elevation: Principal Datum:

+27.2 m

16

2000 49.8 m +27.2 m

road

recreation


+27.2 m

17


build atop

multiple discontinuous

The Belcher’s Year of Completion: Ground Elevation: Principal Datum:

+35.4 m

18

2002 55.4 m +35.4 m

program

recreation


+35.4 m

Datum Shift

The datum shift is resulted from dividing the development into two; the bottom is dedicated to a shopping mall of commercial purpose while the top is dedicated to residential purpose. The plinth/podium as such is composed of the shopping mall for commerical purpose and a clubhouse for residential purpose. The plinth is equivalent to a 20 storey building in itself, which elevates the apartements above a normal building since 70’s in its neighborhood. 19


1977 Broadview Terrace

1963 Hillview Gardens

-17.9 m

0.0 m

1990 Hilltop Gardens

0.0 m

8.3 m +7.0 m

24.7 m

Buil 1955 ding Setb Ordinan ack Line ce Buil 1 1 P.D. ding Pla 980 Bui 9 6 6 Plot ldin n +15 m n ning R Rat g Or on d e io a d ome gulation nd S inance stic ite C pod s over ium age Sino 1 Lim British 984 it la J nd s oint D ec ales < 50 laratio Ha/ n year

20

1997 L i repla st ces a Policy nnu al la n


2002 The Belcher’s

A Critique: Ground Thickening as an economic agenda Thickened Ground Over the time the artificial ground has been “thickened” by means of code and injecting optional program. There is a shift from applying building code for practical concern to manipulation to achieve a building mass which shows more economic greed than architectural concern. The ever-shifting datum continuously disengages itself from the idea of “ground”. Programs are interiorized. Open spaces are rendered as leftover spaces.

A thickened ground has proven to have economic value in current manifestation. Yet is it possible to re-imagine an alternate scenario: where datum is also a device to induce intimate spatial relationship between ground and building mass? +35.4 m

Princip a +56.4 m

l Datum

nd s

ales

“Thickened Ground” // Datum Shift // Building Code 21


1955

1966

Building Ordinance Setback line

Hillview Garden

cut and fill

Broadview Terrace

single continuous

structure

carpark

Tai Hong Court

build atop

Building Ordinance Plot Ratio & Site Coverage

build atop

single discontinuous

road

carpark

single continuous

road

carpark

multiple discontinuous

program

carpark

Palm Court

single continuous

structure

carpark

build atop

Comfort Gardens

cut and fill

stage 1 tower on slope

stage 2 transition

new ground plane

ground plane ‘thickening’

Stage 1 Tower on slope Ease of Access/ Construction

Stage 2 Transition Program Necessity

Stage 3 Typical Podium Towers “15m Non-Domestic Podium”

New Ground Plane

Ground Plane ‘Thickening’

Artificial Ground Mass

15m p.d.

22


1980

Building (Planning) Regulation P.D. +15m non-domestic podium

1984

Sino British Joint Declaration Limit land sales < 50 Ha /year

1997

Hilltop Gardens

cut and fill

List Policy replaces annual land sales

The Belcher’s

single discontinuous

program

recreation

Flora Garden

build atop

multiple discontinuous

program

recreation

multiple discontinuous

road

recreation

multiple discontinuous

road

recreation

Leighton Hill

cut and fill

single discontinuous

program

recreation

build atop

The Legend

build atop

Thickened Ground as the only building mass

The plinth has developed stage 3 from a ground plane to a building in itself with stage 4 typical podium towers increasing mass and program content. While the building mass on top has mega podium been inert to the15m ground condition. Is it possible to imagine a scenario where GFA concession shifting datum + extra concession the building as a whole is the plinth that reshape the ground and the space for habitation? (20m) 15m 15m p.d. p.d. Stage 4 Mega Podium Shifting Datum + Extra Concession

Stage 5 Ground Mass Artificial Re-shaping Ground

Artificial Ground Mass becomes Building

Ground as the only Mass

(20m) 15m p.d.

23


Hillview Garden, 1963

Broadview Terrace, 1977

Hilltop Gardens, 1990 24


The Belcher’s, 2000

Scale Comparison “Thickened Ground” Models @ 1: 500 25


Hillview Gardens

Tai Hong Court

Year of Completion: Site Area: Site Coverage:

Year of Completion: Site Area: Site Coverage:

1963 3,800m2 60%

1969 2,21 88%


Palm Court

9 10m2 %

Year of Completion: Site Area: Site Coverage:

26

1964 1,590m2 96%

Broadview Terrace

Comfort Gardens

Year of Completion: Site Area: Site Coverage:

Year of Completion: Site Area: Site Coverage:

1977 3,060m2 87%

1974 1,960m2 85%


Hilltop Gardens Year of Completion: Site Area: Site Coverage:

Leighton Hill 1990 5,540m2 92%

Year of Completion: Site Area: Site Coverage:

2000 42,763m2 33%

27


The Belcher’s Year of Completion: Site Area: Site Coverage:

2002 31,890m2 68%


30.9 m

17.4 m

S

Ho Man Tin Hill Road, Ho Man Tin

+/- 13.5 m

18.9 m

26.5 m

93.9 m

L 28

Tin Hau Temple Road, North Point

+/- 75.0 m


5.8 m

20.4 m

35.1 m

53.3 m

62.2 m

M

Hopewell Center Second Phase, North Point

+/- 56.4 m

Site

Hopewell Center Second Phase is a Thickened Ground Phenomenon; a generic datum with huge level difference within the site 13.9 m

32.1 m

24.5 m

18.0 m 21.3 m 8.2 m

L

Hong Kong Observatory, Tsim Sha Tsui

+/- 23.9 m

29


30


Urban Slope

The site is located on a urban slope with secondary schools in its neighborhood. Frequent movement happens from the urban fabric to upon the slope. The site could act as a mediator in-between.

Natural Slope MTR Sportsground Swimming Pool Site School Schools and Sports Facilities 1:4000 31


Thickening Device: Footbridge + 6.5 m

Hopewell Centre

To Kennedy Road

To Kennedy Road

+6.5 m

To Kennedy Road +4.5 m Wu Chung House

ue Q

ad Ro s ’ en

0

32

10 m

st

Ea

QRE Plaza


Thickening Device: Landfill + 11.7 m

+11.7 m

Nan Koo Terrace

p Shi eet Str

0

10 m

33


Thickening Device: Express Lift + 48.5 m

Hopewell Centre

dy nne

ad Ro

Ke

3/F to 17/F + 42 m

d Roa en’s

+6.5 m

0

34

10 m

e Qu

t

Eas


Thickening Device: Driveway Ramp + 30.0 m

Camelot Height

+30.0 m

0

10 m

35


Second Jury Date: Panel Members:

1.

March 26th, 2012 Debra Cheung, Tao Zhu

Synopsis of Presentation

Building Plinth Analysis showing the physical, circulatory and programmatic composition A Chronological Study of Building Types together with development of building code was done. By shifting the principal datum with multiple developments in one site and nondomestic podium GFA exemption, the building plinth gains volume. Ground Thickening phenomenon is discovered. Several Sites of various scale has been chosen for the Project to test out the idea that “Thickened Ground” as the Building Mass

2.

Synopsis of Reviewers’ Comments

3.

Response

TZ: The current thickened ground separates the building mass and the ground program. Consider the alternative where the ground is dicided into fragments. How the notion of ground can still be conveyed. DC: The datum is where the project reference to. AL: A site like the Belcher’s should not be defined by one single datum but rather multiple datum. Since the datum is the underlying factor, if the datum definition is different the project should end up with a different massing. If the site is chopped off into lots they could have different datum but still remain as one site.

The method used to analyze the case study should be tested out on the site. How the ground is defined instead of having one generic datum has to be developed. Go on to look st how a site can be chopped off.

36


Site Analysis

Operations to transform the generic datum to a site specific multiple datum subdivision

37


B.L.

B.L.

m 60 P.D. 40

Datum Shift!

20

0

“Specified Street”

Building (Planning) Regulation s23(1) The mean level of the street or streets on which it fronts or abuts being a specified street or specified streets not less than 4.5m wide, or where the building abuts on specified streets not less than 4.5m wide having different levels, from the mean level of the lower or lowest of such streets, to the mean height of the roof over usable floor space in the building.

“The mean level of the street or streets on which it fronts or abuts being a specified street... ” a.k.a. Principal Datum

Datum Shift? “Principal Datum” - Building Code definition

38


Single Datum results in one gigantic building mass and disconnected topography. Program spaces are interiorized and disconnected from the GROUND. Datum is a device to “elevate” the building

B.L.

B.L.

“underground”

“Thickened Ground” Generic Datum

39


m 60

40

20

0

Site Subdivision New Datums for Individual Lots 40


Internal street becomes specified street

Consider the site divided into INDIVIDUAL LOTS for multiple developments, NEW DATUMS MUST SET UP for each development. The size of the site could be equivalent to 6 individual developments. Internal streets now become “specified streets� in determining the new datums.

41


“ a reference point, surface, or axis on an object for the measurement of heights and depths.� -Oxford Dictionary There are EXISTING GROUNDS where people perceive as absolute reference for existing/demolished buildings. Open grounds of public access prove itself a DATUM for reference

Remaining Plinth of Pre WWII houses

Existing Path as Continuous Datum (leading to Nam Koo Terrace)

+43.0 m

+25.0 m

Existing Grounds as Datums Preserved Topography

42


To preserve the historic footprint, the datum shifts to conform the existing topography

Queen’s Road East Ship Street

Kennedy Road Secondary School Sau Wa Fong

New Datum shifted New Datum Lot Boundary Pedestrian (Existing) Pedestrian (Proposed)

Conforming Topography Datum Shift

Vehicular (Existing) Vehicular (Proposed)

43


Kennedy Road Hopewell Centre Shopping Mall

Kennedy Road Queen’s Road East Ship Street

Kennedy Road Secondary School Sau Wa Fong

Pedestrian (Existing) Pedestrian (Proposed)

Existing/Possible access to Site Basis for New Ground

44

Vehicular (Existing) Vehicular (Proposed)


The Datum shifts to the level where access is provided

Kennedy Road Hopewell Centre Shopping Mall

Queen’s Road East Ship Street

Kennedy Road Secondary School

New Datum shifted New Datum Lot Boundary Pedestrian (Existing) Pedestrian (Proposed)

Conforming Access Datum Shift

Vehicular (Existing) Vehicular (Proposed)

45


Kennedy Road Hopewell Centre Shopping Mall

Kennedy Road Queen’s Road East Ship Street

Kennedy Road Secondary School Sau Wa Fong

New Datum Preserved Topography Lot Boundary Pedestrian (Existing) Pedestrian (Proposed)

Superimposition Forming the NEW GROUND

46

Vehicular (Existing) Vehicular (Proposed)


Building Mass Negotiating Level Differences Building Mass as Thickened Ground

B.L.

B.L.

Existing Plinth Access at boundary

Thickened Ground Otherwise Multiple Datum

47


48


Method Site Subdivision From One Generic Datum to Multiple Specific Datum Models @ 1:500 49


B.L.

Hopewell Centre Shopping Mall

B.L.

Kennedy Road

Commercial Shopping


B.L.

C

M

Y

CM

MY

CY

CMY

K

Commerical Condominium Art and Culture 50


B.L.

B.L.

Ship Street

Art and Culture Sports

Art and Culture

51


B.L.

ip eet

Sau Wa Fong

Unfolded Journey 0

10

20

Park Hotel 50 m


Car Park

Commercial

Site Coverage 50.6 %

Hotel

Total 101,667 m2 +

Park

Outdoor Programme 52


oor amme

Car Park

Car Park

Sports

Gym Swimming pool Commercial

Art & Culture Auditorium Studio Commercial Office Retail Dining

Site Coverage 50.6 %

Site Coverage Residential Condominium Serviced Apartment Hotel

Hotel

Backpacker Hostel Boutique Hotel

Total 101,667 m2 +

Total +

Basketball X Game Hiking Trail Rock Climbing

Park

Amphitheatre Street Market

Outdoor Programme

Outdoor Programme 53


“Re-G r Mult ounding” iple D atum

Origina l Prop Single D osal atum 220 m

105

Sta Sing tus Quo le D atum

Hopewell Office

0

Ho Shopp pewell ing M all

Mu Interv ltip ent le D ion atu m

+13.0 m

Exi st

L ing ot 02 Plin th

Sho p

pin

g M Lo all t 01 Acc ess Ken n

Lo edy t 03 Roa d

54

Exis t

L ing ot 04 Plin th


” m

+105.0 m

Kennedy Road +56.0 m

+43.0 m

+20.4 m +25.0 m

Sau Wa Fong +10.4 m

Lot 05 Nei Histo r ghb orho ic od

Lot 06 Lo borh cal ood

Nei gh

Site Subdivision Multiple Ground

Qu ee

n’s Ro ad

Eas

t 55


plan upper lines.pdf 1 31/5/2012 15:00:08

+55.2

+54.8

+54.3

11

56

+43.0 9

+56.0

10

+43.0 8 7


15

16

+56.0

+51.5 14

+47.5

14 14

+46.0

+25.0

12

+42.0 13

+42.0

13

13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

+42.0 13

0

10

20

Queen’s Road Dropoff Auditorium Carparl Shopping Mall Hostel Lobby Street Market Plaza Cafe Amphitheatre Office Lobby Roof Garden Sky Bridge Backpacker’s Hostel Gallery Deck Basketball Court Upper Dropoff Kennedy Road Entrance

50 m

57


58


59


60


61


62


63


64


65


Study Model @ 1: 500

Case Study Model @ 1: 500 66

Massing Model


Sectional Model @ 1: 200

l @ 1: 500

Final Jury Presentation 67


68


Sectional Model @ 1:200 69


Juxtaposition: Vehicular Ramp/ Shopping Mall Roof @ 1:200 70


Multiple Ground @ 1:200

Amphitheatre +43.0m @ 1:200 71


Current Proposal @ 1:500

Thickened Ground @ 1:500

72

Existing Topography @ 1:500


73


Major Circulation @ 1:500

74


75


Third Jury Date: Panel Members:

1.

May 16th, 2012 Beisi Jia, Eunice Seng

Synopsis of Presentation

Over the time the artificial ground has been “thickened” by means of code and injecting optional program. There is a shift from applying building code for practical concern to manipulation to achieve a building mass which shows more economic greed than architectural concern. The ever-shifting datum continuously disengages itself from the idea of “ground”. The interpretation (manipulation) of building code is vital in defining the relationship between ground and building mass. This project aims to methodically interpret datum as physical manifestation. Given its size and its hilly topography the site should not be treated with one generic datum. A research of existing conditions in defining datums and ways to reinterpret them systematically has to be done.

2.

Synopsis of Reviewers’ Comments

3.

Response

ES: The method of subdividing the site has to be highlight in the presentation. ES: Representation of a comparison of the existing proposal is missing. BSJ: Site analysis is missing. Massing relationship is not visible AL: 1:200 physical model is helpful for critics to understand how the ground is redefined by the datum subdivision.

The benefit of subdividing the site has to be shown through a comparative analysis. Original proposal has to be shown but not too dominant. Site Analysis has to be clearer.

76


Final Jury Date: Panel Members:

1.

June 6th, 2012 Beisi Jia, Eunice Seng, Aaron Tan , Juan Du

Synopsis of Presentation

Over the time the artificial ground has been “thickened” by means of code and injecting optional program. There is a shift from applying building code for practical concern to manipulation to achieve a building mass which shows more economic greed than architectural concern. The ever-shifting datum continuously disengages itself from the idea of “ground”. The interpretation (manipulation) of building code is vital in defining the relationship between ground and building mass. The site is divided into 6 lots with its datum defined according to the existing datums, access points to the site. If this attempt of Thickened Ground set up an example, it is anticipated that the future development on urban slopes will include even larger sites, but broken down into small lots of individual datums.

2.

Synopsis of Reviewers’ Comments

3.

Response

AT: Value the way to use the slope differently. The shortcoming of the current proposal is the traffic load it brings. The thesis project seeks a compromise which the current proposal is looking for. It creates more public space with the same density. ES: The economic value needs to be addressed as a counter argument to the status quo. The architectural aspect has to be addressed for this new typology. JD: The government, the developer and the user. What each of these party is getting. While more public space is provided, the elongated main circulation is creating more business opportunities. BSJ: Wonder the value of leaning the tower AL: Construction cost-wise the project is defnitely more expensive than the current proposal, while the profit it returns may overcome the current.

It is important to present the conflicts for the original development of the status quo to reinforce my project as an alternative.

77


Acknowledgements

Ken Fung Iris Lau Denise Lau

Tommy Gunawan

KinKin Cheung

Chan Wang Fung

Jeffrey Lam

Ian Chan

Ronald Kam

Chen Lok Yan ARCHOI

Howell Tsang

This Thesis Project could not be done without the help of: Chen Lok Yan Lam Pok Yin Jeffrey Chan Wang Fung Amanda Ho I would like to give thanks to Professor Anderson Lee, my thesis advisor, for given me persistent support and clear guidance along the way. I owe my greatest thanks to my parents who have given me freedom and support to strive for my goals.

78


Bibliogrpahy Willis, Carol. Form Follows Finance. New York: Princeton Architectural Press, 1995 Vassigh, Shahin. Building systems integration for enhanced environmental performance. FL: J.Ross Publication, 2011 Gauld, Bryan J.B.. Structures for architects. Harlow, Essex: Longamn Scientific & Technical, 1995 Leatherbarrow, David. Uncommon groundL architecture, technology and topography. MIT Press, 2000 The function of the oblique: the architecture of Claude Parent and Paul Virilio, 1963-1969. LondonL AA Publications, 1996 Allen, Stan and McQuade, Marc. Landfrom building: architecture’s new terrain. Princeton University School of Architecture, 2011 Poon, Alice. Land and the ruling class i Hong Kong. Richmond, BC: A.Poon, 2005

79


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.