
1 minute read
Fig 80- Gwalior Land-Use Masterplan
ITERATION 3
1. Sports facilities act as a bridge that connects youth center to stadium. 2. Space for open ground near youth center is increased. 3. Opening up the volumes at east of the stadium. Entry from rear side (North-east and east side) is more receiving in this case. 4. Volume is more spread on the site. 5. The space formed between sports facility is shaded quite well, from east west and south sun. Lifting the volume up might even help the winter sun to penetrate inside a bit, which might help in achieving the comfort range.
Advertisement
Fig 135- Physical Model (Iteration 3) Source- Author Sketch Plan (From Iteration 1,2 and 3) 3D Exploration (From Iteration 1,2 and 3)




Fig 136- Ideation from Iteration 1,2 and 3 Source- Author