Dwg 13- Design 2: +6700 Plan Source- Author (using AutoCAD) 1. The front plaza at +6700mm level is too bulky and is a massive floor plate, with very less room for vertical circulation.
2. In terms of joinery between the front mass and the stadium mass, the junction would have a huge expansion joint and the joinery needs to be worked in a much better way. Currently, the joinery of the two blocks pose a lot of structural and fundamental problems.
3. There also lies problems in term of lighting and ventilation as it would be extremely challenging to ventilate and natural lit such a huge mass.
4. Corridors would be introduced behind the stands for smooth horizontal circulation of spectators.