PORTFOLIO GRADUATE OF ARCHITECTURE
PENGYAN CHEN
1
RESUME
PENGYAN CHEN
BIO
+61(0)423 588 383 pengyan.chen13@gmail.com
51 Galada Ave, Parkville,VIC,3052
Pengyan is passionate about how humans interact with their environments. Inspired by art, travel and histosty, she sees architecture as a universal language that can orchestrate an interactive environment and change the way people connect to each other, their surroundings, and themselves. She believes that being an avid listener and thinking creatively and holistically are key. Her design approach includes a willingness to consider and work through a plethora of options to get the ideal result. She enjoys testing out diverse potential outcomes and options to inform her final selection. She also enjoys creating playful and colourful designs. She believes architecture should help and nourish the broader community and its surroundings. A curiosity around the vernacular of architecture, the history and the language of building design, sparked Pengyan’s career in the field. She is intrigued by architecture’s ability to represent how people live within a particular time and place. Pengyan enjoys seeing the transformation from drawing to building, even if it is just a representative model. Pengyan joined architectural practical feild in 2019. With strengths in producing complete construction packages, her role includes completing working drawings (in both schematic design, tender and construction stage) and indicative 3D renders that give clients a clear understanding of the designs. She has also worked on mixed-use, complex residential, educational, commercial,aged care facility and recladding projects. Pengyan enjoys the challenge of problem-solving while embracing a range of aesthetic implications. She is particularly interested in finding the striking contrast of large and small scales present in architectural possibilities. She also enjoys exploring the balance how the architecture and the city would interact and negotiate with each other. Pengyan believes good design is practical, adaptable and future-proof. She views a project not as an end, but as a step towards a more adaptable solution, and one that responds to an ever-changing world.
EDUCATION
MASTER OF ARCHITECTURE 2017.7-2019.7 GPA3.3/4
RMIT UNIVERSITY, MELBOURNE,VIC
BACHELOR OF LANDSCAPE ARCHITECTURE 2012.6-2016.9 GPA3.22/4
EMPLOYMENT
SICHUAN AGRICULTURAL UNIVERSITY, SICHUAN,CHINA
GRADUATE OF ARCHITECTURE 11/2021-01/2022
FREELANCE BENOY TAIKOO SHING,HONG KONG
GRADUATE OF ARCHITECTURE 07/2019-NOW
FULLTIME HINGE ARCHITECTS MELBOURNE, VIC, AUSTRALIA
GRADUATE OF ARCHITECTURE 07/2019-09/2021
FULLTIME NAAU /BILD ARCHITECTURE MELBOURNE, VIC, AUSTRALIA
2
RESUME
PENGYAN CHEN
EMPLOYMENT
HONOR
+61(0)423 588 383 pengyan.chen13@gmail.com
LANDSCAPE ARCHITECTURE INTERN 04/2016-05/2016
INTERNSHIP CHENGDU WAVELY INTERNATIONAL LANDSCAPE DESIGN CHENGDU, SICHUAN, CHINA
LANDSCAPE ARCHITECTURE INTERN 08/2015-01/2016
INTERNSHIP SICHUAN URBAN AND RURAL ACADEMY OF PLANNING AND DESIGN, RESEARCH INSTITUTE IN CHENGDU, SICHUAN, CHINA
SHORTLISTED PROJECTS OF AWARD FOR DESIGN EXCELLENCE, MASTER OF ARCHITECTURE DESIGN STUDIOS, RMIT ARCHITECTURE, SEM2,2018 CROSS REALITIES
SKILLS
51 Galada Ave, Parkville,VIC,3052
TUTOR_SANDRA MANNINGER
ARCHICAD REVIT PHOTOSHOP ILLUSTRATTOR INDESIGN RHINO TIWNMOTION ENSCAPE VRAY OCATNE RENDER SKETCHUP AUTO CAD MAYA ZBRUSH MICROSOFT OFFICE PHSICAL MODEL MAKING LASERCUTTING 3D PRINTING HOLOLENS UR-10 GRASSHOPPER
LANGUAGE
REFEREE
CHINESE(MANDARIN), ENGLISH
Dr. JOHN DOYLE
+61 (0) 0423 005 142
https://issuu.com/chenpengyan/docs/portfolio_pengyan_chen_2021
3
CONTENTS
PROJECTS (PRACTICAL)
ZHONGJUN WORLD CITY_9th GALAXY 2021-2022 COLIVING CONCEPTS 2020
JIULITING,SONGJIANG DISTRICT,SHANGHAI,CHINA MIXED-USE SYDNEY, NWS,AUSTRALIA COMMERCIAL AND RESIDENTIAL
EAGLE POINT 2020-2021
EAST GIPPSLAND, VIC, AUSTRALIA PUBLIC
PLENTY RD APARTMENT 2019-2021
PRESTON, VIC, AUSTRALIA RESIDENTIAL
A CLUSTER OF ACCOMMODATION 2020-2021
WODONGA, VIC, AUSTRALIA RESIDENTIAL AND AMINISTRATION
RMIT B108 L13 2019-2020
MELBOURNE CBD, VIC, AUSTRALIA EDUCATION
4
CONTENTS
PROJECTS (ACADEMIC)
THE ‘18 STAIRS’ 2019
CHONGQING, CHINA PUBLIC
CROSS REALITIES_PALINDROMIC CHAMBERS 2018
MODELS
ROBIN BOYD EXHIBITION FOR HEIDE MUSEUM OF MODERN ART 2019 SCULPTING ILLUSIONS 2018
MELBOURNE CBD, VIC,AUSTRALIA RESIDENTIAL
HAND MAKING RESIDENTIAL HOLOLENS OBEJCTS
ARCHITECTURAL ROBOTICS 2017
UR-10 ROBOTICS ACOUSTICS IN MEETING ROOM
5
PROJECTS _2020-2021
ZHONGJUN WORLD CITY_9th GALAXY Jiuliting, SongJiang District, Shanghai, China, 201615
One of my key responsibilities is to produce concept design presentation slides and develop them. I helped the team produce 3D models and visualization renders, involved in its day-to-day design. I also participated in the facade design of three towers. The opportunity to be involved in the commercial project is exciting and the design experience is also fantastic.
ZHONGJUN WORLD CITY 9th GALXY_BENOY
The project concept comes from the flow of gravity and orbiting by creating a singularity point on the top, footfalls circulate it, creating multiple layers of tracks. Sketching from the universe, the site turns to a mixed-use facility with a commercial centre and related towers (containing a head office and two residential towers). It also brings a futuristic lifestyle to the local people.
SHANGHAI, CHINA
「一个引领松江全新生活方式的九亭社区」 “A Jiuting Community Leading Shanghai’s New Lifestyle”
19 中骏世界城项目商业建筑项目 Zhongjun Jiuliting Mixed-use, Shanghai.
6 © BENOY 2021
PROJECTS _2020
CO-LIVING CONCEPT 39-41 York St, Sydeny, NSW, 2000
In this project, I was involved in redesigning the elevation of the building, producing a 3D render, and doing researches on co-living models.
DOUBLE ROOM A: 24.6 m2
SINGLE ROOM A: 17.0 m2
SINGLE ROOM A: 17.0 m2
SINGLE ROOM
LOUNGE
A: 17.0 m2
A: 17.0 m2
SINGLE ROOM A: 17.0 m2
SINGLE ROOM
SINGLE ROOM
A: 17.0 m2
KITCHEN
DOUBLE ROOM
A: 17.0 m2
A: 23.9 m2
DINING
A: 14.8 m2
CO-LIVING CONCEPTS_HINGE ARCHITECTS
The project intends to redesign the facade and internals based on the original building. The lower levels of the building will continue to be used as retails, while the upper floors are considered to be residential. We have researched prototypes of contemporary living spaces, and make them as modules to rebuild the model. This project is only in the conceptual stage.
LOUNGE
A: 15.9 m2
A: 13.4 m2
DOUBLE ROOM A: 24.7 m2
LIFTS
A: 11.4 m2
LAUNDRY
WASTE
A: 9.5 m2
STAIR
A: 2.2 m2
A: 9.3 m2
IS
DC
DC
IS
GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
SYDNEY, AUSTRALIA
7
PROJECTS _2020-2021
EAGLE POINT Eagle Bay Road, Eagle Point, VIC, 3878 We won the project of building a whole new community center for residents in Eagle Point from the East Gippsland Shire Council. We propose a multifunctional center for people to share and enjoy the view of the place, with retail, cafe, and kitchen.
WWW.NAAUSTUDIO.COM / US@NAAUSTUDIO.COM 36 COBDEN ST, NORTH MELBOURNE,VIC 3051
WWW.NAAUSTUDIO.COM / US@NAAUSTUDIO.COM 36 COBDEN ST, NORTH MELBOURNE,VIC 3051
FINISHES & FIXTURES LEGEND
FINISHES & FIXTURES LEGEND
CF02 CONCRETE, BURNISH WITH PENETRATING SEALANT TO SPEC.
1A
CF02 CONCRETE, BURNISH WITH PENETRATING SEALANT TO SPEC. DP1 90MM PVC DOWNPIPE CONCEALED IN WALL DP2 90MM DOWNPIPE, MATCH ROOF FINISH RS01 SELECTED VINYL FLOORING TF01 SELECTED TIMBER FLOORING TF03 SELECTED TIMBER DECKING
1A
900
X7
X7
X6
X6 CO L.
750 0
1B
306 5
512 0 OP ENI NG 111 0
920
2 A500
EQ
561 7
E
1 A302
CO L.
145 0
1B
CAG
X5 X4
CO L.
12 A500
X5 X4
2A
1 A302
144
DP1
265 0
2A
11 A500
W5F
WT3 WT1
EQ
ED1
4 A302
X3
A200 4 LOCATION FOR AC UNIT CONDENSOR UNITS. REFER TO SERVICES ENGINEERS DRAWINGS FOR DETAILS
4 DP1
1
EQ
PROVIDE FLOOR TO CEILING DURAGAL STEEL CAGE WITH WELDED MESH CLADDING. PROVIDE GATE WITH LOCKABLE BOLT
WT1
X2 2B
187 5
3 A303 110
CAG
NON-ACCESSIBLE SUBFLOOR SPACE
FFL 6510
NOTE: ALL DRAWINGS ARE FOR DESIGN INTENT ONLY. STRUCTURAL MEMBERS INDICATED ARE INDICATIVE ONLY. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR STRUCTURAL DESIGN.
3A
A400
2585 5845
163 0
W3D
REV. DESCRIPTION
GD1
GD2
16
WT4
A400 13
3B
15
GD2
CF02
W7D
DP2 DP2 D5
2 HALL 9 m²
SN06
100 195
4 A500
RS01
WT4
WT2
A200 ABBREVIATIONS/CODING:
3 A302
Y3
Above Finished Floor Construction Joint Column Door Type Downpipe Existing Downpipe Drawings Expansion Joint Existing Ground Level 1 Engineer Existing A300 Finished Ceiling Level Finished Floor Level Finished Ground Level Finished Structural Level Fire Resistance Level Gross Floor Area
MAX MECH MIN NLA NOM NTS RA RL RO RWO SIM SPEC TOW TYP UNO US WT W
W1C
CAFE 52 m² TF01 FFL 6510
REV. DESCRIPTION
NOTE: FINISHES AND JOINERY BY TENNANT
26
A402
W8B
W8B
W8B
W8B
7 A500
DP1
9 A500
ED4
5
DP1
Z4
6 A520
WT3
DP1
WT2
ED3
A200 ABBREVIATIONS/CODING:
3 A302
Z3
Y4
2 A302
Z2
AFFL CJ COL D DP EDP DWG EJ EGL ENG EXST FCL FFL FGL FSL FRL GFA
Y5
ED3 WT2
1 A303
Y3
GENERAL NOTES:
Y2
Y1
CLIENT:
2 A303
MAX MECH MIN NLA NOM NTS RA RL RO RWO SIM SPEC TOW TYP UNO US WT W
Y2
460 2610 980
Y1
CLIENT:
EAST G'LAND SHIRE COUNCIL
PROJECT:
EAGLE POINT FORESHORE REDEVELOPMENT EAGLE BAY ROAD, EAGLE POINT
DRAWING:
DRAWING:
LOWER GROUND LEVEL PLAN
GROUND LEVEL PLAN
ISSUE: FOR INFORMATION ONLY
ISSUE: FOR INFORMATION ONLY
SCALE 1 : 100@A1
DRAWING ID
0047
PROJECT NUMBER
A110
0047
30/06/2021
PLOT DATE:
NORTH
PROJECT:
EAGLE POINT FORESHORE REDEVELOPMENT EAGLE BAY ROAD, EAGLE POINT
PROJECT NUMBER
Maximum Mechanical Minimum Net Lettable Area Nominal Not To Scale Return Air Relative Level Rough Opening Rain Water Overflow Similar Specification Top Of Wall Typical Unless Otherwise Noted Underside Wall Type Window Type / Glazing Sys.
- DO NOT SCALE FROM DRAWINGS. THE BUILDER AND SUBONTRACTORS SHALL CHECK AND VERIFY ALL DIMENSIONS, SETBACKS, LEVELS AND SPECIFICATIONS IN ALL RELEVANT DOCUMENTATION, PRIOR TO COMMENCEMENT OF WORKS. - CODE FOLLWED BY A NUMBER INDICATES SPECIFIC TYPE (EG. CD01, TF10 etc.) REFER TO SPECIFCIATION FOR FURTHER DETAILS - CONTRACTOR IS TO REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION. - ANY CHANGES PROPOSED BY THE CONTRACTOR MUST BE DOCUMENTED AND FORWARDED TO THIS OFFICE FOR APPROVAL PRIOR TO UNDERTAKING THE RELEVANT WORK. - DRAWINGS SHOW DESIGN INTENT ONLY. ALL SHOP DRAWINGS TO BE SUBMITTED TO THIS OFFICE FOR APPROVAL PRIOR TO MANUFACTURE. - CONTRACTOR TO ENSURE THAT ALL DRAWINGS ARE THE CURRENT ISSUE BEFORE THE COMMENCEMENT OF WORK. - THE DESIGN, DRAWINGS AND OTHER INFORMATION DOCUMENTED IN THIS PACKAGE ARE COPYRIGHT OF BILD ARCHITECTURE PTY LTD (t/a NAAU), AND ARE PROTECTED BY LAW.
2858
2858
Z1
NORTH
EAST G'LAND SHIRE COUNCIL
Above Finished Floor Construction Joint Column Door Type Downpipe Existing Downpipe Drawings Expansion Joint Existing Ground Level Engineer Existing Finished Ceiling Level Finished Floor Level Finished Ground Level Finished Structural Level Fire Resistance Level Gross Floor Area
GENERAL NOTES:
- DO NOT SCALE FROM DRAWINGS. THE BUILDER AND SUBONTRACTORS SHALL CHECK AND VERIFY ALL DIMENSIONS, SETBACKS, LEVELS AND SPECIFICATIONS IN ALL RELEVANT DOCUMENTATION, PRIOR TO COMMENCEMENT OF WORKS. - CODE FOLLWED BY A NUMBER INDICATES SPECIFIC TYPE (EG. CD01, TF10 etc.) REFER TO SPECIFCIATION FOR FURTHER DETAILS - CONTRACTOR IS TO REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION. - ANY CHANGES PROPOSED BY THE CONTRACTOR MUST BE DOCUMENTED AND FORWARDED TO THIS OFFICE FOR APPROVAL PRIOR TO UNDERTAKING THE RELEVANT WORK. - DRAWINGS SHOW DESIGN INTENT ONLY. ALL SHOP DRAWINGS TO BE SUBMITTED TO THIS OFFICE FOR APPROVAL PRIOR TO MANUFACTURE. - CONTRACTOR TO ENSURE THAT ALL DRAWINGS ARE THE CURRENT ISSUE BEFORE THE COMMENCEMENT OF WORK. - THE DESIGN, DRAWINGS AND OTHER INFORMATION DOCUMENTED IN THIS PACKAGE ARE COPYRIGHT OF BILD ARCHITECTURE PTY LTD (t/a NAAU), AND ARE PROTECTED BY LAW.
2 A303
Z1
DATE
W8B
GD6
W8A
D4
RS01
FSL 6510
WC 1 6 m²
Maximum Mechanical Minimum Net Lettable Area Nominal Not To Scale Return Air Relative Level Rough Opening Rain Water Overflow Similar Specification Top Of Wall Typical Unless Otherwise Noted Underside Wall Type Window Type / Glazing Sys. 2257
AFFL CJ COL D DP EDP DWG EJ EGL ENG EXST FCL FFL FGL FSL FRL GFA
Y5 Y4
2 A302 1 A303
3
4
DP1
DIS WC 6 m²
2476
Z4
Z3 Z2
D3
A401
KITCHEN 25 m²
WT2
FEMALE 16 m²
WC 2 6 m²
5
1 A300
6
7 D2
WT2
2 A300
A401
5
RS01
2
WT1
1
CF02 D2
A200
SLAB ON GROUND ABOVE
D6
WT4
MALE 16 m²
PRELIMINARY NOT FOR CONSTRUCTION ARCHITECTURAL SET TO BE READ IN CONJUNCTION WITH ARCHITECTURAL SPECIFICATION, ARCHITECTURAL FIXTURE, FINISHES AND EQUIPMENT SELECTIONS, LANDSCAPE ARCHITECT'S DRAWINGS & SPECIFICATION, STRUCTURAL & CIVIL ENGINEER'S DRAWINGS & SPECIFICATION, SERVICES ENGINEER'S DRAWINGS AND SPECIFICATION, PROJECT ENERGY RATING AND RELEVANT CULTURAL HERITAGE MANAGEMENT PLAN.
GD1
FSL 6510
W3E
WT2
FFL 6513
2
W1D
14
WT4 DATE
1 A301
2 A300
COL.
A401
W6E 1 ARCHITECTURAL SET TO BE READ IN CONJUNCTION A500 SN07 8 WITH ARCHITECTURAL SPECIFICATION, A401 ARCHITECTURAL FIXTURE, FINISHES AND EQUIPMENT SELECTIONS, LANDSCAPE ARCHITECT'S ARCHITECTURE SCOPE DRAWINGS & SPECIFICATION, & CIVIL LINE, REFERSTRUCTURAL LANDSCAPE DOCUMENTATION FOR ENGINEER'S DRAWINGS & SPECIFICATION, SCOPE BEYOND SERVICES ENGINEER'S DRAWINGS AND SPECIFICATION, PROJECT ENERGY RATING AND RELEVANT CULTURAL HERITAGE MANAGEMENT PLAN.
187 5
WATER PROOFING NOTE: ALL WET AREAS TO WATERPROOFED / WATER RESISTANT TO AS 3740. REFER TO 07140 IN PROJECT SPECIFICATION FOR WET AREA MEMBRANE REQUIREMENTS
3
W7E
SN01
PRELIMINARY NOT FOR CONSTRUCTION
NOTE: PROVIDE MINIMUM 6000MM2 PER 1.5M NATURAL VENTILATION TO EXISTING & PROPOSED TIMBER SUBFLOOR TO COMPLY WITH BCA Part 3.4.1
3A
A200
GD5
3B
1 A301
NOTE: ALL STORMWATER DISPOSAL TO BE CONNECTED TO EXISTING SUMP AND LPOD.
ARCHITECTURE SCOPE LINE, REFER LANDSCAPE DOCUMENTATION FOR SCOPE BEYOND
6 A500
DP2
FSL 6510
ED5
NON-ACCESSIBLE SUBFLOOR SPACE
A200
D1
12
WT1
WT1
NOTE: PROVIDE VAPOUR PERMEABLE WATER BARRIER BUILDING WRAP TO EXTERNAL WALLS. BRAFORD ENVIROSEAL RW (OR EQUIVALENT) TO AS/NZ4200.1 INSTALLATION TO AS/NZ4200.2. BUILD UP TO COMPLY WITH NCC PART 3.8.7 CONDENSATION MANAGEMENT
2B 6
DECK 121 m²
GD3A
FFL 6510
CF02
11 GD4
GD3B
1655
SLAB ON GROUND ABOVE
10
11
D7
TF03
WATER PROOFING NOTE: 1010 ALL WET AREAS TO WATERPROOFED / WATER RESISTANT TO AS 3740. REFER TO 07140 IN PROJECT SPECIFICATION FOR WET AREA MEMBRANE 9 REQUIREMENTS 10 RETAIL 38 m² A401
WT1
NOTE: ALL DRAWINGS ARE FOR DESIGN INTENT ONLY. STRUCTURAL MEMBERS INDICATED ARE INDICATIVE ONLY. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR STRUCTURAL DESIGN.
9
12 WT2
NOTE: PROVIDE VAPOUR PERMEABLE WATER BARRIER BUILDING WRAP TO EXTERNAL WALLS. BRAFORD ENVIROSEAL RW (OR EQUIVALENT) TO AS/NZ4200.1 INSTALLATION TO AS/NZ4200.2. BUILD UP TO COMPLY WITH NCC PART 3.8.7 3 CONDENSATION MANAGEMENT FUNCTION ROOM 1 A500 DP1 48 m² NOTE: ALL STORMWATER DISPOSAL TO BE TF01 CONNECTED TO EXISTING SUMP AND LPOD. 5 WT2 W9 8 NOTE: PROVIDE MINIMUM 6000MM2 PER 1.5M NATURAL VENTILATION TO EXISTING & A400 PROPOSED TIMBER SUBFLOOR TO COMPLY 6 7 WITH BCA Part 3.4.1
X1
E
3 A303
1
TF01
4 A303
CF02 FSL 3950
WT1
A200
FUNCTION ROOM 2 48 m²
GARAGE 50 m²
CF02
4 A303
X2
W5D
A200
A200
ED2
X1
A200
10 A500
W5E
90EA NON-STRUCTURAL COLUMNS
4 A302
X3
EAGLE POINT_NAAU/BILD ARCHITECTURE
My major role in this project is to help prepare architectural packages in concept design, design development, and tender stage. I also participated in producing visualisations of the project.
PLOT DATE:
SCALE 1 : 100@A1 DRAWING ID
A111
30/06/2021
WWW.NAAUSTUDIO.COM / US@NAAUSTUDIO.COM 36 COBDEN ST, NORTH MELBOURNE,VIC 3051
X1
X2
X3
X4
X5
X6 Sim
Sim
X7 Sim
10 A511
10 A511
10 A511
Sim 7 A511
RIDGE 12240
3 A520
WINDOW DATUM 8910
Sim
Sim
2 A511
14 A511 HARD LANDSCAPE DOTTED FOR REFERENCE, REFER LANDSCAPE ARCHITECTURAL AND CIVIL ENGINEERING DRAWINGS
RETAIL
FUNCTION ROOM 1
14 A511
FUNCTION ROOM 2
Sim
Sim
7 A510
3 A510 GROUND FFL 6510
GENERAL NOTES: LOWER GROUND FCL 6202 1 A510
ALL DRAWINGS & DIMENSIONS ARE INDICATIVE AND FOR DESIGN INTENT ONLY. CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS, PRIOR TO COMMENCEMENT OF WORK. REPORT ALL DISCREPANCIES IN WRITING TO THE ARCHITECT.
HARD LANDSCAPE DOTTED FOR REFERENCE, REFER LANDSCAPE ARCHITECTURAL AND CIVIL ENGINEERING DRAWINGS
GARAGE
ENSURE MIN. 6000mm2 PER 1.5m NATURAL VENTILATION TO EXISTING TIMBER SUBFLOOR STRUCTURAL NOTE: ALL STRUCTURAL ELEMENTS SHOWN ARE INDICATIVE ONLY. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR DESIGN & LOCATION OF STRUCTURAL ELEMENTS.
LOWER GROUND FFL 3950
NOTE: ALL STORMWATER DISPOSAL TO BE CONNECTED TO EXISTING SUMP AND LPOD.
1
NOTE: PROVIDE VAPOUR PERMEABLE WATER BARRIER BUILDING WRAP TO EXTERNAL WALLS. BRAFORD ENVIROSEAL RW (OR EQUIVALENT) TO AS/NZ4200.1 INSTALLATION TO AS/NZ4200.2. BUILD UP TO COMPLY WITH NCC PART 3.8.7 CONDENSATION MANAGEMENT
SECTION 3
NOTE: PROVIDE MINIMUM 6000MM2 PER 1.5M NATURAL VENTILATION TO EXISTING & PROPOSED TIMBER SUBFLOOR TO COMPLY WITH BCA Part 3.4.1
1 : 50
PRELIMINARY NOT FOR CONSTRUCTION
1A
3A
1B
Sim
8 A511
16 A511
16 A511
WWW.NAAUSTUDIO.COM / US@NAAUSTUDIO.COM 36 COBDEN ST, NORTH MELBOURNE,VIC 3051 ARCHITECTURAL SET TO BE READ IN CONJUNCTION WITH ARCHITECTURAL SPECIFICATION, ARCHITECTURAL FIXTURE, FINISHES AND EQUIPMENT SELECTIONS, LANDSCAPE ARCHITECT'S DRAWINGS & SPECIFICATION, STRUCTURAL & CIVIL ENGINEER'S DRAWINGS & SPECIFICATION, SERVICES ENGINEER'S DRAWINGS AND SPECIFICATION, PROJECT ENERGY RATING AND RELEVANT CULTURAL HERITAGE MANAGEMENT PLAN.
3B Sim
Sim
Sim
Sim 8 A511
6 A511
REV. DESCRIPTION
DATE
Sim 5 A511 TOP OF WALL 9760
TOP OF WALL 9760
WINDOW DATUM 8910
WINDOW DATUM 8910
HALL
FUNCTION ROOM 1
ABBREVIATIONS/CODING: AFFL CJ COL D DP EDP DWG EJ EGL ENG EXST FCL FFL FGL FSL FRL GFA
DIS WC 10 A510
GROUND FFL 6510
GROUND FFL 6510
2 A510
Above Finished Floor Construction Joint Column Door Type Downpipe Existing Downpipe Drawings Expansion Joint Existing Ground Level Engineer Existing Finished Ceiling Level Finished Floor Level Finished Ground Level Finished Structural Level Fire Resistance Level Gross Floor Area
MAX MECH MIN NLA NOM NTS RA RL RO RWO SIM SPEC TOW TYP UNO US WT W
Maximum Mechanical Minimum Net Lettable Area Nominal Not To Scale Return Air Relative Level Rough Opening Rain Water Overflow Similar Specification Top Of Wall Typical Unless Otherwise Noted Underside Wall Type Window Type / Glazing Sys.
GENERAL NOTES: GENERAL NOTES:
- DO NOT SCALE FROM DRAWINGS. THE BUILDER AND SUBONTRACTORS SHALL CHECK AND VERIFY ALL DIMENSIONS, SETBACKS,
ALL DRAWINGS & DIMENSIONS ARE IN INDICATIVE LEVELS AND SPECIFICATIONS ALL RELEVANT DOCUMENTATION, PRIOR TO COMMENCEMENT OF WORKS. AND FOR DESIGN INTENT ONLY. CONTRACTOR TO - CODE FOLLWED BY A NUMBER INDICATES SPECIFIC TYPE (EG. CD01, CONFIRM ALL EXISTING CONDITIONS, PRIOR TO TF10 etc.) REFER TO SPECIFCIATION FOR FURTHER DETAILS COMMENCEMENT OF WORK. REPORT ALL - CONTRACTOR IS TO REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION. DISCREPANCIES IN WRITING TO THE ARCHITECT. - ANY CHANGES PROPOSED BY THE CONTRACTOR MUST BE DOCUMENTED AND FORWARDED TO THIS OFFICE FOR APPROVAL
ENSURE MIN. 6000mm2 PER 1.5mTHE NATURAL PRIOR TO UNDERTAKING RELEVANT WORK. - DRAWINGS SHOW TIMBER DESIGN INTENT ONLY. ALL SHOP DRAWINGS TO BE VENTILATION TO EXISTING SUBFLOOR
SUBMITTED TO THIS OFFICE FOR APPROVAL PRIOR TO MANUFACTURE. - CONTRACTOR TO ENSURE THAT ALL DRAWINGS ARE THE CURRENT
STRUCTURAL NOTE: ISSUE BEFORE THE COMMENCEMENT OF WORK.
- THE DESIGN, DRAWINGS AND OTHER INFORMATION DOCUMENTED IN
THIS PACKAGE ARE COPYRIGHT BILD ARCHITECTURE PTY LTD (t/a ALL STRUCTURAL ELEMENTS SHOWNOF ARE NAAU), AND ARE PROTECTED BY LAW. INDICATIVE ONLY. REFER TO STRUCTURAL ENGINEER'SCLIENT: DRAWINGS FOR DESIGN & LOCATION OF STRUCTURAL ELEMENTS. EAST G'LAND SHIRE COUNCIL PROJECT:
NOTE: ALL STORMWATER TO BE EAGLE POINTDISPOSAL FORESHORE REDEVELOPMENT CONNECTED TO EXISTING SUMP AND LPOD. EAGLE BAY ROAD, EAGLE POINT
4
SECTION C
1
1 : 50
NOTE: PROVIDE VAPOUR PERMEABLE WATER BARRIER BUILDING WRAP TO EXTERNAL WALLS. DRAWING: RW (OR EQUIVALENT) TO BRAFORD ENVIROSEAL AS/NZ4200.1SECTIONS INSTALLATION TO AS/NZ4200.2. BUILD UP TO COMPLY WITH NCC PART 3.8.7 ISSUE: CONDENSATION MANAGEMENT FOR INFORMATION ONLY NOTE: PROJECT NUMBER PROVIDE MINIMUM 6000MM2 PER 1.5M NATURAL VENTILATION TO EXISTING & PROPOSED TIMBER 0047 SUBFLOOR TO COMPLY WITH BCA Part 3.4.1
SECTION Y 1 : 50
PLOT DATE:
1A
1B
3A
3B
Sim
Sim
Sim
A301
ARCHITECTURAL SET TO BE READ IN CONJUNCTION WITH ARCHITECTURAL SPECIFICATION, ARCHITECTURAL FIXTURE, FINISHES AND EQUIPMENT SELECTIONS, LANDSCAPE ARCHITECT'S DRAWINGS & SPECIFICATION, STRUCTURAL & CIVIL ENGINEER'S DRAWINGS & SPECIFICATION, SERVICES ENGINEER'S DRAWINGS AND SPECIFICATION, PROJECT ENERGY RATING AND RELEVANT CULTURAL HERITAGE MANAGEMENT PLAN.
8 A511
6 A511
16 A511
SCALE 1 : 50@A1 DRAWING ID
30/06/2021
PRELIMINARY NOT FOR CONSTRUCTION
REV. DESCRIPTION
TOP OF WALL 9760
TOP OF WALL 9760
WINDOW DATUM 8910
WINDOW DATUM 8910
DATE
Sim 5 A511
RETAIL
ENTRY 27 m²
MALE
ENTRY
Sim 9 A510
Sim
5 A510
5 A510
FEMALE
WC 1 4 A520
ABBREVIATIONS/CODING:
GROUND FFL 6510
AFFL CJ COL D DP EDP DWG EJ EGL ENG EXST FCL FFL FGL FSL FRL GFA
Above Finished Floor Construction Joint Column Door Type Downpipe Existing Downpipe Drawings Expansion Joint Existing Ground Level Engineer Existing Finished Ceiling Level Finished Floor Level Finished Ground Level Finished Structural Level Fire Resistance Level Gross Floor Area
MAX MECH MIN NLA NOM NTS RA RL RO RWO SIM SPEC TOW TYP UNO US WT W
Maximum Mechanical Minimum Net Lettable Area Nominal Not To Scale Return Air Relative Level Rough Opening Rain Water Overflow Similar Specification Top Of Wall Typical Unless Otherwise Noted Underside Wall Type Window Type / Glazing Sys.
GENERAL NOTES:
- DO NOT SCALE FROM DRAWINGS. THE BUILDER AND SUBONTRACTORS SHALL CHECK AND VERIFY ALL DIMENSIONS, SETBACKS, LEVELS AND SPECIFICATIONS IN ALL RELEVANT DOCUMENTATION, PRIOR TO COMMENCEMENT OF WORKS. - CODE FOLLWED BY A NUMBER INDICATES SPECIFIC TYPE (EG. CD01, TF10 etc.) REFER TO SPECIFCIATION FOR FURTHER DETAILS - CONTRACTOR IS TO REPORT ANY DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION. - ANY CHANGES PROPOSED BY THE CONTRACTOR MUST BE DOCUMENTED AND FORWARDED TO THIS OFFICE FOR APPROVAL PRIOR TO UNDERTAKING THE RELEVANT WORK. - DRAWINGS SHOW DESIGN INTENT ONLY. ALL SHOP DRAWINGS TO BE SUBMITTED TO THIS OFFICE FOR APPROVAL PRIOR TO MANUFACTURE. - CONTRACTOR TO ENSURE THAT ALL DRAWINGS ARE THE CURRENT ISSUE BEFORE THE COMMENCEMENT OF WORK. - THE DESIGN, DRAWINGS AND OTHER INFORMATION DOCUMENTED IN THIS PACKAGE ARE COPYRIGHT OF BILD ARCHITECTURE PTY LTD (t/a NAAU), AND ARE PROTECTED BY LAW. CLIENT:
EAST G'LAND SHIRE COUNCIL PROJECT:
EAGLE POINT FORESHORE REDEVELOPMENT EAGLE BAY ROAD, EAGLE POINT
3
SECTION D 1 : 50
2
SECTION Z
DRAWING:
SECTIONS
1 : 50
ISSUE: FOR INFORMATION ONLY PROJECT NUMBER
0047
PLOT DATE:
8
SCALE 1 : 50@A1 DRAWING ID
A303
30/06/2021
EAGLE POINT, AUSTRALIA
11 A510
GROUND FFL 6510
PROJECTS _2019-2021
PLENTY ROAD APARTMENT 425 Plenty Rd, Preston, VIC 3072 We cooperate with AV Builders to design and build a 7-story high profile residential apartment in Preston, VIC. It is a mixed-use building. The apartment consists of a basement for car parking, a ground floor for retail purposes, 5 upper levels for residential, and a rooftop.
ENERGY NOTES
STAGE 2 BUILDING PERMIT ONLY THIS DOCUMENT IS STRICTLY FOR USE AS PART OF THE STAGE 2 BUILDING PERMIT FOR CONCRETE FOUNDATIONS AND IS NOT TO BE USED FOR ANY OTHER PURPOSE
NOT FOR CONSTRUCTION
F7
F8
F9
F10 S2
S1 700
2,736
664
1. INSULATION: a. R1.5 INSULATION TO THE CEILING OF SUSPENDED CONCRETE SLAB AREAS WITH BALCONY ABOVE ON LEVELS 4 AND 5 ONLY AS SHOWN ON THE ARCHITECTURAL DRAWINGS. b. R3.5 BULK INSULATION IN THE CEILING OF THE METAL DECK ROOF AREAS AS SHOWN ON THE ARCHITECTURAL DRAWINGS. c. R1.0 INSULATION TO ALL FIRST FLOOR AREAS THAT DO NOT SIT DIRECTLY ABOVE THE LOBBY AND RETAIL AREAS ON THE GROUND FLOOR AS SHOWN ON THE ARCHITECTURAL DRAWINGS. d. INSULATION BATTS AND BLANKETS ARE NOT TO BE COMPRESSED WHEN BEING INSTALLED AND ALL VOIDS MUST BE COMPLETELY FILLED. e. INSULATION IS TO BE LAID OVER ALL MANHOLE LIDS, ENSURING A CONTINUOUS LAYER OF INSULATION. NO CEILING PENETRATIONS HAVE BEEN ENTERED FOR MAN HOLES. f. SHAFT INSULATION IS TO BE INSTALLED TO THE SAME R-VALUE AS CEILING INSULATION WHERE SKYLIGHTS ARE PROPOSED. IN INSTANCES WHERE SUCH INSULATION HAS NOT BEEN INCLUDED THIS WILL CHANGE THE PERFORMANCE OF THE ENERGY RATING AND A RE-RATING WILL BE REQUIRED. g. ALL INSULATION IS TO BE SUPPLIED AND INSTALLED AS PER AUSTRALIAN STANDARDS AND REQUIRED REGULATIONS. 2. WINDOWS, GLAZED DOORS, GLAZING: a. ALL GLAZING TO BE IN ACCORDANCE WITH THE WINDOW AND DOOR SCHEDULE DRAWINGS. b. TOTAL SYSTEM 'U-VALUE' - THE GLASS WINDOWS AND/OR GLASS DOORS SUPPLIED MUST EQUAL AND/OR CAN BE LESS THAN THE 'UVALUES" SHOWN ON THE ARCHTIECTURAL DRAWINGS. c. TOTAL SYSTEM 'SHGC' - THE GLASS WINDOWS AND/OR GLASS DOORS SUPPLIED SHOULD NOT BE GREATLY REDUCED OR INCREASED (A 5% VARIANCE IS ACCEPTABLE) THAN THE TOTAL SYSTEM 'SHGC' VALUES SHOWN ON THE ARCHITECTURAL DRAWINGS. d. ALL OPERABLE WINDOWS AND DOORS ARE TO BE FITTED WITH WEATHER STRIPS. 3. OTHER: a. HOLES, RIPS AND PENETRATIONS THROUGH SISALATION, REFLECTIVE FOILS AND INSULATION WRAPS MUST BE SEALED OR REPAIRED. GAPS AND CRACKS AROUND WINDOWS AND DOORS MUST BE SEALED. b. ALL DOWNLIGHTS AND EXHAUST FANS THAT PENETRATION THE CEILING MUST BE SEALED. DOWNLIGHTS ARE TO BE SEALED/FITTED WITH SHROUDS.EXHAUST FANS ARE TO BE SELF SEALING. 4. THE THERMAL ASSESSMENT PREPARED BY FRATER CONSULTING DATED 16/4/2020 TAKES PRECEDENCE OVER THESE NOTES.
149
S3
140
S4
2,260
S5
140
1,296
F12 F2
F1 2,050
F3
F4
F5
F6
F11
F14
F13
1,600 2,885
1,850
150
2,945
5,000
2,334
2,050
D-05
RL: 82.22
1,836 1,221
S.14 A306
BEDROOM
BP-1
CA-1
18.29 13 o37'
BATHROOMD-03 1.6.5 A: 5.0 m2
1.5.3
TI-1 A: 5.0 m2
D-03 HALLWAY
STUDY
RL: 82.22
1.4.1 A: 39.0 m2
BP-1 BP-1 GD4A-01 RL: 82.22 RL: 82.22
3,234
CA-1
WIR
S.11 A305
1.4.7 A: 4.3 m2
D-05 SD-03 BATHROOM
BEDROOM 1.4.2 A: 10.6 m2
CA-1
D-03 HALLWAY 1.2.4 A: 4.3 m2
A: 5.0 m
E.08 A204
A204
TI-1
A: 5.0 m
E.10 A204
LIVING
1.0.0 A: 5.3 m2
BP-1 RL: 82.22
270o28'30'' 30.48
14,864 S.01 A300
S.02 A300
E.03 A201
DP.03 A403
A: 2.2 m2
E.02 A202
RL: 82.22
CA-1
G
S.09 A304
V.03 A407
H
S.10 A304
BEDROOM 1.3.2 A: 9.5 m2
F
S.08 A303
BP-1
PL3
D-05
1.3.5 A: 3.0 m2
TI-1
BP-1 GD3B-02
TI-1
S.11 A305
RL: 82.22
AC1
ACC
3,440
S.03 A301
SD-04
BATHROOM
1.3.4 A: 3.0 m2
W3-06 BP-1
BP-1
HALLWAY D-05 1.3.6
BATHROOM
E
S.07 A303
RL: 82.22
LIFT-1
SD-04
D
S.14 A306 V.02 A407
A: 10.9 m2
TMB-1
CA-1
BP-1
BALCONY GD4A-02 1.3.8
1.3.1 A: 31.1 m2
A: 11.4 m
1.2.5 A: 10.2 m2
GD3A-03
RL: 82.22
AC1
BALCONY BP-1
AC1
AED-01
BALCONY BALCONY GD5A-01 BEDROOM 1.3.7 1.3.3 GD5B-02 1.4.8 2 E.09 2 2
1.4.6 A: 3.0 m2
AC1
ACC
I
TMB-1
SD-08
HALLWAY
BATHROOM SD-02 1.4.5 2 A: 3.0 m TI-1
1.4.4 A: 3.3 m2
PL2
CSD-11 LIVING
1.2.1 A: 22.0 m2
C
S.13 A306 RS-2 FALL 2°
GD3B-03
1.1.6 A: 11.2 m2
TI-1
SD-10 D-05
1.4.3 A: 11.4 m2
RL: 82.22
BP-1
CSD-01 HALLWAY
1.2.3 A: 3.7 m2
LIFT
STAIR
BEDROOM BP-1 GD3B-01
CA-1
BATHROOM
AED-01
2,200
1.0.0 A: 10.2 m2
PL6
S.10 A304
1.2.2 A: 11.3 m2
FD-01
TMB-1
2,430
1,231 2,630
V.06 A407
H
AED-01
LIVING
1.4.9 A: 13.2 m2
1.0.0 A: 13.1 m2
AED-01
AC1 BALCONY
S.09 A304
B ACC ACC
BEDROOM TI-1
AED-01 CORRIDOR TI-2
1.5.4 A: 6.3 m2
S.12 A305
V.01 A407
TI-1
1.1.4 A: 3.3 m2
D-03 AED-01
1.6.6 A: 8.5 m2
TMB-1
AC1 S.08 A303
CSD-01 BATHROOM
CA-1
1.1.5 A: 3.3 m2
LIVING
BP-1
GD3A-01 PL1 BP-1 RL: 82.22 RL: 82.22
D-05
1.1.3 A: 9.6 m2
A
1.1.8 A: 6.3 m2
TMB-1
BATHROOM
1.5.1 A: 37.3 m2
2,715
BALCONY
1.1.1 A: 21.7 m2
GD5A-01
BP-1
CA-1
1,800
LIVING AC1
1.1.2 A: 9.8 m2
CA-1
BEDROOM
1.6.3 A: 9.6 m2
D-03
D-03
W3-02
E.07 A204
TI-1
TI-1
RL: 82.22
BP-1 GD3A-04 RL: 82.22
F G
BATHROOM
1.5.2 A: 10.8 m2
BP-1 GD3B-04
PL5
V.05 A407
S.07 A303
BP-1 W3-03
1.6.4 A: 3.7 m2
ACC BALCONY 1.5.4 A: 12.2 m2
E.04 A203
3,445
E
E.06 A204
GD5B-01
CSD-05 BATHROOM
ACC
S.13 A306
E.05 A204
AC1 BEDROOM
W3-01
GUT-1
CA-1
BP-1
RL: 82.22
S.06 A302 12,358
1.1.7 A: 8.4 m2
3,000 TO BOUNDARY
PL4
TMB-1
NBN
V.04 A407
S.05 A302
BALCONY
GR
GD3A-02
BP-1
1.6.7 A: 4.4 m2
EM
S.12 A305
S.04 A301
BALCONY
1.6.2 A: 10.3 m2
B C D
E.01 A200
AC1 BEDROOM
1.6.1 A: 29.1 m2
3,150 TO BOUNDARY
4,172
1.6.8 A: 7.5 m2
4,650 90o28'30'' 30.48
AC1 LIVING
BALCONY
18.29
S.03 A301
13,481
A
193 o37'
S.02 A300
WM
S.01 A300
I
12,124 DP.06 A416
DP.07 A416
S.05 A302
S.04 A301
425 PLENTY ROAD APARTMENT_HINGE ARCHITECTS
In this project, I have contributed to tender, construction documentation, and contract administration as a co-leader. I have also worked closely with our consultants (civil, structural, services, etc.)
S.06 A302
F12 F1
F2
F3
F4
F5
F11
F6
S2
S1 F7
F8
F9
S3
S4
F14
F13
S5 F10
REV DD.0 DD.1 DD.2 CA.1
ISSUE DesignDevelopment DesignDevelopment DesignDevelopment Construction
DATE 8/10/2019 3/12/2019 5/03/2020 Work in Progress
Builder/ Contractorsshall verifyjob dimensionsbeforeany job commences. Figureddimensionstake precedenceover drawings and job dimensions. All shopdrawingsshall be submittedto Architect/ Consultantand manufactureshall not commenceprior to returnof inspectedshopdrawingsby the Architect/ Consultant. HINGE ARCHITECTSPTY LTDACN 139201059 EXCEPTAS ALLOWED UNDERCOPYRIGHTACT, NO PARTOF THIS DRAWINGMAYBE REPRODUCEDOR OTHERWISEDEALTWITH WITHOUTWRITTEN PERMISSIONOF HINGE ARCHITECTSPTY LTD.
Hinge Architects 36 CobdenStreet, NorthMelbourne,Victoria3051, Australia Phone +613 90138570 Email studio@ hingearchitects.com.au www .hingearchitects .com.au
PROJECT
PROJECT DETAILS
SHEET
106
Theia Apartments
A104
425PlentyRoad Preston3072 CLIENT
DRAWN
425PlentyRoad Pty Ltd
PC
SHEET TITLE
First Floor Plan SCALE AT A1
1:100
DATE
STATUS
15/09/2020
PRELIMINARY CA.1/ P
REVISION
GSPublisherEngine 0.0.100.100
MELBOURNE, AUSTRALIA
9
PROJECTS _2020-2021
A CLUSTER OF ACCOMMODATION Wodonga, VIC, 3690
One of my key responsibilities is to produce CAD documentations, exploratory testing prototypes, and visualizations. I am co-project lead on this project, involved in its day to day design, administration, client communication and consultant coordination roles. The opportunity to be involved in both metropolitan and regional projects is also exciting. 263
1 121
10 1,75 0
BED
DP
BED 2
ENTRY
A506
FT-1 13
1.0.2 A: 4.3 m2
W4-04
6
S
16
20
VI-2
A503
3,98 8
S.08 A303
DW ELL ING
3 8,51 7
110 KITCHE BED 3 3,09 N 5,03 0 LIVING 0 4,80 0
S.03 A301
290 121
4,91 0
S
18
JP.19 A424 DP.09 A504
DP.08 A504
S.09 A303
ENT RY KITCHE 4,430 N 4,43 LIVING 0 4,20 0
S.10 A303
JP.14 A420
W4-04
290 ACC
BED 1 4,11 2,40 0 0 110 CORRI DOR 110 2 4,34 1,60 0 110 0
BED
110 DW ELL ING 1 9,01 9
7 8
499 3,145
1
5
STAFF SLEEPOVER 19 A.1.9
A502
3
A501 21
JP.17 A424
DP.04 A503
JP.17 A424
4,51 0
E.02 A200
1,50 0
ENT RY 4,40 LIVING 0 4,40 LIVING 0 4,40 0
JP.13 A419
JP.23 A425
JP.07 A430
STORE A.1.5 A: 4.1 m2
VI-3 2 CSD-1
10
1,25 0
260
12
5,400
326
JP.01 A429
EGD2-1 EM-1
D-1
S.02 A300 E.03 A200
E.08 A201
1
4
A500 3
D-3
2 EGD3-1
S.05 A302
CONSULTATION 02 A.1.9 7 2
JP.04 A427
8
A500
C
EGD3-2
A: 11.1 m
CA-1
CU
6
5
MSB
DP.05 A502
JP.06 A430
S.01 A300
S.06 A302
J
DP.06 A502
7,144 ADMIN 12,596
5,73 2
11
A.1.8 A: 10.8 m2
CA-1
S.04 A301
250 260
VI-1
CONSULTATION 01
8
9
VI-3
260
10
A501
A.1.8 A: 6.8 m2
20 CA-1
JP.05 A428
A: 6.3 m2
12
VI-3
E.07 A201
JP.10 A423
W17-01 FOYER 9 A.0.0
A500
UACC
A.0.1 A: 6.4 m2
ACC WC
A: 11.8 m2
22
JP.03 A427
D-2
6 D-4
S.07 A303
10 GD-1 11
GD-2
18
A501
S
260
9
A.1.4
A500 17
CSD-1
FD-1
W4-01
A: 34.8 m
MEETING 19A: 9.8 m2 CA-1 20
4
HW JP.08 A425
4,63 0
290
121
4,31 0
JP.10 A423
VI-1 16
A.1.6 A: 5.8 m2
7 D.03 A416
D.08 A417
JP.09 A425
BED 1 3,48 BAT 5 H 2,17 5 CORRI 110 BED 110DOR 1,20 2 3,53 110 0 5 290 DW ELL ING 4,00 2 8,19 5 4
5 6
E.12 A202
13 GD-2 CORRIDOR A.1.0 VI-1 2
12
A.1.3 A: 12.5 m2
17 14 L'DRY / STORE
EGD2-3
LIVING
1.0.1 A: 16.3 m2
ESD4-2 JP.15 A421
290 290
290
4
19
HW
15
VI-3
T1
1 BAT H 2,29 3,607 7 110CORRI DOR110 BED ENT 2 3,60 RY 1101,200 7 1,83 0 110
T2
A500
VI-2
DP
121 121
RW
A501
TEA ROOM
A501
13
1.0.1 A: 15.8 m2
17
2,006 3,446
1,96 0
13
2,76 8
14
15 REV SD.0 DD.0 T.0
I
JP.02 A429 W14-01
4
11
15 18
KITCHEN/DINING
BED 2
1.0.5 A: 16.9 m2
DP CU
ESD4-3
E.11 A202
DP
10 CSD-4
VI-2
D-5 7
HW
BED
CSD-2
S.05 A302
1
GD-2 14
GD-3
W4-02 11
A501
1,10 7
14 CORRIDOR
A503
3
600
16
18,5 00
T2
13
D-6
A503
FT-1 9
CA-1
MPR 4,73 4 MPR 5,93 0 OFF ICE 6,08 OFF 6 ICE 6,08 6 OFF ICE 6,58 OFF 9 ICE 6,93 W 5,80 9 9
1.0.4 A: 6.5 m2
VI-4
8 5
12
1.0.0 A: 7.9 m2
D-5 A503 15
2
A.1.1 A: 36.4 m2
150 VOI D 3,13 CORRI 3,096 2 296 DOR 150L'DRY /STOR 1,63 2,70 4 4 E CORRI 844 116L'DRY/ST 149 1161,540 116 DOR 149 ORE TEA 1,63 4 STO ROOM 1161,540 114 149 CONSU 116 RE 2,33 LTA 1,54 3 TIO CONSU TEA 0 N 02 150 ROOM LTA 3,27 172 116 TIO VOI 3 1,88 3,68 CO N 02 D 2,91 5 3 MEETI 3,27 172 CONSU RRIDO 3 116 CORRI 6 124 R 10,4 EGD NG LTA DOR 3,68 52 TIO CONSU 1,65 3 N 01 1,60 0 CORRI LTA 3,20 172 116 8 172 TIO 3 116 DOR N 01 EGD 1,60 3,20 172 UAC 2,20 8 3 C 1,90 0 116 0 116 UAC C 1,90 3,19 116 0 116 FOYER 9 2,37 FOY 0 ER 150 2,02 116 0 EGD ADM 1,61 242 116 IN 18,5 2 00 474
RW
DP ACC BATH
14
15 VI-2
OFFICE
ACC
A504
2.0.1 A: 23.5 m2
E.06 A201
ED3-1 ENTRY
16
LIVING/DINING
DP.07 A415
VI-1
22
EGD2-2
VI-2
2
1
5
121 121
ION LOOP
6,400 16
VI-2
BL1
2,38 4
2.0.6 A: 12.8 m2
A503
A.1.2 A: 33.0 m2
A500 21
1.0.3 A: 16.0 m2
EPO VER
ESD4-4
6
4
13
FBD-1 BED 2
7 A504
JP.21 A430
24
BED 1
3
103
FBD-2
8
DP CU
D.04 A416
11
2.0.1 A: 11.9 m2
D-8
21 LIVING/DINING 3.0.2 VI-2 A: 28.5 m2
VI-2
W4-04
A504
MULTIPURPOSE ROOM
23
FE-ABEBL1 2
W4-07
10 9
KITCHEN
VI-2
2.0.5 VI-4 A: 2.6 m2
22
2.0.0 A: 8.0 m2
12
2.0.2 A: 5.4 m2
WC
A505
ESD4-1
S.10 A303
ED3-2 ENTRY FT-1 CSD-3
SLE
D.05 A416
23 24
6
BED 2
3.0.7 A: 11.6 m2
BL1
VI-2
EPO VER
5
2.0.3 A: 11.2 m2
2
1 D-7 19
D-7 D-7
A505
A504
VI-4 18 A504 20 D-8 CSD-5 CORRIDOR 17
WS1
SLE
8
4
BATH
2.0.4 A: 6.9 m2
DP
JP.19 A424
BED 1
3
10
9
WS1
2
A: 4.1 m2
7
A505
VI-2
3.0.1 A: 14.6 m2
BL1
S.06 A302
W1-02
DP
12 BED 3
3.0.8 A: 11.4 m2
KITCHEN
EGD1-1 LAUNDRY VI-4 3.0.5
DP.03 A505
1,000
W1-01
S.09 A303
T1
14
D-9
18
E.05 A201
WS1
STAFF OUTDOOR ACTIVITY
TV
BL1
RW
A505 13 CSD-3
A505
3.0.3 A: 7.6 m2
VI-2
BL1
2,600
FE-ABE
T3 RW S HW CU
20
E.09 FE-ABE A202 2
W4-07
RW
121
121
16
VI-4 19 D-8
D-8
2,400
WS1
0.0.2 A: 34.5 m2
D.06 A417 11
17 CSD-5 CORRIDOR
3.0.6 A: 2.8 m2
2,400
BL1
WS1
FE-ABE1 BL1
BL1
D.09 A418 W4-07
VI-2 ENTRY 15 3.0.0 D-7
BATH
VI-4 WC
BINS
0.0.1 A: 12.7 m2
1,000
BL1
BL1
3.0.9 A: 7.2 m2
W3-02
W3-01
171,065
170,900
ED1-1
VI-2
2
3
E.10 A202
S.07 A303
DP.02 A506
15
1,000
WS1
3.0.4 A: 13.3 m2
A505
IB
BL1
2,400
16
S.12 A304
A: 4.4 m2
JP.19 A424
S.11 A304
A506
ED3-3
D.07 A417
BED 1
1
W4-05 4
3,040
2,400
DP
2 3,60 7 BED 2 3,60 7
121
INCREMENTAL ASSEMBLY ARRANGEMENT, REFER SCHEDULES, DETAILS AND SPECIFICATION
2,600
S.08 A303
W4-03
DP.01 A506
121
INCREMENTAL SYSTEM TYPE, REFER DETAILS AND SPECIFICATION
2,600
14
4.0.0 A: 7.6 m2
6
5
W4-03
850
BL1
DP
8
E.15 A203
E.16 A203
18
17 4.0.1 A: 17.6 m2
4.0.6 VI-2 A: 11.5 m2 7
DP
DP
A506
KITCHEN
CSD-3
2,756
20
VI-2
A506 CSD-5 10
5,090
11
INDUCT
4.0.2 A: 5.4 m2
D-8
1,751
S HW CU
171,065 19 VI-2
CORRIDOR VI-4
12
JP.19 A424
290
290
17
TD.01 A415
170,800
DP
2,00 0
BATH
4.0.4 A: 7.2 m2
JP.08 A425
JP.18 A424
121
1
263 263 263
SHED
5,400
T4 RW 11,4 68
200
110
110 1,80 0
2 3,20 0 1 3,20 0
ENT RY
BED
260
260
BED 260
260
260 260
260
260
110
12,0 48 13,8 78
16
0.0.0 A: 14.3 m2
4.0.1 A: 14.6 m2
D-7 9
BED 121
121
121
15
TD.01 A415
EG-1
LIVING/DINING
D-7
VI-4 D-8
JP.18 A424
121
14
- 01
10,4 60
170,850
ESD4-5
VI-2
W4-06
JP.10 A423
S.01 A300
LIVING
13
1
01
263
600
S.12 A304
W4-04
2
BED 1
4.0.3 A: 11.6 m2
WC
4.0.5 A: 2.8 m2
S.11 A304
DP.01 A506
JP.16 A422
WC DWELL 1,20 11,0 ING 88 2 11,6 1100 67 CORRI BATH DW LIVING 3,15 ELL DOR 0 ING /KIT 4,46 2 10,2 CHE 110 0 N 8,26 67 BED 7 110 BED 2 3,89 1 3,20 260 7 0 BED DW ELL 1 3,20 110 260 ING 200 0 1 10,7 260 ACC DW ENT 07 260 LIVING ELL 2,70 RY ING /KIT 1,80 CHE 1 9,30 0 0 110 N 7,30 7 260 7 BED 1 3,89 260 0 200 260 ENT 260 RY 1,80 0 260
BED 1 3,70 0 BED 1 3,70 0 ENT 260 RY 2,40 3 3,69 0 0 260 260
110
110
BED
110 LAU NDR Y 1,80 DW 110 0 WC ELLING 1,20 3 13,4 1100 97 CORRI BAT DW DOR ELL H 3,15 6,37 /KIT ING CHE 0 0 3 12,1 N 9,68 CHE 97 N 8,39 7 7
A506 3
W3-04 W3-03
DP.02 A506
D
/KIT
110
110
LIVING
2 3,20 7 2 3,20 7 BED
BED 121
121
121
121
121
121
F
124
W - WINDOW ED - EXTERNAL DOOR EG - EXTERNAL GATE EGD - EXTERNAL GLAZED DOOR ESD - GLAZED SLIDING DOOR CSD - CAVITY SLIDING DOOR D - DOOR FBD - FLEXI-BEDROOM DOOR FD - FIRE DOOR GD - GLAZED SWING DOOR
7 G 7,68
1 4
E.04 A200
G
12
W
S.04 A301
E.13 A203
W4-05 E.14 A203
B
H
11
263
134
121
121
121
121
121
1 3,20 7 1 3,20 7
260 260 260
N/LIVIN
DW ELL ING BAT 4 11,0 H 3,15 87 0 CORRI 110 WC DOR 1,20 4,46 1100 0 DW ELL ING 110 4 9,68 KITCHE 7
BED
4,658
260
E.01 A200
S.02 A300
E
W1-01 W
263 SLEEPO
18,6 40
JP.18 A424
C
WINDOW AND EXTERNAL DOOR TYPE LEGEND
263
3
BED DW 1 BAT ELL H 2,29 3,607 ING 7 110CORRI 4 7,91 4,31 7 BED DOR110 0 2 3,60 1101,200 7 LIVING 110 KITCHE 4,200 N 4,20 ENT 0 RY 4,20 0 S.03 A301
A
MPR 124 6,11 124 8 TEA RO L'DR Y/STOR OM 2,68 CO 6 116 RRIDO E 3,79 116 VER 124 R 7,17 7 124 987 MEETI 5 116 NG SLE 2,65 STO EPO OFF CORRI 7 RE VER ICE CORRI 2,65 2,65 5,80 116 DOR 7 DOR 2 0 1,60 116 116 7,17 0 296 5 FOY 1,60 ADMIN 12,852 116 ER 0 116 ACC 2,92 W 1,200 2,51 1 1 CORRI 1,347 CONSU UACC 3,38 W 1,637 116 DOR 116 LTA 2 1,60 2,451 FSCV TIO 116 0 CONSU N 01 1,000 LTA 3,38 TIO CONSU 2 559 N 02 LTA 3,38 TIO 2 N 02 3,38 1,25 2 0
2
3,98 8
121 121 121
A CLUSTER OF ACCOMMODATION_HINGE ARCHITECTS
This project starts with the schematic design stage for 4 dwellings and an administration building for the Wodonga-based Centre Against Violence (CAV) through the project management of the Department of Families, Fairness and Housing (DFFH, now Homes Victoria). CAV acts as an agent and provides crisis accommodation, support, and recovery services to victim-survivors and children experiencing family violence.
17
ISSUE Schematic Design Design Deveopment Tender
DATE 25/02/2021 25/06/2021 13/08/2021
PROJECT Builder/ Contractors shall verify job dimensions before any job commences. Figured dimensions take precedence over drawings and job dimensions . All shop drawings shall be submitted to Architect/ Consultant and manufacture shall not commence prior to return of inspected shop drawings by the Architect /Consultant. HINGE ARCHITECTS PTY LTD ACN 139 201 059EXCEPT AS ALLOWED UNDER COPYRIGHT ACT , NO PART OF THIS DRAWING MAY BE REPRODUCED OR OTHERWISE DEALT WITH WITHOUT WRITTEN PERMISSION OF HINGE ARCHITECTS PTY LTD .
Hinge Architects 36 Cobden Street,North Melbourne , Victoria3051, Australia Phone +61 3 9013 8570Email studio@ hingearchitects .com.au www .hingearchitects .com.au
147
PROJECT DETAILS
SHEET
CAV CCF
A103
CLIENT
DRAWN
87-89 Phillips Street Wodonga VIC 3690
Department of Families , Fairness and Housing VictoriaPC
SHEET TITLE
Proposed Ground Floor Plan SCALE AT A 1
DATE
STATUS
1:100
13/08/2021
TENDER
REVISION
T.0
GSPublisherEngine 0.0.100.100
WODONGA, AUSTRALIA
10
PROJECTS _2019-2020
RMIT B108 L13 REFURBISHMENT 235-251 Bourke St, Melbourne, VIC, 3000
RMIT B108 L13 REFURBISHMENT_HINGE ARCHITECTS
The RMIT Building 8 Level 7 was a refurbishment project. We worked with RMIT to encounter an outstanding feasibility study of the open offices, meeting rooms, small study nooks, and kitchens. It was designed to support RMIT staff with a new layout and working vibe. We introduce multiple open offices with diverse themes to serve the requested group of staff. The idea is to make the whole level operable, and provides a more flexible floor layout for staff. In this project, I am involved in the discussion of each stage, producing 3D visualisations and preparing in all stages of documentations.
ASBESTOS NOTES 1. CRITICAL: CONTRACTOR TO REVIEW PRENSA MEMORANDUM 6/10/15 “18353 MEMO BLD 108 ELECTRICAL CONDUIT V2” WITH REGARDS TO ASBESTOS CONTAMINATION OF ELECTRICAL CONDUIT AND PROVIDE SAFE, PERMANENT AND SECURE FIXING METHOD FOR APPROVAL OF RMIT UNIVERSITY PRIOR TO COMMENCING WORK.
EXISTING DIMS, COS
DOOR LEGEND D-1
NEW SOLID DOOR, KEY LOCK
D-8
1. NOTES IN DOOR SCHEDULE AND ARCHITECTURAL SPECIFICATION AND SELECTIONS TAKE PRECEDENT OVER DOOR LEGEND, DOOR CODING IS PROVIDED FOR BROAD NOTATION PURPOSES ONLY AND SHOULD NOT BE RELIED UPON. 2. ALL EXIT DOORS AND DOORS IN THE PATH OF TRAVEL TO EXITS ARE TO BE CAPABLE OF BEING OPENED AT ALL TIMES FROM THE SIDE FACING A PERSON SEEKING EGRESS FROM THE BUILDING WITH A SINGLE HANDED DOWNWARD OR PUSHING ACTION ON A SINGLE DEVICE WITHOUT USING A KEY AND LOCATED BETWEEN 900mm AND 1100mm ABOVE FLOOR LEVEL IN ACCORDANCE WITH CLAUSE D2.21 OF THE BCA. 3. ALL DOORWAYS ARE TO ACHIEVE A MINIMUM LUMINANCE CONTRAST OF 30% BETWEEN (A) DOOR LEAF AND DOOR JAMB, (B) DOOR LEAF AND ADJACENT WALL, (C) ARCHITRAVE AND WALL, (D) DOOR LEAF AND ARCHITRAVE; OR (E) DOOR JAMB AND ADJACENT WALL. 4. ALL DOORS THAT AUTOMATICALLY LOCK ARE TO BE FITTED WITH A FAIL SAFE DEVICE THAT AUTOMATICALLY OPENS ON FIRE ALARM AND/OR POWER FAILURE. 5. ALL BATHROOM AND TOILET SIGNAGE IS TO BE OF A COMPLIANT BRAILLE AND TACTILE TYPE IN ACCORDANCE WITH SPECIFICATION D3.6 OF THE BCA. 6. ALL CARD READERS, BREAK GLASS TO EXIT BUTTONS, PUSH TO EXIT BUTTONS, AND SIMILAR ACCESSIBLE DEVICES, ARE NOT TO BE LOCATED WITHIN 500mm OF AN INTERNAL CORNER. 7. ALL GLAZED DOORS TO BE FITTED WITH A 75mm HIGH GLAZING DECAL LOCATED BEWEEN 900mm AFFL AND 1100mm AFFL ACROSS THE FULL WIDTH OF THE GLAZING.
NEW SOLID DOOR, MIN 1100mmW x 2250mmH CLEAR, RAVEN ACOUSTIC SEALS, ELECTRONIC MORTICE/SWIPE CARD LOCK
D-9
EXISTING CHALLENGER UNIT MOUNTED IN EXISTING ENCLOSURE APPROXIMATELY AS INDICATED, CONFIRM ON SITE EXISTING VERTICAL FIBRE CABLE CHANNEL TO BE RETAINED IN POSITION, SHOWN INDICATIVELY, CONTRACTOR TO ENSURE NO DAMAGE, CONFIRM ON SITE 2 x PROPOSED NEW 1000mmW x 900mmD COMMUNICATIONS RACK SUPPLIED AND INSTALLED RMIT DSB VOL 10. STANDARD, REFER DSB FOR SPECIFICATION OF UNIT
BACK
INCREMENTAL DOOR REFERENCE, REFER DOOR SCHEDULE, DETAILS AND SPECIFICATION
1,000 707 118 792 118
1
- 1
D - SWING DOOR DD - DOUBLE SWING DOOR SD - SLIDING DOOR OR SLIDING PANEL CS - CAVITY SLIDING DOOR BD - BIFOLD DOOR OW - OPERABLE WALL
1,940 DD 2,000 1,825 90 RACK 1,000 RACK 1,000
D
D
DD-1
NEW SOLID DOOR, MIN 1000mmW (PER DOOR) x 2250mmH CLEAR, RAVEN ACOUSTIC SEALS, NO MULLION, KEY LOCK PROPOSED NEW WALL AND SOLIDCORE DOOR WITH ANODISED ALUMINIUM FRAME, NOTE DOOR TO HAVE BRUSH SEALS TO ALL PERIMETER JUNCTIONS, TOP AND BOTTOM DROP BOLTS AND BARREL LOCK TO ACTIVE LEAF, REFER DOOR SCHEDULE AND ARCHITECTURAL SPECIFICATION FOR DETAIL INCLUDING DOOR HARDWARE
COL 620 118 118
GENERAL NOTES 1. ALL DOCUMENTATION TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, SCHEDULES AND PRELIMINARIES. 2. ALL DOCUMENTATION TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS DOCUMENTATION AND SPECIFICATION. 3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON SITE PRIOR TO WORK COMMENCING. 4. CONTRACTOR SHALL NOTIFY ARCHITECT AND SUPERINTENDENT OF ANY DISCREPANCY IN DOCUMENTATION OR SPECIFICATION, OR IN THOSE OF ANY CONSULTANTS, PRIOR TO WORK COMMENCING. 5. ALL MEASUREMENTS IN MILLIMETRES UNLESS OTHERWISE STATED. 6. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE CONDITIONS OF THE BUILDING CODE OF AUSTRALIA, RELEVANT AUSTRALIAN STANDARDS, THE VICTORIAN BUILDING REGULATIONS, SAA CODES AND MANUFACTURER RECOMMENDATIONS, SPECIFICATIONS AND INSTRUCTIONS. 7. DO NOT SCALE FROM DRAWINGS. 8. ALL DETAILS NOT DOCUMENTED SHALL BE CONFIRMED BY THE ARCHITECT BEFORE COMMENCING WORK. 9. ALL WORKS TO BE UNDERTAKEN IN STRICT CONFORMITY WITH THE RMIT DESIGN STANDARDS AND THE RMIT FURNITURE GUIDELINES AVAILABLE AT HTTPS://WWW.RMIT.EDU.AU/ABOUT/OUR-LOCATIONS-ANDFACILITIES/FACILITIES/DESIGN-STANDARDS. THE CONTRACTOR IS TO UNDERSTAND AND ABIDE BY THE RMIT DESIGN STANDARDS AT ALL TIMES. 10. COMMENCEMENT OF WORK MEANS ACCEPTANCE OF ALL NOTES AND CONDITIONS. 11. ANY PENETRATIONS THROUGH ELEMENTS REQUIRED TO BE FIRE RATED AND TO BE SEALED IN ACCORDANCE WITH THE REQUIREMENTS OF BCA C3.15. 12. ALL GLAZING TO BE IN ACCORDANCE WITH THE REQUIREMENTS OF AS1288.1:2006. 13. ALL WET AREAS TO BE IN ACCORDANCE WITH THE REQUIREMENTS OF AS3740.
NEW ANTI-STATIC VINYL TO SELECTIONS SCHEDULE
118 118 118 118
RACK 900 RACK 900
769
90
RISER 620 90 3,099
(TYPICAL, TO ALL EXISTING AND NEW WALLS) MAKE GOOD AND PAINT FINISH, APPLY NEW 100mmH ANO. ALU. SKIRTINGS REFER ELECTRICAL DOCUMENTATION FOR ALL POWER AND DATA REQUIREMENTS EXISTING DIMS, COS
2,899 OVERALL INTERNAL 4,000
D 1,180
HUB
COLLAB
EXISTING DIMS, COS
011 A: 35.1 m2
OW-3A
OW-3C
Communications Room Detail Plan 1:50
DP.04 (TYPICAL) ALL GAPS AROUND SKIRTING, BETWEEN WALLS, AND THE LIKE, SHALL BE SEALED: - WHERE LESS THAN 10mm, USE A FIRE RATED SEALANT - WHERE GREATER THAN 10mm, USE A COMPRESSED BACKING ROD AND FIRE RATED SEALANT - WHERE GREATER THAN 25mm, COVER WITH A STEEL ANGLE, THEN SEAL WITH A FIRE RATED SEALANT
1,578
1,725
OW-3B
(WHERE NO BATTEN WALL INDICATED) PROVIDE NEW LAYER OF 13mm CSR GYPROCK SOUNDCHEK ACOUSTICALLY RATED PLASTERBOARD PATCH FIXED OVER EXISTING MASONRY WALL
BP
EXISTING DOOR, INSTALL NEW 25mm INSULATION OR ACOUSTIC FOAM TO INSIDE FACE EQUIVILANT TO MEGASORBER P25, RELOCATE EXISTING DOOR LEVER AND BARREL PER OTHER ANNOTATION, PROVIDE REPLACEMENT DOOR LEVER (NO BARREL) AND BLANK KEY PLATES (NOT SHOWN, ABOVE) PROVIDE NEW MIN. 50mm THICK 32kg/m3 DENSITY BULK INSULATION TO CEILING/BULKHEAD AROUND PLANTROOM EXTENDING A MIN. 2m IN ALL HORIZONTAL DIRECTIONS FROM THE EXTERNAL FACE OF THE PLANT ROOM WALL PROVIDE NEW THRESHOLD HOB BETWEEN DOOR LEAVES TO OBTAIN POSITIVE SEAL TO ROOM EQUIVALENT TO THE PYROPANEL PYROSIL WITH INCORPORATED RUBBER SEAL
NORTH WEST OFFICE 010 A: 458.5 m2
PROVIDE NEW 25mm ACOUSTIC FOAM OR INSULATION INSTALLED TO THE INSIDE FACE OF THE DOOR EQUIVILANT TO MEGASORBER P25
FHR
009 A: 0.6 m2
PROVIDE NEW MIN. 50mm THICK INSULATION TO ALL EXPOSED MASONRY AND SURFACES INSIDE PLANT ROOM EQUIVALENT TO MEGASORBER P50 (NOTE: WHERE REQUIRED FOR PROTECTION, INSULATION SHOULD BE COVERED WITH A PERFORATED METAL SCREEN WITH AN OPEN AREA OF NOT LESS THAN 20%)
Smoke Spill Room Detail Plan 1:50
DP.05
DP.02 A501
FEMALE BATHROOM
DIS. WC
405 24.7 m2
1,469
D-5
D-2 LOCKER QTY: 9
LOCKER QTY: 18
DOOR TO HAVE MORTICED OR SEMI-MORTICED AUTOMATIC DROP SEAL EQUIVALENT TO RAVEN RP8 AND SURFACE MOUNTED ACOUSTIC SEALS INSTALLED TO EXISTING FRAME DOORSTOPS EQUIVALENT TO RAVEN RP24
009 A: 5.4 m2
D-5
D-5
2P FOCUS
2P FOCUS
008 A: 6.2 m2
2P FOCUS
012 A: 6.0 m2
013 A: 6.4 m2
BP
TV
311 0.3 m2
STAIR
406 A: 5.0 m2
D-5
2P FOCUS
007 A: 6.2 m2
210 17.9 m2
NOT IN SCOPE
SD-2
12P MEETING ROOM
PRINTER
NEW (ADDITIONAL) MIN. 40mm THICK SOLID CORE TIMBER DOOR WITH MIN. 1mm THICK STEEL FACES TO BOTH SIDES INSTALLED ON EXISTING METAL FRAME, RELOCATE DOOR LEVER AND BARREL FROM INSIDE DOOR TO NEW OUTSIDE DOOR, CONFIRM CAPACITY OF DOOR FRAME TO TAKE ADDITIONAL WEIGHT PRIOR TO PUTTING WORK IN HAND
004 A: 25.7 m2
D-10
PLANT
030 A: 24.0 m2
029 A: 63.5 m2
106 21.1 m2 NOT IN SCOPE
TV
306 2.3 m2
202 22.1 m2
308 2.0 m2
LOCKER QTY: 42
026 A: 209.3 m2
MALE BATHROOM 404 23.5 m2
907 3.9 m2
LOCKER QTY: 18
D-5
BP
1P FOCUS 028 A: 6.4 m2
4P MEETING ROOM
HUB
STAIR
MEETING
211 9.4 m2
025 A: 41.0 m2
027 A: 13.1 m2
NOT IN SCOPE
TV
4P MEETING ROOM 021 A: 13.1 m2
TV
2P FOCUS 024 A: 6.8 m2
SD-3
BP
D-5
1P FOCUS
1P FOCUS
D-5
D-1
PRINTING 019 A: 18.3 m2
D-5
SD-2
905 3.9 m2
BP 1,469
D-4
FOYER
201 A: 60.1 m2
003 A: 27.1 m2
018 A: 45.1 m2
D-8 301 0.5 m2
OW-2B
D-1
MOCOW
203 A: 41.3 m2 SD-5
D-9 901 4.8 m2
COMMS DD-1
BP
BP
ENTRY
DP.04 A101
COLLAB TV
022 A: 5.6 m2
023 A: 5.2 m2
204 A: 37.0 m2
OW-2A
D-5
PRINTER
D-2 F. H. R.
LOCKER QTY: 45
BP SD-3
906 3.9 m2
SD-2
12P MEETING ROOM
NOT IN SCOPE
401 A: 5.0 m2
BP
TV
NOT IN SCOPE
CLEANER
OW-1 D-3
BP
403 16.5 m2
CSNK A: 4.1 m2
BP
SD-2 305 5.9 m2 NOT IN SCOPE
PLANT
LOCKER QTY: 54
BREAKOUT
PROJECT ROOM SOUTH WEST OFFICE
CORRIDOR
309 0.7 m2
903 4.8 m2
902 4.8 m2 NOT IN SCOPE
402 A: 10.2 m2
904 4.8 m2
SD-4
AUDITORIUM 002 A: 37.3 m2
RECEPTION 001 A: 10.1 m2
HUB
D-5
BP OW-2C
BP
SOUTH EAST OFFICE
BP
STAFF LOUNGE 017 A: 58.8 m2
STAFF KITCHEN 016 A: 55.5 m2
LOCKER QTY: 24
LOCKER QTY: 24
020 A: 153.7 m2
OW-4
NORTH EAST OFFICE 015 A: 162.0 m2
COLLAB 014 A: 40.9 m2
HUB
SMOKE SPILL 412 2.8 m2
SMOKE SPILL
D-7
411 2.8 m2
DP.05 A101
D-7
DP.05 A101
REV T.0
ISSUE Trade Packages 1, 2, 3 Letting
DATE 22/01/2020
Builder/ Contractorsshall verifyjob dimensionsbeforeany job commences. Figureddimensionstake precedenceover drawings and job dimensions. All shopdrawingsshall be submittedto Architect/ Consultantand manufactureshall not commenceprior to returnof inspectedshopdrawingsby the Architect/ Consultant. HINGE ARCHITECTSPTY LTDACN 139201059 EXCEPTAS ALLOWED UNDERCOPYRIGHTACT, NO PARTOF THIS DRAWINGMAYBE REPRODUCEDOR OTHERWISEDEALTWITH WITHOUTWRITTEN PERMISSIONOF HINGE ARCHITECTSPTY LTD.
Hinge Architects 36 CobdenStreet, NorthMelbourne,Victoria3051, Australia Phone +613 90138570 Fax +613 90138571 Email studio@ hingearchitects.com.au www .hingearchitects .com.au
PROJECT
PROJECT DETAILS
SHEET
139
RMIT Building 108 Level 13
A101
CLIENT
DRAWN
SCALE AT A1
DATE
STATUS
RMIT University
ED
1:100
22/01/2020
TENDER
Building108, L13, Melbourne3000
SHEET TITLE
Proposed Plan REVISION
T.0
GSPublisherEngine 0.0.100.100
MELBOURNE, AUSTRALIA
11
PROJECTS_2019
THE ‘18 STAIRS’_ A STRIP OF CIVIC INFRASTRUCTURE
CHONGQING, CHINA
12
PROJECTS_2019
THE ‘18 STAIRS’_ A STRIP OF CIVIC INFRASTRUCTURE
THE ‘18 STAIRS’ A COLLECTION OF THE MUTATION OF THE VERNACULAR STILTED HOUSES. A STRIP OF THE CIVIC INFRASTRUCTURE. AN OBJECT OF THE FINE GRID PLANING. A RESISTANCE TO THE MEGA STRUCTURE. A REMINISCENCE OF THE LOCAL LYFESTYLE.
have the opportunity to get close to the culture and experience. That’s why people are willing to travel to ancient town to get a glimpse of the local living experience. China is a nation of great antiquity. It is no doubt that there are a lot ancient town and particular vernacular architecture. Nevertheless, the majority of the town have been knocked down due to the rapid expansion of morden cities last 20 years. Many expert and scholar are starting to take actions of resisting the demolishment now. People are starting to realize the importance of old and paying more attention to it. There has been a dramatic shift of the attitude towards it. But it is not enough.
Imagine: you stand to see the scenery on the bridge, seeing the person of the scenery see you in the upstairs. The bright moon decorated your window, and you decorated the other people’s dream. People seeing people is the most beautiful scenario. But, how does this can actually happen? You have to keep the aborigines there. They live there, they live traditionally. And you 13
CHONGQING, CHINA
Architecture is the carrier of culture, while ancient architecture is the core of cultural heritage. Ancient architecture is a carrier of cultural spirit and the historical record of a nation’s life. It is the habitat of the soul of human culture, temples of human cultural beliefs, and halls engraved with historical monuments and cultural souls. It reflects the cultural patterns of different regions, countries, nationalities and communities. It is also a symbol of cultural diversity. The architecture has very important historical and cultural value. Recording history and displaying culture, Carrying the soul, providing identity and enhancing self-confidence, these are all ancient buildings that can give us. Without ancient buildings, our cultural roots can not be found. Ancient buildings are temples and palaces of human cultural beliefs. Only in front of these temples, We just know who we really are.
PROJECTS _2019
THE ‘18 STAIRS’ A STRIP OF CIVIC INFRASTRUCTURE I often find myself wondering what the attraction of a city is and what the future of cities is. I guess it is the uniqueness and conventional characteristics of the city. And future cities are supposed to preserve these delicate factors. THE ‘18 STAIRS’_ A STRIP OF CIVIC INFRASTRUCTURE
Future cities are supposed to preserve their uniqueness and conventional characteristics. Most cities are now undergoing the homogenization of globalization. The contemporary city has been out of control and lost its potential identities. The context of a city can no longer provide inhabitants with the conventional language to the space of the street or premises. Places that were once unique and iconic are suffering from being erased in their entirety. Pursuing the gentrification and industrialization in quality and efficiency in life, cities have become similar in extrinsic features and experience. A child born in Shanghai is probably experiencing a remarkably similar lifestyle like another born in New York. The younger generation will no longer have opportunities to reconnect to the way their parents used to live, even the elder would get lost in their ways of finding the past. It is crucial to explore the approach of preventing cities from being identical. My approach to the preservation of cities’ identity starts with investigating a specific city, Chongqing, which locates in the southwest of China. The ’18 Stairs’ is an experimental project that sought to retrofit the urban field condition through an investigation of the fine grid system in the large civic infrastructure. This investigation consists of a range of typological study and the testing of the scale shift from small to large, focusing on how a traditional typology could be mutated into a new architectural language. The objects are generated by a collection of vernacular stilted houses in Chongqing. Elements are unpacked and repacked to assemble a new object. The flatness of the field creates a public urban corridor for the city, constructing a new masterplan with injected shared sports fields. The rafters of single detached stilted houses, the floor joists, the studs, pipes, details and the house itself with all of the structural and ornamental elements will be unpacked and repacked as formwork to retrofit the new ’18 stairs’. It also intends to explore the balance between urban context and human activity. The aggregation of the stilted houses provides a special hierarchy within the urban context. The tiny scale stilted houses are repeatable on the site, creating an inverse of the megastructure in the city. This argues the layout of small scale density between large scale context. The massive grid of new stilted houses is essentially an integral large structure, which creates a strip of civic infrastructure that serving the surroundings. Ultimately, it is an expansion of a fine grid in between the high-rises. The inhabitants would celebrate the life here, meet with each other, talking and laughing.
CHONGQING, CHINA
14
PROJECTS _2019
1. SPORTS FIELDS. 2. MEETING ROOM. 3. OFFICE. 3. REST ROOM. 4. CIRCULATIONS. 5. SHOWCASE. 6. PLATFORMS. 7. CHAGING ROOMS. 8. CAFE. 9.CORRIDOR. 10. LIBRARY. 11. ARCHIVE. 12. STUDY ROOM. 13.GALLERY SHOP.
THE ‘18 STAIRS’_ A STRIP OF CIVIC INFRASTRUCTURE
PLAN
THE FINE GRIDS AND THE BIG BLOCKS. THE SPORTS FEILDS AND THE BUILDINGS. THE PRIVATE AND THE PUBLIC. THE TIGHT AND THE MASSIVE. THE EMPTY AND THE DENSITY.
CHONGQING, CHINA
15
PROJECTS _2019 _2018
CROSS REALITIES_PALINDROMIC CHAMBERS
CROSS REALITIES_PALINDROMIC CHAMBERS
CROSS REALITIES_PALINDROMIC CHAMBERS 300M TOWER
As the high resolution could be presented effortlessly in digital tools, how to transfer it into real world becomes an enquiry. We start to 3D print a quarter of one-floor section, in the beginning we found that the chunk expresses too complex structure/ patterns. As it supposed to print a small scale, some zone of the chunk suffered a really thin volume which could not be printed. Even the 3D printer would have some limitations to printing. Printable turned out to be a big issue. The digital and the reality complement each other, while 3D print could be the binding approach between them.
16
MELBOURNE CBD, AUSTRALIA
Cross Realities could be considered as a process of pattern recognition and creation through merging design technologies. Unlike general architecture systems by the only use of only CAD techniques, this studio attempts to take MAYA as a core computational design tool with using mirror cutting and Arnold rendering. New technologies give us a brand-new recognition of design, with the using of AR/VR, people could be get access to the digital world easily. The new computational tools also help us to define a subject in a variant way, which means we could use MAYA for instance to obtain this high resolution tower or other fabrications. In this studio, how we generate the patterns /components/iteration objects and how they are impacted or represented need to be considered. We are not making art, but creating a new way of representing architecture. Even when working with the massive new digital tools, we can still find ourselves would get lost in the dimension of creating patterns or fabrication protocols. The role of design is a way to inspire the world, and to demonstrate in today’s design creator cannot ignore and in fact, should embrace the changing techniques to deliver previously unseen aesthetics and theory.
PROJECTS _2019 _2018
ITERATION DEVELOPMENT MIRROR ROTATION 30 - 60 DEG
ITERATION DEVELOPMENT MIRROR ROTATION 30 - 60 DEG E/i.1
D/i.1
D/i.1
C/i.1
B/i.1
A/i.1
CROSS REALITIES_PALINDROMIC CHAMBERS
D/i.1.1
PLAN - CONSERVATORY 1:500
CIRCULATION PRIMARY CHAMBERS
PLAN - CRYPT 1:500 MELBOURNE CBD, AUSTRALIA
CIRCULATION PRIMARY CHAMBERS
17
PROJECTS _2018
NORTH ELEVATION FACADE - FIELD 150 percent
CROSS REALITIES_PALINDROMIC CHAMBERS
MELBOURNE CBD, AUSTRALIA
18
PROJECTS _2018
SECTION - LABORATORY 1:20
CROSS REALITIES_PALINDROMIC CHAMBERS
PERPECTIVES
MELBOURNE CBD, AUSTRALIA
19
MODELS _2019
ROBIN BOYD EXHIBITION Robin Boyd could be regarded as the most influential architect in Australia, he led Melbourne’s Modern Architecture movement, had a unique visionary in urban design. ROBIN BOYD EXHIBITION
I found that Robin can always bring us a surprise, not only for the material he was using but also for the structure and layout of each house. When you first look at his project, you probably would think it is an ordinary house. But as you walked into the house and experienced it, you will realize it is such a gift. I was shocked when I stepped into his house, it is so beautiful, the structure, the material, the scale, and the layout. He was a talent. He could always find a balance between his idea and the client’s needs. For instance, his negotiation between client makes the Featherston house special. The bold innovation and attempt of it were advanced, challenging the traditional architecture. Even nowadays, the house could still be counted for a masterpiece and a leading notion.
HEIDE MUSEUM OF MODERN ART
20
MODELS _2018
SCULPTING ILLUSIONS By using Hololens to transform physical objects from digital ones, to research what is the variation between virtual world and reality, to experience and explore how the agmented reality techniques can be benefited to us. SCULPTING ILLUSIONS
01
02
03
04
05
01
02
03
04
05
06
07
08
09
10
06
07
08
09
10
11
12
13
14
15
11
12
13
14
15
16
17
18
19
20 16
17
18
19
20
TUTOR_CAITLYN PARRY
FINAL OUTCOME _ RESIN OBJECTS
21
MODELS _2017
ARCHITECTURAL ROBOTICS _ FOAM CARVING New advanced techniques are becoming increasingly popular, UR-10 robot could be one of the most well used machines. Taken UR-10 robot with hot wire cuter as a tool, to carve foams and test diverse interior decorations of a public meeting pavilion. ARCHITECTURAL ROBOTICS_FOAM CARVING TUTOR_ROLAND SNOOKS
22
PENGYAN CHEN THANKS
+61(0)423 588 383 pengyan.chen13@gmail.com
23