SOUND INSULATION REQUIREMENTS FOR WALLS

1

2

3

4

5

6

7

8

45 50 55 60 65

45 50 55 60 65

45 50 55 60 65

45 50 55 60 65

Minimum STC45 Minimum STC50 Minimum STC55 Minimum STC60 Equal or above STC65

SPECIAL SOUND INSULATION REQUIREMENTS

1

Acl

AR-06-604

Acl

Acl

Acl

Special acoustic requirements

SOUND INSULATION REQUIREMENTS FOR DOORSETS

AC

I

Acoustic doorset with minimum required STCrating in decibels

INTERNAL BACKGROUND NOISE REQUIREMENTS Name

W

C85% NRC.75

NC (Noise Criteria) required for the room background noise from services & equipment

REVERBERATION TIME / SOUND ABSORBENT MATERIALS

55.

PANTRY GF-004 35

0.8 NC 30 C85% NRC.75

H

55.

55.

Trainee Name : CHINMAY JHA

Name

LAUNDRY GF-005

Reverberation time in seconds Absorbent materials required on ceilings. -- % of the ceiling area with NRC -Absorbent materials required on walls. -- % of the ceiling area with NRC -Absorbent materials required on floors. -- % of the ceiling area with NRC --

REF.

40

35

NOTES 1. BLOCK WALLS: - ALL JOINTS BETWEEN BLOCKS, VERTICAL AND HORIZONTAL, SHALL BE FILLED WITH MORTAR TO THE FULL LENGTH, DEPHT AND HEIGHT OF THE CONCRETE BLOCKS - NO CAVITIES OR HOLES ARE ACCEPTED IN THE MORTAR - ALL BLOCK WALLS SHALL BE PLASTERED FROM BOTH SIDES

G

55.

TOILET GF-006 50.

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

2. FSTC (FIELD SOUND TRANSMISSION CLASS) - TEST SHOULD BE REALIZED BY THE CONTRACTOR AS PER ASTM E-336-09 OR THE LATEST IN DATE.

PARKING

3. NO "BACK TO BACK" INSTALLATIONS ARE ACCEPTED. 4. MINIMUM DISTANCE BETWEEN ELECTRICAL OR OTHER ELEMENTS TO BE INSTALLED IN THE WALLS SHOULD BE APPROVED BY THE ENGINEERS AND SHOWN ON THE SHOP DRAWINGS.

35

55.

Date of Joining :1/8/2019

55.

55.

5. THE CONTRACTORS ARE REQUIRED TO PROVIDE SHOP DRAWINGS SHOWING : - THE INTERSECTION BETWEEN WALLS OF THE SAME TYPE AND / OR DIFFERENT TYPES - THE INTERSECTION OF WALLS WITH THE FLOORS AND THE CEILINGS - THE INTERSECTION OF THE FALSE CEILING WITH THE WALLS

F

6. ALL COMPOSITION OF WALLS SHOULD HAVE A TEST CONFIRMING THE STC INDICATED

No.

E

Description

Date

1 AR-06-603

DRAWING ROOM GF-001

D

50.

C

VILLA 49 B

40

PORCH

Ground Floor Acoustics

A

9/9/2019

Date

C.J.

Drawn by Checked by

1

AC-01-101

Ground Floor - Acoustics Plan 1 : 25

M.Z.

Scale

1 : 25


1

2

3

4

5

6

7

8

SOUND INSULATION REQUIREMENTS FOR WALLS 45 50 55 60 65

1 AR-06-604

45 50 55 60 65

45 50 55 60 65

45 50 55 60 65

Minimum STC45 Minimum STC50 Minimum STC55 Minimum STC60 Equal or above STC65

SPECIAL SOUND INSULATION REQUIREMENTS Acl

Acl

Acl

Acl

Special acoustic requirements

SOUND INSULATION REQUIREMENTS FOR DOORSETS

AC

Acoustic doorset with minimum required STCrating in decibels

INTERNAL BACKGROUND NOISE REQUIREMENTS Name C85% NRC.75

REVERBERATION TIME / SOUND ABSORBENT MATERIALS

I 40

TOILET FF-008

NC (Noise Criteria) required for the room background noise from services & equipment

Trainee Name : CHINMAY JHA

Name 0.8 NC 30 C85% NRC.75

Reverberation time in seconds Absorbent materials required on ceilings. -- % of the ceiling area with NRC -Absorbent materials required on walls. -- % of the ceiling area with NRC -Absorbent materials required on floors. -- % of the ceiling area with NRC --

NOTES

H

1. BLOCK WALLS: - ALL JOINTS BETWEEN BLOCKS, VERTICAL AND HORIZONTAL, SHALL BE FILLED WITH MORTAR TO THE FULL LENGTH, DEPHT AND HEIGHT OF THE CONCRETE BLOCKS - NO CAVITIES OR HOLES ARE ACCEPTED IN THE MORTAR - ALL BLOCK WALLS SHALL BE PLASTERED FROM BOTH SIDES

40

BED ROOM FF-005

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

2. FSTC (FIELD SOUND TRANSMISSION CLASS) - TEST SHOULD BE REALIZED BY THE CONTRACTOR AS PER ASTM E-336-09 OR THE LATEST IN DATE.

G

35

3. NO "BACK TO BACK" INSTALLATIONS ARE ACCEPTED. 4. MINIMUM DISTANCE BETWEEN ELECTRICAL OR OTHER ELEMENTS TO BE INSTALLED IN THE WALLS SHOULD BE APPROVED BY THE ENGINEERS AND SHOWN ON THE SHOP DRAWINGS. 5. THE CONTRACTORS ARE REQUIRED TO PROVIDE SHOP DRAWINGS SHOWING : - THE INTERSECTION BETWEEN WALLS OF THE SAME TYPE AND / OR DIFFERENT TYPES - THE INTERSECTION OF WALLS WITH THE FLOORS AND THE CEILINGS - THE INTERSECTION OF THE FALSE CEILING WITH THE WALLS

35

BED ROOM FF-004

BATHROOM FF-007

6. ALL COMPOSITION OF WALLS SHOULD HAVE A TEST CONFIRMING THE STC INDICATED

F

No.

Description

Date

40

40

CLOSET FF-006

E

1 AR-06-603

D 35

35

C

OFFICE FF-003

SUITE FF-001

VILLA 49 First Floor Acoustics Plan

40

B

40

A

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AC-01-102 1

First Floor - Acoustics Plan 1 : 25

Scale

1 : 25


1

2

3

4

5

6

7

AG-Signage Legend

8

1

DR-01 1

Sign Type Sign Number

Directional Sign

EV-01 1

Sign Type Sign Number

Environmental Sign

ID-01 1

Sign Type Sign Number

Identification Sign

IN-01 1

Sign Type Sign Number

Informational Sign

SR-01 1

Sign Type Sign Number

Service Sign

AR-06-604

I

PANTRY GF-004

Notes: 1. Sign Tags shown in the drawings are only indicative.

LAUNDRY GF-005 H

G

Trainee Name : CHINMAY JHA

2. For wall finishing refer to Interior Architecture package.

Date of Joining :1/8/2019

3. For exact message to be included on the signs refer to Sign Message Schedule, REF.xxxxxxxxx

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

4. For exact sign details and dimensions refer to Sign Standard Manual, REF xxxxxxx

Submission Date : 9/9/2019

5. For exact sign location refer to context elevation included in Sign Standard Manual, REF xxxxxxx

TOILET GF-006

F

No.

E

Description

Date

PARKING

1 AR-06-603

D DRAWING ROOM GF-001 C

ID01

VILLA 49 B

PORCH

Ground Floor Signages

A

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

IN01

1

AG-01-101

Ground Floor - Signage Plan 1 : 25

Scale

1 : 25


1

2

3

4

5

7

6

8

1 AR-03-302 AR-06-604

10350 600

2250

1950

870

1930

1375

1375

W

I K-WM-101

1300

PANTRY GF-004

Trainee Name : CHINMAY JHA

LAUNDRY GF-005 H K-RT-101

1000

REF.

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

13/8/2019

Submission Date : 9/9/2019 G

K-CT-101

2

600

1

TOILET GF-006

X-WC-101

450

1300

X-WB-101

AR-04-406

AR-04-406

F

S-CH-102

1150

S-PF-101

9550

S-SF-101

E

700

1 AR-03-301 AR-06-603

No. A B

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

D

C-DT-102

650

S-SF-101

C S-CH-102

C-TB-101

S-CH-101

S-CH-101

C-DT-101

S-CH-101

DRAWING ROOM GF-001

C-TB-103

2600

S-CH-101

S-PF-101

S-CH-101

VILLA 49 PORCH

850

B

S-CH-101

A

Ground Floor Furniture Plan 9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AI-01-101 1

Ground Floor - Furniture Plan 1 : 25

Scale

1 : 25


1 AR-03-302 AR-06-604

1

2

3

4

5

6

7

8

10350 2250

1270

600

T-HS-101

1950

X-WB-102

870

1930

765

1375

1375

BALCONY TOILET FF-008

I

Trainee Name : CHINMAY JHA

845

1300

C-TB-105

BALCONY

S-CH-104

X-WC-101

Date of Joining :1/8/2019

450 T-HB-101

H

B-KB-101

Mentor :

M. ZUBAIR

Start Date :

13/8/2019

Submission Date : 9/9/2019 1000

BED ROOM FF-005

S-SF-102 C-TB-105

T-HS-101 C-TB-105

G

BATHROOM FF-007

B-KB-101

1300

C-CB-101

BED ROOM FF-004

X-WB-102

F C-TB-105

X-WC-101

1

CLOSET FF-006

C-CB-101

AR-03-301 AR-06-603

No. A B

T-HB-101

C-CB-101

9550

C-CB-101

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

E

700

GALLERY FF-002

C-CB-101

1150

C-TB-104

650

D S-SF-102

C C-TB-102

OFFICE FF-003

SUITE FF-001 B-KB-101

2600

S-CH-103

C-TB-105

S-CH-103 S-CH-103

VILLA 49 C-TB-105

S-CH-103

850

B

First Floor Furniture Plan

A

9/9/2019

Date

BALCONY

BALCONY

C.J.

Drawn by Checked by

M.Z.

AI-01-102 1

First Floor - Furniture Plan 1 : 25

Scale

1 : 25


1

2

3

4

5

6

7

8

1 AR-03-302 AR-06-604

10350 600

2250

1950

870

1930

1375

1375 I

655

443

1310

655

PANTRY GF-004

+2450

+2450

1125

1125

620

740

1500

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

13/8/2019

G

C-AGP-01

875

905

1250

+2375

C-AGP-01

LEGEND

TOILET GF-006

SYMBOL

1300

+2450

2500

H

Submission Date : 9/9/2019

560

620

Trainee Name : CHINMAY JHA

LAUNDRY GF-005

560

500

625

500

C-AGP-01

1000

C-AGP-01

820

1300

885

560

443

875

CODE

DESCRIPTION

C-AGP-01

GYPSUM BOARD

900

3990 EQ EQ

Date 13/8/19 26/8/19

D

C

500

EQ

1635

479

958

635

500

+2450

C-AGP-01

2600

1500

EQ 1955

635

250 +2375

VILLA 49

B 850

1214 250

1215 500

Description Week 2 Submission Week 3 Submission

300

610 1635

1462

1465

700

2335

600

+2375

DRAWING ROOM GF-001

No. A B

1955

500

C-AGP-01

500

300 C-AGP-01

1400

+2450

C-AGP-01

EQ

500 250

1025 700

600

2315

1200

650

E

700

C-AGP-01

AR-03-301 AR-06-603

1150

500

900

9550

250

650

1000

+2450

1500

1500

270 1

1400

600 EQ

625

1400 3490

250

F

A 2429

Ground Floor Ceiling Plan 9/9/2019

Date

C.J.

Drawn by Checked by

1

AI-01-103

Ground Floor - Ceiling Plan 1 : 25

M.Z.

Scale

1 : 25


3

4

5

1950

870

1300

H

500 675

+2450

13/8/2019

C-AGP-01

1074

BATHROOM FF-007

1050

950

CLOSET FF-006

475

1400

CODE

DESCRIPTION

C-AGP-01

GYPSUM BOARD

F 1150

C-AGP-01

SYMBOL

1300

No. E

A B

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

700

1435

Start Date :

LEGEND

9550

+2450

M. ZUBAIR

1300

1100

GALLERY FF-002

Mentor :

Submission Date : 9/9/2019

1000

665

950

2420

675

970

1210

C-AGP-01

1088

1300 1143

1435

1088

1050

1200

C-AGP-01

1000

500

AR-03-301 AR-06-603

+2450

Date of Joining :1/8/2019

G

500

485

500 1

+2450

Trainee Name : CHINMAY JHA

250

2470

+2450

BED ROOM FF-005

+2375

835

+2375

1325

500

1143

C-AGP-01

1235

1570

2470

1570

BED ROOM FF-004

1375

660

C-AGP-01

500

1075

250

550

2175

1210

1235

1074

1220

1050

1200

850

500

1100

1050

1040

450

660

1040

871

550 1235

1375

I

1235

500

1770

1930

C-AGP-01

250

250

500

1200

850

8

1050

+2450

TOILET FF-008

450

7

AR-03-302 AR-06-604

250

2250

550

600

6

1

10350

835

2

250

1

C-AGP-01

EQ

500

500

650

VILLA 49 B

+2450

C-AGP-01

1318

First Floor Ceiling Plan

850

250

1318

500

OFFICE FF-003

1000

EQ

C-AGP-01

EQ

500

250

+2375

900

SUITE FF-001 EQ

250

+2375

C-AGP-01

2420

1470

500

C

250

2071

1070

500

EQ

3000

250

1415

EQ EQ

EQ

EQ

2600

1625

EQ

EQ

700

C-AGP-01

1075

1285

+2450

500

750 1000

1000

500 900

1450

250

D 750

A

9/9/2019

Date

C.J.

Drawn by Checked by

1

M.Z.

AI-01-104

First Floor - Ceiling Plan 1 : 25 Scale

1 : 25


1

2

3

4

5

7

6

10350

8

1 AR-03-302 AR-06-604

600

2250

1950

870

1930

1375

1375

HT : @ 1250 mm from FFL

250 2 x SWITCHES 1 x 1 PIN SOCKET

W

LAUNDRY GF-005

250

1 x 1 PIN SOCKET 1 x SWITCH

Trainee Name : CHINMAY JHA

1 x SWITCH

200

HT : @ 450 mm from FFL

H

200

1000

REF.

HT : @ 1250 mm from FFL

1300

I PANTRY GF-004

HT : @ 1250 mm from FFL

M. ZUBAIR

Start Date :

13/8/2019

G

HT : @ 1250 mm from FFL

1300

160

1 x SWITCH

HT : @ 450 mm from FFL

TOILET GF-006 F 1150

HT : @ 450 mm from FFL

2 x SWITCHES

251

1 x DATA OUTLET 1 x COMM. OUTLET 1 x 1 PIN SOCKET 1 x SWITCH

E

AR-03-301 AR-06-603

No. A B

700

1

9550

1 x 3 PIN SOCKET

400

Mentor :

Submission Date : 9/9/2019

1 x SWITCH 1 x 1 PIN SOCKET

Date of Joining :1/8/2019

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

650

D

450

DRAWING ROOM GF-001

C

1 x 1 PIN SOCKET 1 x 1 PIN SOCKET

2 x SWITCHES

1 x SWITCH

HT : @ 1400 mm from FFL

HT : @ 1250 mm from FFL

2 x SWITCHES

2600

HT : @ 450 mm from FFL

VILLA 49 PORCH

850

B

A

Ground Floor PCP 9/9/2019

Date

C.J.

Drawn by Checked by

1

AI-01-105

Ground Floor - Power and Communication Plan 1 : 25

M.Z.

Scale

1 : 25


1

2

3

4

5

6

10350

7

8

1 AR-03-302 AR-06-604

600

2250

1950

870

1930

1375

BALCONY

1375

1 x 1 PIN SOCKET HT : @ 1250 mm from FFL

1 x SWITCH

250

1 x 1 PIN SOCKET

BALCONY

Trainee Name : CHINMAY JHA

2 x SWITCHES

1300

TOILET FF-008

400

I

Date of Joining :1/8/2019

HT : @ 450 mm from FFL

1 x SWITCH

H

Start Date :

13/8/2019

309

1000

1 x 1 PIN SOCKET

9

2 x SWITCHES 1 x 1 PIN SOCKET

M. ZUBAIR

Submission Date : 9/9/2019

BED ROOM FF-005

HT : @ 450 mm from FFL

HT : @ 450 mm from FFL

150

826

HT : @ 1250 mm from FFL

Mentor :

1 x COMM. OUTLET

G

1 x SWITCH

HT : @ 1500 mm from FFL

HT : @ 450 mm from FFL

1 x SWITCH

1 x SWITCH 1 x SWITCH

CLOSET FF-006

GALLERY FF-002

AR-03-301 AR-06-603

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

E

700

HT : @ 1250 mm from FFL 1

No. A B

9550

300

100

HT : @ 1250 mm from FFL

F

HT : @ 1250 mm from FFL

1 x SWITCH

835

826

1 x 1 PIN SOCKET 2 x SWITCHES

BATHROOM FF-007

1 x 1 PIN SOCKET

1150

BED ROOM FF-004

1300

1 x SWITCH HT : @ 1250 mm from FFL

D HT : @ 1250 mm from FFL

650 1023

HT : @ 1250 mm from FFL

250

150 150

2 x SWITCHES

1 x SWITCH

1 x SWITCH

SUITE 1 x 1 PIN SOCKET FF-001

1 x SWITCH

1541

HT : @ 1250 mm from FFL

2600

1 x DATA OUTLET 1 x COMM. OUTLET HT : @ 1250 mm from FFL

C

HT : @ 450 mm from FFL

OFFICE FF-003 1 x 1 PIN SOCKET

VILLA 49

1 x 1 POINT SOCKET 2 x SWITCHES

1 x 1 PIN SOCKET

1 x SWITCH HT : @ 450 mm from FFL

B 850

225

450

1 x SWITCH HT : @ 1500 mm from FFL

First Floor - PCP

A

9/9/2019

Date

BALCONY

BALCONY

C.J.

Drawn by Checked by

M.Z.

AI-01-106 1

First Floor - Power and Communication Plan 1 : 25

Scale

1 : 25


100

580

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

185

1938 121

W2

242

571

572

70

571

242

121

Trainee Name : CHINMAY JHA

2

400

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

3/9/2019

1400

300

Submission Date : 9/9/2019

450

400

F-ST-101

1250

300

150

F-ST-101

Dining Room Wall Elevation

2

1 : 10

3.02 01-FF-FFL

No.

Description

Date

Office Wall Elevation 1 : 10

775

W-PT-102

W-WC-101

2634 2294

340 1029

552

90

250

205

802

462

VILLA 49

800 250

551

1029

802

3

1 : 10

C.J.

Drawn by Checked by

W-PT-102

Drawing Room Wall Elevation

9/9/2019

Date

800

601

800

89

350

Interior Elevation

450

1

100

0.15 00-GF-FFL

1140 F-WDF-101

M.Z.

AI-02-201 0.15 00-GF-FFL

Scale

1 : 10


Trainee Name : AKHIL NAWANI Date of Joining :1/8/2019 Mentor :

RIJILDAS V.

Start Date :

5/8/2019

Submission Date : 9/9/2019

No. A B C

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

VILLA 49 COVER PAGE 9/9/2019

Date Drawn by

A.N.

Checked by

R.V.

AR-00-000 Scale

N.T.S.


LIST OF DRAWINGS Sheet Name Cover Page List of Drawings Ground Floor Plan First Floor Plan Roof Plan Ground Floor - Flooring Plan First Floor - Flooring Plan Ground Floor - Furniture Plan First Floor - Furniture Plan Ground Floor - Ceiling Plan First Floor - Ceiling Plan Ground Floor - PCP First Floor - PCP North Elevation East Elevation South Elevation West Elevation Section 1 Section 2 Staircase Detail Wall Details Skin Details Aluminum Schedule Wet Area Details Mill Work Details Miscellaneous Details Window Schedule Window Schedule Door Schedule Interior Elevation Ground Floor - Signages Ground Floor - Fire Rating First Floor - Fire Rating Ground Floor - Acoustics Plan First Floor - Acoustics Plan Ground Floor - Presentation Plan First Floor - Presentation Plan Section 1 - Presentation Section 2 - Presentation

Sheet Number AR-00-000 AR-00-001 AR-01-101 AR-01-102 AR-01-103 AR-01-104 AR-01-105 AI-01-101 AI-01-102 AI-01-103 AI-01-104 AI-01-105 AI-01-106 AR-02-201 AR-02-202 AR-02-203 AR-02-204 AR-03-301 AR-03-302 AR-04-401 AR-04-402 AR-04-403 AR-04-404 AR-04-405 AR-04-406 AR-04-407 AR-05-501 AR-05-502 AR-05-503 AI-02-201 AG-01-101 BSCU-01-101 BSCU-01-102 AC-01-101 AC-01-102 AR-06-601 AR-06-602 AR-06-603 AR-06-604

Folder Landing Page Landing Page Floor Plan Floor Plan Floor Plan Flooring Plans Flooring Plans Furniture Plans Furniture Plans Ceiling Plans Ceiling Plans Power and Communication Plan Power and Communication Plan Elevations Elevations Elevations Elevations Sections Sections Details Details Details Details Details Details Details Schedules Schedules Schedules Interior Elevations Signage Fire Rating Fire Rating Acoustics Acoustics Presentation Drawings Presentation Drawings Presentation Drawings Presentation Drawings

Scale N.T.S. N.T.S. 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 AS SHOWN 1 : 20 AS SHOWN AS SHOWN 1 : 10 1 : 10 AS SHOWN 1 : 10 1 : 10 1 : 10 1 : 10 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25

Checked By R.V. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z.

Drawn By A.N. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J.

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019

No. A B C

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

VILLA 49 LIST OF DRAWINGS 9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-00-001 Scale

N.T.S.


1

1

2

3

4

5

7

6

AR-03-302

8

10350 600

4200

870

1930

1375

1375

W4 4

I 2620

3

FFL

Date of Joining :1/8/2019 H

1000

955

3835

GF-005a

Trainee Name : CHINMAY JHA

GF-005b

965

870

1285

GF-004

FFL

2120

4

LAUNDRY GF-005 0.14 225

5

1120

W5

W4

600

AR-04-402

PANTRY GF-004 0.14

1750

Mentor :

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019 G

345

1750 TOILET GF-006 0.14

GF-006

2 AR-04-402

1120

725

3270

690

W6 6

FFL

F

KITCHEN GF-002 0.15

W7 7

DRAWING ROOM GF-001 0.15

600

PARKING 0.02 FFL

9550

FFL

FFL

E

1 W3

AR-03-301

No. A B C

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

1530

3

D

W3

4477

AI-02-201

3

650

3

C

600 2000 1000

AI-02-201

FFL

13

2600

UP 1

14

W10

2

11

4

2580

10

5

9

6

8

7

1400

110 1400 830

GF-001

PORCH

VILLA 49

2 AR-04-403

W2

2630

AR-04-403

3

12

2

10,11

1

B

1288

AR-04-402

15

DINING ROOM GF-003 1 0.15

473

1

3270

16

0.12 FFL

2800

A

Ground Floor Plan

W1 1

1 AR-04-401

9/9/2019

Date

3

C.J.

Drawn by

AR-04-404

Checked by

1

1 : 25

AR-01-101

695

Ground Floor Plan

M.Z.

Scale

1 : 25


3

4

5

600

2250

1950

6

1

870

1930

6

FFL

4000 3

735

3.01

1320

FFL

795

1000 185

W8 8

Date of Joining :1/8/2019

825

2444

2845

Trainee Name : CHINMAY JHA

AR-04-402

3140

1275

1375

I

TOILET FF-008

FF-004b

1375

FF-005b

3025

FFL

8

BALCONY 3.02

1770 W6

BALCONY 3.02

7

AR-03-302

10350

1300

2

H 2005

BED ROOM FF-005 3.02

FF-008

W5 8

FFL

Start Date :

5/8/2019

BATHROOM FF-007

2 AR-04-402

1 AR-04-405

1300

2100

FF-005a

BED ROOM FF-004 3.02

M. ZUBAIR

G

2860

3270

2585

970

Mentor :

Submission Date : 9/9/2019

1000

1

3.01

FFL

F

FFL

3175

2870

3

4000

3.02

W8 8

1485

FFL

E

A B C

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

700

585

W3

AR-03-301

700

FFL 1

No. 9550

CLOSET FF-006 3.02

1670

GALLERY FF-002

FF-004a

600

1150

FF-007

D 4000

FF-001a

650

3

FF-001b

650

3050

W3

1115

C 600

SUITE FF-001 3.02

DN

3070

FFL

2

2614

628

FF-001c 12

4

10

5

9

6

3.02 FFL

2360

110

1 AR-04-403

1911

605 B

W9

W9

First Floor Plan

9

9

7

A

BALCONY 3.02

BALCONY 1105

2

3

11

8

W2

VILLA 49

2

850

2545

13

FF-003

W2

1

14

FFL

AI-02-201

FFL

3890

1975

2

15

2600

OFFICE FF-003 3.02

2185

1 AR-04-402

3270

16

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-01-102 1

First Floor Plan 1 : 25

Scale

1 : 25


1

2

3

4

1

5

6

AR-03-302

7

8

10350 2250

1950

870

1930

1375

1000

1000

600

37°

Trainee Name : CHINMAY JHA

1300

35°

SLOPE

I

SLOPE

37° 37°

35°

SLOPE

1800

SLOPE

2850

1375

SLOPE

Date of Joining :1/8/2019 H

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019

1000

5600

37°

SLOPE

Mentor :

1300

SLOPE

F 1150

SLOPE

37°

37°

G

12450

9550

Date 5/8/19 13/8/19 26/8/19

D

WATER TANK 7.22

650

C 2281

23°

SLOPE

AR-03-301 AR-06-603

E

Description Week 1 Submission Week 2 Submission Week 3 Submission

700

801

1

No. A B C

FFL

2600

37°

37°

5675

37°

37°

SLOPE 28°

SLOPE

VILLA 49

6850

SLOPE

SLOPE

Roof Plan

3394

850

SLOPE

B

A 2540

9/9/2019

Date

C.J.

Roof Plan 1 : 25

3450

SLOPE

37° 645

1

SLOPE

37°

Drawn by Checked by

M.Z.

AR-01-103 4850 Scale

1 : 25


1

2

3

4

5

7

6

8

1 AR-03-302 AR-06-604

10350 600

2250

1950

870

1930

1375

1375 I

S.O.P

1300

F-PC-101

PANTRY GF-004 0.14

F-PC-101

S.O.P

LAUNDRY GF-005

FFL

Trainee Name : CHINMAY JHA

0.14

H 1000

FFL

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

13/8/2019

Submission Date : 9/9/2019

S.O.P

G

1300

TOILET GF-006 0.14 FFL

F-PC-101

S.O.P

0.15

PARKING FFL

0.02

F-ST-102

1150

F

9550

FFL

E

AR-03-301 AR-06-603

No. A B

700

1

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

650

D DRAWING ROOM GF-001 0.15

C

FFL

F-WDF-101

2600

F-ST-101

0.15 FFL

VILLA 49 B

PORCH 0.12 FFL

F-ST-103

850

S.O.P

A

Ground Floor Flooring Plan 9/9/2019

Date

C.J.

Drawn by Checked by

1

AR-01-104

Ground Floor - Flooring Plan 1 : 25

M.Z.

Scale

1 : 25


1

2

3

4

5

6

7

8

1

10350 600

2250

1950

AR-03-302 AR-06-604

870

1930

1375

1375

S.O.P

BALCONY F-ST-104 3.02 FFL

S.O.P

S.O.P

F-ST-104

Trainee Name : CHINMAY JHA 1300

BALCONY 3.02

I TOILET FF-008 3.01 FFL

FFL

Date of Joining :1/8/2019

F-PC-101

H

F-WDF-101

1000

BATHROOM FF-007 3.01

FFL

F-WDF-101

F 1150

FFL

No. A B

9550

CLOSET FF-006 3.02 FFL

Description

Date

Week 2 Submission Week 3 Submission

13/8/19 26/8/19

E

700

1

13/8/2019

1300

F-PC-101

BED ROOM FF-004 3.02

F-ST-101

Start Date :

G

FFL

S.O.P

M. ZUBAIR

Submission Date : 9/9/2019

S.O.P

BED ROOM FF-005 3.02

Mentor :

AR-03-301 AR-06-603

GALLERY FF-002 3.02

650

D

FFL

C

F-WDF-101

SUITE FF-001 3.02

F-ST-101

2600

FFL

OFFICE FF-003 3.02

VILLA 49

FFL

First Floor Flooring Plan

S.O.P

850

B

F-ST-104

F-ST-104

BALCONY 3.02 FFL

1

A

S.O.P

BALCONY 3.02 FFL

S.O.P

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-01-105

First Floor - Flooring Plan 1 : 25 Scale

1 : 25


8

7

6

5

4

3

2

1

Trainee Name : CHINMAY JHA

840

9.17 04-RF-CL

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

1950

Submission Date : 9/9/2019

1350

2466

7.22 03-RF-CL

5.87 02-SF-FFL

FF-005b

2850

8

Date 5/8/19 13/8/19 26/8/19

1000

3.02 01-FF-FFL 2.97 01-FF-CL

W4

W4

4

4

VILLA 49 2870

870

1020

1050

1050

FF-004b

NORTH ELEVATION

150

2000

2870 2000

Description Week 1 Submission Week 2 Submission Week 3 Submission

9170

W5

2100

No. A B C

1850

5.82 02-SF-CL

0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-02-201 1

North Elevation 1 : 25

Scale

1 : 25


A

B

C

D

E

F

G

H

I

1950

526

1359

834

9.17 04-RF-CL

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019

1350

1941

1941

7.22 03-RF-CL

5.87 02-SF-FFL 5.82 02-SF-CL

1850

W8

W8

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

8

8

2850

W9

No. A B C

1050

1000

9

920

3.02 01-FF-FFL 2.97 01-FF-CL

W7

W6

7

6

2900 2100

EAST ELEVATION 150

2100

VILLA 49

GF-005b

W10 10,11

0.15 00-GF-FFL 0.12 00-GF-PL

9/9/2019

Date 0.00 00-GF-NGL

C.J.

Drawn by Checked by

1

AR-02-202

East Elevation 1 : 25

M.Z.

Scale

1 : 25


1

2

3

4

5

6

7

8

9.17 04-RF-CL

Trainee Name : CHINMAY JHA

1950

834

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

591

Submission Date : 9/9/2019

1350

7.22 03-RF-CL

5.87 02-SF-FFL 5.82 02-SF-CL

2100

No.

W9

9

9

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

1000

9170

W9

FF-001c

1050

FF-003

1050

2

4209

W2

2850

1850

A B C

3.02 01-FF-FFL 2.97 01-FF-CL

920

1 AR-04-404

W10 10,11

GF-001

VILLA 49

150

2100

2100

1

2820

W1

SOUTH ELEVATION

0.15 00-GF-FFL 0.12 00-GF-PL

0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

1

AR-02-203

South Elevation 1 : 25

M.Z.

Scale

1 : 25


I

H

G

F

E

D

C

B

A

9.17 04-RF-CL

Trainee Name : CHINMAY JHA

1359

1950

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019

1350

7.22 03-RF-CL

5.87 02-SF-FFL 5.82 02-SF-CL

No.

6

2850

W2

Date 5/8/19 13/8/19 26/8/19

1000

1000

4209

2

Description Week 1 Submission Week 2 Submission Week 3 Submission

9170

1850

W6

1150

A B C

3.02 01-FF-FFL

1020

2.97 01-FF-CL

W5 5

2000

2

2000

VILLA 49

3020

W2

WEST ELEVATION

0.12 00-GF-PL 0.15 00-GF-FFL

0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

1

AR-02-204

West Elevation 1 : 25

M.Z.

Scale

1 : 25


1

2

3

4

5

6

7

8

9.17 04-RF-CL

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019

1350

1341

1866

2466

7.22 03-RF-CL

750

225

5.87 02-SF-FFL 5.82 02-SF-CL

No.

CLOSET

2850

Date 5/8/19 13/8/19 26/8/19

8371

1200

2700

2450

2700

GALLERY

Description Week 1 Submission Week 2 Submission Week 3 Submission

900

BEDROOM

2450

2450 2700

2049 2375

A B C

2870

VILLA 49

2000

2870

2720

2450

2375

2049

2720

DRAWING ROOM

185

900

KITCHEN

2375 2450 2570

1020

3.02 01-FF-FFL 2.97 01-FF-CL

SECTION 1

0.15 00-GF-FFL 0.12 00-GF-PL

0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

1

AR-03-301

Section 1 1 : 25

M.Z.

Scale

1 : 25


I

H

G

F

E

D

C

B

A

9.17 04-RF-CL

Trainee Name : CHINMAY JHA

1053

1950

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

5/8/2019

Submission Date : 9/9/2019

WATER TANK

2139 1350

1250

1773

1510

2391

7.22 03-RF-CL

5.87 02-SF-FFL 5.82 02-SF-CL

BEDROOM

2700

Description

Date

Week 1 Submission Week 2 Submission Week 3 Submission

5/8/19 13/8/19 26/8/19

OFFICE

3.02 01-FF-FFL 2.97 01-FF-CL

800

DINING ROOM

1041

2720

2375 2450

VILLA 49

2046

TOILET

800

LAUNDRY

2465

2735

2465 2735

775

345

270

4314

1000

BEDROOM

2450

2450

2450

2062

2375

No. A B C

SECTION 2

0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

1

M.Z.

AR-03-302

Section 2 1 : 25 Scale

1 : 25


40 MM DIA. STEEL GUARD RAIL

9.17 04-RF-CL

A 40 MM DIA. STEEL GUARD RAIL

25 MM DIA. STEEL HANDRAIL

25 MM DIA. STEEL HANDRAIL 25 MM DIA. STEEL POST

5 17 25

25 MM DIA. STEEL GUARD RAIL

STAIR TREADS (REFER TO STAIRCASE DETAILS)

10 15

300

164

1350

25 MM DIA. STEEL GUARD RAIL

10 MM NOSING

310

25

7.22 03-RF-CL

15 MM THICK TREAD PLATE

179

5 17 25

1050

1950

25 MM DIA. STEEL POST

8 MM RISER PLATE

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

26/8/2019

Submission Date : 9/9/2019

225

8 5.87 02-SF-FFL 5.82 02-SF-CL

STAIR TREADS (REFER TO STAIRCASE DETAILS)

SECTION A

A

3

Railing Details

Stair - Detail

2

1:5

1 : 10

3

4

No.

1950

A

2450

1000

FFL

9 TREADS @ 300 MM

16

AR-04-404

3.02 01-FF-FFL 2.97 01-FF-CL

2690

15

13

15

RISE = 179.4 mm TREAD = 300 mm

14

1

13

2

12

3

12

11

4

10

5

9

6

8

7

6 TREADS @ 300 MM

B 4005

11 10 9

VILLA 49

850

9 RISERS

1614

14

2870

1000 0.15

2

16

Date 26/8/19

1800

2850

2000

Description Week 3 Submission

8 7

A

7 RISERS

2

1041

AR-04-401

STEEL BALUSTRADE AND HANDRAIL

5 4

1120

1256

6

3 2 1

F-ST-101

LANDING

0.15 00-GF-FFL 0.12 00-GF-PL

Staircase Detail 9/9/2019

Date

C.J.

Drawn by

0.00 00-GF-NGL 4 AR-04-401

4

AR-04-401

Section - Stair 1 : 20

M.Z.

Checked by

1

Staircase Details - Detail Plan 1 : 20

Scale

AS SHOWN


4 4

25 MM THICK ROOF TILES

1

25 MM THICK ROOF TILES 75 MM THICK CONCRETE SLAB

75 MM THICK CONCRETE SLAB

7.22 03-RF-CL

75 MM THICK CONCRETE SLAB

Trainee Name : CHINMAY JHA 25 MM THICK ROOF TILES

Date of Joining :1/8/2019 ° 37

100 MM THICK CONCRETE SLAB 5.87 02-SF-FFL 5.82 02-SF-CL

100 MM THICK CONCRETE SLAB

180 X 250 MM CONCRETE BEAM

180 X 250 MM CONCRETE BEAM

100 MM THICK CONCRETE SLAB

ALUMINUM RAINWATER GUTTER

5.87 02-SF-FFL 5.82 02-SF-CL

PRECAST CEMENT FACIA BOARD

Mentor :

M. ZUBAIR

Start Date :

26/8/2019

Submission Date : 9/9/2019

165 x 250 MM CONCRETE BEAM

C-AGP-01 GYPSUM BOARD CEILING

GYPSUM BOARD CEILING

GYPSUM BOARD CEILING

150 MM THICK BRICK WALL

C-AGP-01 15 MM THICK PLASTER WITH PAINT FINISH

C-AGP-01

15 MM THICK PLASTER WITH PAINT FINISH

15 MM THICK PLASTER WITH PAINT FINISH

150 MM THICK BRICK WALL W3 3

WOODEN FLUSH DOOR

150 MM THICK BRICK WALL

15 MM THICK 400 x 400 WALL TILES

F-WDF-101 F-PC-101 ANTI-SLIP STONE TILE FLOORING

WOODEN FLOORING

20 MM THICK CEMENT PLASTER 15 MM THICK PLASTER WITH PAINT FINISH

F-ST-101

WOODEN FLOORING

3.02 01-FF-FFL 2.97 01-FF-CL

100 MM THICK CONCRETE SLAB

185 x 250 CONCRETE BEAM

Description

Date

Week 3 Submission

26/8/19

F-ST-101

MARBLE STONE FLOORING

F-WDF-101

No. A

MARBLE STONE FLOORING

3.02 01-FF-FFL 2.97 01-FF-CL

165 x 250 MM CONCRETE BEAM

100 MM THICK CONCRETE SLAB

180 x 250 CONCRETE BEAM GYPSUM BOARD CEILING

GYPSUM BOARD CEILING

GYPSUM BOARD CEILING

150 MM THICK BRICK WALL

15 MM THICK PLASTER WITH PAINT FINISH

15 MM THICK PLASTER WITH PAINT FINISH

15 MM THICK PLASTER WITH PAINT FINISH

W3 3

W2

F-PC-101

15 MM THICK PLASTER WITH PAINT FINISH

150 MM THICK BRICK WALL

F-ST-101

0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL

50 MM THICK PCC

CONCRETE FOUNDATION

450

Wall Details

0.00 00-GF-NGL

CONCRETE FOUNDATION

CONCRETE FOUNDATION

450

450 600

600

0.15 00-GF-FFL 0.12 00-GF-PL

50 MM THICK PCC

125

125 100 150

50 MM THICK PCC

150 MM HIGH SKIRTING

150 MM HIGH SKIRTING

MARBLE STONE FLOORING

100

ANTI-SLIP STONE TILE FLOORING

MARBLE STONE FLOORING

125 100 125

F-PC-101 ANTI-SLIP STONE TILE FLOORING

MARBLE STONE FLOORING

VILLA 49

F-ST-101

F-ST-101

150 MM HIGH SKIRTING

600

Date

900

Drawn by

9/9/2019 C.J.

Checked by

3

Wall Section - Interior Wall (Wet Area) 1 : 20

2

Wall Section - Interior Wall 1 : 20

1

AR-04-402

Wall Section - Exterior Wall 1 : 20

M.Z.

Scale

1 : 20


RECTANGULAR GRID CURTAIN SYSTEM

15 MM THICK PLASTER WITH PAINT FINISH GYPSUM BOARD CEILING 150 MM THICK BRICK WALL

FIXED MULLION - 50 MM THICK ALUMINIUM BOX SECTION

STONE CLADDING

25 MM THICK CLEAR GLASS PANE

CORNER WINDOW

STONE PAVEMENT FOR PARKING

200 x 200 GLASS BRICK

B

A

Trainee Name : CHINMAY JHA 150 MM THICK BRICK WALLS

15 MM THICK PLASTER WITH PAINT FINISH W1

20 MM THICK PLASTER WITH PAINT FINISH

FF-001c

Mentor :

M. ZUBAIR

Start Date :

26/8/2019

Submission Date : 9/9/2019

25 MM DIA. STEEL HANDRAIL AT 887.5 MM HEIGHT.

W9

20 MM THICK PLASTER WITH PAINT FINISH

Date of Joining :1/8/2019

9

40 MM DIA. STEEL HANDRAIL AT 1010 MM HEIGHT.

STONE FLOORING TILES CONCRETE BASE

3

ANTI-SKID TILE FLOORING

Skin Detail - Entrance 3D CONCRETE BASE FLOOR

25 MM DIA. STEEL BALUSTERS 3.02 01-FF-FFL 2.97 01-FF-CL

180 4

5

20 MM THICK STONE CLADDING

6

15 MM THICK PLASTER

150 MM THICK BRICK WALL

WOODEN FLOORING 150 MM THICK BRICK WALL

No. 100 MM THICK CONCRETE SLAB

A

Description

Date

Week 3 Submission

26/8/19

300 MM DIAMETER CONCRETE COLUMN

CORNER WINDOW

F-WDF-101

1

CORNER WINDOW

STONE FLOORING

55

40

75

AR-04-403

PLINTH BEAM

1400 1000

110

0.00 00-GF-NGL

458

110

VILLA 49

CONCRETE BASE FLOOR

B

CONCRETE BASE

1400

1

1288

F-ST-103

830

0.15 00-GF-FFL 0.12 00-GF-PL

Entrance and Balcony Section

Skin Detail

1 : 20

PORCH

9/9/2019

Date

C.J.

Drawn by

2800

A

M.Z.

Checked by

2

Skin Detail - Entrance Plan 1 : 10

AR-04-403

STONE FLOORING TILES Scale

AS SHOWN


1215

3

50

568

4

2100

1165

1950

598 525

525

525

525

5.82 02-SF-CL

Trainee Name : CHINMAY JHA

FIXED MULLION - 50 MM THICK ALUMINIUM BOX SECTION

1065

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

26/8/2019

2800

Submission Date : 9/9/2019

1039

25 MM THICK CLEAR GLASS PANE

No. A

3

Description

Date

Week 3 Submission

26/8/19

4 RECTANGULAR CURTAIN GRID SYSTEM

1950 2

2000

100

AR-04-404

1039

100

2.97 01-FF-CL

VILLA 49 Aluminum Schedule

593

1235

1133

593

50

3.02 01-FF-FFL

100

1066

1970

525

525

525

9/9/2019

Date

525

C.J.

Drawn by

2100

M.Z.

Checked by

3

Aluminum Schedule - Plan 1 : 10

2

Aluminum Schedule - Section 1 : 10

1

AR-04-404

Aluminum Schedule - Elevation 1 : 10

Scale

AS SHOWN


2 AR-04-405

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019

W5 8

500

1084

C-AGP-01 GLASS PARTITION

W-PT-103

400 x 400 MM WALL TILES

400

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

EQ

400

Submission Date : 9/9/2019

400

400

400

RE

EQ

400

FD

400

25

225

S.O.P

5.82 02-SF-CL

T-HS-101 W4

A-MR-101

400

S.O.P

25 400

F-PC-101

A-MR-101

No.

920

750

50

400

400

400 993

FD

RE

X-WB-102

150

RE

560 400 804 400

600

F-PC-101

X-WC-101

FD

VILLA 49

T-HB-101

3.02 01-FF-FFL 2.97 01-FF-CL

RE

165

200

400

X-WC-101

SKIRTING

Date

400

108

T-HB-101

150

25

BATHROOM FF-007

900

BATHROOM FF-007

1100 267

400

400 1750

400

400

B-CT-101

Description

X-WB-102

F-ST-101

Wet Area Details 2

Wet Area - Section 1 : 10

1

Wet Area - Detail Plan 1 : 10

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-04-405 Scale

1 : 10


Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

C-AGP-01

OVERHEAD CABINET

GYPSUM CEILING

W-PT-102

1000

W4 4

1000

C-CB-103

450

450

300

1000

C-CB-103

C-CB-103

No.

450

450

GYPSUM CEILING

450

C-AGP-01

Description

Date

W-PT-102

400 X 200 CERAMIC TILES

400

OVERHEAD CABINET

C-CB-103 X-KS-101

UNDER COUNTER CABINETS

GRANITE COUNTER TOP

C-CB-101

650 100mm THICK KITCHEN COUNTER GRANITE FINISH

K-CT-101

C-CT-101

C-CB-101

C-CB-101

C-CB-101

C-CB-102

900

900

C-CB-102

C-CT-101

102

600

350

650

650

X-KS-101

VILLA 49 F-ST-101

0.15 00-GF-FFL

Mill Work Details 2

Kitchen - Section 1 : 10

1

Kitchen - Elevation 1 : 10

9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-04-406 Scale

1 : 10


STAINLESS STEEL FLOOR TRIM

15 MM THICK PLASTER

WOODEN FLOORING

OUTSIDE

10 x 10 MM GROOVE

SAND CEMENT SCREED

RCC SLAB STONE FLOORING

UNDERLAY LINE OF WALL ASPHALT SHINGLES 5 MM THICK WOOD BACKING 100 MM THICK ROOF SLAB

15 MM THICK WOOD BASE

Trainee Name : CHINMAY JHA WOODEN FLOORING

Date of Joining :1/8/2019

SAND CEMENT SCREED GUTTER RCC SLAB

20 MM THICK FASCIA

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

MIN. 50 MM

CONCRETE BEAM

100 MM THICK SLAB

3

Floor Transition Detail 1:1

20 MM THICK EXTERIOR WALL PLASTER

GEOTEXTILE SHEET 150 MM THICK BRICK WALL

SEPARATION & PROTECTION SHEET WATERPROOFING MEMBRANE

8

INSULATION

Wood Base Detail

FLOOR DRAIN (REF. MECH. SPECIFICATIONS)

1:1 INSIDE

FINISH

No.

Description

Date

LINE OF WALL

15 MM THICK PLASTER

15 MM THICK PLASTER LINE OF WALL COVED BASE CERAMIC / PORCELAIN TILE

5

Rool Wall Joint 1:5

CHAMFER STEEL PIPE POST STONE BASE ADHESIVE

2

Y

ADHESIVE

STAINLESS STEEL FLANGE EXPANSION ANCHOR FLOOR FINISH

ELASTOMERIC SEALENT

STONE FLOORING

Floor Drain Detail 1:1

SAND-CEMENT SCREED

TILE WITH ADHESIVE

RCC SLAB

LIQUID APPLIED POLYURETHANE WATERPROOFING

REINFORCED CONCRETE SLAB

CERAMIC / PORCELAIN TILE FLOORING

SAND CEMENT SCREED

GEOTEXTILE SHEET

GROUT TO MATCH THE COLOUR OF STONE/TILE UNLESS INDICATED

VILLA 49

RCC SLAB

SECTION X

Miscellaneous Details

120 EXPANSION ANCHOR

X

120

STAINLESS STEEL FLANGE

9/9/2019

Date

STEEL PIPE POST

C.J.

Drawn by

M.Z.

Checked by

AR-04-407

SECTION Y

7

Stone Base Detail 1:1

6

Ceramic / Porcelian Base Detail 1:1

4

Pipe and Tube Railing Detail 1:2

1

Toilet Waterproofing Detail 1:1

Scale

AS SHOWN


800

600

400

Trainee Name : CHINMAY JHA 1200

1100

600

600

400

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

2100

2100

2100

Mentor :

1500

2100 500

900

1000

1500

2100

1600

Date of Joining :1/8/2019

3.02 01-FF-FFL

9

W9

0.15 00-GF-FFL

6

1 : 10

600

W6

5

1 : 10

W5

3

1 : 10

2

1 : 10

Description

Date

W2 1 : 10

1950

1800

1300

1300

1200

1000

600

W3

No.

2100

2100

2100

2100

VILLA 49

9/9/2019

800

Date

800

900

1100

Window Schedule

C.J.

Drawn by Checked by

AR-05-501

0.15 00-GF-FFL

8

W8 1 : 10

7

W7 1 : 10

4

W4 1 : 10

1

W1 1 : 10

M.Z.

Scale

1 : 10


1370

1280

1270 40

363

40

383

1180 40

363

40

10040

333

40

353

40

333

40

100

1300

Date of Joining :1/8/2019 M. ZUBAIR

Start Date :

26/8/2019

2100

Submission Date : 9/9/2019

0.15 00-GF-FFL

10

Mentor :

800

800

2100

1300

Trainee Name : CHINMAY JHA

0.15 00-GF-FFL

W10 - Front Elevation

11

1 : 10

Type Mark W1 W2 W3 W4 W5 W6 W7 W8 W9 W10

Count 1 3 4 2 2 2 1 2 2 1

Window Schedule Sill Height Head Height 800 900 1000 1100 1500 1500 800 900 500 800

2100 2100 2100 2100 2100 2100 2100 2100 2100 2100

No.

Description

Date

W10 - Side Elevation 1 : 10

Height 1300 1200 1100 1000 600 600 1300 1200 1600 1300

Width 1950 400 400 1800 600 800 600 600 800 1270

VILLA 49 Window Schedule 9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-05-502 Scale

1 : 10


2100

2100

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

26/8/2019

Submission Date : 9/9/2019

FF008 FF007 GF006 GF005a GF004

600

FF001b

1400

FF005a FF004a FF001a GF005b

700

FF010 FF009

1600

GF001

900

FF005b FF004b

1800

Door Detail - Front Elevation 1 : 10

No.

OPENING IDENTITY

Door Room Level Number Number 00-GF-FFL 00-GF-FFL 00-GF-FFL 00-GF-FFL 00-GF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL

GF-001 GF-004 GF-005a GF-005b GF-006 FF-001a FF-004a FF-005a FF-007 FF-008

GF-001 GF-004 GF-005 GF-005 GF-006 FF-001 FF-004 FF-005 FF-007 FF-008

Room Name DRAWING ROOM PANTRY LAUNDRY LAUNDRY TOILET SUITE BED ROOM BED ROOM TOILET TOILET

OPENING IDENTITY

Door Room Level Number Number

Room Name

Door Schedule LEAF OPENING Number Leaf Leaf of Wall Width Height Width Height Undercut Leaves Type (mm) (mm) (mm) (mm) (mm) 1 1 1 1 1 1 1 1 1 1

W1 W2 W2 W1 W2 W2 W2 W2 W2 W2

900 600 600 700 600 700 700 700 600 600

2100 2100 2100 2100 2100 2100 2100 2100 2100 2100

950 650 650 750 650 750 750 750 650 650

2125 2125 2125 2125 2125 2125 2125 2125 2125 2125

10 10 10 10 10 10 10 10 10 10

Door Schedule (Sliding) LEAF OPENING Number Leaf Leaf of Wall Width Height Width Height Undercut Leaves Type (mm) (mm) (mm) (mm) (mm)

WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD

Type

A01 A01 A01 A01 A01 A01 A01 A01 A01 A01

Face Face Fire STC Finish Material Elevation Finish Rating Rating PL PL PL PL PL PL PL PL PL PL

DOOR LEAF DATA

Material

Type

Date

DOOR FRAME DATA

DOOR LEAF DATA

Material

Description

WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD

F01 F01 F01 F01 F01 F01 F01 F01 F01 F01

PL PL PL PL PL PL PL PL PL PL

90 45 45 90 45 45 45 45 45 45

40 35 35 40 35 35 40 35 40 35

VILLA 49 Door Schedule

DOOR FRAME DATA

Face Face Fire STC Finish Material Elevation Finish Rating Rating

9/9/2019

Date

C.J.

Drawn by

01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL

FF-001b FF-004b FF-005b FF-001c FF-003

FF-001 FF-004 FF-005 FF-009 FF-010

SUITE BED ROOM BED ROOM BALCONY BALCONY

W2 W1 W1 W1 W1

1400 1800 1800 1600 1600

2100 2100 2100 2100 2100

GLASS GLASS GLASS GLASS GLASS

35 40 40 40 40

Checked by

M.Z.

AR-05-503 Scale

1 : 10


1

2

3

4

5

7

6

8

10350 600

4200

870

1930

1375

1375

I W

Room Legend PANTRY 0.14

DINING ROOM

LAUNDRY

DRAWING ROOM

Trainee Name : CHINMAY JHA

0.14

FFL

Date of Joining :1/8/2019

FFL

H

KITCHEN REF.

LAUNDRY

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

PANTRY G

TOILET TOILET 0.14 FFL

F

KITCHEN 0.15 PARKING 0.02

FFL

9550

FFL

E

No.

Description

Date

D 650

DRAWING ROOM 0.15

C

FFL

0.15 FFL

15

UP

14

1

13

2

12

3

11

4

10

5

9

6

PORCH

8

7

2800

VILLA 49 B 850

DINING ROOM

2600

16

0.12 FFL

A

Ground Floor Presentation Plan 9/9/2019

Date

C.J.

Drawn by Checked by

M.Z.

AR-06-601 1

Ground Floor - Presentation Plan 1 : 25

Scale

1 : 25


1

2

3

600

4

2250

10350

1950

5

6

870

1930

7 1375

8 1375

BALCONY 3.02

1770

FFL

Room Legend

I

TOILET

BALCONY 3.02

BATHROOM

Trainee Name : CHINMAY JHA

3.01

1300

BALCONY

FFL

FFL

Date of Joining :1/8/2019

BED ROOM CLOSET

H

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019 1000

GALLERY OFFICE BEDROOM

SUITE

G

3.02

2585

TOILET

1300

FFL

3270

BEDROOM 3.02

TOILET 3.01

FFL

F 1150

FFL

Description

Date

FFL

3.02

1485

FFL

E

700

585

700

9550

3.02

GALLERY 2870

No.

CLOSET

1670

600

D 650

650

4000

3050

1115

C 600

BEDROOM 3.02

DN

3070

FFL

2

12

3

11

4

10

5

9

6

8

7

2185

1

13

VILLA 49

2360

1105

FFL

605 B

First Floor Presentation Plan

A

BALCONY 3.02

BALCONY 3.02

1911

850

628

110

FFL

3890

1975

2614

1

14

FFL

2545

3270

15

OFFICE 3.02

2600

16

C.J.

Drawn by Checked by

M.Z.

AR-06-602

First Floor - Presentation Plan 1 : 25

9/9/2019

Date

Scale

1 : 25


1

2

3

4

5

6

7

8

9.17 04-RF-CL

10350 2250

1950

870

1930

1375

1375

Date of Joining :1/8/2019 1950

600

Trainee Name : CHINMAY JHA

Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019

50

1350

7.22 03-RF-CL

5.87 02-SF-FFL 5.82 02-SF-CL

GALLERY

CLOSET

9170

Date

3.02 01-FF-FFL 2.97 01-FF-CL

VILLA 49

30

DRAWING ROOM

120

KITCHEN

Description

2820

50

BEDROOM

2800

No.

Section 1 Presentation

0.15 00-GF-FFL 0.12 00-GF-PL

0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

1

Section 1 - Presentation

M.Z.

AR-06-603

1 : 25

Scale

1 : 25


I

H

G

F

E

D

C

B

A

9550 1300

1000

1300

1150

700

650

2600

850 9.17 04-RF-CL

Trainee Name : CHINMAY JHA

1950

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

3/9/2019

Submission Date : 9/9/2019 WATER TANK

50

1350

7.22 03-RF-CL

5.87 02-SF-FFL 5.82 02-SF-CL

OFFICE

Date

3.02 01-FF-FFL 2.97 01-FF-CL

2820

DRAWING ROOM

VILLA 49

30

TOILET

120

LAUNDRY

Description

9170

BEDROOM

50

BEDROOM

2800

No.

Section 2 Presentation

0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL

9/9/2019

Date

C.J.

Drawn by Checked by

1

Section 2 - Presentation

M.Z.

AR-06-604

1 : 25 Scale

1 : 25


FIRE AND LIFE SAFETY LEGEND

1

2

3

4

5

7

6

8

STANDPIPE EXIT STAIRS FIREMAN'S LIFT EXIT SIGNS 3 HOURS FIRE RATED 2 HOURS FIRE RATED 1 HOURS FIRE RATED 1/2 HOURS FIRE RATED

1

1HR FIRE RATED CURTAIN

AR-06-604

SC: Self-Closing Component

I

0 5.

PANTRY GF-004

Fire Resistance Rating Walls (Hr)

Fire Doors Assemblies Rating (Hr)

Exit stairways

2

1 ½ hour SC

Electro-Mechanical Shafts

2

1 ½ hour SC

Elevators Hoistways

2

Exit Passageways

2

High Hazard Rooms

2

1 ½ hour SC

Moderate Hazard Rooms

1

3/4 hour SC

Hotel Corridors

1/2

1/3 hour SC

Separation Between Rooms

1/2

1/3 hour SC

1 ½ hour SC 1 ½ hour SC

m t.

Trainee Name : CHINMAY JHA

LAUNDRY GF-005 H

Date of Joining :1/8/2019 Mentor :

M. ZUBAIR

Start Date :

26/8/2019

Submission Date : 9/9/2019 7.1 mt.

G TOILET GF-006

5.5 m t. F

5.7 mt.

E

No.

Description

Date

1 AR-06-603

D DRAWING ROOM GF-001 C

3.55 mt.

9.3 mt.

-

1 AI-02-201

VILLA 49 B

A

Ground Floor Fire Rating 9/9/2019

Date

C.J.

Drawn by

M.Z.

Checked by

BSCU-01-101 1

Ground Floor Plan - Fire Rating 1 : 25

Scale

1 : 25


1

2

3

4

5

6

7

FIRE AND LIFE SAFETY LEGEND

8

STANDPIPE EXIT STAIRS

1

FIREMAN'S LIFT

AR-06-604

EXIT SIGNS 3 HOURS FIRE RATED 2 HOURS FIRE RATED 1 HOURS FIRE RATED 1/2 HOURS FIRE RATED 1HR FIRE RATED CURTAIN SC: Self-Closing Component

18.8 mt

Fire Resistance Rating Walls (Hr)

Fire Doors Assemblies Rating (Hr)

Exit stairways

2

1 ½ hour SC

Electro-Mechanical Shafts

2

1 ½ hour SC

Elevators Hoistways

2

Exit Passageways

2

High Hazard Rooms

2

1 ½ hour SC

Moderate Hazard Rooms

1

3/4 hour SC

Hotel Corridors

1/2

1/3 hour SC

Separation Between Rooms

1/2

1/3 hour SC

1 ½ hour SC 1 ½ hour SC

I

20.1 mt

Trainee Name : CHINMAY JHA Date of Joining :1/8/2019

H

Mentor :

M. ZUBAIR

Start Date :

26/8/2019

Submission Date : 9/9/2019 18.4 mt

20.0 mt G

F

No.

Description

Date

E 1 AR-06-603

D

C

-

2

VILLA 49

AI-02-201

16.2 mt B

16.2 mt

First Floor - Fire Rating

A

9/9/2019

Date

C.J.

Drawn by

M.Z.

Checked by

1

First Floor Plan - Fire Rating

BSCU-01-102

1 : 25 Scale

1 : 25