SOUND INSULATION REQUIREMENTS FOR WALLS
1
2
3
4
5
6
7
8
45 50 55 60 65
45 50 55 60 65
45 50 55 60 65
45 50 55 60 65
Minimum STC45 Minimum STC50 Minimum STC55 Minimum STC60 Equal or above STC65
SPECIAL SOUND INSULATION REQUIREMENTS
1
Acl
AR-06-604
Acl
Acl
Acl
Special acoustic requirements
SOUND INSULATION REQUIREMENTS FOR DOORSETS
AC
I
Acoustic doorset with minimum required STCrating in decibels
INTERNAL BACKGROUND NOISE REQUIREMENTS Name
W
C85% NRC.75
NC (Noise Criteria) required for the room background noise from services & equipment
REVERBERATION TIME / SOUND ABSORBENT MATERIALS
55.
PANTRY GF-004 35
0.8 NC 30 C85% NRC.75
H
55.
55.
Trainee Name : CHINMAY JHA
Name
LAUNDRY GF-005
Reverberation time in seconds Absorbent materials required on ceilings. -- % of the ceiling area with NRC -Absorbent materials required on walls. -- % of the ceiling area with NRC -Absorbent materials required on floors. -- % of the ceiling area with NRC --
REF.
40
35
NOTES 1. BLOCK WALLS: - ALL JOINTS BETWEEN BLOCKS, VERTICAL AND HORIZONTAL, SHALL BE FILLED WITH MORTAR TO THE FULL LENGTH, DEPHT AND HEIGHT OF THE CONCRETE BLOCKS - NO CAVITIES OR HOLES ARE ACCEPTED IN THE MORTAR - ALL BLOCK WALLS SHALL BE PLASTERED FROM BOTH SIDES
G
55.
TOILET GF-006 50.
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
2. FSTC (FIELD SOUND TRANSMISSION CLASS) - TEST SHOULD BE REALIZED BY THE CONTRACTOR AS PER ASTM E-336-09 OR THE LATEST IN DATE.
PARKING
3. NO "BACK TO BACK" INSTALLATIONS ARE ACCEPTED. 4. MINIMUM DISTANCE BETWEEN ELECTRICAL OR OTHER ELEMENTS TO BE INSTALLED IN THE WALLS SHOULD BE APPROVED BY THE ENGINEERS AND SHOWN ON THE SHOP DRAWINGS.
35
55.
Date of Joining :1/8/2019
55.
55.
5. THE CONTRACTORS ARE REQUIRED TO PROVIDE SHOP DRAWINGS SHOWING : - THE INTERSECTION BETWEEN WALLS OF THE SAME TYPE AND / OR DIFFERENT TYPES - THE INTERSECTION OF WALLS WITH THE FLOORS AND THE CEILINGS - THE INTERSECTION OF THE FALSE CEILING WITH THE WALLS
F
6. ALL COMPOSITION OF WALLS SHOULD HAVE A TEST CONFIRMING THE STC INDICATED
No.
E
Description
Date
1 AR-06-603
DRAWING ROOM GF-001
D
50.
C
VILLA 49 B
40
PORCH
Ground Floor Acoustics
A
9/9/2019
Date
C.J.
Drawn by Checked by
1
AC-01-101
Ground Floor - Acoustics Plan 1 : 25
M.Z.
Scale
1 : 25
1
2
3
4
5
6
7
8
SOUND INSULATION REQUIREMENTS FOR WALLS 45 50 55 60 65
1 AR-06-604
45 50 55 60 65
45 50 55 60 65
45 50 55 60 65
Minimum STC45 Minimum STC50 Minimum STC55 Minimum STC60 Equal or above STC65
SPECIAL SOUND INSULATION REQUIREMENTS Acl
Acl
Acl
Acl
Special acoustic requirements
SOUND INSULATION REQUIREMENTS FOR DOORSETS
AC
Acoustic doorset with minimum required STCrating in decibels
INTERNAL BACKGROUND NOISE REQUIREMENTS Name C85% NRC.75
REVERBERATION TIME / SOUND ABSORBENT MATERIALS
I 40
TOILET FF-008
NC (Noise Criteria) required for the room background noise from services & equipment
Trainee Name : CHINMAY JHA
Name 0.8 NC 30 C85% NRC.75
Reverberation time in seconds Absorbent materials required on ceilings. -- % of the ceiling area with NRC -Absorbent materials required on walls. -- % of the ceiling area with NRC -Absorbent materials required on floors. -- % of the ceiling area with NRC --
NOTES
H
1. BLOCK WALLS: - ALL JOINTS BETWEEN BLOCKS, VERTICAL AND HORIZONTAL, SHALL BE FILLED WITH MORTAR TO THE FULL LENGTH, DEPHT AND HEIGHT OF THE CONCRETE BLOCKS - NO CAVITIES OR HOLES ARE ACCEPTED IN THE MORTAR - ALL BLOCK WALLS SHALL BE PLASTERED FROM BOTH SIDES
40
BED ROOM FF-005
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
2. FSTC (FIELD SOUND TRANSMISSION CLASS) - TEST SHOULD BE REALIZED BY THE CONTRACTOR AS PER ASTM E-336-09 OR THE LATEST IN DATE.
G
35
3. NO "BACK TO BACK" INSTALLATIONS ARE ACCEPTED. 4. MINIMUM DISTANCE BETWEEN ELECTRICAL OR OTHER ELEMENTS TO BE INSTALLED IN THE WALLS SHOULD BE APPROVED BY THE ENGINEERS AND SHOWN ON THE SHOP DRAWINGS. 5. THE CONTRACTORS ARE REQUIRED TO PROVIDE SHOP DRAWINGS SHOWING : - THE INTERSECTION BETWEEN WALLS OF THE SAME TYPE AND / OR DIFFERENT TYPES - THE INTERSECTION OF WALLS WITH THE FLOORS AND THE CEILINGS - THE INTERSECTION OF THE FALSE CEILING WITH THE WALLS
35
BED ROOM FF-004
BATHROOM FF-007
6. ALL COMPOSITION OF WALLS SHOULD HAVE A TEST CONFIRMING THE STC INDICATED
F
No.
Description
Date
40
40
CLOSET FF-006
E
1 AR-06-603
D 35
35
C
OFFICE FF-003
SUITE FF-001
VILLA 49 First Floor Acoustics Plan
40
B
40
A
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AC-01-102 1
First Floor - Acoustics Plan 1 : 25
Scale
1 : 25
1
2
3
4
5
6
7
AG-Signage Legend
8
1
DR-01 1
Sign Type Sign Number
Directional Sign
EV-01 1
Sign Type Sign Number
Environmental Sign
ID-01 1
Sign Type Sign Number
Identification Sign
IN-01 1
Sign Type Sign Number
Informational Sign
SR-01 1
Sign Type Sign Number
Service Sign
AR-06-604
I
PANTRY GF-004
Notes: 1. Sign Tags shown in the drawings are only indicative.
LAUNDRY GF-005 H
G
Trainee Name : CHINMAY JHA
2. For wall finishing refer to Interior Architecture package.
Date of Joining :1/8/2019
3. For exact message to be included on the signs refer to Sign Message Schedule, REF.xxxxxxxxx
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
4. For exact sign details and dimensions refer to Sign Standard Manual, REF xxxxxxx
Submission Date : 9/9/2019
5. For exact sign location refer to context elevation included in Sign Standard Manual, REF xxxxxxx
TOILET GF-006
F
No.
E
Description
Date
PARKING
1 AR-06-603
D DRAWING ROOM GF-001 C
ID01
VILLA 49 B
PORCH
Ground Floor Signages
A
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
IN01
1
AG-01-101
Ground Floor - Signage Plan 1 : 25
Scale
1 : 25
1
2
3
4
5
7
6
8
1 AR-03-302 AR-06-604
10350 600
2250
1950
870
1930
1375
1375
W
I K-WM-101
1300
PANTRY GF-004
Trainee Name : CHINMAY JHA
LAUNDRY GF-005 H K-RT-101
1000
REF.
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
13/8/2019
Submission Date : 9/9/2019 G
K-CT-101
2
600
1
TOILET GF-006
X-WC-101
450
1300
X-WB-101
AR-04-406
AR-04-406
F
S-CH-102
1150
S-PF-101
9550
S-SF-101
E
700
1 AR-03-301 AR-06-603
No. A B
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
D
C-DT-102
650
S-SF-101
C S-CH-102
C-TB-101
S-CH-101
S-CH-101
C-DT-101
S-CH-101
DRAWING ROOM GF-001
C-TB-103
2600
S-CH-101
S-PF-101
S-CH-101
VILLA 49 PORCH
850
B
S-CH-101
A
Ground Floor Furniture Plan 9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AI-01-101 1
Ground Floor - Furniture Plan 1 : 25
Scale
1 : 25
1 AR-03-302 AR-06-604
1
2
3
4
5
6
7
8
10350 2250
1270
600
T-HS-101
1950
X-WB-102
870
1930
765
1375
1375
BALCONY TOILET FF-008
I
Trainee Name : CHINMAY JHA
845
1300
C-TB-105
BALCONY
S-CH-104
X-WC-101
Date of Joining :1/8/2019
450 T-HB-101
H
B-KB-101
Mentor :
M. ZUBAIR
Start Date :
13/8/2019
Submission Date : 9/9/2019 1000
BED ROOM FF-005
S-SF-102 C-TB-105
T-HS-101 C-TB-105
G
BATHROOM FF-007
B-KB-101
1300
C-CB-101
BED ROOM FF-004
X-WB-102
F C-TB-105
X-WC-101
1
CLOSET FF-006
C-CB-101
AR-03-301 AR-06-603
No. A B
T-HB-101
C-CB-101
9550
C-CB-101
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
E
700
GALLERY FF-002
C-CB-101
1150
C-TB-104
650
D S-SF-102
C C-TB-102
OFFICE FF-003
SUITE FF-001 B-KB-101
2600
S-CH-103
C-TB-105
S-CH-103 S-CH-103
VILLA 49 C-TB-105
S-CH-103
850
B
First Floor Furniture Plan
A
9/9/2019
Date
BALCONY
BALCONY
C.J.
Drawn by Checked by
M.Z.
AI-01-102 1
First Floor - Furniture Plan 1 : 25
Scale
1 : 25
1
2
3
4
5
6
7
8
1 AR-03-302 AR-06-604
10350 600
2250
1950
870
1930
1375
1375 I
655
443
1310
655
PANTRY GF-004
+2450
+2450
1125
1125
620
740
1500
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
13/8/2019
G
C-AGP-01
875
905
1250
+2375
C-AGP-01
LEGEND
TOILET GF-006
SYMBOL
1300
+2450
2500
H
Submission Date : 9/9/2019
560
620
Trainee Name : CHINMAY JHA
LAUNDRY GF-005
560
500
625
500
C-AGP-01
1000
C-AGP-01
820
1300
885
560
443
875
CODE
DESCRIPTION
C-AGP-01
GYPSUM BOARD
900
3990 EQ EQ
Date 13/8/19 26/8/19
D
C
500
EQ
1635
479
958
635
500
+2450
C-AGP-01
2600
1500
EQ 1955
635
250 +2375
VILLA 49
B 850
1214 250
1215 500
Description Week 2 Submission Week 3 Submission
300
610 1635
1462
1465
700
2335
600
+2375
DRAWING ROOM GF-001
No. A B
1955
500
C-AGP-01
500
300 C-AGP-01
1400
+2450
C-AGP-01
EQ
500 250
1025 700
600
2315
1200
650
E
700
C-AGP-01
AR-03-301 AR-06-603
1150
500
900
9550
250
650
1000
+2450
1500
1500
270 1
1400
600 EQ
625
1400 3490
250
F
A 2429
Ground Floor Ceiling Plan 9/9/2019
Date
C.J.
Drawn by Checked by
1
AI-01-103
Ground Floor - Ceiling Plan 1 : 25
M.Z.
Scale
1 : 25
3
4
5
1950
870
1300
H
500 675
+2450
13/8/2019
C-AGP-01
1074
BATHROOM FF-007
1050
950
CLOSET FF-006
475
1400
CODE
DESCRIPTION
C-AGP-01
GYPSUM BOARD
F 1150
C-AGP-01
SYMBOL
1300
No. E
A B
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
700
1435
Start Date :
LEGEND
9550
+2450
M. ZUBAIR
1300
1100
GALLERY FF-002
Mentor :
Submission Date : 9/9/2019
1000
665
950
2420
675
970
1210
C-AGP-01
1088
1300 1143
1435
1088
1050
1200
C-AGP-01
1000
500
AR-03-301 AR-06-603
+2450
Date of Joining :1/8/2019
G
500
485
500 1
+2450
Trainee Name : CHINMAY JHA
250
2470
+2450
BED ROOM FF-005
+2375
835
+2375
1325
500
1143
C-AGP-01
1235
1570
2470
1570
BED ROOM FF-004
1375
660
C-AGP-01
500
1075
250
550
2175
1210
1235
1074
1220
1050
1200
850
500
1100
1050
1040
450
660
1040
871
550 1235
1375
I
1235
500
1770
1930
C-AGP-01
250
250
500
1200
850
8
1050
+2450
TOILET FF-008
450
7
AR-03-302 AR-06-604
250
2250
550
600
6
1
10350
835
2
250
1
C-AGP-01
EQ
500
500
650
VILLA 49 B
+2450
C-AGP-01
1318
First Floor Ceiling Plan
850
250
1318
500
OFFICE FF-003
1000
EQ
C-AGP-01
EQ
500
250
+2375
900
SUITE FF-001 EQ
250
+2375
C-AGP-01
2420
1470
500
C
250
2071
1070
500
EQ
3000
250
1415
EQ EQ
EQ
EQ
2600
1625
EQ
EQ
700
C-AGP-01
1075
1285
+2450
500
750 1000
1000
500 900
1450
250
D 750
A
9/9/2019
Date
C.J.
Drawn by Checked by
1
M.Z.
AI-01-104
First Floor - Ceiling Plan 1 : 25 Scale
1 : 25
1
2
3
4
5
7
6
10350
8
1 AR-03-302 AR-06-604
600
2250
1950
870
1930
1375
1375
HT : @ 1250 mm from FFL
250 2 x SWITCHES 1 x 1 PIN SOCKET
W
LAUNDRY GF-005
250
1 x 1 PIN SOCKET 1 x SWITCH
Trainee Name : CHINMAY JHA
1 x SWITCH
200
HT : @ 450 mm from FFL
H
200
1000
REF.
HT : @ 1250 mm from FFL
1300
I PANTRY GF-004
HT : @ 1250 mm from FFL
M. ZUBAIR
Start Date :
13/8/2019
G
HT : @ 1250 mm from FFL
1300
160
1 x SWITCH
HT : @ 450 mm from FFL
TOILET GF-006 F 1150
HT : @ 450 mm from FFL
2 x SWITCHES
251
1 x DATA OUTLET 1 x COMM. OUTLET 1 x 1 PIN SOCKET 1 x SWITCH
E
AR-03-301 AR-06-603
No. A B
700
1
9550
1 x 3 PIN SOCKET
400
Mentor :
Submission Date : 9/9/2019
1 x SWITCH 1 x 1 PIN SOCKET
Date of Joining :1/8/2019
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
650
D
450
DRAWING ROOM GF-001
C
1 x 1 PIN SOCKET 1 x 1 PIN SOCKET
2 x SWITCHES
1 x SWITCH
HT : @ 1400 mm from FFL
HT : @ 1250 mm from FFL
2 x SWITCHES
2600
HT : @ 450 mm from FFL
VILLA 49 PORCH
850
B
A
Ground Floor PCP 9/9/2019
Date
C.J.
Drawn by Checked by
1
AI-01-105
Ground Floor - Power and Communication Plan 1 : 25
M.Z.
Scale
1 : 25
1
2
3
4
5
6
10350
7
8
1 AR-03-302 AR-06-604
600
2250
1950
870
1930
1375
BALCONY
1375
1 x 1 PIN SOCKET HT : @ 1250 mm from FFL
1 x SWITCH
250
1 x 1 PIN SOCKET
BALCONY
Trainee Name : CHINMAY JHA
2 x SWITCHES
1300
TOILET FF-008
400
I
Date of Joining :1/8/2019
HT : @ 450 mm from FFL
1 x SWITCH
H
Start Date :
13/8/2019
309
1000
1 x 1 PIN SOCKET
9
2 x SWITCHES 1 x 1 PIN SOCKET
M. ZUBAIR
Submission Date : 9/9/2019
BED ROOM FF-005
HT : @ 450 mm from FFL
HT : @ 450 mm from FFL
150
826
HT : @ 1250 mm from FFL
Mentor :
1 x COMM. OUTLET
G
1 x SWITCH
HT : @ 1500 mm from FFL
HT : @ 450 mm from FFL
1 x SWITCH
1 x SWITCH 1 x SWITCH
CLOSET FF-006
GALLERY FF-002
AR-03-301 AR-06-603
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
E
700
HT : @ 1250 mm from FFL 1
No. A B
9550
300
100
HT : @ 1250 mm from FFL
F
HT : @ 1250 mm from FFL
1 x SWITCH
835
826
1 x 1 PIN SOCKET 2 x SWITCHES
BATHROOM FF-007
1 x 1 PIN SOCKET
1150
BED ROOM FF-004
1300
1 x SWITCH HT : @ 1250 mm from FFL
D HT : @ 1250 mm from FFL
650 1023
HT : @ 1250 mm from FFL
250
150 150
2 x SWITCHES
1 x SWITCH
1 x SWITCH
SUITE 1 x 1 PIN SOCKET FF-001
1 x SWITCH
1541
HT : @ 1250 mm from FFL
2600
1 x DATA OUTLET 1 x COMM. OUTLET HT : @ 1250 mm from FFL
C
HT : @ 450 mm from FFL
OFFICE FF-003 1 x 1 PIN SOCKET
VILLA 49
1 x 1 POINT SOCKET 2 x SWITCHES
1 x 1 PIN SOCKET
1 x SWITCH HT : @ 450 mm from FFL
B 850
225
450
1 x SWITCH HT : @ 1500 mm from FFL
First Floor - PCP
A
9/9/2019
Date
BALCONY
BALCONY
C.J.
Drawn by Checked by
M.Z.
AI-01-106 1
First Floor - Power and Communication Plan 1 : 25
Scale
1 : 25
100
580
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
185
1938 121
W2
242
571
572
70
571
242
121
Trainee Name : CHINMAY JHA
2
400
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
3/9/2019
1400
300
Submission Date : 9/9/2019
450
400
F-ST-101
1250
300
150
F-ST-101
Dining Room Wall Elevation
2
1 : 10
3.02 01-FF-FFL
No.
Description
Date
Office Wall Elevation 1 : 10
775
W-PT-102
W-WC-101
2634 2294
340 1029
552
90
250
205
802
462
VILLA 49
800 250
551
1029
802
3
1 : 10
C.J.
Drawn by Checked by
W-PT-102
Drawing Room Wall Elevation
9/9/2019
Date
800
601
800
89
350
Interior Elevation
450
1
100
0.15 00-GF-FFL
1140 F-WDF-101
M.Z.
AI-02-201 0.15 00-GF-FFL
Scale
1 : 10
Trainee Name : AKHIL NAWANI Date of Joining :1/8/2019 Mentor :
RIJILDAS V.
Start Date :
5/8/2019
Submission Date : 9/9/2019
No. A B C
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
VILLA 49 COVER PAGE 9/9/2019
Date Drawn by
A.N.
Checked by
R.V.
AR-00-000 Scale
N.T.S.
LIST OF DRAWINGS Sheet Name Cover Page List of Drawings Ground Floor Plan First Floor Plan Roof Plan Ground Floor - Flooring Plan First Floor - Flooring Plan Ground Floor - Furniture Plan First Floor - Furniture Plan Ground Floor - Ceiling Plan First Floor - Ceiling Plan Ground Floor - PCP First Floor - PCP North Elevation East Elevation South Elevation West Elevation Section 1 Section 2 Staircase Detail Wall Details Skin Details Aluminum Schedule Wet Area Details Mill Work Details Miscellaneous Details Window Schedule Window Schedule Door Schedule Interior Elevation Ground Floor - Signages Ground Floor - Fire Rating First Floor - Fire Rating Ground Floor - Acoustics Plan First Floor - Acoustics Plan Ground Floor - Presentation Plan First Floor - Presentation Plan Section 1 - Presentation Section 2 - Presentation
Sheet Number AR-00-000 AR-00-001 AR-01-101 AR-01-102 AR-01-103 AR-01-104 AR-01-105 AI-01-101 AI-01-102 AI-01-103 AI-01-104 AI-01-105 AI-01-106 AR-02-201 AR-02-202 AR-02-203 AR-02-204 AR-03-301 AR-03-302 AR-04-401 AR-04-402 AR-04-403 AR-04-404 AR-04-405 AR-04-406 AR-04-407 AR-05-501 AR-05-502 AR-05-503 AI-02-201 AG-01-101 BSCU-01-101 BSCU-01-102 AC-01-101 AC-01-102 AR-06-601 AR-06-602 AR-06-603 AR-06-604
Folder Landing Page Landing Page Floor Plan Floor Plan Floor Plan Flooring Plans Flooring Plans Furniture Plans Furniture Plans Ceiling Plans Ceiling Plans Power and Communication Plan Power and Communication Plan Elevations Elevations Elevations Elevations Sections Sections Details Details Details Details Details Details Details Schedules Schedules Schedules Interior Elevations Signage Fire Rating Fire Rating Acoustics Acoustics Presentation Drawings Presentation Drawings Presentation Drawings Presentation Drawings
Scale N.T.S. N.T.S. 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 AS SHOWN 1 : 20 AS SHOWN AS SHOWN 1 : 10 1 : 10 AS SHOWN 1 : 10 1 : 10 1 : 10 1 : 10 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25 1 : 25
Checked By R.V. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z. M.Z.
Drawn By A.N. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J.
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019
No. A B C
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
VILLA 49 LIST OF DRAWINGS 9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-00-001 Scale
N.T.S.
1
1
2
3
4
5
7
6
AR-03-302
8
10350 600
4200
870
1930
1375
1375
W4 4
I 2620
3
FFL
Date of Joining :1/8/2019 H
1000
955
3835
GF-005a
Trainee Name : CHINMAY JHA
GF-005b
965
870
1285
GF-004
FFL
2120
4
LAUNDRY GF-005 0.14 225
5
1120
W5
W4
600
AR-04-402
PANTRY GF-004 0.14
1750
Mentor :
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019 G
345
1750 TOILET GF-006 0.14
GF-006
2 AR-04-402
1120
725
3270
690
W6 6
FFL
F
KITCHEN GF-002 0.15
W7 7
DRAWING ROOM GF-001 0.15
600
PARKING 0.02 FFL
9550
FFL
FFL
E
1 W3
AR-03-301
No. A B C
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
1530
3
D
W3
4477
AI-02-201
3
650
3
C
600 2000 1000
AI-02-201
FFL
13
2600
UP 1
14
W10
2
11
4
2580
10
5
9
6
8
7
1400
110 1400 830
GF-001
PORCH
VILLA 49
2 AR-04-403
W2
2630
AR-04-403
3
12
2
10,11
1
B
1288
AR-04-402
15
DINING ROOM GF-003 1 0.15
473
1
3270
16
0.12 FFL
2800
A
Ground Floor Plan
W1 1
1 AR-04-401
9/9/2019
Date
3
C.J.
Drawn by
AR-04-404
Checked by
1
1 : 25
AR-01-101
695
Ground Floor Plan
M.Z.
Scale
1 : 25
3
4
5
600
2250
1950
6
1
870
1930
6
FFL
4000 3
735
3.01
1320
FFL
795
1000 185
W8 8
Date of Joining :1/8/2019
825
2444
2845
Trainee Name : CHINMAY JHA
AR-04-402
3140
1275
1375
I
TOILET FF-008
FF-004b
1375
FF-005b
3025
FFL
8
BALCONY 3.02
1770 W6
BALCONY 3.02
7
AR-03-302
10350
1300
2
H 2005
BED ROOM FF-005 3.02
FF-008
W5 8
FFL
Start Date :
5/8/2019
BATHROOM FF-007
2 AR-04-402
1 AR-04-405
1300
2100
FF-005a
BED ROOM FF-004 3.02
M. ZUBAIR
G
2860
3270
2585
970
Mentor :
Submission Date : 9/9/2019
1000
1
3.01
FFL
F
FFL
3175
2870
3
4000
3.02
W8 8
1485
FFL
E
A B C
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
700
585
W3
AR-03-301
700
FFL 1
No. 9550
CLOSET FF-006 3.02
1670
GALLERY FF-002
FF-004a
600
1150
FF-007
D 4000
FF-001a
650
3
FF-001b
650
3050
W3
1115
C 600
SUITE FF-001 3.02
DN
3070
FFL
2
2614
628
FF-001c 12
4
10
5
9
6
3.02 FFL
2360
110
1 AR-04-403
1911
605 B
W9
W9
First Floor Plan
9
9
7
A
BALCONY 3.02
BALCONY 1105
2
3
11
8
W2
VILLA 49
2
850
2545
13
FF-003
W2
1
14
FFL
AI-02-201
FFL
3890
1975
2
15
2600
OFFICE FF-003 3.02
2185
1 AR-04-402
3270
16
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-01-102 1
First Floor Plan 1 : 25
Scale
1 : 25
1
2
3
4
1
5
6
AR-03-302
7
8
10350 2250
1950
870
1930
1375
1000
1000
600
37°
Trainee Name : CHINMAY JHA
1300
35°
SLOPE
I
SLOPE
37° 37°
35°
SLOPE
1800
SLOPE
2850
1375
SLOPE
Date of Joining :1/8/2019 H
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019
1000
5600
37°
SLOPE
Mentor :
1300
SLOPE
F 1150
SLOPE
37°
37°
G
12450
9550
Date 5/8/19 13/8/19 26/8/19
D
WATER TANK 7.22
650
C 2281
23°
SLOPE
AR-03-301 AR-06-603
E
Description Week 1 Submission Week 2 Submission Week 3 Submission
700
801
1
No. A B C
FFL
2600
37°
37°
5675
37°
37°
SLOPE 28°
SLOPE
VILLA 49
6850
SLOPE
SLOPE
Roof Plan
3394
850
SLOPE
B
A 2540
9/9/2019
Date
C.J.
Roof Plan 1 : 25
3450
SLOPE
37° 645
1
SLOPE
37°
Drawn by Checked by
M.Z.
AR-01-103 4850 Scale
1 : 25
1
2
3
4
5
7
6
8
1 AR-03-302 AR-06-604
10350 600
2250
1950
870
1930
1375
1375 I
S.O.P
1300
F-PC-101
PANTRY GF-004 0.14
F-PC-101
S.O.P
LAUNDRY GF-005
FFL
Trainee Name : CHINMAY JHA
0.14
H 1000
FFL
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
13/8/2019
Submission Date : 9/9/2019
S.O.P
G
1300
TOILET GF-006 0.14 FFL
F-PC-101
S.O.P
0.15
PARKING FFL
0.02
F-ST-102
1150
F
9550
FFL
E
AR-03-301 AR-06-603
No. A B
700
1
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
650
D DRAWING ROOM GF-001 0.15
C
FFL
F-WDF-101
2600
F-ST-101
0.15 FFL
VILLA 49 B
PORCH 0.12 FFL
F-ST-103
850
S.O.P
A
Ground Floor Flooring Plan 9/9/2019
Date
C.J.
Drawn by Checked by
1
AR-01-104
Ground Floor - Flooring Plan 1 : 25
M.Z.
Scale
1 : 25
1
2
3
4
5
6
7
8
1
10350 600
2250
1950
AR-03-302 AR-06-604
870
1930
1375
1375
S.O.P
BALCONY F-ST-104 3.02 FFL
S.O.P
S.O.P
F-ST-104
Trainee Name : CHINMAY JHA 1300
BALCONY 3.02
I TOILET FF-008 3.01 FFL
FFL
Date of Joining :1/8/2019
F-PC-101
H
F-WDF-101
1000
BATHROOM FF-007 3.01
FFL
F-WDF-101
F 1150
FFL
No. A B
9550
CLOSET FF-006 3.02 FFL
Description
Date
Week 2 Submission Week 3 Submission
13/8/19 26/8/19
E
700
1
13/8/2019
1300
F-PC-101
BED ROOM FF-004 3.02
F-ST-101
Start Date :
G
FFL
S.O.P
M. ZUBAIR
Submission Date : 9/9/2019
S.O.P
BED ROOM FF-005 3.02
Mentor :
AR-03-301 AR-06-603
GALLERY FF-002 3.02
650
D
FFL
C
F-WDF-101
SUITE FF-001 3.02
F-ST-101
2600
FFL
OFFICE FF-003 3.02
VILLA 49
FFL
First Floor Flooring Plan
S.O.P
850
B
F-ST-104
F-ST-104
BALCONY 3.02 FFL
1
A
S.O.P
BALCONY 3.02 FFL
S.O.P
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-01-105
First Floor - Flooring Plan 1 : 25 Scale
1 : 25
8
7
6
5
4
3
2
1
Trainee Name : CHINMAY JHA
840
9.17 04-RF-CL
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
1950
Submission Date : 9/9/2019
1350
2466
7.22 03-RF-CL
5.87 02-SF-FFL
FF-005b
2850
8
Date 5/8/19 13/8/19 26/8/19
1000
3.02 01-FF-FFL 2.97 01-FF-CL
W4
W4
4
4
VILLA 49 2870
870
1020
1050
1050
FF-004b
NORTH ELEVATION
150
2000
2870 2000
Description Week 1 Submission Week 2 Submission Week 3 Submission
9170
W5
2100
No. A B C
1850
5.82 02-SF-CL
0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-02-201 1
North Elevation 1 : 25
Scale
1 : 25
A
B
C
D
E
F
G
H
I
1950
526
1359
834
9.17 04-RF-CL
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019
1350
1941
1941
7.22 03-RF-CL
5.87 02-SF-FFL 5.82 02-SF-CL
1850
W8
W8
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
8
8
2850
W9
No. A B C
1050
1000
9
920
3.02 01-FF-FFL 2.97 01-FF-CL
W7
W6
7
6
2900 2100
EAST ELEVATION 150
2100
VILLA 49
GF-005b
W10 10,11
0.15 00-GF-FFL 0.12 00-GF-PL
9/9/2019
Date 0.00 00-GF-NGL
C.J.
Drawn by Checked by
1
AR-02-202
East Elevation 1 : 25
M.Z.
Scale
1 : 25
1
2
3
4
5
6
7
8
9.17 04-RF-CL
Trainee Name : CHINMAY JHA
1950
834
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
591
Submission Date : 9/9/2019
1350
7.22 03-RF-CL
5.87 02-SF-FFL 5.82 02-SF-CL
2100
No.
W9
9
9
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
1000
9170
W9
FF-001c
1050
FF-003
1050
2
4209
W2
2850
1850
A B C
3.02 01-FF-FFL 2.97 01-FF-CL
920
1 AR-04-404
W10 10,11
GF-001
VILLA 49
150
2100
2100
1
2820
W1
SOUTH ELEVATION
0.15 00-GF-FFL 0.12 00-GF-PL
0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
1
AR-02-203
South Elevation 1 : 25
M.Z.
Scale
1 : 25
I
H
G
F
E
D
C
B
A
9.17 04-RF-CL
Trainee Name : CHINMAY JHA
1359
1950
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019
1350
7.22 03-RF-CL
5.87 02-SF-FFL 5.82 02-SF-CL
No.
6
2850
W2
Date 5/8/19 13/8/19 26/8/19
1000
1000
4209
2
Description Week 1 Submission Week 2 Submission Week 3 Submission
9170
1850
W6
1150
A B C
3.02 01-FF-FFL
1020
2.97 01-FF-CL
W5 5
2000
2
2000
VILLA 49
3020
W2
WEST ELEVATION
0.12 00-GF-PL 0.15 00-GF-FFL
0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
1
AR-02-204
West Elevation 1 : 25
M.Z.
Scale
1 : 25
1
2
3
4
5
6
7
8
9.17 04-RF-CL
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019
1350
1341
1866
2466
7.22 03-RF-CL
750
225
5.87 02-SF-FFL 5.82 02-SF-CL
No.
CLOSET
2850
Date 5/8/19 13/8/19 26/8/19
8371
1200
2700
2450
2700
GALLERY
Description Week 1 Submission Week 2 Submission Week 3 Submission
900
BEDROOM
2450
2450 2700
2049 2375
A B C
2870
VILLA 49
2000
2870
2720
2450
2375
2049
2720
DRAWING ROOM
185
900
KITCHEN
2375 2450 2570
1020
3.02 01-FF-FFL 2.97 01-FF-CL
SECTION 1
0.15 00-GF-FFL 0.12 00-GF-PL
0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
1
AR-03-301
Section 1 1 : 25
M.Z.
Scale
1 : 25
I
H
G
F
E
D
C
B
A
9.17 04-RF-CL
Trainee Name : CHINMAY JHA
1053
1950
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
5/8/2019
Submission Date : 9/9/2019
WATER TANK
2139 1350
1250
1773
1510
2391
7.22 03-RF-CL
5.87 02-SF-FFL 5.82 02-SF-CL
BEDROOM
2700
Description
Date
Week 1 Submission Week 2 Submission Week 3 Submission
5/8/19 13/8/19 26/8/19
OFFICE
3.02 01-FF-FFL 2.97 01-FF-CL
800
DINING ROOM
1041
2720
2375 2450
VILLA 49
2046
TOILET
800
LAUNDRY
2465
2735
2465 2735
775
345
270
4314
1000
BEDROOM
2450
2450
2450
2062
2375
No. A B C
SECTION 2
0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
1
M.Z.
AR-03-302
Section 2 1 : 25 Scale
1 : 25
40 MM DIA. STEEL GUARD RAIL
9.17 04-RF-CL
A 40 MM DIA. STEEL GUARD RAIL
25 MM DIA. STEEL HANDRAIL
25 MM DIA. STEEL HANDRAIL 25 MM DIA. STEEL POST
5 17 25
25 MM DIA. STEEL GUARD RAIL
STAIR TREADS (REFER TO STAIRCASE DETAILS)
10 15
300
164
1350
25 MM DIA. STEEL GUARD RAIL
10 MM NOSING
310
25
7.22 03-RF-CL
15 MM THICK TREAD PLATE
179
5 17 25
1050
1950
25 MM DIA. STEEL POST
8 MM RISER PLATE
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
26/8/2019
Submission Date : 9/9/2019
225
8 5.87 02-SF-FFL 5.82 02-SF-CL
STAIR TREADS (REFER TO STAIRCASE DETAILS)
SECTION A
A
3
Railing Details
Stair - Detail
2
1:5
1 : 10
3
4
No.
1950
A
2450
1000
FFL
9 TREADS @ 300 MM
16
AR-04-404
3.02 01-FF-FFL 2.97 01-FF-CL
2690
15
13
15
RISE = 179.4 mm TREAD = 300 mm
14
1
13
2
12
3
12
11
4
10
5
9
6
8
7
6 TREADS @ 300 MM
B 4005
11 10 9
VILLA 49
850
9 RISERS
1614
14
2870
1000 0.15
2
16
Date 26/8/19
1800
2850
2000
Description Week 3 Submission
8 7
A
7 RISERS
2
1041
AR-04-401
STEEL BALUSTRADE AND HANDRAIL
5 4
1120
1256
6
3 2 1
F-ST-101
LANDING
0.15 00-GF-FFL 0.12 00-GF-PL
Staircase Detail 9/9/2019
Date
C.J.
Drawn by
0.00 00-GF-NGL 4 AR-04-401
4
AR-04-401
Section - Stair 1 : 20
M.Z.
Checked by
1
Staircase Details - Detail Plan 1 : 20
Scale
AS SHOWN
4 4
25 MM THICK ROOF TILES
1
25 MM THICK ROOF TILES 75 MM THICK CONCRETE SLAB
75 MM THICK CONCRETE SLAB
7.22 03-RF-CL
75 MM THICK CONCRETE SLAB
Trainee Name : CHINMAY JHA 25 MM THICK ROOF TILES
Date of Joining :1/8/2019 ° 37
100 MM THICK CONCRETE SLAB 5.87 02-SF-FFL 5.82 02-SF-CL
100 MM THICK CONCRETE SLAB
180 X 250 MM CONCRETE BEAM
180 X 250 MM CONCRETE BEAM
100 MM THICK CONCRETE SLAB
ALUMINUM RAINWATER GUTTER
5.87 02-SF-FFL 5.82 02-SF-CL
PRECAST CEMENT FACIA BOARD
Mentor :
M. ZUBAIR
Start Date :
26/8/2019
Submission Date : 9/9/2019
165 x 250 MM CONCRETE BEAM
C-AGP-01 GYPSUM BOARD CEILING
GYPSUM BOARD CEILING
GYPSUM BOARD CEILING
150 MM THICK BRICK WALL
C-AGP-01 15 MM THICK PLASTER WITH PAINT FINISH
C-AGP-01
15 MM THICK PLASTER WITH PAINT FINISH
15 MM THICK PLASTER WITH PAINT FINISH
150 MM THICK BRICK WALL W3 3
WOODEN FLUSH DOOR
150 MM THICK BRICK WALL
15 MM THICK 400 x 400 WALL TILES
F-WDF-101 F-PC-101 ANTI-SLIP STONE TILE FLOORING
WOODEN FLOORING
20 MM THICK CEMENT PLASTER 15 MM THICK PLASTER WITH PAINT FINISH
F-ST-101
WOODEN FLOORING
3.02 01-FF-FFL 2.97 01-FF-CL
100 MM THICK CONCRETE SLAB
185 x 250 CONCRETE BEAM
Description
Date
Week 3 Submission
26/8/19
F-ST-101
MARBLE STONE FLOORING
F-WDF-101
No. A
MARBLE STONE FLOORING
3.02 01-FF-FFL 2.97 01-FF-CL
165 x 250 MM CONCRETE BEAM
100 MM THICK CONCRETE SLAB
180 x 250 CONCRETE BEAM GYPSUM BOARD CEILING
GYPSUM BOARD CEILING
GYPSUM BOARD CEILING
150 MM THICK BRICK WALL
15 MM THICK PLASTER WITH PAINT FINISH
15 MM THICK PLASTER WITH PAINT FINISH
15 MM THICK PLASTER WITH PAINT FINISH
W3 3
W2
F-PC-101
15 MM THICK PLASTER WITH PAINT FINISH
150 MM THICK BRICK WALL
F-ST-101
0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL
50 MM THICK PCC
CONCRETE FOUNDATION
450
Wall Details
0.00 00-GF-NGL
CONCRETE FOUNDATION
CONCRETE FOUNDATION
450
450 600
600
0.15 00-GF-FFL 0.12 00-GF-PL
50 MM THICK PCC
125
125 100 150
50 MM THICK PCC
150 MM HIGH SKIRTING
150 MM HIGH SKIRTING
MARBLE STONE FLOORING
100
ANTI-SLIP STONE TILE FLOORING
MARBLE STONE FLOORING
125 100 125
F-PC-101 ANTI-SLIP STONE TILE FLOORING
MARBLE STONE FLOORING
VILLA 49
F-ST-101
F-ST-101
150 MM HIGH SKIRTING
600
Date
900
Drawn by
9/9/2019 C.J.
Checked by
3
Wall Section - Interior Wall (Wet Area) 1 : 20
2
Wall Section - Interior Wall 1 : 20
1
AR-04-402
Wall Section - Exterior Wall 1 : 20
M.Z.
Scale
1 : 20
RECTANGULAR GRID CURTAIN SYSTEM
15 MM THICK PLASTER WITH PAINT FINISH GYPSUM BOARD CEILING 150 MM THICK BRICK WALL
FIXED MULLION - 50 MM THICK ALUMINIUM BOX SECTION
STONE CLADDING
25 MM THICK CLEAR GLASS PANE
CORNER WINDOW
STONE PAVEMENT FOR PARKING
200 x 200 GLASS BRICK
B
A
Trainee Name : CHINMAY JHA 150 MM THICK BRICK WALLS
15 MM THICK PLASTER WITH PAINT FINISH W1
20 MM THICK PLASTER WITH PAINT FINISH
FF-001c
Mentor :
M. ZUBAIR
Start Date :
26/8/2019
Submission Date : 9/9/2019
25 MM DIA. STEEL HANDRAIL AT 887.5 MM HEIGHT.
W9
20 MM THICK PLASTER WITH PAINT FINISH
Date of Joining :1/8/2019
9
40 MM DIA. STEEL HANDRAIL AT 1010 MM HEIGHT.
STONE FLOORING TILES CONCRETE BASE
3
ANTI-SKID TILE FLOORING
Skin Detail - Entrance 3D CONCRETE BASE FLOOR
25 MM DIA. STEEL BALUSTERS 3.02 01-FF-FFL 2.97 01-FF-CL
180 4
5
20 MM THICK STONE CLADDING
6
15 MM THICK PLASTER
150 MM THICK BRICK WALL
WOODEN FLOORING 150 MM THICK BRICK WALL
No. 100 MM THICK CONCRETE SLAB
A
Description
Date
Week 3 Submission
26/8/19
300 MM DIAMETER CONCRETE COLUMN
CORNER WINDOW
F-WDF-101
1
CORNER WINDOW
STONE FLOORING
55
40
75
AR-04-403
PLINTH BEAM
1400 1000
110
0.00 00-GF-NGL
458
110
VILLA 49
CONCRETE BASE FLOOR
B
CONCRETE BASE
1400
1
1288
F-ST-103
830
0.15 00-GF-FFL 0.12 00-GF-PL
Entrance and Balcony Section
Skin Detail
1 : 20
PORCH
9/9/2019
Date
C.J.
Drawn by
2800
A
M.Z.
Checked by
2
Skin Detail - Entrance Plan 1 : 10
AR-04-403
STONE FLOORING TILES Scale
AS SHOWN
1215
3
50
568
4
2100
1165
1950
598 525
525
525
525
5.82 02-SF-CL
Trainee Name : CHINMAY JHA
FIXED MULLION - 50 MM THICK ALUMINIUM BOX SECTION
1065
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
26/8/2019
2800
Submission Date : 9/9/2019
1039
25 MM THICK CLEAR GLASS PANE
No. A
3
Description
Date
Week 3 Submission
26/8/19
4 RECTANGULAR CURTAIN GRID SYSTEM
1950 2
2000
100
AR-04-404
1039
100
2.97 01-FF-CL
VILLA 49 Aluminum Schedule
593
1235
1133
593
50
3.02 01-FF-FFL
100
1066
1970
525
525
525
9/9/2019
Date
525
C.J.
Drawn by
2100
M.Z.
Checked by
3
Aluminum Schedule - Plan 1 : 10
2
Aluminum Schedule - Section 1 : 10
1
AR-04-404
Aluminum Schedule - Elevation 1 : 10
Scale
AS SHOWN
2 AR-04-405
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019
W5 8
500
1084
C-AGP-01 GLASS PARTITION
W-PT-103
400 x 400 MM WALL TILES
400
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
EQ
400
Submission Date : 9/9/2019
400
400
400
RE
EQ
400
FD
400
25
225
S.O.P
5.82 02-SF-CL
T-HS-101 W4
A-MR-101
400
S.O.P
25 400
F-PC-101
A-MR-101
No.
920
750
50
400
400
400 993
FD
RE
X-WB-102
150
RE
560 400 804 400
600
F-PC-101
X-WC-101
FD
VILLA 49
T-HB-101
3.02 01-FF-FFL 2.97 01-FF-CL
RE
165
200
400
X-WC-101
SKIRTING
Date
400
108
T-HB-101
150
25
BATHROOM FF-007
900
BATHROOM FF-007
1100 267
400
400 1750
400
400
B-CT-101
Description
X-WB-102
F-ST-101
Wet Area Details 2
Wet Area - Section 1 : 10
1
Wet Area - Detail Plan 1 : 10
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-04-405 Scale
1 : 10
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
C-AGP-01
OVERHEAD CABINET
GYPSUM CEILING
W-PT-102
1000
W4 4
1000
C-CB-103
450
450
300
1000
C-CB-103
C-CB-103
No.
450
450
GYPSUM CEILING
450
C-AGP-01
Description
Date
W-PT-102
400 X 200 CERAMIC TILES
400
OVERHEAD CABINET
C-CB-103 X-KS-101
UNDER COUNTER CABINETS
GRANITE COUNTER TOP
C-CB-101
650 100mm THICK KITCHEN COUNTER GRANITE FINISH
K-CT-101
C-CT-101
C-CB-101
C-CB-101
C-CB-101
C-CB-102
900
900
C-CB-102
C-CT-101
102
600
350
650
650
X-KS-101
VILLA 49 F-ST-101
0.15 00-GF-FFL
Mill Work Details 2
Kitchen - Section 1 : 10
1
Kitchen - Elevation 1 : 10
9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-04-406 Scale
1 : 10
STAINLESS STEEL FLOOR TRIM
15 MM THICK PLASTER
WOODEN FLOORING
OUTSIDE
10 x 10 MM GROOVE
SAND CEMENT SCREED
RCC SLAB STONE FLOORING
UNDERLAY LINE OF WALL ASPHALT SHINGLES 5 MM THICK WOOD BACKING 100 MM THICK ROOF SLAB
15 MM THICK WOOD BASE
Trainee Name : CHINMAY JHA WOODEN FLOORING
Date of Joining :1/8/2019
SAND CEMENT SCREED GUTTER RCC SLAB
20 MM THICK FASCIA
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
MIN. 50 MM
CONCRETE BEAM
100 MM THICK SLAB
3
Floor Transition Detail 1:1
20 MM THICK EXTERIOR WALL PLASTER
GEOTEXTILE SHEET 150 MM THICK BRICK WALL
SEPARATION & PROTECTION SHEET WATERPROOFING MEMBRANE
8
INSULATION
Wood Base Detail
FLOOR DRAIN (REF. MECH. SPECIFICATIONS)
1:1 INSIDE
FINISH
No.
Description
Date
LINE OF WALL
15 MM THICK PLASTER
15 MM THICK PLASTER LINE OF WALL COVED BASE CERAMIC / PORCELAIN TILE
5
Rool Wall Joint 1:5
CHAMFER STEEL PIPE POST STONE BASE ADHESIVE
2
Y
ADHESIVE
STAINLESS STEEL FLANGE EXPANSION ANCHOR FLOOR FINISH
ELASTOMERIC SEALENT
STONE FLOORING
Floor Drain Detail 1:1
SAND-CEMENT SCREED
TILE WITH ADHESIVE
RCC SLAB
LIQUID APPLIED POLYURETHANE WATERPROOFING
REINFORCED CONCRETE SLAB
CERAMIC / PORCELAIN TILE FLOORING
SAND CEMENT SCREED
GEOTEXTILE SHEET
GROUT TO MATCH THE COLOUR OF STONE/TILE UNLESS INDICATED
VILLA 49
RCC SLAB
SECTION X
Miscellaneous Details
120 EXPANSION ANCHOR
X
120
STAINLESS STEEL FLANGE
9/9/2019
Date
STEEL PIPE POST
C.J.
Drawn by
M.Z.
Checked by
AR-04-407
SECTION Y
7
Stone Base Detail 1:1
6
Ceramic / Porcelian Base Detail 1:1
4
Pipe and Tube Railing Detail 1:2
1
Toilet Waterproofing Detail 1:1
Scale
AS SHOWN
800
600
400
Trainee Name : CHINMAY JHA 1200
1100
600
600
400
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
2100
2100
2100
Mentor :
1500
2100 500
900
1000
1500
2100
1600
Date of Joining :1/8/2019
3.02 01-FF-FFL
9
W9
0.15 00-GF-FFL
6
1 : 10
600
W6
5
1 : 10
W5
3
1 : 10
2
1 : 10
Description
Date
W2 1 : 10
1950
1800
1300
1300
1200
1000
600
W3
No.
2100
2100
2100
2100
VILLA 49
9/9/2019
800
Date
800
900
1100
Window Schedule
C.J.
Drawn by Checked by
AR-05-501
0.15 00-GF-FFL
8
W8 1 : 10
7
W7 1 : 10
4
W4 1 : 10
1
W1 1 : 10
M.Z.
Scale
1 : 10
1370
1280
1270 40
363
40
383
1180 40
363
40
10040
333
40
353
40
333
40
100
1300
Date of Joining :1/8/2019 M. ZUBAIR
Start Date :
26/8/2019
2100
Submission Date : 9/9/2019
0.15 00-GF-FFL
10
Mentor :
800
800
2100
1300
Trainee Name : CHINMAY JHA
0.15 00-GF-FFL
W10 - Front Elevation
11
1 : 10
Type Mark W1 W2 W3 W4 W5 W6 W7 W8 W9 W10
Count 1 3 4 2 2 2 1 2 2 1
Window Schedule Sill Height Head Height 800 900 1000 1100 1500 1500 800 900 500 800
2100 2100 2100 2100 2100 2100 2100 2100 2100 2100
No.
Description
Date
W10 - Side Elevation 1 : 10
Height 1300 1200 1100 1000 600 600 1300 1200 1600 1300
Width 1950 400 400 1800 600 800 600 600 800 1270
VILLA 49 Window Schedule 9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-05-502 Scale
1 : 10
2100
2100
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
26/8/2019
Submission Date : 9/9/2019
FF008 FF007 GF006 GF005a GF004
600
FF001b
1400
FF005a FF004a FF001a GF005b
700
FF010 FF009
1600
GF001
900
FF005b FF004b
1800
Door Detail - Front Elevation 1 : 10
No.
OPENING IDENTITY
Door Room Level Number Number 00-GF-FFL 00-GF-FFL 00-GF-FFL 00-GF-FFL 00-GF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL
GF-001 GF-004 GF-005a GF-005b GF-006 FF-001a FF-004a FF-005a FF-007 FF-008
GF-001 GF-004 GF-005 GF-005 GF-006 FF-001 FF-004 FF-005 FF-007 FF-008
Room Name DRAWING ROOM PANTRY LAUNDRY LAUNDRY TOILET SUITE BED ROOM BED ROOM TOILET TOILET
OPENING IDENTITY
Door Room Level Number Number
Room Name
Door Schedule LEAF OPENING Number Leaf Leaf of Wall Width Height Width Height Undercut Leaves Type (mm) (mm) (mm) (mm) (mm) 1 1 1 1 1 1 1 1 1 1
W1 W2 W2 W1 W2 W2 W2 W2 W2 W2
900 600 600 700 600 700 700 700 600 600
2100 2100 2100 2100 2100 2100 2100 2100 2100 2100
950 650 650 750 650 750 750 750 650 650
2125 2125 2125 2125 2125 2125 2125 2125 2125 2125
10 10 10 10 10 10 10 10 10 10
Door Schedule (Sliding) LEAF OPENING Number Leaf Leaf of Wall Width Height Width Height Undercut Leaves Type (mm) (mm) (mm) (mm) (mm)
WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD
Type
A01 A01 A01 A01 A01 A01 A01 A01 A01 A01
Face Face Fire STC Finish Material Elevation Finish Rating Rating PL PL PL PL PL PL PL PL PL PL
DOOR LEAF DATA
Material
Type
Date
DOOR FRAME DATA
DOOR LEAF DATA
Material
Description
WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD WOOD
F01 F01 F01 F01 F01 F01 F01 F01 F01 F01
PL PL PL PL PL PL PL PL PL PL
90 45 45 90 45 45 45 45 45 45
40 35 35 40 35 35 40 35 40 35
VILLA 49 Door Schedule
DOOR FRAME DATA
Face Face Fire STC Finish Material Elevation Finish Rating Rating
9/9/2019
Date
C.J.
Drawn by
01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL 01-FF-FFL
FF-001b FF-004b FF-005b FF-001c FF-003
FF-001 FF-004 FF-005 FF-009 FF-010
SUITE BED ROOM BED ROOM BALCONY BALCONY
W2 W1 W1 W1 W1
1400 1800 1800 1600 1600
2100 2100 2100 2100 2100
GLASS GLASS GLASS GLASS GLASS
35 40 40 40 40
Checked by
M.Z.
AR-05-503 Scale
1 : 10
1
2
3
4
5
7
6
8
10350 600
4200
870
1930
1375
1375
I W
Room Legend PANTRY 0.14
DINING ROOM
LAUNDRY
DRAWING ROOM
Trainee Name : CHINMAY JHA
0.14
FFL
Date of Joining :1/8/2019
FFL
H
KITCHEN REF.
LAUNDRY
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
PANTRY G
TOILET TOILET 0.14 FFL
F
KITCHEN 0.15 PARKING 0.02
FFL
9550
FFL
E
No.
Description
Date
D 650
DRAWING ROOM 0.15
C
FFL
0.15 FFL
15
UP
14
1
13
2
12
3
11
4
10
5
9
6
PORCH
8
7
2800
VILLA 49 B 850
DINING ROOM
2600
16
0.12 FFL
A
Ground Floor Presentation Plan 9/9/2019
Date
C.J.
Drawn by Checked by
M.Z.
AR-06-601 1
Ground Floor - Presentation Plan 1 : 25
Scale
1 : 25
1
2
3
600
4
2250
10350
1950
5
6
870
1930
7 1375
8 1375
BALCONY 3.02
1770
FFL
Room Legend
I
TOILET
BALCONY 3.02
BATHROOM
Trainee Name : CHINMAY JHA
3.01
1300
BALCONY
FFL
FFL
Date of Joining :1/8/2019
BED ROOM CLOSET
H
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019 1000
GALLERY OFFICE BEDROOM
SUITE
G
3.02
2585
TOILET
1300
FFL
3270
BEDROOM 3.02
TOILET 3.01
FFL
F 1150
FFL
Description
Date
FFL
3.02
1485
FFL
E
700
585
700
9550
3.02
GALLERY 2870
No.
CLOSET
1670
600
D 650
650
4000
3050
1115
C 600
BEDROOM 3.02
DN
3070
FFL
2
12
3
11
4
10
5
9
6
8
7
2185
1
13
VILLA 49
2360
1105
FFL
605 B
First Floor Presentation Plan
A
BALCONY 3.02
BALCONY 3.02
1911
850
628
110
FFL
3890
1975
2614
1
14
FFL
2545
3270
15
OFFICE 3.02
2600
16
C.J.
Drawn by Checked by
M.Z.
AR-06-602
First Floor - Presentation Plan 1 : 25
9/9/2019
Date
Scale
1 : 25
1
2
3
4
5
6
7
8
9.17 04-RF-CL
10350 2250
1950
870
1930
1375
1375
Date of Joining :1/8/2019 1950
600
Trainee Name : CHINMAY JHA
Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019
50
1350
7.22 03-RF-CL
5.87 02-SF-FFL 5.82 02-SF-CL
GALLERY
CLOSET
9170
Date
3.02 01-FF-FFL 2.97 01-FF-CL
VILLA 49
30
DRAWING ROOM
120
KITCHEN
Description
2820
50
BEDROOM
2800
No.
Section 1 Presentation
0.15 00-GF-FFL 0.12 00-GF-PL
0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
1
Section 1 - Presentation
M.Z.
AR-06-603
1 : 25
Scale
1 : 25
I
H
G
F
E
D
C
B
A
9550 1300
1000
1300
1150
700
650
2600
850 9.17 04-RF-CL
Trainee Name : CHINMAY JHA
1950
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
3/9/2019
Submission Date : 9/9/2019 WATER TANK
50
1350
7.22 03-RF-CL
5.87 02-SF-FFL 5.82 02-SF-CL
OFFICE
Date
3.02 01-FF-FFL 2.97 01-FF-CL
2820
DRAWING ROOM
VILLA 49
30
TOILET
120
LAUNDRY
Description
9170
BEDROOM
50
BEDROOM
2800
No.
Section 2 Presentation
0.15 00-GF-FFL 0.12 00-GF-PL 0.00 00-GF-NGL
9/9/2019
Date
C.J.
Drawn by Checked by
1
Section 2 - Presentation
M.Z.
AR-06-604
1 : 25 Scale
1 : 25
FIRE AND LIFE SAFETY LEGEND
1
2
3
4
5
7
6
8
STANDPIPE EXIT STAIRS FIREMAN'S LIFT EXIT SIGNS 3 HOURS FIRE RATED 2 HOURS FIRE RATED 1 HOURS FIRE RATED 1/2 HOURS FIRE RATED
1
1HR FIRE RATED CURTAIN
AR-06-604
SC: Self-Closing Component
I
0 5.
PANTRY GF-004
Fire Resistance Rating Walls (Hr)
Fire Doors Assemblies Rating (Hr)
Exit stairways
2
1 ½ hour SC
Electro-Mechanical Shafts
2
1 ½ hour SC
Elevators Hoistways
2
Exit Passageways
2
High Hazard Rooms
2
1 ½ hour SC
Moderate Hazard Rooms
1
3/4 hour SC
Hotel Corridors
1/2
1/3 hour SC
Separation Between Rooms
1/2
1/3 hour SC
1 ½ hour SC 1 ½ hour SC
m t.
Trainee Name : CHINMAY JHA
LAUNDRY GF-005 H
Date of Joining :1/8/2019 Mentor :
M. ZUBAIR
Start Date :
26/8/2019
Submission Date : 9/9/2019 7.1 mt.
G TOILET GF-006
5.5 m t. F
5.7 mt.
E
No.
Description
Date
1 AR-06-603
D DRAWING ROOM GF-001 C
3.55 mt.
9.3 mt.
-
1 AI-02-201
VILLA 49 B
A
Ground Floor Fire Rating 9/9/2019
Date
C.J.
Drawn by
M.Z.
Checked by
BSCU-01-101 1
Ground Floor Plan - Fire Rating 1 : 25
Scale
1 : 25
1
2
3
4
5
6
7
FIRE AND LIFE SAFETY LEGEND
8
STANDPIPE EXIT STAIRS
1
FIREMAN'S LIFT
AR-06-604
EXIT SIGNS 3 HOURS FIRE RATED 2 HOURS FIRE RATED 1 HOURS FIRE RATED 1/2 HOURS FIRE RATED 1HR FIRE RATED CURTAIN SC: Self-Closing Component
18.8 mt
Fire Resistance Rating Walls (Hr)
Fire Doors Assemblies Rating (Hr)
Exit stairways
2
1 ½ hour SC
Electro-Mechanical Shafts
2
1 ½ hour SC
Elevators Hoistways
2
Exit Passageways
2
High Hazard Rooms
2
1 ½ hour SC
Moderate Hazard Rooms
1
3/4 hour SC
Hotel Corridors
1/2
1/3 hour SC
Separation Between Rooms
1/2
1/3 hour SC
1 ½ hour SC 1 ½ hour SC
I
20.1 mt
Trainee Name : CHINMAY JHA Date of Joining :1/8/2019
H
Mentor :
M. ZUBAIR
Start Date :
26/8/2019
Submission Date : 9/9/2019 18.4 mt
20.0 mt G
F
No.
Description
Date
E 1 AR-06-603
D
C
-
2
VILLA 49
AI-02-201
16.2 mt B
16.2 mt
First Floor - Fire Rating
A
9/9/2019
Date
C.J.
Drawn by
M.Z.
Checked by
1
First Floor Plan - Fire Rating
BSCU-01-102
1 : 25 Scale
1 : 25