Creekside portfolio

Page 1

Creekside VIllage School of Architecture / Clemson University Xiao Xiao/ Bingqing Yang


Site Analysis

C l o se to resi d e n tial distr ict

Close to d ow ntow n Greenv i l l e

C l o se to Gree n vi lle county

C l os e to p ub l i c p ar k s


Site Plan


The site

Expose the river

Shaped by topo

Directed by the sun

Follow the topo

Find public space

Concept Evolution


View from the parking lot


UP

UP

UP

UP

DN

Ground FL

FL 3 DN DN

UP

UP

UP

UP

DN

UP

DN

DN

UP DN UP

DN UP DN UP

UP

FL 1

FL 4 DN

DN

UP

UP

UP

DN

UP

UP DN

DN

DN DN

FL 2

Floor Plans

FL 5 Studio

1 b/ 1 b

2b /2b


ch K it

in L iv

o g ro

m B a th

Bed

Unit A 2 bedroom/ 2 bathroom 900 sf Number: 15

en

ro o

ro o

m

m B a th

M .B

e d ro

ro o

Residence 27500 sf Office 15800 sf

m

om

Parking 16200 sf

Public Other 13000 sf 6500 sf Unit B 1 bedroom/ 1 bathroom 600 sf Number: 15

B a th m Roo Bed

ro o

m

K it

L iv

in g

ro o

che

n

m

PROGRAM FUNCTION NUMBERAREA(sf) TOTAL(sf) RESIDENCE 27500 UNITE A UNITE B UNITE C

15 15 10

900 600 500

25 15

250 450

OFFICE TYPE A TYPE B

Unit A Studio 500 sf Number: 10 K it

Bed

ro o

m

L iv

in g

ro o

m

che

n

B a th m Roo

13000

CONFERENCE PUBILIC LOBBY&RECEPT GYM CAFÉ LUNDRAY KETCHEN RESTROOM OTHER

6250 6750

2800 15000 1 1 1 2 4 5*2 1

1500 2000 1000 250 500 150 6500

90

180

16200

TOTAL

74500

PARKING CAR PARKING

13500 9000 5000

1500 2000 1000 500 2000 1500 6500

16200

Program


N

N

E

E

W

W

Utilize the bamboo on site

S

S

Spring

Transform into the skin of the buildings

Su m m er

N

N

E

E

W

W

S

S

Fall

Win ter


Overhang +

Skin

Overhang +

Shadwo study: Office

Skin

Shadow study: Residence

50 feet

1. The difference in elevation lead to abundant access to natural light in both buildings. 2. The open 3rd floor of the office building not only offers an interactive public space but also encourage free ventilation on site

Residence Residence

Passive Strategy


View interior of the office


We s t e l eva t i on

Ea st e l eva t i on

So u t h e l eva t io n

N or t h e l eva t io n


View of the open 3rd floor


1 3

S e c t io n 1

S e c t io n 2

S e c t io n 3


Office builidng

Mechanical details

Residential building


Exterior condensing unit Interior evaporator unit

Air intake

Air exhaust

11/8� VRF 20 tons duct size

Mechanical

Room

Mechanical circulation


Structural components

Force analysis


ANCHOR PLATE WITH COMPRESSION BARS CONTINUOUS CLEAT FORMED METAL COPING WOOD BLOCK DRAINAGE GRAVELLED LAYER ROOF MEMBRANCE 2% SLOPE THERMAL INSULATION VAPOR RETARDER ROOF DECK

TWO LAYER GLASS WINDOW WINDOW FRAME

INSULATION CONCRETE CURTAIN WALL PANEL ANCHOR BOLT BEARING PLATE

METAL STUDS CONCRETE FLOOR DECKING L JOINT HPVC PIPE BEARING PALTE

BEARING PLATE

CABLE

BEARING PLATE 12” W SHAPE STEEL BEAM

ARCHRO BOLT

JOINT

MUSHROOM CAP PLATE JOINT STEEL JOINT

VERTICAL BAMBOO SHADING TUBE PICKET CONCRETE MEMBRANCE INSULATION CONCRETE TOE PLATE BEARING PLATE

WALKWAY WOOD STRIP FLOORING WALKWAY WOOD FLOORING UNDERLAYER WALKWAY DECK W SHAPE STEEL I-BEAM SHEAR WALL

SUPPORTING W SHAPE STEEL I-BEAM INSULATION AROUND THE BEAM

PEARING PLATE

ARCHOR JOINT

ANCHOR BLOT STEEL BASE PLATE BOLT SET LOOSE IN CONCRETE 10" I BEAM

CONCRETE FOOTING WATERPROOF MEMBRANCE 4" DRAINAGE PIPE COMPECTED GRAVEL

Wall section detail


Structural Model


Wall section model


Office

Residence

Gym Lundry Kitchen Cafe

Parking Other


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.