Christopher Hill - Graduate of Architecture Portfolio 2021

Page 1

CHRISTOPHER HILL GRADUATE OF ARCHITECTURE (M.ARCH)

updated: September 17th, 2023

PORTFOLIO

SELECTED WORKS (2015 - 2021)

1
2 student of architecture CONTENTS green spine dwellings 04 the factory 10 entendrous pyrophyte 14 fish river workshop construction 24 pharmacy house 28

NOTE: all images from professional work used with permission from: Brown Falconer

3 graduate of architecture dominican school masterplan 46 golden grove high school 42 st. martin de porres (stage 2) 32 resthaven berri community services 38

GREEN SPINE DWELLINGS

studio 5 construction study period 2 2015 Bachelor of Architecture

Based upon Damian Madigan’s research ‘The Missing Middle’, ‘Green Spine Dwellings’ is the result of design explorations into infill suburban housing using existing Adelaide villas and cottages.

Following group modelling workshop and exploration of larger scale designs across existing residences, Green Spine Dwellings is a residential infill exploration, combining 2 adjacent residential sites with villas in Dulwich with the aim to increasing density to over 60 dwellings/hectare, whilst respecting the existing villas where possible to follow existing council guidelines on maintaining existing local character.

Throughout the project, material and construction-based design decisions through hand-drawing and Revit formed the backbone of the design process, naturally leading to highly detailed levels of resolution in the project.

Using design principles from Dr. Madigan’s research, Green Spine Dwellings was able to achieve a total of 8 ‘dwellings’ across the combined sites: 2 flexible office spaces, 4 double storey residences that may accommodate single-child families comfortably, a cafe’, plenty of public and private green space and car parking spaces to accommodate.

The project gets its namesake

from the central ‘spine’ of green spine along the former boundary between each individual site. All internal public spaces have views to external greening, and the residences at the back of the site have access to their own individual private garden spaces and a shared community garden. Additionally, the existing front yard space is extended onto the footpath, allowing for more landscape space and 90’ parking from the street.

4
5
left: design development street elevations and sections

this page: site plan

opposite: first floor plan

6
7
8 J8
9

THE FACTORY

studio 8 construction

study period 5 2016 Master of Architecture

Integrating the former Mitsubishi Motors building next to Tonsley’s Main Assembly Building, ‘The Factory’ is the result of a 4-person group construction design studio and development of professional group work practices.

Parallel to initial precedent analysis, the first stage of the studio was spent developing an ‘office profile’ that the group would work under, which we dubbed “H3K” (using the first letter of the team’s last names: Hebart, Hill, Hsu and Khaliq). Next, was the development of a group contract and shared file database that H3K would use as a baseline for good work practice throughout the semester.

Utilizing Renewal SA’s 2016 iteration of the design guidelines for the Tonsley District Masterplan, the Factory was intended to have a commerical/light industrial program. However H3K wanted to take advantage of the site’s advantageous positioning as one of the first buildings visitors to the Tonsley District would see if entering from South Road. As such, public and education facilities were also integrated.

My role within the group was ‘construction and sustainability supervisor’: checking group member’s work against BCA and NCC standards, designing primarily in sections and

construction details, as well as integrating passive and low maintenance design strategies where possible.

The design ethos was to literally re-wrap the existing concrete structure in different facades to communicate different internal programs: a porous brick slip skin around the eastern side for public and learning facilities, simple inset glass for offices, and danpalon polycarbonate on the west for the large manufactury spaces. Landscaping further softens the thresholds between interior and exterior inviting people in to observe manufacturing processes.

10 16
11
Final Design Render (by Project Group Member Wei Jung Hsu)
12 18
far left: Long sections
13
right: entry section 22
middle: Section 21 page & opposite: Plan Details left: brick slip wall section top right: parapet detail bottom right: brick veneer corner detail

INTRODUCTION

ENTENDROUS PYROPHYTE

studio 9 & 10 integration

study period 2 & 5 2017

Master of Architecture

The final studio project of my Master’s degree, the Entendrous Pyrophyte was the result of a year’s worth of exploration into the place of bushfires in Australia’s landscape culture and the phenomenon’s potential impacts on architecture as their frequency and intensity are projected to increase due to climate change. Combining research into existing bushfire legislation, construction codes, as well as a variety of design and material exploration the key intent of the project is twofold: to provide community and research facilities aimed at bushfires and mitigation strategies, but also as a major node in a proposed landscaping ‘barrier’ including nature preservation, walking trails,

public space and sites for controlled burns. Combining these two intents results in spaces with the aspiration to balance awareness of bushfires, not just as a destructive force, but also as an important aspect in Australian landscape identity.

14 24
15
right: studio 10 landscape design render left: studio 9 final design render

RESEARCH & INVESTIGATION

Preliminary investigations and mapping exercises within the themes of EXCESS and BOUNDARIES revealed two major issues that would later become the primary focii of the Entendrous Pyrophyte project: an excessive amount of green space integrated into urban and suburban fabric of Canberra, which in turn creates a major bushfire risk. Consequently, the Canberra Spatial Plan puts an emphasis on bushfire mitigation strategies parallel to the need for future expansion.

Typically, more green space in built environments is encouraged on a variety of levels; health, aesthetic, land value etc. however in this case, the amount of vegetated space

in Canberra actually strays into dangerous territories, and has been a major contributing factor of bushfires in Canberra, including the 2003 fire which resulted in over 70% of the Australian Capital Territory being destroyed. 14 years on, the suburb of Denman Prospect is undergoing development as the next major urban/suburban precinct of Canberra, but just so happens to also be located on land that has previously been scorched by major bushfires.

This being said, bushfires have a place in the Australian landscape and concurring cultures. Certain prominent species of flora and fauna such as eucalyptus, banksia and sand monitors actually require fire

in order to thrive. Before and after Australia’s colonization, Aboriginal communities would use controlled burning as a means of managing the landscape, as well as a means of promoting growth of certain vegetation and animals for food and other necessities. Therefore it is the Entendrous Pyrophyte’s intention to bring attention to these traits of bushfires as an important ecological factor.

16 26
top: abstract model and material explorations of burning
17 1920 1926 1939 1952 1979 1983 1985 2001 2003 1920 1926 1939 1952 1979 1983 1985 2001 2003 1920 1926 1939 1952 1979 1983 1985 2001 2003
right: initial research and mapping poster of Canberra (studio 9) left: mapping the ACT’s major bushfire events since 1920

THE FINAL PROJECT

The site is located in a forest clearing on the boundary of Stromlo and Denman Prospect approximately 10 kilometres west of the Canberra CBD. In its prototype stage, the Entendrous Pyrophyte was a rectilinear building drawing upon watchtower and bunker typologies in order to reflect the need to survey the surrounding landscape, and the need to retreat and seek shelter from bushfires respectively. Due to a desire to reduce visual impact to the site, the watchtower aspect is delivered as a viewing platform as a trailhead to a proposed extension to existing walking trails. The overall form of the buildings follow the existing contour lines of the site, with internal floor plates being

stepped to create a stronger sense of place and reduction of site impact.

A north-facing cafe’ links with a nature play-space with amenities accessible internally and externally to connect with existing walking trails. On the eastern side of the main building is a slightly submerged gallery that makes up the ‘bunker’ aspect of the brief. Above it flexible spaces are interpreted as classrooms or seminar spaces, which connect to a small lecture theatre via a small internal bridge. Public and private building functions are split with a central service core: on the southern and western sides of the building are the administration and

research facilities respectively. The research section includes labs for testing and analysis of bushfire mitigation and postdisaster strategies.

18 30

next page, left: Ground Floor Plan

19
left: final design site plan CAFE’
MAIN BUILDING next page, right: First Floor Plan
GROUND FLOOR PLAN 1:200 1 2 3 1 1 4 4 4 5 6 5 5 7 8 9 10 11 12 13 15 14 16 17 19 5 20 21 22 23 5 26 24 25 27 28 29 30 31 32 33 35 26 34 32 32 36 9 8 10 7 37 38 39 39 19 19 40 41 42 43 44 44 44 44 45 46 46 47 48 49 50 51 52 53 54 1 1 55 56 57 58 59 5 7 9 59 60 8 10 1112 13 14 17 61 62 63 64 66 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 RAINWATER TANK FIRE HOSE REEL FIRE LABORATORY SUPPORT LAB STORE LABORATORY MALE TOILET CLEANER AMBULANT TOILET FEMALE TOILET DISTRIBUTION BOARD WATER RISER SEWER RISER MECHANICAL RISER DIGITAL LAB CONTROL POINT COURTYARD LABORATORY ENTRY FIRE STAIR MULTIPURPOSE LECTURE THEATRE LECTURE THEATRE ACCESS/WAITING OFFICE UTILITY SECURITY RECEPTION FOYER INFORMATION KIOSK AIR LOCK ENTRY/PORTE COCHERE CLOAK ROOM BUNKER GALLERY PUBLIC ARCHIVE RECEIVING/PREPERATION GALLERY/ARCHIVE STORE COMPACTUS LIFT GOODS LIFT FIRE EMERGENCY PANEL MASTER EMERGENCY CONTROL PANEL UNISEX SHOWER + CHANGING ROOM OFFICE ENTRY + HOTDESKING KITCHEN MEETING DIRECTOR’S OFFICE ENCLOSED OFFICE OPEN PLAN OFFICE/LAB WRITE UP OFFICE STORE OFFICE CLEANER COMMUNICATIONS ROOM MAIN SWITCH BOARD ROOM HYDRAULICS FIRE PUMP ROOM TRANSFORMER GAS METER ENCLOSURE FIRE HYDRANT BOOSTER STAFF CAR PARK BICYCLE PARKING SERVERY CAFE’ KITCHEN CAFE’ WATER STOP EXISTING BUSHWALKING TRAIL LANDSCAPE PROMENADE NATURE PLAY SPACE DELIVERIES 57 11 11 12 13 4 A B C D E F G H I J K L N O Q M P 1 2 3 4 5 6 6 7 8 A A B B C C D D E E F F
FIRST FLOOR PLAN 1:200 66 20 19 67 68 69 19 4 69 70 70 70 70 70 70 71 72 73 74 73 73 74 75 75 65 13 35 36 9 8 10 7 11 12 13 65 66 67 68 69 70 71 72 73 74 75 VIEWING PLATFORM PLATFORM ACCESS RAMP PLATFORM INTERNAL ACCESS BRIDGE COLLABORATIVE SEATING MULTIPURPOSE TEACHING MECHANICAL PLANT ACCESS MECHANICAL PLANT ROOM (ROOF) GREEN ROOF SOLAR PANELS SOLAR WATER HEATING A B C D E F G H I J K L N O Q M P 1 2 3 4 5 6 6 7 8

top left: walkway section between gallery and cafe

top middle: viewing platform walkway section

top right: viewing platform section

bottom: main building section opposite right: laboratory wall section detail

opposite left: green wall section detail

22 36

VIVAGREEN MODULAR GREEN WALL SYSTEM FILLED WITH EPICORMIC SEEDS

GUTTERS

ROOF SPRINKLER

GRAVEL GUTTER

HIGH MOISTURE GREEN ROOF SYSTEM (300MM SOIL SUBSTRATE)

INTERNAL FUSIBLE LINK + 200 X 200 X 100 MM SHUTER SYSTEM CONTROLLER

FIRESTOP SEALANT

100MM DIAMETER SHADE DEVICE

250MM BUSHFIRE SHUTTER MECHANISM

EXPANDED CORTEN STEEL SHADING

CONCRETE BOND BEAM LINTEL

FRL -/90/90

INSULATED STEEL PYROPANEL GLAZING W/47MM GLASS THICKNESS SYSTEM + FIRE RESILIENT GLAZING AND RUBBER WEATHER STEEL

INSULATED RAMMED EARTH (VARYING THICKNESS, 350MM MIN)

23
DIVERTING TO RAINWATER STORAGE BELOW 50MM HANDRAIL @ 900MM ABOVE FFL

FISH RIVER RANGER ACCOMMODATION

As part of re-developing Aboriginal Ranger’s accommodation in Fish River, Northern Territory, the UniSA Design-Construct Program required multiple groups of students to develop and construct the project at the UniSA Mawson Lakes workshops before shipping the pre-fabricated design to site.

Within a 2-week period, my group was responsible for the test construction of 4 central modules that would serve as bedding and storage for short and long term Rangers before the components could be sent to site. Building upon previous student progress with reports as reference. The majority of plywood

components had already been machined, so our job was to physical put the modules together and ensure they were structurally sound. However, inconsistencies between physical components and the documentation were evident almost immediately, so a stocktake was the first stage of the workshop period.

Using a coding system to determine which components still needed to be made and processed, the majority of the time spent in the workshop was spent designing the actual construction process and designing small details such as storage compartment door hinges. Ordering additional components and cutting new

construction in the workshop study period

3 2018

pieces at the CNC workshop at UniSA’s City West campus . The construction phase in the workshop consisted of a lot of strong-arming and forcing pieces into place as some plywood components were severely bowed, and required screws to hold the finished product together despite original intentions to simply slot pieces together.

The result was a successful inworkshop construction of all four joinery-bedding modules, development of an components schedule, and a report on the group’s project for reference at the on-site construction phase at Fish River, Northern Territory.

24 44

far left: completed joinery structure onsite (photo used with permission from Joti Weijers=Coghlan)

top right: completed bula-bula on site (photo used with permission from Joti Weijers=Coghlan)

bottom right: flat-packed joinery bedding components in workshop

25
26 46
far left: joinery module reference model top right: joinery labelling bottom right: test construction of 1st module
27
middle top: cutting hinges middle bottom: storage door hinge detail sketch far right: completed module construction

PHARMACY HOUSE (OSAKA STUDY TOUR)

With increase in dwelling density being inevitable, Australia faces the issue of adapting beyond the prominent single dwellings and high rise apartments. This study tour’s aim was to explore the possibilities that the Nagaya typology (traditional Japanese row housing) might offer through a 6 day cross-cultural design studio.

The group brief (where each group consists of at least 2 University of South Australia students, and 2 Osaka City University students) was to adapt a vacant 56m2 row house in Osaka into an international student dormitory for at least 3 students.

AAD Study Tour (Osaka, Japan)

study period 6 2018

Our site was a double front, Nagaya facing a pedestrian laneway and street. The lane itself was described as ‘legally ambiguous’ which allowed us to playfully bend the rules and integrate pop-out window seat from the ground floor.

The project drew inspiration from a number of architectural sites around Osaka such as Tadao Ando’s “House in Nipponbashi” and the Suehiro Nagaya by Takehara & Koike Laboratory, such as how each precedent handled insideoutside thresholds, as well as delicate altering of levels to clarify differences in internal spaces as well.

Due to language barriers and a

limited knowledge on Japanese design conventions, the project was kept simple with most of the focus going towards streamlining the ground floor interior using traditional Japanese grid construction systems. A central corridor is accessed from both sides of the house, with the main entry moved to the pedestrian alley due to a steep drop between the main street footpath and the ground floor interior. A small but flexible dining/living area faces the alley with fixed ‘seating’ along the central ‘corridor’ and window seats. As a design compensation for moving the main entry, a timber screen with integrated seating wraps around the external corner.

28 48
29
far left: final design model middle: ground floor interior model top right: ground floor interior model bottom right: first model design model

ST MARTIN DE PORRES (STAGE 2)

BROWN FALCONER

Located on an elevated site in Sheidow Park, Stage 2 works of Stage Martin de Porres continues on previous work done by Brown Falconer. With consideration to the heavily sloped site and use of existing transportable classrooms, two new extensions were constructed: multidisciplinary learning spaces for junior primary students, and an enclosed common area for middle primary students replacing the covered outdoor area.

Extensive and precise on-site measurement was required due to the nature of the additional facilities, specifically the middle primary school commons as it is situated between the existing school hallway, and the transportables orientated

45 degrees from the rest of the campus buildings. 4 junior primary learning spaces were added onto existing classrooms with a central commons corridor that is orientated towards the middle school commons. Simple but bespoke roof angles and angled soffits transitioning into the classroom spaces above high strip windows cover the junior primary learning spaces with a feeling of lightness in the building form, lending visual consistency to the Learning Centre constructed in Stage 1 works.

Bespoke shelving joinery was designed around the curved walls between the junior commons and learning spaces, as well as between the small level change between the

middle primary transportables and open plan commons space. The latter consists of open shelf bag storage on the lower side and fixed seating on the higher level for presentations and activities. Additionally, cupboards acting as storage and an operable ‘teaching wall’ with AV facilities were also designed.

In addition to conducting site measurements, architectural modelling and documentation, ongoing visual development of the project was also conducted with Lumion.

32
education documentation 2020
33
top left: junior primary west entry top right: middle primary north entry bottom: junior primary south entry
34 2 130 4 130 4 130 3 130 5 131 5 131 PT01 01 02 03 04 05 06 B B D D F F E E G G 10 3 0 6 5 5 5 5 0 2 6 C O S 5 4 8 2 1 6 8 5 6 6 3 5 1 6 8 5 8697° COS 5250 R2849 R2301 R2301 RECEPTION -GLA G.05 RECEPTION -GLA G.04 RECEPTION -GLA G.03 TRANSITION -GLA G.02 COMMON AREA G.01 TEACHER PREP G.08 UNISEX BATHROOM G.07 LINE OF ROOF OVER LINE OF CANOPY OVER LINE OF CANOPY OVER DP-01 DP-01 DP-01 DP-01 WT1 WT1 WT2 WT2 WT1 PT01 PT02A PT02A PT02A PT01 PT03 PT03 PT03 THERAPY ROOM G.09 SENSORY ROOM G.06 9 132 9 132 6 131 7 131 7 131 1 130 1 140 3 140 6 140 5 140 4 140 2 140 WT4 WT4 WT4 WT4 WT4 WT4 9303 RL 152.74 6 1 5 2 0 5 5 2 42 2 42 4 00 75 1 12 2 2738 2 3 6 0 4 5 8 131 1 8 7 9 1 0 7 0 W G 0 A W G 05 B W G 04 A W G 0 4 B W G 0 A W G 02 D W G 0 C W G 0 2 A D G 04 A E D G 0 1 A ED. G.01.B D G 0 A D. G.07.A D. G.09.A W G 0 6 B D G 0 5 B D G 0 3 B D.G.08.A D G 03 A D G 0 A W G 0 6 C W G 0 6 D A B O V E W.G.05.C ABOVE W G 0 4 C ABO VE W G 3 B ABOVE W G 0 A W.G.02.E ABOVE J.04 7 140 PT05 PT01 PT01 PT01 WT2 PT01 PT01 PT01 PT01 PT02 PT05 PT04 COL COL COL COL EX COL EX COL EX COL EX COL EX COL EX COL EX COL CL C 3594 3510 882 1618 D. EX D.EX D. EX D.EX D.EX D.EX D.EX EXISTING STUD WALL PT10 PT07 9000 EXISTING JOINERY 90.00 ABOVE & BELOW GLAZING ABOVE & BELOW GLAZING D.EX D.EX EXISTING STUD WALL PT01 PT01 8 0 5 14 9 1 1 6 4 9 2 2 4 2 1097 1 0 1 2 6 7 3 RL EX 152.60 D. EX D. EX J.01 D.G.01.B W. G.01.B W. G.01.A J.18 PT01 PT01 PT01 1892 0 1 8 7 3 2 0 4 6255 2 2 PT02 90 5160 C C A A 2 5 2 1 6 8 5 8 2 2 8 2 5 2 EXISTING G.00 6 6 6 1 1 6 0 3 5 3 9 3 1 6 1 1 52 33 1 7 120 3 9 0 1 2 6 9 5 2 8 9 2 2 3 6 0 4 2 1 INTERNAL OPENINGS INTERNAL WALLS EXTERNAL OPENINGS GENERAL 1 4 7 9 8 7 3 2 5 3 7 1 2 0 6 9 2 1 5 9 3 9 2 6 5 4 3 9 2 7199 90 33 91 3505 36 56 36 5729 7175 1787 1686 1606 4508 6849232709257692 5263 5368 550 193 3178 360 685 0 9 3 57 92 8 0 1 0 8 0 92 8 0 1 0 8 0 9 211 6 71 6 FENCE BELOW 7 5 0 6 1 5 2 5 1 3 1 5 9 7 250 115 5155 92 2295 2608 6650 150 INTERNAL OPENINGS INTERNAL WALLS EXTERNAL OPENINGS NEW STRUCTURE SETOUT GENERAL 5312 1001708 2590 3415 12482402 I N T E R N A L O P E N N G S N T E R N A L W A L L S E X T E R N A L O P E N N G S G E N E R A L 9 2 8 2 2 8 9 2 1 6 3 9 1 6 8 5 6 6 3 5 1 6 8 5 J.05 J.06 J.07 J.08A J.02 J.09 J.11 J.12 J.11 J.13 J.09 J.14 J.08B J.03 J.03 J.03 J.11 J.15 J.09 J.08A J.08B J.11 J.09 J.17 TV PT07 PT07 PT01A PT01A W. G.08.A W. G.00.A COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL COL RL EX 152.50 C.O.S. PT01 TO INFILL EXISTING OPENING J.27 RL 152.74 TP01 W G 0 2 B PT09 LINE OF EXISTING VERANDAH OVER ED. G.01.C PT07 PT01 D G 06 A D.G.01.C EX COL 6 1 5 2 4 5 4 00 0 116 8 0 3560 150 LINE OF CEILING BULKHEAD OVER LINE OF CEILING BULKHEAD OVER LINE OF CEILING BULKHEAD OVER COL EXISTING JOINERY PT02 R 917 TO CENTER OF STUD 0 2 5 60 2 0 2 R 917 6 0 2 3 2 4 95 CL 783 186 4437 3624 77 1728 77 24 5 CL CL 1 1 1 4 1 92 2 42 1 2 CL 1 5 5 1 CL 1 5 5 1 2 6 SPECIFIED METAL SCREEN TO NEW WINDOW DP-01 DP-01 DP-01 DP-01 COL COL COL COL WT1A BRICK LEAF INTERTERNALLY -BRICK TYPE BT1 50MM CAVITY 92MM LIGHTWEIGHT STEEL STUDWORK. 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 92 PT01 92MM LIGHTWEIGHT STEEL STUD FRAME WITH 13MM PLASTERBOARD LINING BOTH SIDES (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 92 PT02 92MM LIGHTWEIGHT STEEL STUD FRAME WITH 13MM PLASTERBOARD LINING BOTH SIDES (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL WT4 92MM LIGHTWEIGHT STEEL STUD FRAME WITH COLORBOND METAL CLADDING EXTERNALLY 35MM TOP HAT THERMAL INSULATION AS SPECIFIED. 13MM PLASTERBOARD LINING INTERNALLY (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 3592 WT2 BRICK LEAF EXTERNALLY -BRICK TYPE BT2 50MM CAVITY 92MM LIGHTWEIGHT STEEL STUDWORK WITH THERMAL INSULATION AS SPECIFIED 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 92 WT5 92MM LIGHTWEIGHT STEEL STUD FRAME WITH FC CLADDING EXTERNALLY 35MM TOP HAT THERMAL INSULATION AS SPECIFIED. 13MM PLASTERBOARD LINING INTERNALLY (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 3592 WALL TYPES WT1 BRICK LEAF EXTERNALLY -BRICK TYPE BT1 50MM CAVITY 92MM LIGHTWEIGHT STEEL STUDWORK WITH THERMAL INSULATION AS SPECIFIED 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 92 WT6 EXISTING TRANSPORTABLE WALL STUD FRAME WITH COLORBOND METAL CLADDING EXTERNALLY 35MM TOP HAT EXISTING THERMAL INSULATION EXISTING 13MM PLASTERBOARD LINING INTERNALLY 35 PT02A 92 92 92MM LIGHTWEIGHT STEEL STUD FRAME AND FLEXIBLE TRACK FOR CURVED WALLS 13MM PLASTERBOARD LINING BOTH SIDES (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL PT03 92 1X13MM SOUND RATED PLASTERBOARD 92MM LIGHTWEIGHT STEEL STUD FRAME 2X13MM SOUND RATED PLASTERBOARD ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL PT04 92 20MM GAP FROM EXISTING WALL 92MM LIGHTWEIGHT STEEL STUD FRAME 2X13MM FIRE RATED PLASTERBOARD ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL PT05 76 76MM LIGHTWEIGHT STEEL STUD FRAME AND FLEXIBLE TRACK FOR CURVED WALL 13MM PLASTERBOARD TO EXPOSED SIDE PT07 13MM PLASTERBOARD LINING DIRECT STICK FIXING TO EXISTING BRICK VENEER WALL 13 PT09 2 X 92MM LIGHTWEIGHT STEEL STUD FRAME WITH AIR GAP TO SUIT EXISTING WALL DEPTH. 13MM PLASTERBOARD LINING BOTH SIDES. INFILL WALL IN EXISTING BRICK WALL 92 92 PT10 LIGHTWEIGHT STEEL FURRING CHANNEL WITH 13MM PLASTERBOARD LINING TO EXISTING WALL. ADJUST FURRING CHANNEL SIZE TO ALIGN WITH STEP IN ADJOINING WALL PT01A 92MM LIGHTWEIGHT STEEL STUD FRAME WITH 13MM PLASTERBOARD LINING TO EXPOSED SIDE (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 92 PT08 92 92MM LIGHTWEIGHT STEEL STUD FRAME 13MM PLASTERBOARD TO EXPOSED SIDE WT1B BRICK LEAF INTERTERNALLY -BRICK TYPE BT1 50MM CAVITY 150MM LIGHTWEIGHT STEEL STUDWORK. 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 150 WT4A 150MM LIGHTWEIGHT STEEL STUD FRAME WITH COLORBOND METAL CLADDING EXTERNALLY 35MM TOP HAT THERMAL INSULATION AS SPECIFIED. 13MM PLASTERBOARD LINING INTERNALLY (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 35 150 EXISTING HALL ROOF SHEETING CEILING 150MM LIGHTWEIGHT STEEL STUDWORK. ABOVE ROOF SHEETING: PROFIED STEEL CLADDING (LOW RIB) COLORBOND ON ONE SIDE TO MATCH THE EXISTING UNDER SIDE CEILING: 13MM FLUSH PLASTERBOARD INTERNAL LININGS ON ONE SIDE ON EXISING HALL SIDE: 9mm THICK INTERIOR GRADE HOOP PINE PLYWOOD CLADDING STAINED 'MAPLE' THEN CLEAR POLYURETHANE FINISH (SATIN) TO MATCH PT11 EXISTING HEAD HEIGHT EXISTING 150 PT12 76 76MM LIGHTWEIGHT STEEL STUD FRAME AND 13MM PLASTERBOARD TO EXPOSED SIDE PT06 EXISTING TRANSPORTABLE WALL BIM 360://St Martin ST 2/2019084_St Martin ST2_R18_ WD.rvt 1/05/2020 9:44:12 AM 1 100 FLOOR PLAN -JP
right: junior primary floor plan
35 UP UP UP UP UP NOTES THE INFORMATION CONTAINED IN THIS DOCUMENT MAY NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT PURPOSE. VERIFY ALL DIMENSIONS AND LEVELS ON AND REPORT ANY DISCREPANCIES TO BROWN FALCONER FOR DIRECTION PRIOR COMMENCEMENT OF ANY WORK. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS. USE FIGURED DIMENSIONS ONLY. DO NOT SCALE DRAWINGS BROWN FALCONER CANNOT GUARANTEE THE ACCURACY OF CONTENT AND FORMAT FOR COPIES DRAWINGS ISSUED ELECTRONICALLY. THE COMPLETION OF ISSUE DETAILS CHECKED AND AUTHORISED SECTION IS CONFIRMATION OF THE STATUS OF THE DRAWING. THE DRAWING SHALL NOT BE USED FOR CONSTRUCTION UNLESS ENDORSED "FOR CONSTRUCTION" AND AUTHORISED FOR ISSUE. MAKE GOOD ANY PENETRATIONS THROUGH THE MASONRY WALLS TO THE CONDENSERS THAT ARE BEING RELOCATED GENERAL LEGEND REFER TO ARCHITECTURAL SPECIFICATION AND APPENDICES FOR GENERAL ARRANGEMENT DETAILS AND COMPUTATIONS FROM MANUFACTURER PARTICULAR TO THIS PROJECT ALL ACCESSIBLE TOILETS TO COMPLY WITH AS1428.1 REFER STRUCTURAL DRAWINGS MEMBER LOCATIONS AND SIZE MAKE GOOD ALL EXISTING FINISHES DAMAGED DURING WORKS TO THE SATISFACTION OF THE SUPERINTENDENT AS PER THE SPECIFICATION, SHOP DRAWINGS AND PROTOTYPE SAMPLES ARE REQUIRED FOR SIGN OFF BY THE ARCHITECT. READ IN CONJUNCTION WITH CIVIL, STRUCTURAL, ELECTRICAL, FIRE, HYDRAULICS, MECHANICAL AND LANDSCAPING DRAWINGS. FLOOR PLAN LEGEND ACU AIR CONDITIONING UNIT AG WALL ANGLE GUARD EX. EXISTING DP-01 DOWNPIPE HR HAND RAIL COL COLUMN WL WALL LIGHT NOTES 1. ALL DIMENSIONS ARE TO BE CHECKED AND VERIFIED BEFORE COMMENCING WORK 2. CONTRACTOR TO MAKE ALLOWANCE FOR ALL BUILDERS WORK ASSOCIATED WITH SERVICES INCLUDING ALL CUTTING IN AND MAKING GOOD AS REQUIRED. REFER TO SERVICES DRAWINGS FOR EXTENT 3. SET OUT ALL INTERNAL DOOR FRAMES TO OUTER FACE OF ADJOINING FINISHED PARTITION UNLESS NOTED OTHERWISE 4. ALL INTERNAL STUDWORK IS DIMENSIONED TO CENTRELINE OF STUD UNLESS NOTED OTHERWISE 5.ALL DOORS IN STUDWORK PARTITIONS TO BE SETOUT 100MM FROM FINISHED FACE OF ADJACENT PARTITION LINING, UNLESS DIMENSIONED OR NOTED OTHERWISE. 6.SET OUT ALL DOORWAYS 100mm FROM FINISHED FACE OF ADJOINING WALL UNLESS DIMENSIONED OTHERWISE 7.ALL STUDWORK SET OUT DIMENSIONS ARE TO THE CENTRE OF THE STUD UNLESS NOTED OTHERWISE FE FIRE EXTINGUISHER-REFER MECHANICAL DRAWINGS BH BULKHEAD OVER BAG BAG HOOKS GWIV ISOLATION VALVE BOX FOR WATER SUPPLY TO GREENWALL NOM. 1800 AFL GB GLAZING BALUSTRADE 5 133 7 134 ITALIAN G.11 EXISTING HALL OSHC STORE EXISTING TRANSPORTABLES LINE OF CANOPY OVER OSHC OFFICE G.12 1:14RAMPUP 120WALKWAY COL COL COL COL COL COL COL COL COL BULKHEADOVER ENTRY NORTH ENTRY NORTH ENTRYSOUTH EXISTINGBOUNDARY 2970 DP-01 DP-02 DP-02 DP-02 RL: 152.74m FFL: 152.74m RL: 152.4m RL: 152.4m COL 1 132 3 132 2 132 4 132 A1 A2 A3 A3 RL 15265m ED G10C ED G10 A ED G10D DG11B D G 11 A ED G10 E DEX DEX DEX DEX DEX DEX DEX DEX DEX DEX D EX WT1B WT1B WT1B WT4 WT4 WT1A WT.EX WT.EX WT.EX WT2 WT.EX PT02 W G 12 A COL EXISTING COMMUNICATIONS CABINET FB FB B2 B3 B4 B5 B7 B8 1 141 2 141 3 141 4 141 COL COL COL COL COL COL COL LINE OF SKY LIGHT OVER 8 134 DP-02 WT6 WT6 WT6 WT6 WT6 WT6 PT01 PT01 PT06 PT02 PT02 PT02 COL PT10 PT10 PT10 PT12 D EX FB CANOPY OVER ENTRY 4100 540 906 3305 D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX EXISTING CORRIDOR EXISTING TOILETS EXISTING TOILETS EXISTING STORE EXISTING ACC TOILETS EX.FF D EX D EX D EX D EX D EX D EX 1 2 1 2 HR2 HR1 J.21 J.19 A 141 1634 92 654 92 3180 6392 3869 5917 1822 2222 21105 5179 92 115 5015 17 5218 EXTERNALOPENNGS NEW STRUCTURESETOUT GENERAL NTERNAL WALLS 2948 207 2881 4516 5139 5342 4321 1501 19152 1570 EXTERNALOPENNGS NEW STRUCTURESETOUTGENERAL INTERNAL WALLS 3081 CL 6169 2485 1522 92 2947 92 780 150 1216 TV CL368 2812
J.22 J.22 1460 B6 B1 COL COL W G10C ED G10 B COL COL COL COL COL COL J.26 3974 ° MSD DP-01 DP-01 DP-01 DP-01 DP-01 DP-01 PT07 PT07 WALL TYPE PT11 TO INFILL THE OPENING WHERE HIGHER WINDOWS ARE DEMOLISHED. REFER SHEET 101 RL: 152.4m PT08 GB DP-01 DP-02 DP-02 DP-02 HR3 HR3 TGSI TGSI TGSI HR4 HR4 TGSI TGSI B 141 C 141 D G12A J.25 D G 12 B J.28 EXISTING DRINKING TAPS WT4A WT1B ENSURE NO VISIBLE JOIN BETWEEN FINISH FACES OF BALUSTRADE WALLS AND JOINERY. FINISH FACES TO BE FLUSH. PT12 PT12 PT12 DP-01 PT06 WT1A BRICK LEAF INTERTERNALLY -BRICK TYPE BT1 50MM CAVITY 92MM LIGHTWEIGHT STEEL STUDWORK. 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 92 PT01 92MM LIGHTWEIGHT STEEL STUD FRAME WITH 13MM PLASTERBOARD LINING BOTH SIDES (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 92 PT02 92MM LIGHTWEIGHT STEEL STUD FRAME WITH 13MM PLASTERBOARD LINING BOTH SIDES (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL WT4 92MM LIGHTWEIGHT STEEL STUD FRAME WITH COLORBOND METAL CLADDING EXTERNALLY 35MM TOP HAT THERMAL INSULATION AS SPECIFIED. 13MM PLASTERBOARD LINING INTERNALLY (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED WT2 BRICK LEAF EXTERNALLY -BRICK TYPE BT2 50MM CAVITY 92MM LIGHTWEIGHT STEEL STUDWORK WITH THERMAL INSULATION AS SPECIFIED 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 92 WT5 92MM LIGHTWEIGHT STEEL STUD FRAME WITH FC CLADDING EXTERNALLY 35MM TOP HAT THERMAL INSULATION AS SPECIFIED. 13MM PLASTERBOARD LINING INTERNALLY (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 3592 WALL TYPES WT1 BRICK LEAF EXTERNALLY -BRICK TYPE BT1 50MM CAVITY 92MM LIGHTWEIGHT STEEL STUDWORK WITH THERMAL INSULATION AS SPECIFIED 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 92 WT6 EXISTING TRANSPORTABLE WALL STUD FRAME WITH COLORBOND METAL CLADDING EXTERNALLY 35MM TOP HAT EXISTING THERMAL INSULATION EXISTING 13MM PLASTERBOARD LINING INTERNALLY 35 PT02A 92 92 92MM LIGHTWEIGHT STEEL STUD FRAME AND FLEXIBLE TRACK FOR CURVED WALLS 13MM PLASTERBOARD LINING BOTH SIDES (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL PT03 92 1X13MM SOUND RATED PLASTERBOARD 92MM LIGHTWEIGHT STEEL STUD FRAME 2X13MM SOUND RATED PLASTERBOARD ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL PT04 92 20MM GAP FROM EXISTING WALL 92MM LIGHTWEIGHT STEEL STUD FRAME 2X13MM FIRE RATED PLASTERBOARD ENTIRE PARTITION TO EXTEND TO UNDERSIDE OF ROOF WITH AIRTIGHT SEAL PT05 76 76MM LIGHTWEIGHT STEEL STUD FRAME AND FLEXIBLE TRACK FOR CURVED WALL 13MM PLASTERBOARD TO EXPOSED SIDE PT07 13MM PLASTERBOARD LINING DIRECT STICK FIXING TO EXISTING BRICK VENEER WALL 13 PT09 2 X 92MM LIGHTWEIGHT STEEL STUD FRAME WITH AIR GAP TO SUIT EXISTING WALL DEPTH. 13MM PLASTERBOARD LINING BOTH SIDES. INFILL WALL IN EXISTING BRICK WALL 92 92 PT10 LIGHTWEIGHT STEEL FURRING CHANNEL WITH 13MM PLASTERBOARD LINING TO EXISTING WALL. ADJUST FURRING CHANNEL SIZE TO ALIGN WITH STEP IN ADJOINING WALL PT01A 92MM LIGHTWEIGHT STEEL STUD FRAME WITH 13MM PLASTERBOARD LINING TO EXPOSED SIDE (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 92 PT08 92 92MM LIGHTWEIGHT STEEL STUD FRAME 13MM PLASTERBOARD TO EXPOSED SIDE WT1B BRICK LEAF INTERTERNALLY -BRICK TYPE BT1 50MM CAVITY 150MM LIGHTWEIGHT STEEL STUDWORK. 13MM FLUSH PLASTERBOARD INTERNAL LININGS (PROVIDE WET AREA LININGS TO WET AREAS) 110 50 150 WT4A 150MM LIGHTWEIGHT STEEL STUD FRAME WITH COLORBOND METAL CLADDING EXTERNALLY 35MM TOP HAT THERMAL INSULATION AS SPECIFIED. 13MM PLASTERBOARD LINING INTERNALLY (PROVIDE WET AREA LININGS TO WET AREAS). INSULATION AS SPECIFIED 35 150 EXISTING HALL ROOF SHEETING CEILING 150MM LIGHTWEIGHT STEEL STUDWORK. ABOVE ROOF SHEETING: PROFIED STEEL CLADDING (LOW RIB) COLORBOND ON ONE SIDE TO MATCH THE EXISTING UNDER SIDE CEILING: 13MM FLUSH PLASTERBOARD INTERNAL LININGS ON ONE SIDE ON EXISING HALL SIDE: 9mm THICK INTERIOR GRADE HOOP PINE PLYWOOD CLADDING STAINED 'MAPLE' THEN CLEAR POLYURETHANE FINISH (SATIN) TO MATCH EXISTING. PT11 SECTION VIEW EXISTING HEAD HEIGHT EXISTING SILL HEIGHT 150 PT12 76 76MM LIGHTWEIGHT STEEL STUD FRAME AND 13MM PLASTERBOARD TO EXPOSED SIDE PT06EXISTING TRANSPORTABLE WALL TENDER ISSUE FOR TENDER Scale Date Job No. Rev: Dwg No. 28 Chesser Street, Adelaide, South Australia Telephone 08 8203 5800 ABN 65 007 846 brownfalconer.com.au 1/05/2020 9:44:18 AM As indicated T1 BIM 360://St Martin ST 2/2019084_St Martin ST2_R18_ WD.rvt 1/05/2020 9:44:18 AM St Martin de Porres Stage 2 FLOOR PLAN MP 2019084 CATHOLIC EDUCATION SOUTH AUSTRALIA 3134 111 17/04/2020 SCALE 100 FLOOR PLAN -MP 1 AEWMG1002 BOVE AEWMG1002 BOVE EWMG1001 ABOVE Rev. Amendment T1 FOR TENDER 01/05/2020 SPECIFIED METAL SCREEN TO CONCEAL BAG POLES
NEWSTRUCTURESETOUT(A2)
left: middle primary commons floor plan
36 LOWER LEVEL 150630 GROUND FLOOR -JP 152740 WALL TOP -JP 155840 ROOF -JP 6100 131 EXISTING BUILDING D F E G 300 2800 CEILING LEVEL 155540 DP-01 DP-01 BT2 RF D.G.01.A W. G.02.A W. G.02.E MF W. G.04.B DP-01 DP-01 MS MS FL FL FL FC1 FC1 W. G.04.C W. G.02.B 9 132 RF LOWER LEVEL 150630 LOWER LEVEL150630 GROUND FLOOR -JP 152740 GROUND FLOOR -JP152740 WALL TOP -JP 155840 WALL TOP -JP155840 ROOF -JP 6100 ROOF -JP6100 2 130 4 130 3 130 EXISTING GYM BUILDING 01 02 03 04 05 06 1 130 600 CEILING LEVEL 155540 CEILING LEVEL155540 BT1 BT1 MCP W. G.03.A W. G.02.D W. G.05.B W. G.05.A W. G.06.A MCP W. G.04.A W. G.02.C EXISTING BUILDING MF W. G.05.C W. G.03.B MF RF RF MF FL MS MS MS MS ? FL FL FL FL 3100 FC1 FC1 FC1 FC1 FC1 FC1 RF 6 131 7 131 SC LOWER LEVEL150630 GROUND FLOOR -JP152740 ROOF -JP6100 131 EXISTING BUILDING D F E G CEILING LEVEL155540 MCP RF W. G.06.B D.G.01.B W. G.06.D MF RF RF W. G.06.C FL MS FL FC1 FC1 DP-01 BT2 9 132 8 131 DP-01 MF BIM 360://St Martin ST 2/2019084_St Martin ST2_R18_ WD.rvt 9:45:06 AM SCALE 1 100 EAST ELEVATION -JUNIOR PRIMARY BUILDING 1 SCALE 1 100 SOUTH ELEVATION -JUNIOR PRIMARY BUILDING 3 SCALE 100 WEST ELEVATION -JUNIOR PRIMARY BUILDING 2
right: junior primary elevations

NOT SCALE DRAWINGS BROWN FALCONER CANNOT GUARANTEE THE ACCURACY OF CONTENT AND FORMAT FOR COPIES DRAWINGS ISSUED ELECTRONICALLY.

THE COMPLETION OF ISSUE DETAILS CHECKED AND AUTHORISED SECTION IS CONFIRMATION OF THE STATUS OF THE DRAWING. THE DRAWING SHALL NOT BE USED FOR CONSTRUCTION UNLESS ENDORSED "FOR CONSTRUCTION" AND AUTHORISED FOR ISSUE.

MAKE GOOD ANY PENETRATIONS THROUGH THE MASONRY WALLS TO THE CONDENSERS THAT ARE BEING RELOCATED GENERAL LEGEND REFER TO ARCHITECTURAL SPECIFICATION AND APPENDICES FOR GENERAL ARRANGEMENT DETAILS AND COMPUTATIONS FROM MANUFACTURER PARTICULAR TO THIS PROJECT ALL ACCESSIBLE TOILETS TO COMPLY WITH AS1428.1 REFER STRUCTURAL DRAWINGS FOR MEMBER LOCATIONS AND SIZE MAKE GOOD ALL EXISTING FINISHES DAMAGED DURING WORKS TO THE SATISFACTION OF THE SUPERINTENDENT AS PER THE SPECIFICATION, SHOP DRAWINGS AND PROTOTYPE SAMPLES ARE REQUIRED FOR SIGN OFF BY THE ARCHITECT. READ IN CONJUNCTION WITH CIVIL, STRUCTURAL, ELECTRICAL, FIRE, HYDRAULICS, MECHANICAL AND LANDSCAPING DRAWINGS.

left: middle primary bag storage & study bench joinery drawings

LOCATIONS AND SIZE • MAKE GOOD ALL EXISTING FINISHES DAMAGED DURING WORKS TO THE SATISFACTION OF THE SUPERINTENDENT • AS PER THE SPECIFICATION, SHOP DRAWINGS AND PROTOTYPE SAMPLES ARE REQUIRED FOR SIGN OFF BY THE ARCHITECT. READ IN CONJUNCTION WITH CIVIL, STRUCTURAL, ELECTRICAL, FIRE, HYDRAULICS, MECHANICAL AND LANDSCAPING DRAWINGS.

37 NOTES THE INFORMATION CONTAINED IN THIS DOCUMENT MAY NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT OR PURPOSE. VERIFY ALL DIMENSIONS AND LEVELS ON SITE AND REPORT ANY DISCREPANCIES TO BROWN FALCONER FOR DIRECTION PRIOR TO COMMENCEMENT OF ANY WORK. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS. USE FIGURED DIMENSIONS ONLY. DO NOT SCALE DRAWINGS BROWN FALCONER CANNOT GUARANTEE THE ACCURACY OF CONTENT AND FORMAT FOR COPIES DRAWINGS ISSUED ELECTRONICALLY. THE COMPLETION OF ISSUE DETAILS CHECKED AND AUTHORISED SECTION IS CONFIRMATION OF THE STATUS OF THE DRAWING. THE DRAWING SHALL NOT BE USED FOR CONSTRUCTION UNLESS ENDORSED "FOR CONSTRUCTION" AND AUTHORISED FOR ISSUE. MAKE GOOD ANY PENETRATIONS THROUGH THE MASONRY WALLS TO THE CONDENSERS THAT ARE BEING RELOCATED GENERAL LEGEND • REFER TO ARCHITECTURAL SPECIFICATION AND APPENDICES FOR GENERAL ARRANGEMENT DETAILS AND COMPUTATIONS FROM MANUFACTURER PARTICULAR TO THIS PROJECT • ALL ACCESSIBLE TOILETS TO COMPLY WITH AS1428.1 • REFER STRUCTURAL DRAWINGS FOR MEMBER
LAM02 FP -LAM02 LAM-01 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE FP -LAM02 FP LAM02 UP06 LAM-03 (KICKER) LAM-01 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE LAM02 FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD LAM03 FXD FXD FXD FXD FXD FXD FXD FXD CURVED PANEL CURVED PANEL 328 3 OFF EQ. 972 100 262 7 x EQ OS 2932 1232 x EQ OS 1684 340250 1400 LAM03 (KICKER) LAM02 LAM02 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE FP -LAM05 ADJ. LAM02 LAM02 LAM02 LAM01 BENCH 262 2932 2 x EQ OS 1232 1684 590 3 x EQ OS 940 800 1060 ADJ. ADJ. ADJ. 100 196 3 196 2 LAM-02 TOP LOCATION OF COLUMN UP06 LOCATION OF COLUMN 400 500 400 500 900 590 1684 2 x EQ OS 1232 2932 262 340 x EQ OS 1684 1232 7 x EQ OS 2933 261 R250 R 2 5 0 5 196 4 196 FIXED BENCHTOP 40 400 40mm HIGH DENSITY SEAT FOAM PROVIDE ADEQUATE STRUCTURE WITHIN 100 500 50 100 50 LAM02 OPEN SHELVING LAM02 BACK OPEN SHELVING 100 50 JOINERY LEGEND SYMBOL DESCRIPTION ADJADJUSTABLE AB ABOVE BENCH AR ACRYLIC RESIN BH JOINERY BULKHEAD BT BENCH TOP CUCUPBOARD DRDRAWER FP FIXED PANEL FSFIXED SHELF TA TAP OHC OVERHEAD CUPBOARDS OHSOVERHEAD SHELF OS OPEN SHELVING WL# WALL LINING LAM# LAMINATE SISINK UB UNDER BENCH -SHOP DRAWINGS TO BE PROVIDED TO ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO MANUFACTURE. -JOINER TO CONFIRM SPECS WITH MANUFACTURER FOR ALL HARDWARE AND EQUIPMENT PRIOR TO MANUFACTURE OF JOINERY. JOINERY GENERAL NOTE: GENERAL NOTES: -ALL GLAZING GRAPHICS TO BE IN ACCORDANCE WITH AUSTRALIAN STANDARDS 1428.1 -ALL POWER AND DATA TO BE CONFIRMED WITH ELECTRICAL ENGINEERS DRAWINGS & SPECIFICATION. -CONFIRM ALL DIMENSIONS ON SITE PRIOR TO MANUFACTURE -ENSURE ADEQUATE IN WALL TRIMMERS TO SUPPORT TV WHERE REQUIRED. -REFER DOOR AND WINDOW SCHEDULE FOR EXTENT OF GLAZING FILM. -REFER JOINERY DRAWINGS FOR DETAILS AND EXTENT OF JOINERY. TENDER ISSUE FOR TENDER Scale 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 ABN 65 007 846 586 brownfalconer.com.au 1/05/2020 10:30:03 AM As indicated BIM 360://St Martin ST 2/2019084_St Martin ST2_R18_ WD.rvt 10:30:03 AM St Martin de Porres Stage 2 JOINERY - J.20 CATHOLIC EDUCATION SOUTH AUSTRALIA SCALE 20 J.20 -ELEVATION 2 3 SCALE 20 J.20 -ELEVATION 1 2 SCALE 20 J.20 -PLAN 1 SCALE J.20 -3D A SCALE 20 J.20 SECTION 01 4 SCALE 1 20 J.20 SECTION 02 5 Rev. Amendment Date T1 FOR TENDER 01/05/2020 NOTES THE INFORMATION CONTAINED IN THIS DOCUMENT MAY NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT OR PURPOSE. VERIFY ALL DIMENSIONS AND LEVELS ON SITE AND REPORT ANY DISCREPANCIES TO BROWN FALCONER FOR DIRECTION PRIOR TO COMMENCEMENT OF ANY WORK. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS. USE FIGURED DIMENSIONS ONLY. DO NOT SCALE DRAWINGS BROWN FALCONER CANNOT GUARANTEE THE ACCURACY OF CONTENT AND FORMAT FOR COPIES DRAWINGS ISSUED ELECTRONICALLY. THE COMPLETION OF ISSUE DETAILS CHECKED AND AUTHORISED SECTION IS CONFIRMATION OF THE STATUS OF THE DRAWING. THE DRAWING SHALL NOT BE USED FOR CONSTRUCTION UNLESS ENDORSED "FOR CONSTRUCTION" AND AUTHORISED FOR ISSUE. MAKE GOOD ANY PENETRATIONS THROUGH THE MASONRY WALLS TO THE CONDENSERS THAT ARE BEING RELOCATED GENERAL LEGEND REFER TO ARCHITECTURAL SPECIFICATION AND APPENDICES FOR GENERAL ARRANGEMENT DETAILS AND COMPUTATIONS FROM MANUFACTURER PARTICULAR TO THIS PROJECT ALL ACCESSIBLE TOILETS TO COMPLY WITH AS1428.1 REFER STRUCTURAL DRAWINGS FOR MEMBER LOCATIONS AND SIZE MAKE GOOD ALL EXISTING FINISHES DAMAGED DURING WORKS TO THE SATISFACTION OF THE SUPERINTENDENT AS PER THE SPECIFICATION, SHOP DRAWINGS AND PROTOTYPE SAMPLES ARE REQUIRED FOR SIGN OFF BY THE ARCHITECT. READ IN CONJUNCTION WITH CIVIL, STRUCTURAL, ELECTRICAL, FIRE, HYDRAULICS, MECHANICAL AND LANDSCAPING DRAWINGS. LAM02 FP -LAM02 LAM-01 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE FP -LAM02 FP LAM02 UP06 LAM-03 (KICKER) LAM-01 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE LAM02 FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD LAM03 FXD FXD FXD FXD FXD FXD FXD FXD CURVED PANEL CURVED PANEL 328 3 OFF EQ. 972 100 262 7 EQ OS 2932 1232 4 x EQ OS 1684 340250 1400 LAM03 (KICKER) LAM02 FP -LAM05 ADJ. LAM02 LAM02 LAM02 LAM01 BENCH 262 2932 2 EQ OS 1232 1684 590 3 x EQ OS 940 800 1060 ADJ. ADJ. ADJ. 100 40 400 40mm HIGH DENSITY SEAT FOAM PROVIDE ADEQUATE STRUCTURE WITHIN 100 500 50 100 50 LAM02 OPEN SHELVING LAM02 BACK OPEN SHELVING 100 50 -SHOP DRAWINGS TO BE PROVIDED TO ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO MANUFACTURE. -JOINER TO CONFIRM SPECS WITH MANUFACTURER FOR ALL HARDWARE AND EQUIPMENT PRIOR TO MANUFACTURE OF JOINERY. JOINERY GENERAL NOTE: GENERAL NOTES: -ALL GLAZING GRAPHICS TO BE IN ACCORDANCE WITH AUSTRALIAN STANDARDS 1428.1 -ALL POWER AND DATA TO BE CONFIRMED WITH ELECTRICAL ENGINEERS DRAWINGS SPECIFICATION. -CONFIRM ALL DIMENSIONS ON SITE PRIOR TO MANUFACTURE -ENSURE ADEQUATE IN WALL TRIMMERS TO SUPPORT TV WHERE REQUIRED. -REFER DOOR AND WINDOW SCHEDULE FOR EXTENT OF GLAZING FILM. -REFER JOINERY DRAWINGS FOR DETAILS AND EXTENT OF JOINERY. Scale Date Job No. Rev: Dwg No. A1 SHEET 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 ABN 65 007 846 586 brownfalconer.com.au As indicated T1 St Martin de Porres Stage 2 JOINERY - J.20 2019084 CATHOLIC EDUCATION SOUTH AUSTRALIA 3134 196 24/04/2020 SCALE 1 20 J.20 -ELEVATION 2 3 SCALE 1 20 J.20 -ELEVATION 1 2 SCALE 1 20 J.20 SECTION 01 4 SCALE 20 J.20 SECTION 02 5 NOTES THE INFORMATION CONTAINED IN THIS DOCUMENT MAY NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT OR PURPOSE. VERIFY ALL DIMENSIONS AND LEVELS ON SITE AND REPORT ANY DISCREPANCIES TO BROWN FALCONER FOR DIRECTION PRIOR TO COMMENCEMENT OF ANY WORK. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS. USE FIGURED DIMENSIONS ONLY. DO
LAM02 FP -LAM02 LAM-01 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE FP -LAM02 FP LAM02 UP06 LAM-03 (KICKER) LAM-01 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE LAM02 FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD FXD LAM03 FXD FXD FXD FXD FXD FXD FXD FXD CURVED PANEL 328 3 OFF EQ. 972 100 262 7 x EQ OS 2932 1232 EQ OS 1684 340250 1400 LAM03 (KICKER) LAM02 LAM02 TO OPEN SHELVING AND EXPOSED CARCASS, MATCHING ABS EDGE FP -LAM05 ADJ. LAM02 LAM02 LAM02 LAM01 BENCH 262 2932 x EQ OS 1232 1684 590 3 x EQ OS 940 800 1060 ADJ. ADJ. ADJ. 100 196 3 LAM-02 TOP LOCATION OF COLUMN UP06 400 500 400 500 900 590 1684 2 x EQ OS 1232 2932 262 340 EQ OS 1684 1232 7 x EQ OS 2933 261 R250 R 2 5 0 40 400 40mm HIGH DENSITY SEAT FOAM PROVIDE ADEQUATE STRUCTURE WITHIN 100 500 50 100 50 LAM02 OPEN SHELVING LAM02 BACK OPEN SHELVING 100 50 JOINERY LEGEND SYMBOL DESCRIPTION ADJADJUSTABLE AB ABOVE BENCH AR ACRYLIC RESIN BH JOINERY BULKHEAD BT BENCH TOP CUCUPBOARD DRDRAWER FP FIXED PANEL FSFIXED SHELF TA TAP OHC OVERHEAD CUPBOARDS OHSOVERHEAD SHELF OS OPEN SHELVING WL# WALL LINING LAM# LAMINATE SISINK UB UNDER BENCH -SHOP DRAWINGS TO BE PROVIDED TO ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO MANUFACTURE. -JOINER TO CONFIRM SPECS WITH MANUFACTURER FOR ALL HARDWARE AND EQUIPMENT PRIOR TO MANUFACTURE OF JOINERY. JOINERY GENERAL NOTE: GENERAL NOTES: -ALL GLAZING GRAPHICS TO BE IN ACCORDANCE WITH AUSTRALIAN STANDARDS 1428.1 -ALL POWER AND DATA TO BE CONFIRMED WITH ELECTRICAL ENGINEERS DRAWINGS & SPECIFICATION. -CONFIRM ALL DIMENSIONS ON SITE PRIOR TO MANUFACTURE -ENSURE ADEQUATE IN WALL TRIMMERS TO SUPPORT TV WHERE REQUIRED. -REFER DOOR AND WINDOW SCHEDULE FOR EXTENT OF GLAZING FILM. -REFER JOINERY DRAWINGS FOR DETAILS AND EXTENT OF JOINERY. Scale Date Job No. Rev: Dwg No. A1 SHEET 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 ABN 65 007 846 586 brownfalconer.com.au As indicated T1 St Martin de Porres Stage 2 JOINERY - J.20 2019084 CATHOLIC EDUCATION SOUTH AUSTRALIA 3134 196 24/04/2020 SCALE 20 J.20 -ELEVATION 2 3 SCALE 20 J.20 -ELEVATION 1 2 SCALE 20 J.20 -PLAN 1 SCALE 20 J.20 SECTION 01 4 SCALE 1 20 J.20 SECTION 02 5

RESTHAVEN BERRI

BROWN FALCONER

Located in Berri, SA, this small scale renovation project of a 1920’s bank building serves as Resthaven’s new Community Services office, with staff relocating from the old office in Loxton.

Primarily housing facilities for Resthaven staff such as offices, a kitchenette and overnight stay, the project also encapsulates rooms for clinical consultants and activity rooms for the elderly.

Due to the heritage requirements to retain as much of the existing frontage and poor street entry conditions, the client entry was required to be moved to the side of the building to comply with ambulant access.

civil / aged care documentation & admin

2019 - 2020

The development of DA, tender and construction drawings were done under the supervision of 3 separate team leaders on account of the first leader moving elsewhere, and the second retiring. As such, the task of justifying previous design discussions via correspondence was often left to me.

Following the completion of construction drawings, the task of contract administration (specifically, the handling of liaising with interior finishes, RFIs, Variations and Progress Claims) was also done under supervision of a team leader.

Limited time on site (in part due to the greater driving distance, as well as COVID restrictions at the time), many critical

construction issues had to be resolved over the phone with builders who were on-site during the contract administration phase.

38

AND NEW). INCLUSIVE OF WINDOWS, DOOR FRAMES ETC. REMOVE EXISTING RAMPS INTO BUILDING (INTERNAL AND EXTERNAL)

PROVIDE NEW RAMP ACCESS INTO BUILDING WITH ALUMINIUM GLAZED ENTRY DOOR SUITE, INCLUDING SIDELIGHT. NEW HANDRAILS & TACTILE INDICATORS TO EXTERNAL RAMP.

DETAIL CLEAN ALL EXISTING WINDOWS TO ENABLE SMOOTH OPERATION. ALLOW FOR NEW MECHANISMS TO WINDOWS AS REQUIRED.

NEW KITCHEN JOINERY AND APPLIANCES TO STAFF KITCHEN.

NEW PAINT FINISH TO INTERNAL STAIR HANDRAIL AND BALUSTRADE.

FIRST FLOOR

• REMOVE WALLS, WINDOWS AND DOORS WHERE SHOWN IN RED. MAKE GOOD FLOOR, WALLS AND CEILING TO TAKE NEW FINISHES

• NEW WC, BASIN AND SHOWER TO EXISTING ROOM LAYOUT

• EXISTING CARPET TO BE RETAINED AND MADE GOOD. STRETCH & REINSTATE AS REQUIRED

• ALLOW FOR NON-SLIP VINYL TO WET AREAS

• ALLOW FOR ALL NEW FLOORING AS AN OPTION PRICE

• NEW PAINT FINISH TO ALL SURFACES THROUGHOUT (RETAINED AND NEW). INCLUSIVE OF WINDOWS, DOOR FRAMES ETC.

• DETAIL CLEAN ALL EXISTING WINDOWS TO ENABLE SMOOTH OPERATION. ALLOW FOR NEW MECHANISMS TO ALL WINDOWS.

• NEW PLUMBING POINTS TO RE-USED KITCHENETTE (FROM GROUND FLOOR)

• ALLOW ADDITIONAL POWER & DATA POINTS TO ALL ROOMS AS PER ELECTRICAL DRAWINGS.

EXTERNAL & LANDSCAPING

• REMOVE EXISTING STEEL STRUCTURE OVER FOOTPATH. MAKE GOOD WALL

• REMOVE ALL EXISTING SIGNS FROM BUILDING EXTERIOR

• DETAIL CLEAN TO PERIMETER OF BUILDING. ALLOW FOR PAINT FINISH TO EXISTING WALLS (COLOUR TO MATCH) BOTTOM FLOOR PERIMETER.

• ALLOW FOR NEW GUTTERS (WHERE VISIBLY DAMAGED) AND UPGRADE OF DOWNPIPES WHERE REQUIRED.

• PRESSURE CLEAN EXISTING CONCRETE SURFACES

• ALLOW FOR UPGRADE OF EXISTING LANDSCAPE AREA

INCLUSIVE OF NEW SLEEPERS (600mm HIGH RETAINING WALL, APPROX. 14m LONG. ALLOW FOR RUST PROTECTION AND PAINT FINISH TO EXISTING POSTS

• ALLOW FOR 3 OFF EXTERNAL SOLAR LIGHTING TO CARPARK. REFER TO ELECTRICAL DRAWINGS ALLOW FOR FORTUBULAR STEEL FENCE TO GARDEN AREA AS SHOWN ALLOW FOR RAMPED ACCESS FROM CAR PARK TO CLIENT ENTRY

ALLOW FOR WHEEL STOPS TO LOWER CARPARKS ALLOW FOR REPAINT ON PREVIOUSLY PAINTED SURFACES IRRIGATION TO LANDSCAPE AREAS

STREET RENDER

001COVER SHEET C1

002EXISTING FLOOR PLANS C1

003DEMOLITION FLOOR PLANS C1

004PROPOSED FLOOR PLANS C1

005ELEVATIONS C1

006NOT USED C1

WILSON STREET

007LANDSCAPING C1

008ROOM LAYOUT C1

009ROOM LAYOUT C1

010ROOM LAYOUT C1

011ROOM LAYOUT C1

012ROOM LAYOUT C1

013FURNITURE PLAN C1

left: proposed site plan top right: street view render (Photoshop)

39 CARPARK APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING
EXISTING SERVICES ROWE RESERVE APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING EXISTING BUILDING BOUNDARY 50.29m BOUNDARY 50.29m BOUNDARY 20.1m BOUNDARY 20.1m PAVED FOOTPATH EXISTING CROSSOVER 3110 BRICK WALL ON-STREET CARPARKING EXISTING STREET TREE EXISTING STREET TREE EXISTING RETAINING SLEEPER WALL WITH NEW FENCE ON TOP EXTENT OF CONCRETE PAVING UP NEW ACCESS RAMP (CHECK ON SITE) OUTDOOR SITTING AREA (PAVED) GARDEN BED GARDEN BED UP UP UP RAISED GARDEN BED EXISTING TANK STAND 1:20 RAMP UP 1:20 RAMP UP DESIGNATED ACCESSIBLE CARPARK NEW SHED WORKS ON NEW ACCESS RAMP NOT PROCEEDING vaughan terrace wilson street murray river NORTH CONSTRUCTION Scale Date Job No. Rev: Dwg No. Drawn A1 SHEET 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 Facsimile 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au As indicated C1 RIVERLAND COMMUNITY SERVICES 7 WILSON STREET, BERRI COVER SHEET 2019063 RESTHAVEN INCORPORATED CH 3306 001 27 MAY 2020 CENTRE 1 200 SITE PLAN NOTE: CONFIRM ALL MEASUREMENTS ON SITE PRIOR TO COMMENCING CONSTRUCTION WORK APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING APPROXIMATE OUTLINE OF NEIGHBOURING BUILDING BOUNDARY 50.29m EXISTING CROSSOVER BRICK WALL EXISTING STREET TREE EXTENT OF CONCRETE PAVING UP NEW ACCESS RAMP (CHECK ON SITE) UP RAISED GARDEN BED 1:20 RAMP UP 1:20 RAMP UP WORKS ON NEW ACCESS RAMP NOT PROCEEDING PROPOSED BUILDING AND SITE vaughan terrace wilson street murray river book purnong r oad NORTH
C:\Users\chill\Documents\2019063_RH Berri_WD_01_c.h illBQUV3.rvt 27/05/2020 5:12:05 PM
1 200 SITE PLAN 1 : 5000 LOCATION PLAN
SHEET LIST

left: street and driveway elevations

right: detail plan of new street entry

SIGN 4 (NON-ILLUMINATED)

(NON-ILLUMINATED)

(NON-ILLUMINATED)

40 STREET LEVEL -500 STREET LEVEL -500 TOP OF LEVEL PARAPET 8895 LEVEL CEILING 7300 SCREW EXISTING DOOR IN CLOSED POSITION GROUND LEVEL STREET LEVEL -500 NEW PAINTED RENDER FINISH TO EXISTING FACE BRICKWORK. 300mm RETURN ON CORNERS SIGN 1. 1250w x 850h NOM. C.O.S. COMMUNITY 300 850 275 CLEAN EXISTING PLINTH DP DP EXISTING RENDER RETAIN EXISTING FACADE ORNAMENTATION LEVEL 4280 530 1250 EX.W EX.W EX.W EX.W EX.W EX.W EX.W EX.W EX.W EX.W EX.D W.G.15A PAINTED RENDER FINISH TO EXISTING FACE BRICKWORK. RETURN 300mm ON CORNERS D.G.15A NOTE: SIGN DIMENSIONS REDUCED TO ACCOMODATE EXISTING OVERFLOW SPOUT. CHECK LOCATION ON SITE AND INCLUDE OVERFLOW POSITION IN SHOP DRAWINGS (AVOID WATER INGRESS TO NEW SIGNAGE) APPROXIMATE LOCATION OF OVERFLOW SPOUT. C.O.S. NOTE: PROVIDE STAYS TO RESTRICT OPENINGS OF FIRST FLOOR WINDOWS TO MAX 125MM NEW FROSTED GLAZING TO EXISTING WINDOW EXISTING ROOF TO REMAIN. REPAIR AS NEEDED EXISTING CHIMNEY STACK CARPARK 50 EXISTING RENDER EXISTING RENDER 1400175 EX.W EX.W EX.W EX.W EX.W EX.W EX.W EXDP SIGN 2 SIGN 3 D.G.39 RENDER WALL INFILL TO MATCH EXISTING EXISTING BRICK PIER COMMUNITY SERVICES 1250 INCLUDE OVERFLOW POSITION IN COMMUNITY SERVICES C:\Users\chill\Documents\2019063_RH Berri_WD_01_c.h illBQUV3.rvt 100 NORTH ELEVATION 100 EAST ELEVATION 100 SOUTH ELEVATION 100 WEST ELEVATION
1 (ILLUMINATED) ILLUMINATED) ILLUMINATED) REPLACE EXISTING WINDOW WITH NEW TO SUIT EX OPENING REPAIR ROOF WHERE VISIBLE AND REQUIRED inclusive OF GUTTERS, VALLEYS AND PARAPETS (CAPPING OR OTHERWISE) RAMP TO 500420 LINE OF EXISTING PARAPET W.G.03 EX. D SIGN 4 HR 200 900 REPAINT LOWER WALL NO PAINTING REQUIRED TO UPPER FLOOR EXTERIOR NOTE: PROVIDE STAYS TO RESTRICT OPENINGS OF FIRST FLOOR WINDOWS TO MAX 125MM TOP OF LEVEL 1 PARAPET 8895 ROOF 7995 LEVEL 1 CEILING 7300 EXISTING AC UNITS EXISTING WATER HEATER EXISTING DOWNPIPE GROUND LEVEL 0 GROUND LEVEL STREET LEVEL -500 STREET LEVEL-500 SERVICES 50885067 2721250 EX.W LINE OF EXISTING PARAPET REMOVE EXISTING SIGN EX.W EX.W EX.W LINE OF EXISTING ON BOUNDARY LINE EXISTING RENDER EXISTING RENDER SIGN 1A LEVEL 1 4280 EX.W EX.W EX.W EX.W EX.W EX.DP RETURN RENDER 300mm 300 REPAINT LOWER WALLS NO PAINTING REQUIRED TO UPPER FLOOR EXTERIOR NOTE: PROVIDE STAYS TO RESTRICT OPENINGS OF FIRST FLOOR WINDOWS TO MAX 125MM NEW PAINTED RENDER FINISH TO EXISTING FACE BRICKWORK. 300mm RETURN ON CORNERS SIGN 1. 1250w 850h NOM. C.O.S. COMMUNITY SERVICES 300 850 275 CLEAN EXISTING PLINTH DP DP RETAIN EXISTING FACADE ORNAMENTATION 530 1250 EX.W EX.W EX.W EX.W EX.W EX.W EX.W EX.W W.G.15A D.G.15A NOTE: SIGN DIMENSIONS REDUCED TO ACCOMODATE EXISTING OVERFLOW SPOUT. CHECK LOCATION ON SITE AND INCLUDE OVERFLOW POSITION IN SHOP DRAWINGS (AVOID WATER INGRESS TO NEW SIGNAGE) APPROXIMATE LOCATION OF OVERFLOW SPOUT. C.O.S. TOP OF LEVEL 1 PARAPET8895 LEVEL 1 CEILING7300 NEW FROSTED GLAZING TO EXISTING WINDOW EXISTING ROOF TO REMAIN. REPAIR AS NEEDED EXISTING CHIMNEY STACK GROUND LEVEL 0 STREET LEVEL-500 RETAIN EXISTING NIGHT ACCESS BOXES. SAND BACK & PAINT -C.O.S. CARPARK 475 50 260 1900 EXISTING RENDER EXISTING RENDER RETAIN EXISTING FACADE ORNAMENTATION 1400175 EX.W EX.W EX.W EX.W EX.W W. 1.07B W. 1.07A EX.W EX.W EX.W W. G.01 EX.WEX.W EX.W EXDP SIGN SIGN D.G.39 RENDER WALL INFILL TO MATCH EXISTING REMOVE EXISTING SIGN EXISTING ETSA SWITCHBOARD LEVEL 4280 EXISTING BRICK PIER EX.DP RETURN RENDER TO FACE BRICKWORK 300mm EX.DP NO PAINTING REQUIRED TO UPPER FLOOR EXTERIOR NOTE: PROVIDE STAYS TO RESTRICT OPENINGS OF FIRST FLOOR WINDOWS TO MAX 125MM DIMENSIONS ACCOMODATE OVERFLOW SPOUT. ON SITE AND OVERFLOW POSITION IN (AVOID WATER SIGNAGE) 475 1400 CARPARK 260 1400 RAMP TO 500 900 ENTRY • REMOVE EXISTING STEEL STRUCTURE OVER FOOTPATH. MAKE GOOD WALL • REMOVE ALL EXISTING SIGNS FROM BUILDING EXTERIOR • DETAIL CLEAN TO PERIMETER OF BUILDING. ALLOW FOR PAINT FINISH TO EXISTING WALLS (COLOUR TO MATCH) BOTTOM FLOOR PERIMETER. • ALLOW FOR NEW GUTTERS (WHERE VISIBLY DAMAGED) AND UPGRADE OF DOWNPIPES WHERE REQUIRED. • PRESSURE CLEAN EXISTING CONCRETE SURFACES • ALLOW FOR UPGRADE OF EXISTING LANDSCAPE AREA INCLUSIVE OF NEW SLEEPERS (600mm HIGH RETAINING WAL APPROX. 14m LONG. ALLOW FOR RUST PROTECTION AND PAI FINISH TO EXISTING POSTS • ALLOW FOR 3 OFF EXTERNAL SOLAR LIGHTING TO CARPAR REFER TO ELECTRICAL DRAWINGS • ALLOW FOR FORTUBULAR STEEL FENCE TO GARDEN AREA A SHOWN • ALLOW FOR RAMPED ACCESS FROM CAR PARK TO CLIENT ENTRY • ALLOW FOR WHEEL STOPS TO LOWER CARPARKS • ALLOW FOR REPAINT ON PREVIOUSLY PAINTED SURFACES • IRRIGATION TO LANDSCAPE AREAS EXTERNAL & LANDSCAPING COMMUNITY SERVICES 1050 1900 CONSTRUCTION ISSUE FOR CONSTRUCTION Scale Date Job No. Rev: Dwg No. Drawn A1 SHEET 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 Facsimile 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au 27/05/2020 5:12:50 PM As indicated C1 RIVERLAND COMMUNITY SERVICES 7 WILSON STREET, BERRI ELEVATIONS 2019063 RESTHAVEN INCORPORATED CH 3306 005 27 MAY 2020 1 100 EAST ELEVATION 1 100 WEST ELEVATION 1 20 SIGN 2 (NON-ILLUMINATED) 1 20 SIGN 3
20
SCOPE OF WORKS 1 20 SIGN 1A
Rev. Amendment Date C1 CONSTRUCTION 26/05/2020 PT01 EXIT MF 3600 EX.MF 3600 NEW T-BAR GRID SYSTEM + EXISTING TILES REUSED EXIT 008 6 008 9 5 8 7 12 10 11 008 14 16 13 15 AIRLOCK G.10 ASV2 UNISEX WC G.11 ASV2 ACCESS UNISEX WC G.12 ASV2 WC HD HB D. G.11 008 17 18 19 20 008 22 21 24 23 ENTRY G.15 TGSI TGSI EX.D PT02 PT01 UNDER CH1 CH1 CH1 110 D.G.12 HB MX PTD GR TRH GR ACC-WC WALL HOOKS ON FACE OF SLIDING DOOR HK HK TRH HANDRAIL HORIZONTALLY RETURNS TO WALL GR GR PT01 1 2 3 HR D.G.15B HR ENTRY STAIRS: 3 RISERS @ 166.7MM 2 GOINGS @ 300MM EXIT EXIT CLEANER G.11A ASV2 CS D. G.15A REUSED DOOR AND SIDELIGHT. ADD WALL INFILL IF NECESSARY 910 C.O.S.90410 PT01 PT01 VOID 2000 110 CL 450 CL 550 90900 996545 90 1110 CL 450450 PB 2800 PB 2800 MF 3600 EXIT C:\Users\chill\Documents\2019063_RH Berri_WD_01_c.h illBQUV3.rvt 27/05/2020 5:13:11 PM 1 50 CEILING PLAN - RECEPTION & WAITING 1 50 ROOM LAYOUT - AIRLOCK 50 CEILING PLAN - AIRLOCK
SIGN

INTERNAL ELEVATIONS SYMBOLS LEGEND

41 EX.SK FG TS EQEQ EX. 008 3 2 1 4 WAITING G.13 CPT1 RECEPTION G.14 CPT1 PT01 PT01 J.G.13 CH1 CH1 CH1 EX.D FE FE MAIN ACTIVITY G.16 CPT1 D.G.09 CH2 EX.FC EX.OS EXIT MF 3600 EX.MF 3600 EXIT 008 9 12 10 11 008 14 16 13 15 UNISEX WC G.11 ASV2 WC HD HB D. G.11 008 22 21 24 23 ENTRY G.15 TGSI TGSI PT02 PT01 UNDER 110 HB MX TRH HANDRAIL HORIZONTALLY RETURNS TO WALL GR GR PT01 HR D.G.15B HR ENTRY STAIRS: 3 RISERS @ 166.7MM 2 GOINGS @ 300MM EXIT CLEANER G.11A ASV2 CS D. G.15A REUSED DOOR AND SIDELIGHT. ADD WALL INFILL IF NECESSARY 910 C.O.S.90410 PT01 VOID 90900 996545 90 1110 C 450450 PB FPB 2700 EXIT EX. WALL HOOKS ON FACE OF SLIDING DOOR WC PB/P VS VS EX. TRH GR 200 810 600 VS VS
ACC-WC AC ADJ BC BH CH CS DATA DPGO DRY DS EB EM FB FC FE FG FP FR GPO HB HD HK HR MC MP MS MW MX OS PB PB/P PBA/P PC PLY RM SHED SK ST SN TB TGPO TGSI TP TRH TS TV VS WB WC WM WR WS WT ACCESIBLE TOILET AIR CONDITIONER ADJUSTABLE BOOKCASE BULKHEAD CHAIR CLEANERS SINK DATA OUTLET DOUBLE GROUNDED POWER OUTLET DRYER DECAL STRIP EXERCISE BIKE ENTRY MAT FIRE BLANKET FILING CABINET FIRE EXTINGUISHER FIXED GLAZING FIREPLACE FRIDGE GROUND POWER OUTLET HAND BASIN HAND DRYER HOOK HANDRAIL MIRROR CABINET MOBILE PEDESTAL STORAGE METAL SHEETING MICROWAVE MIXER TAP OPEN SHELVING PINBOARD PLASTERBOARD PAINT FINISH PLASTERBOARD, ADHESIVE FIX PLASTER CORNICE TO EXISTING WALL PAINT FINISH PLYWOOD ROWING MACHINE STRATCO SHED SKIRTING STORAGE SINK TABLE TRIPLE GROUNDED POWER OUTLET TACTILE GROUND SURFACE INDICATOR TAP TOILET ROLL HOLDER TIMBER SKIRTING TELEVISION -LED SCREEN VINYL SKIRTING WINDOW BLINDS TOILET WASHING MACHINE WARDROBE WORKSTATION WALL TILE XX.XX J.XX.XX FIXTURE, EQUIPMENT OR SANITARYWARE CODE JOINERY CODE EX.XXXX EXISTING. REFER INTERNAL FINISHES SCHEDULE FOR DETAILS D.XX.XX NEW DOOR. SEE SCHEDULE FOR DETAILS W.XX.XX NEW WINDOW. SEE SCHEDULE FOR DETAILS VS EX. EX. VS VS VS TS TS TS ENTRY STAIRS: 3 RISERS @ 166.7MM 2 GOINGS @ 300MM HR 1000 1000 D.G.15 FG DS1 W.G.15A 3080 FG EX. PB/P FG FG FG FG TS TS HANDRAIL RETURNED HORIZONTALLY TO WALL ENTRY STAIRS: RISERS @ 166.7MM GOINGS @ 300MM 300 300300 1 2 3 3300 C.O.S. D.G.15B RECEPTION DESK -ELEVATION 2 RECEPTION DESK -ELEVATION 3 RECEPTION DESK -ELEVATION 4 CONSTRUCTION ISSUE FOR CONSTRUCTION Scale Date Job No. Drawn 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 Facsimile 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au 27/05/2020 5:13:11 PM As indicated RIVERLAND COMMUNITY SERVICES 7 WILSON STREET, BERRI ROOM LAYOUT 2019063 RESTHAVEN INCORPORATED CH 27 MAY 2020 RECEPTION & WAITING -ELEVATION RECEPTION & WAITING -ELEVATION RECEPTION & WAITING -ELEVATION RECEPTION & WAITING -ELEVATION RECEPTION & WAITING RECEPTION & WAITING 1 50 CEILING PLANSCALE 1 50 ACCESS UNISEX WC -ELEVATION SCALE 1 50 ACCESS UNISEX WC -ELEVATION SCALE 1 50 UNISEX WC -ELEVATION SCALE 1 50 UNISEX WC -ELEVATION UNISEX WC -ELEVATION UNISEX WC -ELEVATION UNISEX WC -ELEVATION SCALE 1 50 UNISEX WC -ELEVATION 900 FFL SCALE 50 AIRLOCK -ELEVATION SCALE 50 AIRLOCK -ELEVATION 20 SCALE 50 ENTRY RAMP -ELEVATION 21 SCALE 50 ENTRY RAMP -ELEVATION 22 SCALE 50 ENTRY RAMP -ELEVATION 23 SCALE 50 ENTRY RAMP -ELEVATION 24 900 2100 3200 2700 FFL 500 NOTE: CONFIRM ALL MEASUREMENTS ON SITE PRIOR TO COMMENCING CONSTRUCTION WORK PLAN DETAIL - J.G.13 RECEPTION DESK Rev. Amendment Date C1 CONSTRUCTION 26/05/2020 ? TS PB 1400 DGPO DGPO D. EX. EX.SK EX.SK TS PB/P EX. EX.SK DGPO DATA OPEN EXIT MF 3600 NEW T-BAR GRID SYSTEM EXISTING TILES REUSED EXIT HANDRAIL HORIZONTALLY RETURNS TO WALL ENTRY STAIRS: 3 RISERS @ 166.7MM 2 GOINGS @ 300MM REUSED DOOR AND SIDELIGHT. ADD WALL INFILL IF NECESSARY PB 2800 PB 2800 PB 2800 PB 2800 FPB 2700 MF 3600 EXIT EXIT VS PTD GR TRH ACC-WC HB MX EX. 830 CL 900 C 220 200 800 VS M SD HB MX EX. CL 550 1000 830 VS PB/P D.G.15 WALL HOOKS ON FACE OF SLIDING DOOR VS VS EX. ACC-WC GR GR TRH CL 450 800 WC EX. EX. VS VS TRH GR GR VS EX. WC VS GR VS 810 200 PB/P D. G.11 EX. VS VS EX. VS EX. TRH GR 200 810 600 D. G.11 VS VS EX. VS OPEN VS M HB MX C 490 HB MX VS VS EX. HD 990 C 650 CH CS DATA DPGO DRY DS EB EM FB FC FE FG FP FR GPO HB HD HK HR MC MP MS MW MX OS PB PB/P PBA/P PC PLY RM SHED SK ST SN TB TGPO TGSI TP TRH TS TV VS WB WC WM WR WS WT BULKHEAD CHAIR CLEANERS SINK DATA OUTLET DOUBLE GROUNDED POWER OUTLET DRYER DECAL STRIP EXERCISE BIKE ENTRY MAT FIRE BLANKET FILING CABINET FIRE EXTINGUISHER FIXED GLAZING FIREPLACE FRIDGE GROUND POWER OUTLET HAND BASIN HAND DRYER HOOK HANDRAIL MIRROR CABINET MOBILE PEDESTAL STORAGE METAL SHEETING MICROWAVE MIXER TAP OPEN SHELVING PINBOARD PLASTERBOARD PAINT FINISH PLASTERBOARD, ADHESIVE FIX PLASTER CORNICE TO EXISTING WALL PAINT FINISH PLYWOOD ROWING MACHINE STRATCO SHED SKIRTING STORAGE SINK TABLE TRIPLE GROUNDED POWER OUTLET TACTILE GROUND SURFACE INDICATOR TAP TOILET ROLL HOLDER TIMBER SKIRTING TELEVISION -LED SCREEN VINYL SKIRTING WINDOW BLINDS TOILET WASHING MACHINE WARDROBE WORKSTATION WALL TILE VS VS PB/P D.G.15 OPEN EX. VS EX. EX. VS VS EX. VS TS EX. EX. TS HANDRAIL RETURNED HORIZONTALLY TO WALL TS 300 2 3 300300 ENTRY STAIRS: 3 RISERS @ 166.7MM 2 GOINGS @ 300MM HR 1000 1000 D.G.15 FG DS1 W.G.15A 3080 FG EX. PB/P FG FG FG FG TS TS HANDRAIL RETURNED HORIZONTALLY TO WALL ENTRY STAIRS: 3 RISERS @ 166.7MM 2 GOINGS @ 300MM 300 300300 1 2 3 3300 C.O.S. D.G.15B RECEPTION DESK -ELEVATION RECEPTION DESK -ELEVATION RECEPTION DESK -ELEVATION RECEPTION DESK -ELEVATION Scale Date Job No. Rev: Dwg No. Drawn A1 SHEET 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 Facsimile 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au As indicated C1 RIVERLAND COMMUNITY SERVICES 7 WILSON STREET, BERRI ROOM LAYOUT 2019063 RESTHAVEN INCORPORATED CH 3306 008 27 MAY 2020 SCALE 1 50 RECEPTION & WAITING -ELEVATION 3 900 2100 FFL 300 SCALE 50 RECEPTION & WAITING -ELEVATION 4 900 2100 FFL 2800 50 CEILING PLAN - AIRLOCK 900 2100 FFL 2800 SCALE 50 ACCESS UNISEX WC -ELEVATION 5 SCALE 1 50 ACCESS UNISEX WC -ELEVATION 6 SCALE 1 50 ACCESS UNISEX WC -ELEVATION 7 SCALE 1 50 ACCESS UNISEX WC -ELEVATION 8 SCALE 1 50 UNISEX WC -ELEVATION 9 SCALE 1 50 UNISEX WC -ELEVATION 10 SCALE 1 50 UNISEX WC -ELEVATION 11 SCALE 50 UNISEX WC -ELEVATION 12 SCALE 1 50 UNISEX WC -ELEVATION 13 SCALE 50 UNISEX WC -ELEVATION 16 SCALE 1 50 UNISEX WC -ELEVATION 15 SCALE 1 50 UNISEX WC -ELEVATION 14 900 2100 2700 FFL SCALE 1 50 AIRLOCK -ELEVATION 17 SCALE 1 50 AIRLOCK -ELEVATION 18 SCALE 50 AIRLOCK -ELEVATION 19 SCALE 50 AIRLOCK -ELEVATION 20 SCALE 1 50 ENTRY RAMP -ELEVATION 21 SCALE 50 ENTRY RAMP -ELEVATION 22 SCALE 50 ENTRY RAMP -ELEVATION 23 SCALE 1 50 ENTRY RAMP -ELEVATION 24 900 2100 3200 2700 FFL 500 NOTE: CONFIRM ALL MEASUREMENTS ON SITE PRIOR TO COMMENCING CONSTRUCTION WORK 1 50 PLAN DETAIL - J.G.13 RECEPTION DESK left: internal elevations

GOLDEN GROVE HIGH SCHOOL

BROWN FALCONER

Development on the Golden Grove High School sees new buildings for year 7-8 students in the form of new learning areas, as well as Performance spaces and a Year 12 lounge.

In addition to assisting with the documentation of construction drawings - namely reviewing slab setout drawings, floor and ceiling finishes and internal elevations - the opportunity to develop the concepts for this school’s signage and decal package was presented, allowing for experimentation in communicating the driving concept in visual ways beyond conventional architecture.

The decal designs followed the driving design concept of the morphology of a leaf: a central line (the petiole or stem)

with a small variety of shapes sprouting from it (representing leaves, or the lamina of a leaf). Building on this concept with the use of shades of green, yellow, orange and blue, as well as solid shapes combined with half-tone patterns created the resulting design.

42
education graphic design 2020
43
left (top & bottom): concept renders of Year 7-8 Building and Year 12/Performance Building (used with permission from Brown Falconer) right: final decal concept and colour variations

left: varying applications of decals to full-height glazed doors / partitions

-ARTWORK/GRAPHICS/SYMBOLS DOCUMENTED ARE FOR INFORMATION ONLY. FINAL ARTWORK /GRAPHICS SYMBOLS TO BE CONFIRMED. -REFER PLAN FOR LOCATION ON DOORS/WINDOWS. CHECK ON SITE 0 Sca Bar U t n M me r s 0 0 5 00 00 4 0 00 F1 FILM STATUTORY -100mm SOLID BAND 100MM HIGH HORIZONTAL VINYL BANE (ENTIRE WIDTH OF GLAZED SECTION). COLOUR -30% GREY F2 FILM SHAPE PATTERN -FULL HEIGHT CLEAR PRINTED FILM F3 FILM SHAPE PATTERN -PRIVACY TYPE 2MM APPLIED CAST VINYL TO PUBLIC FACE OF GLASS. DECAL DESIGN TO BE INSTALLED FROM 600 AFL TO 1800 AFL.. REFER COLOUR PALETTE FOR LOCATIONS SOLID LINE OF DECAL DESIGN TO SIT ABOVE F1 STATUTORY BAND F2.1 GLA FILM 1:20 @ A1 F2.2 GLA FILM 1:20 @ A1 F2.3 THINK TANK GROUND 1:20 @ A1 F2.4 THINK TANK LEVEL 1 1:20 @ A1 F2.5 BETWEEN GLA FILM 1:20 @ A1 2MM APPLIED CAST VINYL TO PUBLIC FACE OF GLASS. DECAL DESIGN TO BE INSTALLED FROM 600 AFL TO 1800 AFL.. REFER COLOUR PALETTE FOR LOCATIONS -ARTWORK/GRAPHICS/SYMBOLS DOCUMENTED ARE FOR INFORMATION ONLY. FINAL ARTWORK /GRAPHICS SYMBOLS TO BE CONFIRMED. -REFER PLAN FOR LOCATION ON DOORS/WINDOWS. CHECK ON SITE WITH ARCHITECT. NOTES REV. 00 S a e Ba Un s M met es 0 2 0 2 0 30 400 50 60 70 F1 FILM STATUTORY -100mm SOLID BAND 100MM HIGH HORIZONTAL VINYL BANE (ENTIRE WIDTH OF GLAZED SECTION). COLOUR -30% GREY F2 FILM SHAPE PATTERN -FULL HEIGHT CLEAR PRINTED FILM F3 FILM SHAPE PATTERN -PRIVACY TYPE 2MM APPLIED CAST VINYL TO PUBLIC FACE OF GLASS. DECAL DESIGN TO BE INSTALLED FROM 600 AFL TO 1800 AFL.. REFER COLOUR PALETTE FOR LOCATIONS SOLID LINE OF DECAL DESIGN TO SIT ABOVE F1 STATUTORY BAND F2.1 GLA FILM 1:20 @ A1 F2.2 GLA FILM 1:20 @ A1 F2.3 THINK TANK GROUND 1:20 @ A1 F2.4 THINK TANK LEVEL 1 1:20 @ A1 F2.5 BETWEEN GLA FILM 1:20 @ A1 2MM APPLIED CAST VINYL TO PUBLIC FACE OF GLASS. DECAL DESIGN TO BE INSTALLED FROM 600 AFL TO 1800 AFL.. REFER COLOUR PALETTE FOR LOCATIONS
B-1 B-1 B-B B-B B-2 B-3 B-3 B-F B-6 B-8 B-9 B-11 B-E B-C B-D B-A B-5 B-10 B-7 B-4 GLA 1 05 GLA 02 GLA 1 01 THINK 03 SLA 04 STAFF 06 SLA1 11 LEADER 07 SUPPORT 08 GLA 14 DECK 109 SLA 15 STAFF 17 GLA 3 22 LEADER 21 DECK 108 SLA 26 COMMONS 20 TOILETS 18 CLEANERS 19 GLA 16 GLA 12 THINK 13 STORE 10 TOILETS 09 GLA 24 THINK 23 GLA 25 AREA GF 1 AREA GF 2 B-1 B-1 B-B B-B B-2 B-3 B-3 B-F B-6 B-8 B-9 B-11 B-E B-C B-D B-A B-5 B-10 B-7 B-4 GLA 27 GLA 1 29 GLA 31 TOILETS 32 STORE 33 GLA 39 GLA 2 41 SLA1 30 THINK 28 STAFF 34 LEADER 35 SUPPORT 36 GLA 38 SLA 37 SLA 43 TOILETS 44 CLEANERS 45 GLA 3 49 GLA 3 50 THINK 48 SLA 47 TERRACE 111 GLA 3 46 STAFF 42 THINK 40 LIFT 168 VOID VOID VOID 1800 AREA FF 1 AREA FF 2 01834 @ A1 7323-A-2019 CONTRACT EXECUTION REVISION DPTI DRAWING NO. SHEET NO. DPTI ASSET NO. DRAWN BY - CHECKED BY SCALE AND SHEET SIZE CONTRACT NO. PSC JOB NO. DRAWING TITLE SITE ADDRESS CONTRACT NAME CONTRACTOR WITNESS DATE DATE REV. AMENDMENTS DATE INIT. 00 S a e r n s M me es 0 2 0 20 30 400 0 00 00 Department of Planning, Transport and Infrastructure A A ALI UST R TH SO U Government of South Australia COPYRIGHT - GOVERNMENT OF SOUTH AUSTRALIA - DPTI SETTING OUT OF THE WORK IS THE RESPONSIBILITY OF TH CONTRACTOR ALL DIMENSIONS TO BE VERIFIED ON SITE DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THE SUPERINTENDENT THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONTRACT DOCUMENTS 28 Chesser Street, Adelaide, South Australia 5000 Telephone 08 8203 5800 ABN 65 007 846 586 brownfalconer.com.au 1 : 200 A 15/05/2020 3:47:36 PM GOLDEN GROVE HIGH SCHOOL REDEVELOPMENT 1-200 FLOOR PLANS - YEAR 7-8 2019039 W109 Author Checker 1 ADEY PLACE GOLDEN GROVE 5125 7309-AR-2020 3101 SCALE 200 YEAR 7/8 -GROUND FLOOR SCALE 1 200 YEAR 7/8 -FIRST FLOOR A15/05/2020DPTI left: general arrangement floor plans 7-8 building

DOMINICAN MASTERPLAN

BROWN FALCONER

The Dominican School masterplan sort to generate potential design directions regarding the handling of existing building stock that included building services that were at the end of their lifespan and a 2 story heritage building facing the main street.

Typically, masterplan documents were presented utilizing the standard practice of architectural plans, elevations and sections but an opportunity to explore a different method to communicate design moves in a streamlined fashion was presented.

As existing drawings and surveys of the site were readily available, it was proposed to create axonometric drawings to communicate design intentions

to the client. Architectural Plans communicate site and building layout. Elevations communicate building envelope and character more effectively. In standard architectural workflows, both types of drawings are derived from the same model in software such as Revit.

Axonometric Drawings communicate aspects of both, but do take more time to develop with building components such as roofing needing to be required, which is why 3D representations aren’t typically considered in early design stages. However, having existing drawings of the entire site available allowed for a quick and efficient generation of a 3D model. Such moves included the

improvement of entry conditions from the main street and the Kiss & Drop, removal of existing transportables on site to connect external play space with internal courtyards, and proposed improvements to said play spaces.

Despite the visual effectiveness of 3D diagrams, their limits were realized when it came to communicating the internal layouts of existing buildings. As such, diagrammatic plans were utilized to communicate internal rearrangement of classrooms and staff facilities.

46
education masterplanning 2021
47
left: axonometric & plan diagrams for masterplanning document
48
right: process diagrams exploring removal of existing wall and resulting connections
49
left: exploration of potential external and nature play space

thank

you

PORTFOLIO

DIGITAL VERSION

SELECTED WORKS (2015 - 2021)

50
CHRISTOPHER HILL GRADUATE OF ARCHITECTURE (M.ARCH) for reading!

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.