ARCHITECTURE PORTFOLIO
CHRISTIANDY PRADANGGA 2017
One of the Great Beauties of Architecture is that each time it is like life starting all over again. Renzo Piano
CHRISTIANDY PRADANGGA +393345040206
PROFILE Date of Birth Nationality Gender Address
cpradangga@gmail.com
EDUCATION : 6/02/1991 : Indonesian : Male : Piazzale Susa 15 Milan, Italy 20133
Bachelor of Science in Architecture | 2008-2012 Institut Teknologi Bandung, Indonesia Master of Science in Architecture ( in pursue ) | 2015-present Politecnico di Milano, Italy
WORK EXPERIENCES
AWARDS AND ACHIEVEMENTS
RAW Architecture | 2012-2013
1st Prize Winner - Lombok Epicentrum Square (RAW Architecture 2012)
Jakarta, Indonesia
Architectural Designer
1st Prize Winner - Indonesian National Gallery (RAW Architecture 2013)
DAP | 2014
1st Prize Winner - Christ The Messiah Statue of Jayapura (2014)
Bandung, Indonesia
Architectural Designer
3rd Prize Winner - Pelindo IV Headquarter (2014)
Freelance Architect | 2015-present
Best of 70 - ARBBI Design Award Urban House Competition (2014)
Surabaya, Indonesia ; Milan, Italy
Architectural Designer
2nd Prize Winner - Onduline Green Roof Award (2015)
SKILLS
CERTIFICATION
Autocad 2d 3ds Max Sketchup Revit Adobe Photoshop Adobe Illustrator Adobe Indesign
SKA Arsitek Muda (Indonesian Young Architect Licence) LPJK, Licence number 1.1.101.3.091.14.1086000 2015
4
CONTENTS // ACADEMIC WORKS 6
I - Ski : A New Icon for Milan Architecture Design Studio 2 - Politecnico di Milano
10
FAR-IN Festival : Temporary event for Scalo Farini Milan MIAW-A Workshop - Politecnico di Milano
14
Abandoned Milan [Milano Animal City] : Rethinking City’s Layers for Biodiversity Town Planning Design Workshop - Politecnico di Milano
18
Hilly Hostel Garage San Remo : Between Manner and Self Expression Architecture Design Studio 1 - Politecnico di Milano
24
Bassi Central Business Park : Merging CBD and Business Park Building Technology Studio - Politecnico di Milano
// COMPETITIONS 28
Indonesian National Gallery : When Earth and Sky meet 1st Prize Winner (RAW Architecture 2013)
30
Christ The Messiah Statue of Jayapura : Preaching The Words Through Architecture 1st Prize Winner (2014)
// PROFESSIONAL WORKS 32
UPH School of Medicine : Building Vertical Campus RAW Architecture (2013)
34
Istakagrha : Compact Tropical House RAW Architecture (2013)
36
Arumdalu Resort Belitung : Touching The Earth Lightly RAW Architecture (2012-2013)
5
I - Ski Architecture Design Studio 2 Professors : Leoni Fabrizio, De Matteis Andrea, Ventura Cesare Collaborators : Min Ruilin, Wang Chaoran ACADEMIC
CONCEPT DIAGRAMS
6
BUILDING FUNCTIONS
PEDESTRIAN
BUILDING CIRCULATION
VEHICULAR
LANDSCAPE
MASTERPLAN
SKYLINE SECTION
7
INDOOR SKI SLOPE
PUBLIC SUNKEN SQUARE
BUILDING SECTION
SKI PEAK-HOTEL-LEISURE
GYMNASIUM 8
VERTICAL SPORTS COMPLEX
SPORTS PARK
RACKET SPORTS
MULTIUSE SPORTS 9
FAR-IN FESTIVAL MIAW - A Workshop Professors : Ippolito Pestellini Laparelli ( OMA / AMO ) Masterplan Collaborators : Adriana Luisitano, Antonio Rusconi, Federica Giorgetta, Valentina Cocco ACADEMIC
TIME U D R U G R O O M S L E E P
W
N
S E N S A T I O N A L
I D E N T I T Y
F U C K
F E S T I V A L
S P I R I T U A L F I T N E S S
O X Y G E N
D E C I S I O N S E X
C R A Z Y
ST A J U M P
E V E N T
T R I P
E V A S I O N
O
PE
D
RE
EX
IT
AT
P U R I F Y
D E S T R O Y
D I S C O V E R
D A Z E D
R E L A X I N G A R E A
S T A T I O N A M E N I T I E S
EN
S A N C T U A R Y
T R A N S F O R M A T I O N
FAR - IN S C R E A M
P
RT
TE R
FLOW
MATRIX THEME
TARGET
PEOPLE AWAY FROM HOME
STRESSED WORKERS
PEOPLE BELONGING TO A MINORITY
ETHNIC MINORITIES
LOW PAID WORKERS UN-HAPPY WITH THEIR WORKS PEOPLE WITH A BORING WORK BASED ON REPETITION OF THE SAME ACTION PEOPLE UNHAPPY WITH THEIR FAMILY AND EDUCATION PEOPLE WHO APPROACH THE URBAN SPACE IN AN UNCOVENTIONAL WAY PEOPLE WHO USE THEIR TIME TO DO THING THAT NO ONE WANTS TO DO PEOPLE THAT WANTS TO CHANGE THEIR IDENTITY PEOPLE WHO WANTS TO ESCAPE FROM TECNOLOGY PEOPLE LOOKING FOR TRASGRESSION HIGH-PAID WORKERS WITH NO TIME, HIGH RESPONSABILITY AND STRESS
NAME
SPACE QUALITIES
1) TEMPLE OF VOCATION
INSIDE
2) EXOTIC BOUQUETS
4) MORNING STAGE
OFFICE WORKERS COMMUTERS LGBT COMMUNITY
D.I.Y.
6) SCREAM ROOM
FULL OF WATER
7) SILENT ROOM 8) THE SANCTUARY
SEXUAL PERVERTS
9) DARK ROOM RELIGIOUS MINORITIES
10) FOREST STAGE 11) OXYGEN ROOM
SERVANTS
12) SWIMMING POOL
STUDENTS
13) COLOR FIGHT
SEXUAL CONNOTATION COVERED WITH MIRRORS OPEN AIR
14) JUNGLE VIBRATIONS
ECHO/REVERBERANT
15) MORON’S ROUTE
SOUNDPROOF
16) INFINITE STAGE
COSPLAYER
IN THE FOREST
17) PEEP-HOLE PRECARIOUS WORKERS
18) TOTAL CANVAS 19) PASSION PIT
PLANKERS
SITE SPECIFIC SAME MODULE
20) NOT-SPOT
UNHAPPY URBANISTS PARKOURS NIGHTWORKERS
21) FARADAY CAGE
OPEN ONLY IN SOME MOMENTS
22) TRANSFORMATION ROOM
OPEN H/24
23) RELAXING ROOM
MEDIA CONNECTED
LONELY SINGLE PEOPLE
25) MIRROR CAGE
PEOPLE LOOKING FOR LOVE AND SEX
TATTOOED
PEOPLE UNHAPPY WITH URBAN ENVIRONMENT
BODY MODIFICATORS
PEOPLE LOOKING FOR FAME AND GLORY
SILENT
EMPLOYEE
PEOPLE WHO LIVE IN A VIRTUAL LIFE
PEOPLE NOT PAID OR RECOGNISED FOR THEIR WORK
TRANSPARENT
HIGH SCHOOLERS
24) OPPORTUNE OBJECTS
PEOPLE WHO WANT TO TRY NEW THINGS
DARK
5) PSYCHEDELIC SLEEP
HIKIKOMORI
PEOPLE WHO WANTS TO SAY SOMETHING WITH THEIR BODY
SENSITIVE INTERACTION
3) VISUAL JAMMING
26) JACUZZI BRIDGE
SOFT/SAFE
28) HYPERSPACE JUMP
DANGEROUS
30) TWISTER ROOM YOUNG ARTISTS
31) NEVERLAND
PAST GLORIES
32) MOOD ROOM
TOP MANAGERS BUSINNESS MAN
10
WITH MUSIC
27) CLIMBING WALLS
29) HUMAN CANVAS
UNKNOWN ARTISTS
VISUAL INSTALLATION
CLAUSTROFOBIC MAZE FORM COLORFUL
33) JUMPING PILLOW
IN A WAGON
34) INSTINCTS ROOM
FOR ONLY ONE PERSON AT TIME COLLECTIVE
EXPERIENCES
11
FIRE _IN I
Y
P
E
R
VIBRAT
S
P
BA
INS
SI
TIN
C
A
C
IONS
E
CT
PE
NC
M
M
ARY
LE
JA
RE
M
RD A NO RN DO CA
TE
M
M
G
CAN
VA
S
PL
E
AA
OF
AH
HH
!
TI
GE NK AN
ON
S
IC
PO GEN RTA OVA
E
O SAN OFOR CRIST
PORTA ROMANA
REDO ROGO
RAILWAY ACCESS
SITE ACCESS
FUNCTIONS
main stations + railway yards + railways of Milan
JOURNEY STORYBOARD 12
ARD
EN
SE
X
IN
CA
RV
IC G
DE
LA
VO
SE
TOX
’S
D
P
BA
TT
ON
DE
TU
U
OR
CR
OW
SA
J
PA TER N
RT
SH
E
C
OU
SHAM
H
LI
T
OF
B
SCRE EN
PU
RIT UA L
M CENILAN TR O ALE
E AT MBR LA
GA RIBA LD I
EVENT GROWTH
BRANDING AND COMMUNICATIONS 13
ABANDONED MILAN Town Planning Design Workshop Professors : Stefano Boeri, Michelle Brunello Collaborators : Balintova Lucia, Levicanin Antonije, Pedretti Ottavio ACADEMIC
14
PRESENT SITUATION
FUTURE SITUATION
15
VIEW FROM BALCONY
ELEVATED PUBLIC LEVEL
16
ABANDONED INTERNAL SPACES
WILDLIFE RESERVE PARK
17
Hilly Hostel Garage San Remo Architecture Design Studio 1 Professors : Cino Paolo Zucchi, Paola Sturla, Matilde Cassani Collaborators : Wu Huanyu ACADEMIC
L
SKIN SKIN
N SKIN
IN SK SKIN SKIN
SKIN SKIN
SK I
N SKIN
KIN SKI
SK
IN
SCA SK
CAR RS
IN
ISK
IN
SK I
INTE RN A
SK IN
L OR GA
SK IN
IN
SK
IN
N
SK IN
SK
INTE RN AL
O RG
AN
L OR RNA INTE
GA
N
N
SK IN
IN
SCA R
SK
R SC AR
IN
SCA
N SK
IN S KIN SKI
KIN S
KIN SK
IN S
SK
OSTEL
KIN S
SK
Wu Huanyu Cristiandy Pradangga
SKIN S
SKIN SKIN
SKIN SKIN
GY TE RA ST
S KI
URBAN STRATEGY
ILLY
PE CA DS AN
SKIN
N SKIN
RAFTING GRAF TING AFTING G G GR GR FTIN GRA FTING GRAFTING G GRA NG FTI
SUB U
GY STRATE FORM
GRAFTING GRAFTING GRA FTING GRAFTING GRA FTI GRAFTING GRAFTIN N G GRA FTIN GG RA
G
ING GRAFTING GRAFTING GRAFT ING AFT FTING GRAFTING GRA AFTING G GR FTIN RA
SITE A ALYSIS N
R BAN
URBA N G R A F TI N G
L RESID ENTIAL RESI
RESIDENTIA
L RESID ENTIAL MULTI-PURPOSE
MULTI-PURPOSE
CLASS
AN RB LU IC A
RE
SID
E NT IAL
MUL TI-P
URP
OS
MULTI-PURPOSE
MULTI-PURP OSE M
NTIAL RESIDEN T
IAL
LTI-PU RPOSE
L RESID ENTI
E MULTI-PURPOSE
RESI DEN
ULTI-PURPOSE MU
RESIDENTIA
AL RESIDENTIAL RESIDE
NTIAL
TIAL RESI DENTIAL
L RESID ENTIAL
RESIDENTIA
RESIDENTIA L RESID ENTIA
DENTIAL
RESIDE
VOLU M E
SE ER DIV
MODER
AN RB NU
P U B LI C
P U B LI C
SITE PLAN
EXTERIOR VIEW 18
AL TI EN SID RE
EXPLODED AXONOMETRIC
COURTYARD 19
GROUND FLOOR PLAN 1. Hostel Reception 2. Cafe 3. Buffet Restaurant 4. Market 5. Green House Gallery 6. Service 7. Multipurpose (exhibition and meeting room) 8. Multipurpose (stage and conference)
ELEVATION A
SECTION A
20
FIRST FLOOR PLAN 1. Dining Room 2. Laundry 3. Club 4. Lounge 5. Study Room 6. Service and Press
ELEVATION B
SECTION C
21
1. Ceppo
2. Aluminium window/door frame
3. Clear double glazing
4. Terracotta
5. Aluminium coated column
6. Concrete with pebble filling
7. White marble tile
8. Recycled wood floor
Roof construction - Ceppo panel1 - Supporting steel framework ventilated cavity - Waterproofing/covering layer - Secondary waterproofing layer - Thermal insulation - Concrete roof Total
Wall construction (Urban side) - Ceppo panel1 - Supporting steel framework ventilated cavity - Waterproofing/covering layer - Thermal insulation - Concrete wall Total
Wall construction (Couryard side) - Terracotta bar shading2 - Supporting steel framework - Double toughened safety glass3 Aluminium frame4 - Stiffening glass fin - Steel bracket to support glass fin Total
approx. 30 mm 3 mm 3 mm approx. 60 mm 200 mm approx. 400 mm
approx. 30 mm 3 mm approx. 60 mm 200 mm approx. 300 mm
50x50 mm 34mm 36 x 300 mm approx. 700 mm
Ground construction (Exterior in courtyard) - Concrete tile with pebble filling5 40x40 mm - Cement concrete - Refilled in earth - Mixture of compressed earth
Façade Details, scale 1:20
URBAN GRAFTING Politecnico di Milano – Scuola di Architettura e Società A/A 2015-2016 Architectural Design Studio I - Cino Zucchi - M. Cassani - P. Sturla
22 Scale 1:20 Section/Façade/Material board
Name HUANYU Last name WU Matricola 851801 Name CHRISTIANDY Last name PRADANGGA Matricola 851432 Date 06/07/16
06
Detail Section, scale 1:20
URBAN GRAFTING Politecnico di Milano – Scuola di Architettura e Società A/A 2015-2016 Architectural Design Studio I - Cino Zucchi - M. Cassani - P. Sturla
23 Scale 1:20 Section/Façade/Material board
Name HUANYU Last name WU Matricola 851801 Name CHRISTIANDY Last name PRADANGGA Matricola 851432 Date 06/07/16
07
CBD AND BP LOCATION/MORPHOLOGY/TARGET AUDIENCE
Bassi Central Business Park
LOCATION
TARGET AUDIENCE
MORPHOLOGY
Building Technology Studio BUSINESS PARK
CENTRAL BUSINESS DISTRICT
Urban fringe, well connected.
City center, central commercial zone
Sufficient land resources
Shortage of land resources
CENTRAL BUSINESS DISTRICT
BUSINESS PARK
BUSINESS PARK
CENTRAL BUSINESS DISTRICT
Professors : Morena Marzia, Trupi Tomasso, Mazzola Francesco, Intelligence-intensive enterprise: Service-oriented enterprise: Low floor area ratio, High floor area ratio, A favorable environment is A strong business atmosphere high greening rate low greening rate Olgiati Maria, Tagliabue Lavinia Chiara needed to increase the performance is needed to increase opportunities Low density Small volume, lower level
High density Large volume, high rise
Background service enterprise: Individual working environment in order to conduct unified human resource management.
Headquarters of financial enterprise: Presence in the city center to demonstrate the competence of the company
Collaborators : Asgharian Fatimeh, Lyu Ouyang, Pelangia Maria ACADEMIC
+
= CENTRAL BUSINESS DISTRICT
BUSINESS PARK
FUNCTION PROGRAM
DRIVERS FOR THE OFFICE OF THE FUTURE -MOBILITY -SUSTAINABILITY -SPEED TO MARKET
GENERIC OFFICE FLOOR IN TYPICAL COMPANY 1970
HIGHER FLOORS HIGHER RENT PRICE
OPEN CITY VIEW
MORE PEOPLE WORKING REMOTELY REQUIRING LESS SPACE PER FLOOR COMPANY SIZE UNCHANGED 2010
HYPER COMPRESSED ULTRA MOBILE WORKSPACE 2015
CITY’S NEW SYMBOL
CITY’S NEW KSYLINE
WORKERS INTERACTION IN ATRIUM
WORKER COMMUNICATION
REGULAR OFFICE
WORKER COMMUNICATION
ATRIUM INTERACTION
AERIAL VIEW 24
GROUND FLOOR PLAN
SITE ELEVATION
MAIN STREET VIEW 25
B
2750
4450
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
4450
2750
3150
1000
1000
5600
5600
3350
3350
3070
4000 21500
3600
3150
3070
3500
22550 5620
5620 4000
A
3500
A 3740
6000
6000
1000
1000
3600
3600
3600
3600
3600
3600
3600
3800
3600
3800
3800
3600 5500
6150
2750
4450
3400
3400
3400
3400
3400
20800
3400
3400
3400
3400
3400
10200
3400
4450
4000
2750
15300
13450
20800
51800
7000
B
4000
BUILDING A TYPICAL FLOOR PLAN 1 B
3740
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
4600
3090
7030
58250
2750
4450
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
4450
2750
1000
1000
5600
5600
3350
3350
BUILDING H HOTEL TYPICAL FLOOR PLAN 2750
3500
3490
3490
3490
3490
3520
3470
3490
3480
3470
3500
3470
3490
3480
3600
1000
1000
5250
5250
22550 5620
5620
A
A
6000
15500
6000
1000
1000
2750
4450
3400
3400
3400
3400
20800
3400
3400
3400
3400
3400
3400
10200
3400
4450
3000
3000
5250
5250
1000
1000
2750
2750
3500
3490
3490
7000
3500
3480
3480
3480
3480
7000
3450
3500
3600
830
56000
20800
51800
BUILDING B TYPICAL FLOOR PLAN
B
BUILDING A TYPICAL FLOOR PLAN 2 G
B
2750
4500
3000
3000
4500
3154
3000
10500
4500
3000
3000
4500
D
2750 1000
565
4500
3400
3400
6900
3400
3400
4500
1000
C
1000 2850
2850
5750
5750
2950
2950
5750
5750
4000
A
E
B F
H
5600
4500 3350 18250
22550 7000
5620
A
A
950
950
6000
5500
1000
4500
3400
3400
6900
3400
3400
4500
1000
31500
1000
1000
2750
4500
3000
3000
4500
3150
10200
3000
4500
3000
3000
4500
BUILDING C,D,E,F TYPICAL FLOOR PLAN
2750
51800
B
BUILDING A ROOF GARDEN PLAN
ATRIUM SPACE 26
BUILDINGS KEYPLAN
SECTION A
SECTION B
OFFICE SPACE 27
Indonesian National Gallery 1st Prize Winner National Competition Works at RAW Architecture
COMPETITION
Competition Team : Principal : Realrich Sjarief Design Team : Happy Marfianta , Apriani Sarashayu, Septrio Effendi, Tatyana Kusumo, Miftahuddin Nurdayat, Maria Vania, Muhammad Iqbal Zuchri, Christiandy Pradangga, Donald Aditya, and Mukhamad Ilham
The design of the Galeri Nasional Indonesia ( Indonesian National Gallery ) complex is inspired by the beauty of the sky and the warmth of the earth with an intention similar to the heritage building of Galeri Nasional located right in the middle of the complex. The heritage building, built during the Dutch-Indies government era, will be framed with a gallery with an expression of greeneries representing the earth, and in the background will be the office or administrative building of the Galeri Nasional which represents the sky. The master plan development is divided into two stages. The first stage is focused on the main area, the Galeri Nasional area. On this first stage, it is assumed that the land around the Galeri Nasional is in the acquisition process, thus the development is focused on the Galeri Nasional itself. The first stage, as the main function of the national gallery, can be run independently. The second stage will be conducted in the subsequent development, when the land is acquired. In the second stage, the supporting facilities of this gallery complex-convention center, auditorium, and a hotel located on the north side of the complex, facing the Monas and Gambir train station-will be built. In general, the building masses of the Galeri Nasional Indonesia complex respond to two main axes.
28
PROJECT PHASING
FLOOR PLANS
29
Christ The Messiah Statue of Jayapura, Indonesia 1st Prize Winner National Competition COMPETITION Project year : 2013 Collaborator : Maria Vania Griselda Pardede
main anchors at the peak of the hills
continous circulation
imaginary axis toward the city and the sea
30
sequence of experiences
Journey Sequences
Jesus’s Ministries Garden
Garden of sins
Via Dolorosa
Reflection
Christ Rise and Prevail
Follow Jesus the Only Way
Christ The Almighty
Kingdom of Heaven
Paradise Garden
Christ The Messiah Statue Zone
Passion of The Christ Museum
Trinity Lobby and Papua’s Evangelism Museum
31
Papua Cultural Center
UPH School of Medicine
Work at RAW Architecture
PROFESSIONAL Appointment: 2013 Construction Start: 2013 Completion: 2015 Features : The two volumes mixed program combined as tower and podium, in order to enable separate circulation and different function accommodating best practice for school and living activity. The interlocking volumes inside two mixed volumes creating void which taking advantage of the benefits of the cross air circulation. Client: University of Pelita Harapan
32
CONSTRUCTION
FINAL
33
Istakagrha
Work at RAW Architecture http://www.archdaily.com/795259/istakagrha-raw-architecture PROFESSIONAL Appointment : 2013 Completion : 2015 Area : 180.0 sqm Location : Taman Meruya Ilir, Meruya Utara, Kembangan, Kota Jakarta Barat, Daerah Khusus Ibukota Jakarta 11620, Indonesia Client : Mr. Ferdi Septiono and Ms. Joice Verawati and Family Principal : Realrich Sjarief Project Team : Bambang Priyono, Tatyana Kusumo, Miftahuddin Nurdayat, Rio Triwardhana, Anton Suryanto, Christiandy Pradangga, Maria Vania.
The architecture of istakagrha separated inside and outside with the landscape of a barrier wall made by light weight brick. The combination is stacked with pattern of solid void, which provide sense of privacy and security, meanwhile allowing sunlight and air circulation to flow inside the living room. The house faces east side allowing morning sunlight come to the space at 9 am. The stair is placed at the west side, the west side is walled with brick to provide thermal insulation. The air ventilator is placed at the west side of the house above the stair from ground to 1st floor providing fresh air circulation throught air stacking effect. The house has one open air receiving area as anteroom then no more separation wall between living, dining, and cooking which In the living room, the kitchen also takes some importance its final layout is the result of few adjustments based on the owner’s domestic habits. The only enclosed space in the ground floor is guest room, which doubles as a working space and guest bed room. A simple foyer and a light well integrated with stair, and art work is placed after the receiving area at the west side of the building. The first story houses private spaces. At the end of the corridor is 1 bedroom with shared bathroom and a walk-in closet. An simple and functional feel showering area is attached to the bathroom. The material used in this building is choosed based on the best craftmenship available in Jakarta, concrete structure is used because of the cost efficiency, engineered wood is used because of the look and lightness, metal frame for facade and sunshading are used because of durability.
34
35
Arumdalu Resort Belitung
Work at RAW Architecture http://arumdalubelitung.com/ PROFESSIONAL
Appointment : 2012 Construction Start: 2012 Completion: first phase completed in 2014 Area: 40 Ha Features : The project is renovation project from existing unfinished building. The project was carefully Designed on existing structure, the ten 150 sqm villas is combined in modern and traditional ambiance with private pool and contemporary chic gazebo. The design propose to get the most efficient way of construction by using prefabricated concrete which has effect of natural lime stone. The development also include bridge to sahang, the cafe and resto, landscape features integrated with high technology Mechanical Electrical features and Water Sensitive Urban Design. Client: Arum Dalu Resort, Agus Supramono, Siannie, Albert Aoron Principal Architect| Architect : Realrich Sjarief 1st phase Conceptual Design Team : Maria Vania, Donald Aditya Epiphanius, Christiandy Pradangga
36
37
OTHER WORKS
Cempaka Putih Hotel Jakarta RAW Architecture
Veteran Hotel Jakarta RAW Architecture
Veteran Hotel Bandung DAP
Autocentre PIK Jakarta RAW Architecture
Epicentrum Square Lombok 1st Prize Winner Competition _RAW Architecture
Dewi Sartika Mixed Use Jakarta DAP
Berlin University Residences Competition Entry
Jababeka Service Apartments Bekasi RAW Architecture
Batik Museum of Indonesia Competition Entry
38
Dr. Agustinus Beauty Clinic Surabaya Self Project
Facade Refurbishment Bank Central Asia Competition Entry
Youth Hostel Sariater DAP
Lebak Bulus Townhouse Jakarta RAW Architecture
Duren Tiga Townhouse Jakarta RAW Architecture
ARBBI Design Award Best of 70 Competition
Onduline Green Roof Award 2nd Prize Winner Competition
H House Serang Self Project
Front Line School Papua Competition Entry
39
PHOTOGRAPHY
40
41
CHRISTIANDY PRADANGGA +393345040206 cpradangga@gmail.com