Arc2625 report file lee yet yee 0322328

Page 1


1

SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF SCIENCE (HONOURS) IN ARCHITECTURE

INTERNSHIP TRAINING AND REPORT (ARC 2615)

INTERNSHIP REPORT NAME : LEE YET YEE STUDENT ID : 0322328 COMPANY : SWLEE ARCHITECT TUTOR : MR. MOHAMED RIZAL MOHAMED INTERNSHIP DURATION : 26th DECEMBER 2017 - 10th MARCH 2018 RECORDED DURATION : 2nd JANUARY 2018 - 28th MARCH 2018 REPORT REVIEWED AND APPROVED BY :

______________________________________________ (SUPERVISING ARCHITECT : AR. LEE SIEW WAI) No.Pendaftaran LAM : A/L 260


2 INDEX NO.

ITEM

PAGE

1

INTRODUCTION

1.1 1.2

PROLOGUE INTERNSHIP TRAINING & REPORT

2

WEEKLY PROGRESS

2.1 2.1.1 2.1.2 2.1.3 2.2 2.2.1 2.2.2 2.2.3 2.3 2.3.1 2.3.2 2.3.3 2.4 2.4.1 2.4.2 2.5 2.5.1 2.5.2 2.5.3 2.6 2.6.1 2.6.2 2.6.3 2.6.4 2.7 2.6.1 2.7.2 2.7 2.6.1 2.7.1

WEEK 1 LOG SHEET GUARD HOUSE KHONG GUAN BISCUIT FACTORY WEEK 2 LOG SHEET KHONG GUAN BISCUIT FACTORY SMJK(C) SIN HUA SPORT’S COMPLEX WEEK 3 LOG SHEET SMJK(C) SIN HUA SPORT’S COMPLEX S2 HOTEL WEEK 4 LOG SHEET SMJK(C) SIN HUA SPORT’S COMPLEX WEEK 5 LOG SHEET SMJK(C) SIN HUA SPORT’S COMPLEX METHODIST CHURCH MALAYSIA WEEK 6 LOG SHEET EHSAN SITE OFFICE & MOCK-UP UNIT KHONG GUAN BISCUIT FACTORY DATO’ GOH BUNGALOW WEEK 7 LOG SHEET DATO’ GOH BUNGALOW WEEK 8 LOG SHEET DATO’ GOH BUNGALOW

5 6 7 9 12 13 14 19 21 22 23 25 27 28 29 33 34 35 36 37 38 39 42 44 46 47 48 50 51 52

3

CONCLUSION

53

3 4


3 INTRODUCTION 1.1 PROLOGUE

With great pleasure, I would like to express my gratitude to SWLee Architect for accepting me to carry out my internship in their company. I would like to specially thank Ar.Lee Siew Wai for giving me this opportunity to learn and to practice under his supervision. Also, I want to thank all the staffs of SWLee Architect as they had helped me along the way in various expect. I also want to express my gratitude to my lecturer - Mr.Rizal for his tutoring and assessment of this short semester. Thank you very much as I would not have complete this without any of those mentioned above.


4 INTRODUCTION

1.2 INTERNSHIP TRAINING AND REPORT

This short semester - Internship training and report, prepares and equip us with all the necessary knowledge and skills required for the working industry. It provides us a platform where we are exposed to various aspect in relation to the construction industry by being involved in real life projects which requires certain regulations and procedures. On the other hand, we are able to further equip ourselves with more experience for our remaining semesters which will set a clearer guideline of proper drawings techniques and stronger designs.


5

WEEKLY PROGRESS WEEK 1

2nd January 2018 - 5th January 2018


6 WEEKLY PROGRESS

2.1.1 WEEK 1 LOG SHEET


7 WEEKLY PROGRESS - WEEK 1

2.1.2 GUARD HOUSE 
 PROJECT : SUBMISSION DRAWING JOB SCOPE : TECHINCAL DRAWINGS LOCATION : MUKIM, RANTAU, SEREMBAN, NEGERI SEMBILAN

Figure 1 : Autocad drawings of the guard house

My first project was to produce a submission drawing of a guard house. Through this project, I was able to familiarise myself with the working template and format of the company.


8 WEEKLY PROGRESS - WEEK 1 - GUARD HOUSE AUTHORITY ENDORSEMENT : 13156 [43'-2"]

6000 [19'-8"] 2500 [8'-2"]

3500 [11'-6"]

914 [3'-0"]

3656 [12'-0"] 1828 [6'-0"]

3500 [11'-6"] 914 [3'-0"]

3658 [12'-0"] 2439 1219 [8'-0"] [4'-0"] 1370 2288 [4'-6"] [7'-6"]

2134 [7'-0"]

3500 [11'-6"]

914 [3'-0"]

914 [3'-0"] 1219 [4'-0"]

GROUND FLOOR LEVEL

250 [0'-10"]

ROAD LEVEL

850 [2'-9"]

2439 [8'-0"]

R.C SLAB WITH EPOXY WATER PROOFING TO HOLD WATER TANK WITH 150mm HIGH KERB ALL AROUND TO ENGR'S AND MAUF'S DETAIL

3810 [12'-6"]

610 [2'-0"]

ALUMN. FRAME FROSTED GLASS LOUVERS WINDOW TO MAUF'S DETAIL

PROPOSED RUBBER RETAINING WALL TO ENGR'S DETAIL R.C STEP WITH 255mm THREAD AND 174mm HIGH RISER TO ENGR'S DETAIL

1219 [4'-0"]

4877 [16'-0"]

30°

1 NO. OF 250 GAL (NOMINAL) EACH POLY WATER STORAGE TANK ON 150 THK R.C PLINTH & 125mm(w) x 25mm THK REINFORCED CEMENT PLANK AT 255mm c/c COMES WITH MOSQUITO NETTING TO SAINS APPROVAL

TIMBER BRACING TO DETAIL

SEPTIC TANK MODEL MFR2-PE

R.C STEP WITH 255mm THREAD AND 174mm HIGH RISER TO ENGR'S DETAIL

82 "] 62 '-7 0 [2

30°

1524mm HIGH GLAZED WALL CERAMIC TILES

ROOF BEAM LEVEL PLASTER CEILING TO SPECIALIST DETAIL WITH 610 x 610 MANHOLE ACCESS DOOR

1524mm HIGH GLAZED WALL CERAMIC TILES

METAL FRAME TIMBER FLUSH DOOR WITH G.I SHEET ON THE INTERNAL SURFACE TO MAUF'S DETAIL 1524mm HIGH GLAZED WALL CERAMIC TILES R.C BEAM TO ENGR'S DETAIL

R.C ROOFING TO ENGR'S DETAIL

2438 [8'-0"]

AUTOMATIC GATE TO SPECIALIST DETAIL

SECTION A-A (

150 x 150 CONCRETE KERB TO ENGR'S DETAIL

)

0 79 7"] '[2

PINDAAN :

FINISH ROAD LEVEL TO REFER TO ENGR'S DETAIL

NO.

FLOOR PLAN (

) 2500 [8'-2"]

3500 [11'-6"] 914 [3'-0"]

610 [2'-0"] 2439 [8'-0"]

TARIKH

R.C SLAB WITH EPOXY WATER PROOFING TO HOLD WATER TANK WITH 150mm HIGH KERB ALL AROUND TO ENG'S AND MAUF'S DETAIL AUTOMATIC GATE TO SPECIALIST DETAIL TIMBER FRAME DECORATIVE SOLID TIMBER DOOR TO MAUF'S DETAIL

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : CADANGAN PEMBANGUNAN 4 UNIT RUMAH BANGLO SETINGKAT DAN 22 UNIT RUMAH BERKEMBAR SETINGKAT DI ATAS LOT 21978 - LOT 22003 SEPERTI BERIKUT : PONDOK PENGAWAL

=

1 UNIT

R.C BEAM TO ENGR'S DETAIL

SECTION B-B (

2438 [8'-0"]

) MUKIM RANTAU, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

0 79 7"] '[2

)

2500 [8'-2"]

100mm∅ UPVC VENT PIPE AT 914mm HIGH ABOVE ROOF WITH VERMIN PROOF NETTING

DUAL FLUSHING SYSTEM

SYMBOL

DIMENSION FOR DIMENSION FOR DIMENSION FOR DOOR / WINDOW TOP HUNG GLASS BELOW (WxH) (WxH) (WxH)

D1

150mm∅ VC PIPE

110mm∅ UPVC SOIL PIPE

-

914 x 2134

914 [3'-0"]

1828 [6'-0"]

3500 [11'-6"] 914 [3'-0"]

PARTICULAR

-

METAL FRAME TIMBER FLUSH DOOR WITH G.I SHEET ON THE INTERNAL SURFACE TO MANUF'S DETAIL

-

-

ALUMN. FRAME SLIDING GLASS WINDOW TO MANUF'S DETAIL

-

1676 x 610

ALUMN. FRAME SLIDING GLASS WINDOW TO MANUF'S DETAIL

TIMBER FRAME DECORATIVE SOLID TIMBER DOOR TO MANUF'S DETAIL

D2

914 x 2134

W1

1219 x 1219

W2

1676 x 1219

W3

-

610 x 610

-

ALUMN. FRAME TOP HUNG WINDOW TO MANUF'S DETAIL

W4

-

1676 x 460

-

ALUMN. FRAME FROSTED GLASS LOUVERS WINDOW TO MANUF'S DETAIL

GROUND FLOOR LEVEL ROAD LEVEL

* ALL DOOR FRAME SHALL BE 1.0mm BST (150mm width) METAL FRAME DOOR TO BE PROVIDED. * ALL TOILET DOOR FRAME SHALL REST ON 100mm HIGH CONCRETE PLINTH.

FRONT ELEVATION (

DIAGRAMMATIC SANITARY LAYOUT ( GUARD HOUSE )

) ARKITEK :

NOT TO SCALE

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAKKEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

1 NO. OF 250 GAL (NOMINAL) EACH POLY WATER STORAGE TANK ON 150 THK R.C PLINTH & 125mm(w) x 25mm THK REINFORCED CEMENT PLANK AT 255mm c/c COMES WITH MOSQUITO NETTING TO SAINS APPROVAL WITH UPVC OVERFLOW PIPE DISCHARGE TO TOILET AND UPVC SCOUR PIPE DISCHARGE TO EXTERNAL DRAIN THROUGH SLEEVE PIPE

25mm UPVC CLASS 'C' VENT PIPE

3658 [12'-0"] 2439 1219 [8'-0"] [4'-0"] 1370 2288 [4'-6"] [7'-6"]

2134 [7'-0"]

3500 [11'-6"]

914 [3'-0"]

3500 [11'-6"]

3656 [12'-0"] 914 [3'-0"]

1828 [6'-0"]

13156 [43'-2"]

914 [3'-0"]

6000 [19'-8"] 3500 [11'-6"]

2500 [8'-2"]

38mm∅ UPVC OVERFLOW PIPE AT 100mm HIGH FROM FLOOR FINISH DISCHARGE TO BATH 3

R.C SLAB WITH PLINTH AND EPOXY WATER PROOFING TO HOLD WATER TANK TO ENGR'S AND MAUF'S DETAIL

38mm∅ UPVC SCOUR PIPE DISCHARGE TO EXTERNAL DRAIN

25mm∅ STAINLESS STEEL MAIN RISER (TYPE 304)

30°

25mm∅ UPVC CLASS 'D' SUPPLY PIPE

ROOF BEAM LEVEL

ROOF BREAM LEVEL

30°

150mm∅ BALL VALVE

3810 [12'-6"]

BATH 1 ROAD SIDE DRAIN

PEMBANTU : SKALA :

DISEMAK :

TARIKH :

TAJUK LUKISAN :

GROUND FLOOR LEVEL ROAD LEVEL

GROUND FLOOR LEVEL ROAD LEVEL

1100 [3'-7"]

LOCKABLE VALVE (SPAN APPROVED)

DIAGRAMMATIC PLUMBING LAYOUT ( GUARD HOUSE )

ARKITEK : DILUKIS :

GUARD HOUSE DETAIL 1100 [3'-7"] 850 250 [2'-9"] [0'-10"]

DUAL FLUSHING SYSTEM

3810 [12'-6"]

15mm∅ UPVC PIPE CLASS 'D'

WATER METER 25mm∅ STAINLESS STEEL MAIN RISER TYPE 304 METER STAND PIPE

TAPPING FROM GOVERNMENT 25mm∅ STAINLESS STEEL INCOMING PIPE BURIED 610mm BELOW GROUND LEVEL

TANDATANGAN PEMILIK :

3500 [11'-6"]

3810 [12'-6"]

50mm∅ UPVC WASTE PIPE

3500 [11'-6"]

3656 [12'-0"]

ROOF BREAM LEVEL

DOOR & WINDOW SCHEDULE ( GUARD HOUSE )

100mm∅ UPVC SOIL & WASTE PIPE

13156 [43'-2"]

6000 [19'-8"]

1100 [3'-7"] 250 [0'-10"]

ROOF PLAN (

NOT TO SCALE

PINDAAN

3500 [11'-6"]

R.C FOOTING TO ENGR'S DETAIL

2112 [6'-11"]

4877 [16'-0"]

ROAD LEVEL

R.C SLAB BELOW WITH EPOXY WATER PROOFING TO HOLD WATER TANK TO ENGR'S AND MAUF'S DETAIL

1219 [4'-0"]

914 [3'-0"]

1 NO. OF 250 GAL (NOMINAL) EACH POLY WATER STORAGE TANK ON 150 THK R.C PLINTH & 125mm(w) x 25mm THK REINFORCED CEMENT PLANK AT 255mm c/c COMES WITH MOSQUITO NETTING TO SAINS APPROVAL

GROUND FLOOR LEVEL

1 NO. OF 250 GAL (NOMINAL) EACH POLY WATER STORAGE TANK ON 150 THK R.C PLINTH & 125mm(w) x 25mm THK REINFORCED CEMENT PLANK AT 255mm c/c COMES WITH MOSQUITO NETTING TO SAINS APPROVAL WITH UPVC OVERFLOW PIPE DISCHARGE TO TOILET AND UPVC SCOUR PIPE DISCHARGE TO EXTERNAL DRAIN THROUGH SLEEVE PIPE

2288 [7'-6"]

1219 [4'-0"]

100mm∅ UPVC VENT PIPE AT 914mm HIGH ABOVE ROOF WITH VERMIN PROOF NETTING

82 "] 62 '-7 0 [2

1828 [6'-0"]

ROOF BREAM LEVEL

3500 [11'-6"]

3810 [12'-6"]

1828 [6'-0"]

914 [3'-0"]

3500 [11'-6"]

2743 [9'-0"]

3656 [12'-0"]

3500 [11'-6"]

3656 [12'-0"]

250 [0'-10"]

914 [3'-0"]

914 [3'-0"]

3500 [11'-6"]

1100 [3'-7"]

13156 [43'-2"]

6000 [19'-8"] 2500 [8'-2"]

13156 [43'-2"]

6000 [19'-8"]

NO. LUKISAN :

SIDES ELEVATION (

)

REAR ELEVATION (

)

SWL - 190 - 14 / FTSB / 01b

Figure 2 : Final submission drawing - Guard House

Through a simple guard house, I was able to learn the proper way to present a submission drawing and to what extend of details are required to be included. In addition, I was able to learn the proper way of plotting and arranging drawings to be printed. I was able to familiarise myself with some common specifications such as materials and thickness used for each components.


9 WEEKLY PROGRESS - WEEK 1

2.1.3 KHONG GUAN BISCUIT FACTORY PROJECT : RENNOVATION JOB SCOPE : SITE VISIT, SITE MEASURING, TECHNICAL DRAWINGS, MEETINGS LOCATION : NO.345 JLN TOK UNGKU, SEREMBAN, NEGERI SEMBILAN

Figure 3 & 4 : Site Visit - Architect , contractor & GM of the factory


10 WEEKLY PROGRESS - WEEK 1 - KHONG GUAN BISCUIT FACTORY

Figure 5 : Existing guard house to be demolished

Figure 6 : Existing drain to be diverted and slabbed up Engineer’s detail


11 WEEKLY PROGRESS - WEEK 1 - KHONG GUAN BISCUIT FACTORY

Figure 7 : Existing gate and fencing to be replaced with new gate and GI easy fencing

Figure 8 : Existing room demolished and rebuilt with new guard house


12

2nd January 2018 - 5th January 2018

WEEKLY PROGRESS WEEK 2

8th January 2018 - 12th January 2018


13 WEEKLY PROGRESS

2.2.1 WEEK 2 LOG SHEET


14 WEEKLY PROGRESS - WEEK 2

2.2.2 KHONG GUAN BISCUIT FACTORY PROJECT : RENNOVATION JOB SCOPE : SITE VISIT, SITE MEASURING, TECHNICAL DRAWINGS, MEETINGS LOCATION : NO.345 JLN TOK UNGKU, SEREMBAN, NEGERI SEMBILAN /

FILE NO. : AUTHORITY ENDORSEMENT :

/

BANDAR SEREMBAN

/

/

PINDAAN : NO.

PINDAAN

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KHONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372

BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TANDATANGAN PEMILIK :

KHONG GUAN BISCUIT FACTORY KHONG GUAN BISCUIT FACTTORY S/B, NO 354, JLN TOK UNGKU 70100 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

L E M B AGA A R K I TEK M A L A Y SIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 300

DISEMAK :

TARIKH : JAN 2018

TAJUK LUKISAN :

PROPOSED ALTERATION AND ADDITIONAL WORKS

NO. LUKISAN :

01

SWL - 2018 / KG / 01

03

Figure 9 : Proposed alteration and additional works to Khong Guan Biscuit Factory /

FILE NO. : AUTHORITY ENDORSEMENT :

/

PINDAAN : NO.

PINDAAN

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KHONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372

BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TANDATANGAN PEMILIK :

KHONG GUAN BISCUIT FACTORY KHONG GUAN BISCUIT FACTTORY S/B, NO 354, JLN TOK UNGKU 70100 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

L E M B AGA A R K I TEK M A L A Y SIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 150

DISEMAK :

TARIKH : JAN 2018

TAJUK LUKISAN :

PROPOSED ALTERATION AND ADDITIONAL WORKS DETAIL A

NO. LUKISAN :

SWL - 2018 / KG / 02

Figure 10 : Proposed alteration and additional work - Detail A

02 03


15 WEEKLY PROGRESS - WEEK 2 - KHONG GUAN BISCUIT FACTORY FILE NO. : AUTHORITY ENDORSEMENT :

PINDAAN : NO.

PINDAAN

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372

BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TANDATANGAN PEMILIK :

KHONG GUAN BISCUIT FACTORY KHONG GUAN BISCUIT FACTTORY S/B, NO 354, JLN TOK UNGKU 70100 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

L E M B AGA A R K I TEK M A L A Y SIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 150

DISEMAK :

TARIKH : JAN 2018

TAJUK LUKISAN :

PROPOSED ALTERATION AND ADDITIONAL WORKS DETAIL B

NO. LUKISAN :

03

SWL - 2018 / KG / 03

03

Figure 11 : Proposed alteration and additional work - Detail B

A

B

C

D

1

2 120mm x 120mm (h x w) CONCRETE KERB ANCHORED FIRMLY TO THE GROUND TO ENGR'S DETAIL

70mm∅ ULTRA GALVANIZED ROUND STEEL POST

4mm∅ GALVANIZED IRON FENCING

PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372 BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN NEGERI SEMBILAN TEL : 06-6781328 FAX : 06-6797940 E-MAIL : arksaujana@yahoo.com

NOTE :

FRONT ELEVATION

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

DRAWING TITLE :

GI. FENCING DETAIL (FACTORY)

GI. EASY FENCING DETAIL (FACTORY) SCALE : 1:25

Figure 12 : Proposed new GI Easy Fencing - Detail drawing I

DRAWING NO. : SWL - 2018 / KG / DTL 1

DRAWN BY :

DATE :

LYY

JAN 2018


16 WEEKLY PROGRESS - WEEK 2 - KHONG GUAN BISCUIT FACTORY

A

B

C

D

70mm∅ ULTRA GALVANIZED ROUND STEEL POST

PLAN VIEW

1

4mm∅ GALVANIZED IRON FENCING

PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372 BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN NEGERI SEMBILAN TEL : 06-6781328 FAX : 06-6797940 E-MAIL : arksaujana@yahoo.com

NOTE :

2

120mm (h) x 120mm (w) CONCRETE KERB ANCHORED FIRMLY TO THE GROUND TO ENGR'S DETAIL

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

DRAWING TITLE :

GI. FENCING DETAIL (FACTORY)

GI. EASY FENCING DETAIL (FACTORY)

SECTION A-A

DRAWING NO. : SWL - 2018 / KG / DTL 2

SCALE : 1:25

DRAWN BY :

DATE :

LYY

JAN 2018

Figure 13 : Proposed new GI Easy Fencing - Detail drawing II A

B

C

B

C

PLAN VIEW

A

80mm x 304.8mm MILD STEEL GATE FRAME 40mm x 40mm (thickness) MILD STEEL GATE RAILINGS

PROJECT : STAINLESS STEEL ROLLER TRACK TO MAUF'S DETAIL

120mm x 60mm (thickness) HOLLOW SECTION MS. GATE PORTAL TO MAUF'S DETAIL

HEAVY DUTY GATE WHEELS TO MAUF'S DETAIL

PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372 BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN NEGERI SEMBILAN TEL : 06-6781328 FAX : 06-6797940 E-MAIL : arksaujana@yahoo.com

NOTE :

FRONT ELEVATION

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

DRAWING TITLE :

MS. GATE DETAIL (FACTORY)

MS. SLIDING GATE DETAIL (FACTORY) SCALE : 1:50

Figure 14 : Proposed new MS. Sliding Gate - Detail drawing I

DRAWING NO. : SWL - 2018 / KG / DTL 3

DRAWN BY :

DATE :

LYY

JAN 2018


17 WEEKLY PROGRESS - WEEK 2 - KHONG GUAN BISCUIT FACTORY

80 mm x 304.8 mm MILD STEEL GATE FRAME

120mm x 60mm HOLLOW SECTION MS. GATE PORTAL TO MAUF'S DETAIL

40 mm x 40 mm MILD STEEL GATE RAILINGS

PROJECT : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372 BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN NEGERI SEMBILAN TEL : 06-6781328 FAX : 06-6797940 E-MAIL : arksaujana@yahoo.com

NOTE :

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

DRAWING TITLE : HEAVY DUTY GATE WHEELS TO MAUF'S DETAIL

MS. SLIDING GATE DETAIL

MS. GATE DETAIL (FACTORY) DRAWING NO. : SWL - 2018 / KG / DTL 4

SECTION A-A

SCALE : 1:10

STAINLESS STEEL ROLLER TRACK TO MAUF'S DETAIL

DRAWN BY :

DATE :

LYY

JAN 2018

Figure 15 : Proposed new MS. Sliding Gate - Detail drawing II

A

B

EXISTING WINDOW DEMOLISHED AND REPLACED BY 3048mm (w) X 1550mm (h) ALUMN. FRAME LAMINATED CLEAR GLASS (10mm THICK) FIXED WINDOW TO MANUF'S DETAIL REINFORCED CONCRETE STIFFENER

1 EXISTING BASIN

900mm (w) x 2400mm (h) MERBAU TIMBER DOOR WITH LEVER LOCK AND 4 PAIRS OF STAINLESS STEEL HINGES TO MAUF'S DETAIL

3123mm (l) x 600mm (w) LAMINATED CHIPBOARD COUNTER TOP WITH A THICKNESS OF 40mm TO MAUF'S DETAIL

1524mm (w) x 1550mm (h) ALUMN. FRAME LAMINATED CLEAR GLASS (10mm THICK) FIXED WINDOW TO MANUF'S DETAIL

NEW FAN LOCATION EXISTING BRICKWALL

2

EXISTING CEILING FAN TO BE REALLOCATED

75mm GYPSUM PARTITION WALL PAINTED WITH 3 COATS OF EMULSION PAINT TO MAUF'S DETAIL

PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372 BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

EXISTING DOOR TO ACCOUNT ROOM

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN NEGERI SEMBILAN TEL : 06-6781328 FAX : 06-6797940 E-MAIL : arksaujana@yahoo.com

NOTE :

PLAN

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

DRAWING TITLE :

NEW GUARD HOUSE DETAIL PLAN

NEW GUARD HOUSE (FACTORY) SCALE : 1:25

Figure 16 : Proposed new guard house - Plan

DRAWING NO. : SWL - 2018 / KG / DTL 5

DRAWN BY :

DATE :

LYY

JAN 2018


18 WEEKLY PROGRESS - WEEK 2 - KHONG GUAN BISCUIT FACTORY

A

B

1 EXISTING WINDOW DEMOLISHED AND REPLACED BY 3048mm (w) X 1550mm (h) ALUMN. FRAME LAMINATED CLEAR GLASS (10mm THICK) FIXED WINDOW TO MANUF'S DETAIL EXISTING DOOR TO ACCOUNT ROOM

2

3123mm x 600mm LAMINATED CHIPBOARD COUNTER TOP WITH A THICKNESS OF 40mm TO MAUF'S DETAIL

75mm GYPSUM PARTITION WALL TO MAUF'S DETAIL

EXISTING BRICK WALL

3

PROPOSED ALTERATION AND ADDITION WORKS FOR THE KONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372 BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

EXISTING FLOOR SLAB

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN NEGERI SEMBILAN TEL : 06-6781328 FAX : 06-6797940 E-MAIL : arksaujana@yahoo.com

NOTE :

SECTION A-A

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

DRAWING TITLE :

NEW GUARD HOUSE DETAIL SECTION A-A

NEW GUARD HOUSE (FACTORY) SCALE : 1:25

DRAWING NO. : SWL - 2018 / KG / DTL 6

DRAWN BY :

DATE :

LYY

JAN 2018

Figure 16 : Proposed new guard house - Section

Figure 17 : Submission of drawings to client - First payment made Through this project, I learnt how to deal with the requirements of the client and make appropriate advice in ensuring everything is correct. I was also able to study the turning radius of a truck as well as other specifications like diverge of drainage system, rules and regulations about set backs as well as proposing suitable fencing and gate for a factory.


19 WEEKLY PROGRESS - WEEK 2

2.2.3 SMJK(C) SIN HUA SPORTS COMPLEX PROJECT : SPORTS COMPLEX JOB SCOPE : SITE VISIT, CONCEPTUAL DESIGN, DRAWINGS, PRESENTATION MEETINGS, 3D MODELING, RENDERING LOCATION : NBC 4050, JLN TOK UNGKU , SEREMBAN, NEGERI SEMBILAN

Figure 18 : Site Plan of SMJK(C) SIN HUA - Site for sports complex

In designing the sports complex, I was able to study the nature of the site itself and understand the potential of the land which influences the placement, form, material and orientation of the building. In this project, I was required to produce a conceptual design along with visual presentation to be shown to the school councils for approval. Requirements of spaces are : Gymnasium, 2 Squash Court, 5 Table tennis court, half-olympic swimming pool and a Library. With the guidance of my supervisor, Ar.Lee Siew Wai, I was able to learn the proper way to design a building.


20 WEEKLY PROGRESS - WEEK 2 - SMJK(C) SIN HUA SPORTS COMPLEX

Figure 19 : Standard size of Squash Court , Half-Olympic Pool & Table tennis court

Figure 20 : Experimenting on design layouts, studying requirements of spaces


21

WEEKLY PROGRESS WEEK 3

16th January 2018 - 19th January 2018


22 WEEKLY PROGRESS

2.3.1 WEEK 3 LOG SHEET


23 WEEKLY PROGRESS - WEEK 3

2.3.2 SMJK(C) SIN HUA SPORTS COMPLEX PROJECT : SPORTS COMPLEX JOB SCOPE : SITE VISIT, CONCEPTUAL DESIGN, DRAWINGS, PRESENTATION MEETINGS, 3D MODELING, RENDERING LOCATION : NBC 4050, JLN TOK UNGKU , SEREMBAN, NEGERI SEMBILAN

Figure 21 : Final Conceptual Ground Floor Plan The ground floor arrangement of the sports complex took quite a longer time as the land is quite limited. However, with the help of my supervisor, I was able to figure out the arrangement of spaces in maximising the land to ensure each area has contributed to its full usage.Â


24 WEEKLY PROGRESS - WEEK 3 - SMJK(C) SIN HUA SPORTS COMPLEX

Figure 22 : Final Conceptual First Floor Plan

The first floor plan is an optional design which was proposed by one of the school council. The possibility of constructing the first floor will depend on the overall construction cost in relation to the budget. The school has allocated a budget of 3 million for the entire sports complex. However, it is estimated that the budget is not suďŹƒcient as the estimated construction cost of the building is 2.59 million Ringgit excluding the construction cost of the half-olympic size swimming pool.


25 WEEKLY PROGRESS - WEEK 3

2.3.3 S2 HOTEL PROJECT : 3 STAR HOTEL JOB SCOPE : SUBMISSION DRAWINGS , CONSTRUCTION TEAM MEEITNGS LOCATION : SEREMBAN 2, NEGERI SEMBILAN

Figure 23 : Assist in the completion of the submission drawings - 1st & 2nd Floor Plan

I was required to help my colleagues in rushing for the submission drawings of a hotel located at Seremban 2. I was assigned to contribute in arranging the layouts, amending some minor changes from the clients, area tabulation and final checking of the specifications and annotations. Although the contribution is little , I was able to study all the drawing of the S2 hotel and gain the knowledge in terms of design, materiality, hierarchy in room areas and specifications.


26 WEEKLY PROGRESS - WEEK 3 - S2 HOTEL

Figure 24 : Meeting with clients, engineer, interior designers, contractor and land authority

Even though I was not fully in charge of this project, I was given a chance to participate the final meeting of the construction team which includes the architect, client, engineer, contractor, interior designer and the land authority. It was really an eye opener as I witness and observe the whole meeting. I learnt new terms that are commonly used in the construction industry. In addition, they were discussing about the procedures of submitting the drawings which contributes to the learning of local authorities. On the other hand, they were also discussing about the placement of TNB where it should be an attached unit or stand alone unit where they provide suggestions and statements among themselves.


27

WEEKLY PROGRESS WEEK 4

22nd January 2018 - 26th January 2018


28 WEEKLY PROGRESS

2.4.1 WEEK 4 LOG SHEET


29 WEEKLY PROGRESS - WEEK 4

2.4.2 SMJK(C) SIN HUA SPORTS COMPLEX PROJECT : SPORTS COMPLEX JOB SCOPE : SITE VISIT, CONCEPTUAL DESIGN, DRAWINGS, PRESENTATION MEETINGS, 3D MODELING, RENDERING LOCATION : NBC 4050, JLN TOK UNGKU , SEREMBAN, NEGERI SEMBILAN

Figure 25 : 3D Modeling - Sketchup - Sports Complex - Perspective I

Figure 26 : 3D Modeling - Sketchup - Sports Complex - Perspective II


30 WEEKLY PROGRESS - WEEK 4 - SMJK(C) SIN HUA SPORTS COMPLEX

Figure 27 : 3D Modeling - Sketchup - Sports Complex - Perspective III

Figure 28 : 3D Modeling - Sketchup - Sports Complex - Perspective IV


31 WEEKLY PROGRESS - WEEK 4 - SMJK(C) SIN HUA SPORTS COMPLEX

Figure 29 : Exterior Rendering - Sports Complex

I was required to produce both exterior and interior renderings to be shown to the school councils.. The requirement of the renderings are not just merely about aesthetics, but the information conveyed through the rendering itself. Through this practice, I was able to increase my skills in using the software 3DxMax as well as gaining more knowledge on the effect of materiality towards the facade and ambience of the whole building.


32 WEEKLY PROGRESS - WEEK 4 - SMJK(C) SIN HUA SPORTS COMPLEX

Figure 30 & 31 : Interior Rendering - Internal Courtyard & Swimming Pool


33

WEEKLY PROGRESS WEEK 5

29th January 2018 - 2nd February 2018


34 WEEKLY PROGRESS

2.5.1 WEEK 5 LOG SHEET


35 WEEKLY PROGRESS - WEEK 5

2.5.2 SMJK(C) SIN HUA SPORTS COMPLEX PROJECT : SPORTS COMPLEX JOB SCOPE : SITE VISIT, CONCEPTUAL DESIGN, DRAWINGS, PRESENTATION MEETINGS, 3D MODELING, RENDERING LOCATION : NBC 4050, JLN TOK UNGKU , SEREMBAN, NEGERI SEMBILAN

Figure 32 : Design presentation to the school councils

The SMJK(C) SIN HUA Sports Complex was being presented in front of 6 school councils where they make comments and discussion about the estimated cost to build this complex.


36 WEEKLY PROGRESS - WEEK 5

2.5.3 METHODIST CHURCH MALAYSIA PROJECT : RECREATIONAL RETREAT JOB SCOPE : CONTRACT DOCUMENTATION : TENDER DOCUMENT LOCATION : PETALING JAYA , SELANGOR

Figure 33 & 34 : Tender document & Construction Drawings

Figure 35, 36 & 37 : Interviewing contractors - Tender Document

I was given a chance to witness and participate in the interviewing of 3 different contractors with different quotations for the project. The client will choose the cheapest and the best contractor after the interview with the advice of the architect.


37

WEEKLY PROGRESS WEEK 6

5th February 2018 - 9th February 2018


38 WEEKLY PROGRESS

2.6.1 WEEK 6 LOG SHEET


39 WEEKLY PROGRESS - WEEK 6

2.6.2 EHSAN SITE OFFICE & MOCK-UP UNIT PROJECT : SITE OFFICE & MOCK-UP UNIT JOB SCOPE : SUBMISSION DRAWINGS LOCATION : MUKIM PEDAS, DAERAH REMBAU , NEGERI SEMBILAN FILE NO. : AUTHORITY ENDORSEMENT :

M

L

K J

I

1 2

3 H 4

G

5

6 7

F

E

PINDAAN :

D

PINDAAN

NO.

TARIKH

C

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

- RE

FF

L:

PE AT

1.

25

0

-

B

PROJEK : SITE OFFICE & MOCK-UP UNIT

- RE

FF

L:

A

PE

AT

4. 75

0

SI

TE

-

OFF IC

E

MUKIM PEDAS, DAERAH REMBAU, NEGERI SEMBILAN DARUL KHUSUS. CO

TANDATANGAN PEMILIK :

ST

VE

ORA

RE

D

GE

FO

YE

R

DRO P-

OFF

AR EA

DATO HAJI ABDUL HAMID BIN PUDU VEETTIL ABDU (D.I.M.P) - PENGARAH ( NO. K/P : 691227 - 10 - 5209 )

DRI

VE

W

AY

PEMILIK TANAH PEMAJU

: LOOKEAST CAPITAL SDN. BHD. (NO. SYARIKAT : 412519-X) : UFUK PERDANA SDN. BHD. (NO. SYARIKAT : 280196-T)

ALAMAT

: SUITE C-20-3A, LEVEL 20, BLOCK C, MEGAN AVENUE II, NO. 12, JALAN YAP KWAN SENG, 50450 KUALA LUMPUR.

SWLee Architect

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

LEMBAGA ARKITEK MALAYSIA

................................................................. Ar. Lee Siew Wai ARKITEK No Pendaftaran LAM : A/L 260

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 150

DISEMAK :

TARIKH : FEB 2018

TAJUK LUKISAN :

SITE OFFICE & MOCK-UP UNIT FLOOR PLAN SITE PLAN

N Q

NO. LUKISAN :

Figure 38 : Site plan - Mock-up unit

I was requested to help my colleagues in another submission drawing where I have to draw the site office and mock-up unit of a housing development. I was able to learn more on housing typologies as I study the drawings of the housing development. The mock-up unit is built using partition walls to indicate the spaces. The ground floor level and the first floor level are to be built on the same level.


40 WEEKLY PROGRESS - WEEK 6 - EHSAN SITE OFFICE & MOCK-UP UNIT FILE NO. : AUTHORITY ENDORSEMENT :

1

2

4

3

5

7

6

M

L

PINDAAN : PINDAAN

NO.

TARIKH

NOTE : K

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

J

PROJEK : SITE OFFICE & MOCK-UP UNIT

I TYPICAL GROUND FLOOR MOCK-UP

TYPICAL FIRST FLOOR MOCK-UP

H G A

A

SITE OFFICE

F

MUKIM PEDAS, DAERAH REMBAU, NEGERI SEMBILAN DARUL KHUSUS.

STORAGE

E

TANDATANGAN PEMILIK TANAH & PEMAJU :

D

COVERED FOYER

C

DATO HAJI ABDUL HAMID BIN PUDU VEETTIL ABDU (D.I.M.P) - PENGARAH ( NO. K/P : 691227 - 10 - 5209 )

DROP-OFF AREA

PEMILIK TANAH PEMAJU

: LOOKEAST CAPITAL SDN. BHD. (NO. SYARIKAT : 412519-X) : UFUK PERDANA SDN. BHD. (NO. SYARIKAT : 280196-T)

ALAMAT

: SUITE C-20-3A, LEVEL 20, BLOCK C, MEGAN AVENUE II, NO. 12, JALAN YAP KWAN SENG, 50450 KUALA LUMPUR.

SWLee Architect NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

DRIVEWAY

TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK :

B

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

.................................................................

A

ARKITEK

LEMBAGA ARKITEK MALAYSIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 100

DISEMAK :

TARIKH : FEB 2018

TAJUK LUKISAN : SITE OFFICE & MOCK-UP UNIT FLOOR PLAN

01

NO. LUKISAN :

N Q

04

Figure 39 : Ground floor plan - Site office & mock-up unit FILE NO. : AUTHORITY ENDORSEMENT :

0

1

1a

2

3

4

5

6

6a

7

7a

M1 M

L

PINDAAN : PINDAAN

NO.

TARIKH

NOTE : K

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

J

PROJEK : SITE OFFICE & MOCK-UP UNIT

I

0.37 MM THK. CLIP LOCK COLOURBOND METAL DECK ROOFING AT 3° PITCH

0.37 MM THK. CLIP LOCK COLOURBOND METAL DECK ROOFING AT 3° PITCH

H G

F

MUKIM PEDAS, DAERAH REMBAU, NEGERI SEMBILAN DARUL KHUSUS. E

TANDATANGAN PEMILIK TANAH & PEMAJU :

D D1 M C

DATO HAJI ABDUL HAMID BIN PUDU VEETTIL ABDU (D.I.M.P) - PENGARAH ( NO. K/P : 691227 - 10 - 5209 )

3° PITCH

3° PITCH

PEMILIK TANAH PEMAJU

: LOOKEAST CAPITAL SDN. BHD. (NO. SYARIKAT : 412519-X) : UFUK PERDANA SDN. BHD. (NO. SYARIKAT : 280196-T)

ALAMAT

: SUITE C-20-3A, LEVEL 20, BLOCK C, MEGAN AVENUE II, NO. 12, JALAN YAP KWAN SENG, 50450 KUALA LUMPUR.

SWLee Architect NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

B1

TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK :

B

SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

.................................................................

A LEMBAGA ARKITEK MALAYSIA

ARKITEK

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 100

DISEMAK :

TARIKH : FEB 2018

TAJUK LUKISAN : MOCK-UP UNIT ROOF PLAN

NO. LUKISAN :

02

N Q

03

Figure 40 : Roof Plan - Site office & mock-up unit


41 WEEKLY PROGRESS - WEEK 6 - EHSAN SITE OFFICE & MOCK-UP UNIT FILE NO. : AUTHORITY ENDORSEMENT :

1

2

4

3

5

6

7

8

9

A

PINDAAN : PINDAAN

NO.

B

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

FRONT ELEVATION

PROJEK : SITE OFFICE & MOCK-UP UNIT

SCALE : 1:100 1

2

5

3

7

8

9 MUKIM PEDAS, DAERAH REMBAU, NEGERI SEMBILAN DARUL KHUSUS. TANDATANGAN PEMILIK :

DATO HAJI ABDUL HAMID BIN PUDU VEETTIL ABDU (D.I.M.P) - PENGARAH ( NO. K/P : 691227 - 10 - 5209 )

PEMILIK TANAH PEMAJU

: LOOKEAST CAPITAL SDN. BHD. (NO. SYARIKAT : 412519-X) : UFUK PERDANA SDN. BHD. (NO. SYARIKAT : 280196-T)

ALAMAT

: SUITE C-20-3A, LEVEL 20, BLOCK C, MEGAN AVENUE II, NO. 12, JALAN YAP KWAN SENG, 50450 KUALA LUMPUR.

SWLee Architect

A

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

................................................................. Ar. Lee Siew Wai ARKITEK No Pendaftaran LAM : A/L 260

LEMBAGA ARKITEK MALAYSIA

B

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 20

DISEMAK :

TARIKH : FEB 2018

TAJUK LUKISAN :

FRONT & REAR ELEVATION

REAR ELEVATION SCALE : 1:100

NO. LUKISAN :

03 04

Figure 41 : Front and Rear elevations - Site Office & Mock-up unit FILE NO. : AUTHORITY ENDORSEMENT :

3 3a

5

6a 7

PINDAAN : PINDAAN

NO.

TARIKH

NOTE :

A

THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : SITE OFFICE & MOCK-UP UNIT

MUKIM PEDAS, DAERAH REMBAU, NEGERI SEMBILAN DARUL KHUSUS.

B

TANDATANGAN PEMILIK :

DATO HAJI ABDUL HAMID BIN PUDU VEETTIL ABDU (D.I.M.P) - PENGARAH ( NO. K/P : 691227 - 10 - 5209 )

PEMILIK TANAH PEMAJU

: LOOKEAST CAPITAL SDN. BHD. (NO. SYARIKAT : 412519-X) : UFUK PERDANA SDN. BHD. (NO. SYARIKAT : 280196-T)

ALAMAT

: SUITE C-20-3A, LEVEL 20, BLOCK C, MEGAN AVENUE II, NO. 12, JALAN YAP KWAN SENG, 50450 KUALA LUMPUR.

SWLee Architect NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

LEMBAGA ARKITEK MALAYSIA

SECTION A-A

................................................................. Ar. Lee Siew Wai ARKITEK No Pendaftaran LAM : A/L 260

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 20

MOCK-UP UNIT FRONT ELEVATION

DISEMAK :

TARIKH : FEB 2018

SCALE : 1:100

MOCK-UP UNIT FRONT ELEVATION

TAJUK LUKISAN :

NO. LUKISAN :

04 04

Figure 42 : Section A-A - Mock-up unit front elevation


42 WEEKLY PROGRESS - WEEK 6

2.6.3 KHONG GUAN BISCUIT FACTORY PROJECT : RENNOVATION JOB SCOPE : SITE VISIT, SITE MEASURING, TECHNICAL DRAWINGS, MEETINGS LOCATION : NO.345 JLN TOK UNGKU, SEREMBAN, NEGERI SEMBILAN FILE NO. : AUTHORITY ENDORSEMENT :

/

/ / /

BANDAR SEREMBAN

/ PINDAAN :

/

NO.

PINDAAN

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KHONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372

BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TANDATANGAN PEMILIK :

KHONG GUAN BISCUIT FACTORY KHONG GUAN BISCUIT FACTTORY S/B, NO 354, JLN TOK UNGKU 70100 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

L E M B AGA A R K I TEK M A L A Y SIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 300

DISEMAK :

TARIKH : JAN 2018

TAJUK LUKISAN :

PROPOSED ALTERATION AND ADDITIONAL WORKS

NO. LUKISAN :

SWL - 2018 / KG / 01

01 03

Figure 43 : Amended proposed alteration and additional works - Khong Guan

Amendment has to be made along the way where changes will occur. Through this project, I realised that a way longer period is required to completely accomplish a project as changes will always occur.


43 WEEKLY PROGRESS - WEEK 6 - KHONG GUAN BISCUIT FACTORY FILE NO. : AUTHORITY ENDORSEMENT :

/

/

PINDAAN : NO.

PINDAAN

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KHONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372

/ BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.

/

TANDATANGAN PEMILIK :

KHONG GUAN BISCUIT FACTORY KHONG GUAN BISCUIT FACTTORY S/B, NO 354, JLN TOK UNGKU 70100 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

L E M B AGA A R K I TEK M A L A Y SIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 150

DISEMAK :

TARIKH : JAN 2018

TAJUK LUKISAN :

PROPOSED ALTERATION AND ADDITIONAL WORKS DETAIL A

NO. LUKISAN :

02

SWL - 2018 / KG / 02

03

Figure 44 : Amended proposed alteration and additional works - Detail A FILE NO. : AUTHORITY ENDORSEMENT :

PINDAAN : NO.

PINDAAN

TARIKH

NOTE : THIS DRAWING IS COPYRIGHT AND PROPERTY OF SWLEE ARCHITECT. CONTRACTOR MUST CHECK ALL DIMENSION ON SITE. ONLY FIGURE DIMENSION TO BE WORKED FROM. DISCREPANCIES IN THE DRAWING OR BETWEEN ARCHITECTURE AND C/S DRAWINGS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING.

PROJEK : PROPOSED ALTERATION AND ADDITION WORKS FOR THE KHONG GUAN BISCUIT FACTORY AT LOT 6340 & LOT 9372

BANDAR SEREMBAN , DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TANDATANGAN PEMILIK :

KHONG GUAN BISCUIT FACTORY KHONG GUAN BISCUIT FACTTORY S/B, NO 354, JLN TOK UNGKU 70100 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS

NO. 41, TINGKAT SATU, TAMAN BUKIT EMAS, JALAN TAMPIN, 70450 SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS. TEL : 06-6781328 FAX : 06-6797940 E-MAIL : swleearchitect@gmail.com

ARKITEK : SAYA MEMPERAKUI BAHAWA DETAIL-DETAIL DALAM PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1986 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA.

L E M B AGA A R K I TEK M A L A Y SIA

ARKITEK : AR. LEE

PEMBANTU :

DILUKIS : LYY

SKALA : 1 : 150

DISEMAK :

TARIKH : JAN 2018

TAJUK LUKISAN :

PROPOSED ALTERATION AND ADDITIONAL WORKS DETAIL B

NO. LUKISAN :

SWL - 2018 / KG / 02

Figure 45 : Amended proposed alteration and additional works - Detail B

03 03


44 WEEKLY PROGRESS - WEEK 6

2.6.3 DATO’ GOH BUNGALOW PROJECT : BUNGALOW JOB SCOPE : CONCEPTUAL DESIGN & PRESENTATION DRAWINGS LOCATION : GREEN STREET HOMES , SEREMBAN 2, NEGERI SEMBILAN

Figure 46 : Meeting the client on site

Figure 47 : Discussion of design brief


45 WEEKLY PROGRESS - WEEK 6 - DATO’ GOH BUNGALOW

Figure 48 : Conceptual design - Bubble diagram , Spatial arrangement

Figure 49 : Schematic Diagram - Spatial arrangement


46

WEEKLY PROGRESS WEEK 7

12th February 2018 - 15th February 2018


47 WEEKLY PROGRESS

2.7.1 WEEK 7 LOG SHEET


48 WEEKLY PROGRESS - WEEK 6

2.6.3 DATO’ GOH BUNGALOW PROJECT : BUNGALOW JOB SCOPE : CONCEPTUAL DESIGN & PRESENTATION DRAWINGS LOCATION : GREEN STREET HOMES , SEREMBAN 2, NEGERI SEMBILAN

Figure 50 & 51 : Site Visit -with IJM land - Dato’ Goh Bungalow


49 WEEKLY PROGRESS - WEEK 7 - DATO’ GOH BUNGALOW

WAT

DRYING AREA

E ATUR ER FE

BACK YARD

LAUNDRY

MAID ROOM OUTDOOR KITCHEN

10m

STORE

UTILITY TOILET

WET KITCHEN

8

9

LIFT

6

7

DRY KITCHEN

5

PANTRY

TOILET

4

AV ROOM ALTAR DINING

2

3

PUMP ROOM

1

GRAND LIVING

0

STUDY ROOM

OUTDOOR TERRACE

20

25

30 ft

LOUNGE BAR

OPEN SHOWER

15

OUTDOOR TERRACE

COVERED TERRACE

LOBBY

SWIMMING POOL

5

10

POWDER ROOM

GUEST ROOM FOYER

0

ATTACH BATH AND CLOSET

COVERED TERRACE

Figure 52 : First conceptual design proposal

E ATUR R FE WATE

DRYING AREA BACK YARD LAUNDRY OUTDOOR KITCHEN

UTILITY TOILET

MAID ROOM

10m

WET KITCHEN

PANTRY LIFT

9

TOILET

6

7

8

DRY KITCHEN

5

STORE

4

AV ROOM

PUMP ROOM

ALTAR

3

DINING

1

2

LOUNGE BAR

GRAND LIVING

0

STUDY ROOM

25

30 ft

OUTDOOR TERRACE

OPEN SHOWER

20

GUEST ROOM

15

COVERED TERRACE

ATTACH BATH AND CLOSET

0

5

POWDER ROOM

10

OUTDOOR TERRACE

SWIMMING POOL

LANDSCAPE SCREENING

FOYER

LANDSCAPE SCREENING

LANDSCAPE SCREENING

Figure 53 : Second conceptual design proposal


50

WEEKLY PROGRESS WEEK 8

20th February 2018 - 23rd February 2018


51 WEEKLY PROGRESS

2.8.1 WEEK 8 LOG SHEET 8


52 WEEKLY PROGRESS - WEEK 8 - DATO’ GOH BUNGALOW BACK YARD

DRYING AREA

LANDSCAPE

MAID ROOM

GARDEN OUTDOOR KITCHEN

TOILET

LAUNDRY

POWDER ROOM

WET KITCHEN

UTILITY TOILET

LIFT DRY KITCHEN & PANTRY INTERNAL COURTYARD

STORE

ALTAR

DINING

GRAND LIVING

FOYER

LOUNGE BAR

STUDY ROOM

ENTRANCE LOBBY

COVERED TERRACE FOYER

GUEST ROOM

COVERED TERRACE

AV ROOM

COVERED TERRACE

ATTACH BATH AND CLOSET SWIMMING POOL LANDSCAPE SCREENING

LANDSCAPE SCREENING

OPEN SHOWER

WALKWAY

N

PUMP ROOM

SCALE RULER 0

1

2

3

4

5

6

7

8

9

WALKWAY

0 LANDSCAPE SCREENING / FRONT GARDEN

Figure 54 : Approved conceptual design

Figure 55 : Rendered Conceptual Ground Floor Plan for Presentation

5

10

15

20

25

30 ft

10m


53 CONCLUSION

In conclusion, this short semester - Internship Training and Report has equipped me in various aspect where I have gained knowledge on the requirements, rules and regulations as well as building specifications of a real working project. On the other hand, I am able to experience the lifestyle of an working architect which varies from our studies at Taylor’s University.

Throughout this whole internship, I have been exposed to projects from different categories , small scale to big scale : Guard house, Renovation project, Sport’s Complex, Housing Development and Luxurious Bungalow. I was able to increase my technical skill and working speed which will definitely help in my further semesters.

Aside from technical knowledge and skills, I was able to gain the experience of working with my colleagues. Communication is the key to everything. I was able to work alongside with them and learn from them in all ways. I was able to learn many common standard requirements in designing a building for example : Headroom height, requirements from the Bomba, set backs from each side of the boundary line and many more.

On top of all mentioned above, I was able to gain the experience of working under a superior where all requirements are to be fulfilled and complete in a certain time with a expected quality of work. Hence, I have practiced to produce the best work that I could in the provided amount of time which trains my thinking skills and decision making. “ Less thinking , more doing”.

In a nutshell, I am very grateful that I was given a chance to be exposed to all kinds of projects. I have gained more than I expected through this short semester where all the knowledge and skills learnt will be very useful and beneficial in the future of my architecture journey.