2015 Annual Report

Page 25

79 major water & sewer repairs

82 hanging flower baskets

2016 Major Initiatives: ·

Phase 1 of G.P.S installations in vehicles & equipment

·

Phase 2 of CityWorks based Work Order system

·

Implement CityWorks mobile

·

Field confirm transportation, parks, and utility GIS information

·

Westlawn Cemetery paving and fencing

·

Upgrade approximately 400 street lights to LED

·

Traffic signal upgrade at Victoria Avenue and Kootenay Street

·

Downtown native plant display

·

Upgrade utility monitoring system to VT SCADA

·

Upgrade control valves and instrumentation at Pressure Reducing Stations

·

Rotary Park washroom replacement

4.68 billion litres of potable water

2017 & 2018 Major Initiatives: ·

Underground Sprinklers connected to a central control system

·

Implement mechanized garbage collection

·

Wastewater Treatment Lagoons VFD upgrade

·

Traffic signal upgrade at Victoria Avenue and 6th Street North

·

Mt. Baker Tourist Park water & sewer upgrades

·

Cemetery upgrades

· Gyro Park washroom upgrade ·

Elizabeth Lake Visitors Centre holding tank and sewer line

·

Watershed planting program at Phillips Reservoir

·

Phillips Reservoir Access Road Upgrade

·

Expand Public Works involvement in Noxious Weed Program

·

Replace trees on Baker Street and in Rotary Park

·

RCMP vehicle compound

2015 Annual Report Page 25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.