architectural portfolio

Page 1

clee. christinalee396@hotmail.com

2014-2019 portfolio

/INSTAGRAM chrstinalee

~

/ARCHITECTURAL PORTFOLIO


.

hello ~


.

a journal process of several project experiences about architecture.


01. blogeur 6th Semester school project

02.kerabart 7th Semester school project

03.titikumpul Final project

04.krembangan Architecture Festival Competition2017

05.rumah 513 Freelance Project

06.menganti Freelance Project

07.jil sahara Freelance Project

08.the club house 4th Semester school project

01. 15. 41. 81. 91. 97. 101. 107.


contents

~


01. blogueur 01.


02.

My first journey to learn about semiotics Begin

with

the

intangible through

semiotics

principle

surroundings

triangle

applied untill

in

inside

design.

system

project,

the

building.

:

Area

: +- 2.000m2

2017 (6th semester project)

Site

: Jl. Walikota Mustajab Surabaya : 2

Function

:

fashion blogger

community

the

this

Year

Floors

,

space

~ year 2017


03.

SIGNIFIER “BLOGUEUR”

REFERENT

issues related to fashion

SEMIOTICS

SIGNIFIED

6th semester project - blogueur

“against the current”


04.

1. REFERENT

social issue:

political issue:

how they style themselves:

-Bullying (fashion teenage,adult,kid) -fashion class issue related to what kind of stuffs and cloth brands they wear

-forced labour towards western style in north Korea

-”being yourself” minded, uniqueness, different from the others.

2. SIGNIFIED - CURRENT : massive,dominan, uniformity with surroundings. - A “strong current” “against” a massive current intetionally, become a direct orientation, going upward out of the massive current. This caused transformation of the mass order :

1. rectangular initial shape -> it expects linear circulation in the buildings , just like a current characteristic. 2. The existence of repetition as a massive current. The orientation turns towards the fashion districts surround area. The small side is directed to the surrounding bistro and the big one is towards Jl. Selamet. 3. mass of the building has repetitiones, then building orientation turn towards the fashion district arround the site and the narrower side is directed to the bistro and residential area, the large one towards Jl. Slamet (residentials). 4. One of the masses turned as a symbol of against the current -> oriented towards the Kalimas River as a view.

1.

2.

4.

3.

3. SIGNIFIER CURRENT

AGAINSTMENT

-------> axis towards Jl.Slamet

massive circulation in a linear building starts from a center. showcase area as a turning point is a symbol of “against the current”

modular structure / grid

facades: monotone --> roster wall with 250mm thickness

concrete

truss as a structure material, because its charactyeristic --> strong but still seem lighter (character from “current”)

facade : flexible, different sizes, with ACP and glass material ( as light impression)

axis towards Grand City Mall and Kalimas River also Delta Plaza (variousity of fashion districts)

IWF steel structure material


05.

SITEPLAN SITE SIRCULATION: -Car: can be accessed from 2 directions (from Jl. Mayor Mustajab and JL. Slamet). -Pedestrians: can be accessed via Jl. Wijaya Kusuma and Jl. mayor mustajab because it’s close to pedestrian area which is easier ro access. OUTSIDE THE BUILDINGS: - Green space, for photography exhibition area and as a visual interaction space for visitors - Seating spot, as a place to relax and gather together - Outdoor gallery, as a supporting facility, to attract visitors from outside into the building.

6th semester project - blogueur

FRONT SIDE ELEVATION


06.

LAYOUT PLAN

SECOND FLOOR PLAN


6th semester project - blogueur

07.

CO-WORK AREA LOUNGE & CAFE


08.

SECTION AA

SECTION BB


6th semester project - blogueur

09.


10.

LEFT SIDE ELEVATION

RIGHT SIDE ELEVATION


11.

CO-WORK AREA

HALL AREA

6th semester project - blogueur

BIRD EYE VIEW


12.

FACADE DETAILS

DETAIL PLAFOND


13.

STRUCTURE

6th semester project - blogueur

OUTDOOR GALLERY

NIGHT PERSPECTIVE


14.

SCHOOL PORTFOLIO


02. kerabart 15.


16.

~ year 2017

Kerabart is one part of a high-rise building complex project, which serves as a place for arts education for

the

Lifting suave

community, the

and

concept applied

especially of

“ramah

through

a

among

adolescents.

tamah� type

which

of

means

behavioral

approach through the division of activities in the space that is not saturated, but still educational. Year

: 2017 (7th semester project)

Area

: +- 8000m2

Site

: Jl. Dr.Soetomo Surabaya

Floors

: 10

Function

:

youth education creative centre


17.

CONCEPT DESIGN

7th semester project - kerabart

TRANSFORMATION


18.

MASSING


7th semester project - kerabart

19.

SITEPLAN


20.

BASEMENT PLAN

LAYOUT PLAN


21.

SECOND FLOOR PLAN

7th semester project - kerabart

THIRD FLOOR PLAN


22.

FOURTH FLOOR PLAN

5TH-6TH FLOOR PLAN


7th semester project - kerabart

23.

7TH FLOOR

8TH FLOOR


24.

9TH FLOOR

10TH FLOOR


25.

FRONT SIDE ELEVATION

7th semester project - kerabart

RIGHT SIDE ELEVATION


26.

SECTION AA


27.

BACK SIDE ELEVATION

7th semester project - kerabart

LEFT SIDE ELEVATION


28.

SECTION BB


29.

LIBRARY

LIBRARY READING AREA

7th semester project - kerabart

STUDENT LOUNGE


30.

SPATIALCHARACTER -public library-


31.

BALCONY VIEW

VOID

PRIVATE STUDENT LOUNGE

7th semester project - kerabart

STUDENT HALL


32.

SPATIAL CHARACTER -student lounge area-


7th semester project - kerabart

33.

STRUCTURE


34.

BIRD EYE VIEW

VEHICLES ENTRANCE

DROP OFF AREA


7th semester project - kerabart

35.

UTILITIES


36.

OUTDOOR GALLERY

PUBLIC AMPHITHEATER


7th semester project - kerabart

37.

CLASS VOID (small exhibition area)

SCULPTURE STUDIO

TEMPORARY GALLERY

PERMANENT GALLERY


38.

UTILITIES


7th semester project - kerabart

39.

KERABART AT NIGHT


40.

SCHOOL PORTFOLIO


03. titikumpul 41.


42.

~ year 2018

Titikumpul which means gathering point in Indonesian is my academic final project in the final semester of my lecture. A social-based educational facility for orphans, based on the increasing number of orphans in Surabaya. Year

:

Area

: +- 5200m2

2018 (8th semester project)

Site

: Jl. Dr.Soetomo Surabaya

Floors

: 1-3

Function

:

education creative centre for orphans


43.

description,

a facility for orphans, in the

form of an educational platform that hones their creativity and

skills

or

talents

as

a

provision

background,

the

for

their

increasing

future.

number

of

orphanage children who experience adversity due to different backgrounds of life from adolescents should be (depressed / confined).

problem,

creating

accommodate and

in

the

needs

accordance

of with

approach,

buildings

educational the

skills

character

8th semester project - titikumpul

behaviour architecture

that

can

comfortably of

orphans.


44.

Site,

located on Jalan Ngemplak, Central Surabaya with an area of ​​ about 11,400 m2. The existing is a public facility surrounded by schools and residentials area, also a public facility such a church. Other existing area is a vacant land.

RTDRK-UP. TUNJUNGAN Kecamatan

: Genteng

Kelurahan

: Ketabang

KDB

: 50%

KLB

: 200%

TInggi Bnagunan : 2-4 lantai GSB

: 8m , 6m keliling

SITE ADMINISTRATIVE LIMITS : Utara

: Bank Bisnis International

Selatan

: Perumahan

Barat

: GBI Immanuel

Timur

: Sungai Kalimas


45.

SITE ANALYSIS - micro & macro bytrancik

8th semester project - titikumpul

MACRO - vehicle circulation direction of vehicle circulation and high-traffic point at 12.00-19.00 is located at the intersection to Jl. ngemplak.

MACRO- pedestrians pedestrian circulation paths are almost located on all 2 meters wide sidewalks on the ngemplak road.


46.

MACRO-figure ground

MICRO- science


47.

SITE ANALYSIS - micro & macro by trancik principle

8th semester project - titikumpul

MICRO-access

MICRO-view the best visual capture for visitors / riders is around area no.1 the best view is view A facing kalimas


48.

Estimated distance to the nearest orphanage by car: 1. PA. HIDAYAT UMAT (10 mnt) JL. Ketabang gang II 2. UNDAAN ORPHANAGE (10 mnt) JL. Undaan Kulon 3. PA.ANAK YATIM PIATU UNDAAN (10 mnt) JL. Undaan Kulon 4.PA. YATIM PIATU AL-INSAN (10 mnt) JL. Undaan Peneleh 5. PA.MUHAMADIYAH GUBENG (10mnt) JL. Grogol


8th semester project - titikumpul

49.

CONCEPT DESIGN


50.


8th semester project - titikumpul

51.

MASSING


52.

LEGENDA A : AREA PENGELOLA & PENERIMA B : SERBAGUNA & K.SENI TARI DAN THEATER C : KELAS MEMASAK D : KELAS OTOMOTIF E : KELAS S.RUPA, S.LUKIS, MENJAHIT F : KELAS SMP& SMA G : PERPUSTAKAAN & K.MULTIMEDIA 1.AKSES KENDARAAN (TEMPAT PARKIR) 2.AKSES SERVIS BANGUNAN 3.RUANG BERSAMA 4.AREA MAKAN BERSAMA 5.GALLERY OUTDOOR 6.RUANG INTERAKSI (TRANSISI) 7.AMPHITHEATER 8.PARKIR BENGKEL OTOMOTIF 9.LAPANGAN BERMAIN DAN AREA BERCOCOK TANAM


53.

8th semester project - titikumpul

LAYOUTPLAN - circulation concept

konsep ada 2 tahapan dari teritori publik-->sekunder-->primer


54.

BASEMENT AND SECOND FLOOR PLAN


8th semester project - titikumpul

55.

SECTION AA


56.

3.lunch gathering area

8.private interaction space

11.multimedia room

7. semi public interaction space

13. playground

9. private interaction area


8th semester project - titikumpul

57.

SECTION BB


58.

outdoor gallery

5. hall/gallery

3.akses interaksi


8th semester project - titikumpul

59.

SECTION CC


60.

3.communal area

7. aphitheater

9. reading area

9. transition area to playground


61.

FRONT SIDE ELEVATION

8th semester project - titikumpul

RIGHT SIDE ELEVATION


62.

BACK SIDE ELEVATION

LEFT SIDE ELEVATION


8th semester project - titikumpul

63.

MASS TRANSFORMATION


64.

APPROACH CONCEPT


65.

8th semester project - titikumpul

SPATIAL CHARACTER DETAILS fine arts class


66.


67.

8th semester project - titikumpul

SPATIAL CHARACTER DETAILS drawing class


68.


69.

8th semester project - titikumpul

LANDCSAPE SPATIAL CHARACTER communal space (interaction area)


70.

konsep.


71.

8th semester project - titikumpul

FACADE APPROACH functional area


72.


8th semester project - titikumpul

73.

STRUCTURE


74.


8th semester project - titikumpul

75.


76.


8th semester project - titikumpul

77.


78.


8th semester project - titikumpul

79.


80.

PORTFOLIO FOR KOMPETISI TUGAS AKHIR 2018


04. the krembangan 81.


82.

~ year 2018

The

Krembangan

House

ini

merupakan

karya

Architecture Festival pada tahun 2017 lalu,

lomba

dimana tema

yang diangkat yaitu tentang small housing architecture. Dalam

proses

mendesain,

adanya

tantangan

bahwa

rumah

ini ditinggali oleh sebuah keluarga kecil yang terdiri dari

seorang

ibu

perancangan The

yang

proyek

Krembangan

difable,

The

House

is

dari

krembangan an

sini

House

lah ini

competition

proses

dimulai.

project

for

Architecture Festival in 2017, where the theme is about small housing architecture. In the design process, there is a challenge that this house is inhabited by a small family is

the

consisting process

of

of

a

disabled

designing

mother,

Krembangan

Year

:

Area

: 123.75m2

Site

2017 (architecture festival 2017)

: Jl. Krembangan Barat Surabaya

Floors

: 2

Function

: House

from

House

here, begins.


architecture festival 2017 - the krembangan house

83.

the krembangan house.


84.

site analysis.

Name Location Site Area Area

: The Krembangan House : Jalan Krembangan Barat, Surabaya, Indonesia :120 sqm : 123.75 sqm

The site is in the corner of a road or an alley that help the house to get natural light and passive cooling.


85.

the house

architecture festival 2017 - the krembangan house

with all of the request and needs by the client , these things below are some of things that we designed to fulfill what the user or client needed for a comfortable residence for them to live in.


86.


architecture festival 2017 - the krembangan house

87.


88.


architecture festival 2017 - the krembangan house

89.

DENAH

DENAH LT 1

DENAH LT 2


90.

SECTION AA

SECTION BB

NORTH ELEVATION

EAST ELEVATION

LAYOUTPLAN

SITEPLAN


05. rumah 513 91.


.

92.

~ year 2018

M

erupakan proyek

pertama saya sebagai freelance,

berupa schematic design . Di desain pada bulan Juli 2018, dan proses pembangunan dimulai pada bulan November 2018 . Rumah 513 ini merupakan dihuni keluarga yang terdiri dari 5 anak dan sepasang suami istri dan sepasang kakek dan nenek. Client mengininkan sebuah hunian yang leluasa dengan

suasana

yang

asri

seperti

berada

di

villa.

A freelance project, in the form of schematic design. It was designed in July 2018, and the development process began in November 2018. This house is inhabited by a quiet big family consists of 5 children and a husband and wife and a pair of grandparents. Client wants a minimalist ambience by creating free living spaces like being in a villa. Year

:

Area

: +- 400m2

2018 (freelance project)

Site

: Jl. Kertajaya Indah

Floors

: 2

Function

: house


93.

rfreelance project - trumah 513

GROUND FLOOR PLAN

Konsep tata ruang dibuat leluasa dengan meminimalisir penggunaan sekat , pada lantai 1, terdapat kamar utama untuk orang tua dan kakek nenek. Pemberian ruang hijau untuk mengoptimalkan penghawaan yang sekaligus sebagai view (menghadirkan suasana asri) terhadap kamar utama dan ruang keluarga.


94.

FIRST FLOOR PLAN

Pada lantai 2, terdapat kamar untuk anak, dan juga ada area santai berupa outdoor area untuk berkumpul dan acara barbeque, karena client suka memasak dan merayakan makan bersama keluarga. Pemberian void untuk menghadirkan suasana asri yang tetap terasa dan juga penghawaan alami yang optimal.


rfreelance project - trumah 513

95.

FONT SIDE ELEVATION


96.

SIDE ELEVATION


06. menganti 97.


98.

~ year 2019

The

Menganti

project

was

designed

in

March

2019

which is located in a rural area around Surabaya. The like

client a

wants

villa,

to

since

create it’s

a a

Year

:2019 (freelance project)

Area

: +- 200m2

Site

: Jl. Menganti, Surabaya

Floors

: 2

Function

: house

cozy

atmosphere

retirement

home.


rfreelance project - menganti

U

JL. MENGANTI NO.864 SURABAYA

U

RUMAH MENGANTI

U

ALAMAT

ALAMAT

JL. MENGANTI NO.864 SURABAYA

NAMA PROYEK

U

RUMAH MENGANTI

LAYOUT PLAN DENAH LT.2

JUDUL GAMBAR

LAYOUT PLAN DENAH LT.2

JUDUL GAMBAR

1:100 1:100

SKALA

1:100 1:100

SKALA

17 MARET 2019

TANGGAL

17 MARET 2019

TANGGAL

1

NO.LEMBAR

1

NO.LEMBAR

GROUND FLOOR

NAMA PROYEK

99.

FIRST FLOOR


100.

FRONT SIDE ELEVATION

BACK SIDE ELEVATION


07. jil sahara 101.


102.

~ year 2019

Boutique

renovation

project

in

the

Kemang

Raya,

Jakarta area which was completed in December 2019. The

minimalist

concept

that

gives

the

impression

of comfort for shopping is applied in this project. Year

:

Area

: +- 300m2

2019 (freelance project)

Site

: Jl. Kemang Raya No. 9

Floors

: 3

Function

: Commercial


103.

rfreelance project - jil sahara

GROUND FLOOR PLAN

FIRST FLOOR PLAN


104.

AXONOMETRY - ground floor

AXONOMETRY - first floor


rfreelance project - jil sahara

105.

CONSTRUCTION PROCCESS


106.


08. clubhouse 107.


.

108.

the Clubhouse Taman Dayu is a 4th semester project, where I learned about the mass order that was applied to

contoured

facility

land.

used

for

The

holiday

club and

Year

:

Area

: +- 200-400 m2

Site

: Jl. Kertajaya Indah

house

2015 (4th semester project)

Floors

: 1-4

Function

: clubhouse

is

vacational

a

public

occasion.

~ year 2015


4th semester project - the clubhouse

109.

KONSEP

ANALISA SITE


110.

LEGENDA : A: MASSA UTAMA ( LOBBY & LOUNGE, FITNESS, PENGELOLA ) B: SERBAGUNA C: CAFE D: PERPUSTAKAAN & MUSHOLLA E: SIGHT SEEING TOWER & TANDON ATAS F: POS SATPAM & GUDANG GENSET DAN PANEL


4th semester project - the clubhouse

111.

POTONGAN AA

POTONGAN BB

TAMPAK


112. 01.

SCHOOL PORTFOLIO


.

thank you.


.

By Christina Lee Indonesia, 2019. christinalee396@hotmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.