Landscape Architecture portfolio

Page 1

P

O

F

O O 2008-2013

Huei Chung Cheng

I

O O

F

O

P

R

T

I

T

L

L

R


INDEX

01.

1.1 Sheraton Hotel & Spa Entry Design Fort Worth, Texas

1.2Transportation Oriented Develpment Dallas, Texas DART, MLK Station

1.3 Richard Simpson Waterfront Park Design City of Arlington, Texas Team work

1.4 Eco-Linknage

CITY of Kennedale , Green Infrustructure & Trail System Plan

1.5 City of Kennedale Analysis & Suitability Kennedale, Texas


02.

Planting Design

Team work

2.1 ERB Courtyard Design

The university of Texas at Arlington Arlington, Texas

2.2 New Urbanism Street Landscape The shops at Legacy Plano,Texas

04.

P r a c t i c e . Graphic Design. Photographic 4.1 Memorial Garden

2.3 Median Garden

Arlington, Texas Dalton LandDesign

2.4 Theme Gardens

4.2 Landmark Montage

03.

Division Street Arlington,Texas

4.3 Explorations

Construction Document 3.1 Beck Park Dallas, Texas

INDEX


Landscaope Design .

01. Planning


Wild Wet

1.1

HueiChung Cheng

Richard Simpson Waterfront Park Design

Richard Simpson Waterfront Park Design City of Arlington, Texas Advisor: Claude Thompson Photoshop, Indesign, GIS, Auto Cad

Nov 2012 2 weeks

Introduction

Arlignton padding trails runs along lake and create a good opportunity to connect pakrs and open spaces.

Exisitng Uses

Fishing


Wild Wet

Plan View Richard Simpson Waterfront Park Design

Circulation

Lake Arlington miles padding trails

Lake Arlington


Wild Wet

Richard Simpson Waterfront Park Design

HueiChung Cheng


Wild Wet Richard Simpson Waterfront Park Design


Arlington Life !

SITE

Experience Drive and Walk in Theater in Arlington Hurrican Harbor

I-30 Arlington Convention Center

SITE Ballpark

Cowboy Staudim

Hotels Resturants

1.2

Arlington Life ! Outdoor Theater City of Aerlington, Texas

Nov 2012 2 weeks

Photoshop, Indesign, GIS, Auto Cad

To built a gate image of entering City of Arlignton , the project enhance the area are once original loop ramp of I-30 Highway where people entering Entertainment District( including Cowboy Stadium, Ranger Ball ď€ eld ,Six ags, and Hurrican Harbor...etc.,). Project called Arlignton Life, the purpose is to create a place for people to go out at night to enjoy outdoor thearter (for cars and pedestrian)and a comfortable pedastrian orienated outdoor shopping mall. This project also creates a place for visitors to relax after ball games.


Arlington Life !

Conceptual landuse MEDIUM A R A I N M O R E GFARDEN INTIMATE AND U N I Q U E S E T T I N G A S OUTDOOR THEATER PEDESTRIANS STOP AND WATCH A FILM OUTDOORS AFTER A DA Y O F S HOP PIN G AND SOCIALIZING

Entrance Section PARKING

DAYTIME PARKING & NIGHT TINE DRIVE-IN MOVIE

PEDESTIANS ONLY

ENTRY PLAZA

PROPOSED BUS ROUTE (SHUTTLE FOR TRE TRAIN )

GRAND ENTRANCE TO ARLINGTON LIVE !

Programing Floor Sections


HueiChung Cheng

MLK Transit Oriented District Planning

1.3

City Park Comparision

MLK Transit Oriented District Planning Dallas, Texas Advisor: Dr. Ozdel Taner PhotoshopCS5 , Auto Cad 2010, sketchup Coraldraw 6, GIS Nov 2011 3 weeks City Maps

Study Area Circulations

Project Description MLK STATION is located on Dallas Area Rapid Transit transportation rail green line. Facing toward the Fair park gives the community a good opportunity having aesthetics visual. By using the knowlege of hydrology intergrate with urban planning to show the vision of MLK TOD. Also show issues are happen now? what might happen in the future? As a future landscape architecture what I can do for it?


HueiChung Cheng

Artisitc-in Village MLK Transit Oriented District Planning

Exisitng Landuse Plan

Landuse Relationship

Site Analysis - the pipes will bring the wastewater toward the Trinity river and White Rock Creek - Lack of the drainage pipes could cause the ood in the area. Inlet Map

Lack of tree coverage and green spaces caused water stay on the surface longer time

Permeable Map

- the ground water can become contaminated by high dense human activity in Dallas. These chemicals can enter the soil and rock, polluting the aquifer and eventually to the wells. (Source: EPA 2011)

Unpermeable Map

Outfall Map


HueiChung Cheng

Artisitc-in Village

START HERE

MLK Transit Oriented District Planning

Vision of MLK TOD communinty

WHAT ISSUES WE HAVE TO FACE IN OUR LIFE IN THE 21TH CENTURY ?

CLEAN & AlTERNATIVE ENERGY

Energy conservation

W A T E R CONSERVATIONS AND KEEP WATER ON SITE

COMMUNITY FARMLAND

Grow our own food

Hybrid Energy Save Rain Water

Combiing art and energy saving, less time to sit in front of computers

More green Spaces for people to enjoy outdoor spaces

Introducing U s e p u b l i c l o w c a r b o n transportation c a r s a n d o n & bicycle Dententions s t re e t h y br i d Ponds/ Dry gas stations Creek

Goof gardens Water collect system

Pocket parks


HueiChung Cheng

Artisitc-in Village MLK Transit Oriented District Planning

Master Plan

Dry Creek Track

Dry creek goes to under ground become part of drainage system when it come across to the buildings.

Legend 1 2 3 4 5 6 7

Entrance Plaza MLK Station Plaza BUs Station Roof Garden Artistic-in Village High School Mt Olive Lutheran Church

8 9 10 11 12 13 14

Edible Garden Outdoor Gallery Neighborhood Park Neighborhood Super Market MLK Recreatioanl Center Parking Park MLK Station Surface Detention Pond Underground Detention

Scale : 1"=400'


Artisitc-in Village MLK Transit Oriented District Planning Artistic-in Village

HueiChung Cheng


Re-Birth

HueiChung Cheng

1.3 Sheraton Hotel & Spa

1.3

Sheraton Hotel& SPA , Fort Worth Client: Sheraton Hotel Advisor: Dr. Ozdel Taner PhotoshopCS5 , Auto Cad 2010, sketchup Coraldraw 6 Dec.2011

Sheraton Hotel & Spa

locates on the entrance to the

Downtown Fort Worth and have good access to the water garden. However, the entrance to the hotel is lack of sense of place, and the hotel facade also is poorly design. The client wants us to design a attraction entrance and create a "place" to welcome the residnets.

Existing Conditions view to hotel, walls surround the hotel can not show teh characters of hotel and also disconnect to the Water Garden Shady entrance needs design to create welcome feeling and create more safety place for pedestrian Cars stop and disconnect pedestrian circulations


Re-Birth 1.3 Sheraton Hotel & Spa

Study Area

HueiChung Cheng

Concept Change the service road toward hotel, and wider side walk

To create a welcome arriving experience

Site locates in the entrance to Downtown Fort Worth city. It serves a ď€ rst image of downtown. The client want to create a unique icon for the hotel to present the image of Sheraton. From the site visiting and observation, the conicts between cars and pedestrians are issues and impact to the entraance to the Sheraton Hotel.

Building Enclose the space make this place become kind of sunken plaza


Re-Birth

HueiChung Cheng

1.3 Sheraton Hotel & Spa

Design content: To respond current issues and the observation in site there are ideas when I design the space: (1)To open the entrance to create the welcome feeling, (2)To redesign building facet and open the front view towards water garden (3)increasing the efď€ ciency serve connection of cars and pedestrians.

Scale: 1"= 40'

Opp: Molly tour bus stop here can take visitors having a downtown tour. Proximity to downtown Fort Worth, Art district and the Stockyard is nice. And the walkable distance of the hotel is within the downtown area. Cons: The existing arrival at the hotel is constrained and uneventful, Second, the entrance to the hotel parking garage is limited to the arrival court location, so there are vehicular conicts. Third, the street in front of the arrival court, Commerce Street, is poorly lighted at night for pedestrians.


Re-Birth 1.3 Sheraton Hotel & Spa

HueiChung Cheng

A.

B.

C. D.

A. Pedestrian entrance B. Vehicle Entrance C. Night image to Sheraton D. Section see towards Fort Worth Downtown


Eco-Linkage Parks and Trails Planning

1.5

Proximity to Major Lake

Eco-Linknage

City of Kennedale , Texas Green Infrustructure & Trail System Plan Studio Project Team members : Lynne Carpenter Hong Meng Leonell May 2011 2 weeks

Green Infrastructure Regional Plan

Vision

RECREATION

NATURE

CONNECTIVITY PEOPLE

GREEN INFRASTRUCTURE

By providing more recreations and green infrastructures, the City of Kennedale will not only have the opportunity to attract people from the surrounding cities, but they will also have a chance to provide connectivity between the existing and proposed green spaces.


HueiChung Cheng

Eco-Linkage Parks and Trails Planning

Ecological and Design Responds

Town center Existing Park opportunity of trail system City boundary

Existing circulation system is lacking continuity.

Trails link green infrustructure: Planned trails provide access to parks throughout the city and Village Creek riparian corridor. Circuits and connections affect specie survival •Nodes link corridors, Village Creek and tributaries, •providing resting places for animals and plant seeds. •Network circuitry affects dispersal of plant and animal species.

Village Creek’s 100 Year flood plain

Ideal zone for recreational usage Broken or continuous corridor Broken corridor: Threat of specie extinction Continuous Corridor: Minimal threat of invasive plant or animal species

Highway Roads Railway Flood Plain- Creek -Riparian corridor Proposed Velweb


HueiChung Cheng

Eco-Linkage Parks and Trails Planning

2 miles service radius (Existing community park ) 2 miles service radius (Proposed community park ) 0.5 mile service radius( Existing neighborhood park) 0.5 mile service radius (Proposed neighborhood park )

Kennedale Existing Park Acreage: 31 acres 0.7 % area of the City 4 acres / 1,000 Residents

31 Acreage

Main node Secondary node Tertiary node

Existing planned regional veloweb: Regional connectivity with trails, veloweb and greenbelt corridors

289 acreage

Proposed parks area : 286 acres 6.2% area of the City 20 acres / 1,000 Residents

Primary: Regional trail system Secondary: Hike and Bike/Urban trail system Tertiary: Nature trails/ Equestrian trails/Special trails Edges affect specie survival Dividing a “large patch” into smaller patches create additional “edge” habitat, high specie population size, and variety of edge species.


HueiChung Cheng

Eco-Linkage Parks and Trails Planning

Concepts

Activity nodes along the circulation.

Section

Activity areas occur along the trail line that goes through the park, linking the green zones with internal nodes.


HueiChung Cheng

Eco-Linkage Parks and Trails Planning

Spring Creek Trail

Playground Conservation lake

Ball ď€ elds walking Trail


1.7

City of Kennedale GIS Environmental Analysis & Suitability Kennedale, Texas Studio Team Work

April 2011 4 weeks Kennedale with a population of 5,800 is ten miles southeast of Fort Worth in southeastern Tarrant County.


Overlay Operations

Elevation

Landuse Flora & Fauna

Ian McHarg, Design With Nature Physiography

Natural Factors

Human Factors Unique Human Factors

Hydrrology I

Hydrrology I I

Opportunities

Constraints


suitability analysis Suitability



Site Proď€ le

Location

Public Service

Chu-Pei city locates in norhtwest Hsinchu County is an alluvial plain where Tauchien and Fengshan rivers meet. History

Hsinchu County Affair Bureau(th Art Museum, the Performance Hall and the public library) Institute of Hsinchu County history

Built on the site in Feb, 1996 User Neighborhood communities and people who come to watch the shows

Vision Connect neighborhoods and create a sense of place for Haka cultural center


Site Analysis


Design Concept

Haka Culture

Function Map


Feng Shui Concept of traditional building

Design Concept

Material Palette


Design Elements


Design Model


02.

Planting Design


GARDEN IN OSCILLATION HueiChung Cheng

In Oscillation 2.3 Garden ERB Building Courtyard, University of Texas at Arlington

Advisor: David Hopman Team : A. Romero, K,Patel, H.C.Cheng, X,w. Feng Applications: Photoshop. AutoCad/ 3D Accurender. Site Inventory

Site Inventory & Analysis

May 2011 14 DAYS


2.1 ERB Building Courtyard HueiChung Cheng

Plan View

Design Concpet


GARDEN IN OSCILLATION HueiChung Cheng

Panorama of Site

- Use bamboo and vertical plant material to soften the structure straight line - Underneath ,creating planting bed with seasonal changes and scent flowerrs

- Picnic area surround by high hed ge c re at ing a s ens e o f enclosure and intimate feeling

- Design a widing path through the area and also frame spaces for small group of people


2.1 ERB Building Courtyard HueiChung Cheng

Plant Palette

SECTION 3

SECTION 1

SECTION 2

SECTION 4

SECTION 5

Trees


HueiChung Cheng

Urbanism Street Landscape 2.2 New The shops at Legacy, Plano, Texas Instructor : David Hopman

Applications: Google Earth. Photoshop. AutoCad

Pots Location Tree Wells A.

Plan view

Elevation

C.

B.


HueiChung Cheng

Plant list

2.2 New Urbanism Street Landscape


HueiChung Cheng

Medium Garden Arlington, Texas Instructor: David Hopman Applications: Photoshop. AutoCad

MEDIUM RAIN GARDEN

Section A-B

Medium Garden


2.3 Medium Rain Garden HueiChung Cheng

Section-rain garden


Fall Texture Garden

2.4

HueiChung Cheng

Season Theme Gardens Fall Texture/ Spring Yellow Gardens Dallas, Texas Applications: Photoshop. AutoCad Instructor: David Hopman 5. 2. 8. 9.

7. 12. 6.

13.

4.

10. 3.

1. Scale: 1/8"=1'

PLANT LIST 1. Sophora Afnis 2. Acer palmatum “bloodgood” 3. Oakleaf Hydrangea 4. Narrow leaf sunower/Helianthus angustifolius 5. Ilex vomitoria nana 6. Pluchea odorata 7. violacea tulbaghia 8. Salvia Leucantha 9. Aster 10. Spider lily/Hymenocallis Liriosme 11.Eupetorium 12. Ophiopogon Japonica “nana” 13.Agave sp.


Spring Yellow Garden

1.

2.

3. 4.

5.

7. 6.

9.

10. 8. Scale: 1/8"=1'


03.

Construction Document 3.1 Beck Park

Dallas, Texas Beck Park Constrcution Document Dallas, Texas AutoCad 2010


3.1 Beck Park Constrcution Document

HueiChung Cheng

LS.1 LS.2 LS.3 LS.4 LS.5

LAYOUT PLAN GRADING PLAN HARDSCAPES WALLS & COLUMNS SWIMMING POOL

Layout Plan

LS.6 ARBOR DETAILS LS.7 WOOD DECK DETAILS LS.8 METAL FENCES & WOOD FENCES LS.9 PLANTING & LIGHTING PLAN LS.10 PLANTING DETAILS

Vicinity Map


HueiChung Cheng

Gradign Plan

3.1 Beck Park Constrcution Document


3.1 Beck Park Constrcution Document

HueiChung Cheng

Pavements

Steps and railing

Ramp and railing


HueiChung Cheng

Arbor Plan

3.1 Beck Park Constrcution Document

Wood Fence

Matel Fence


Intern Work.Graphic Design. Photographic

04.


4.1 Residential Design Arlignton, TX Client: Denise Langley Design ofď€ ce : Dalton LandDesign Photoshop, AutoCad, Sketchup July 2011


Rendering Plan

OPTION B

OPTION A

Pirvate Memorial Garden



4.2 Landmark Montage Division St., Arlington, Texas Photoshop

"That quality in a physical object which gives it a high probability of evoking a strong image in any observer. Imageability constitutes the shape color or arrangement which facilitates


the making of vividly identified, powerfully structured highly useful mental imag-es." Kevin Lynch. The Image of the City. 1960


4.3 Exploration Locations

Duration

USA

3 years


SEATTLE 2013 Olympic Sculpture Park Longfellow Creek Legacy Trail


2012 Winter in Manhattan, NY


THANK YOU Huei Chung Cheng E-mail: Chung7403s@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.