VPA Schedule 5 - Architectural Plans

Page 1

Carparking - By Level

Carparking - Summary

B01 Loading

LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING

3 33 2 38

B02

LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112 114 B03

CARSHARE MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

CARSHARE LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

2 8 70 13 22

Basement Storage Schedule 2 3 2 145 2 8 481 65 22

B07 B06 B05 B04 B03

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Bicycle Parking - By Level

116 116 116 105 86

8

B04 B05 B06 B07

35

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

35 35

FOR INFORMATION

113

539

Rev 9 11 14 15 18 23 25 27 29 31 34 39 40 52 53

730

115 B04

RES - STANDARD RESI - ADAPTABLE

93 13

Date 07.08.2017 21.08.2017 05.09.2017 14.09.2017 05.10.2017 19.10.2017 26.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 14.12.2017 12.06.2018 13.03.2020 20.03.2020

Revision

By

Chk.

FOR COORDINATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR COORDINATION FOR INFORMATION CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE FOR INFORMATION DRAFT MOD

106 B05

RES - STANDARD 105 RESI - ADAPTABLE 13

2

1

1

0602

0605

0602

118 B06

RES - STANDARD 105 RESI - ADAPTABLE 13 118

121 730

FAN ROOM 35.6 m² FAN ROOM 52.8 m²

5800

MECH - CARPARK SUPPLY

RES - STANDARD 108 RESI - ADAPTABLE 13

MECH - CARPARK SUPPLY

B07

BASEMENT 06 5856.0 m²

RL -9.30

FIRE STAIR 1

1100

ELEC.

S.P.

FIRE STAIR 3

1

TOWER D LIFT LOBBY

0601 1

TOWER E LIFT LOBBY

0601 COMM.

ELEC.

FIRE STAIR 2

COMM.

1:5.0

Billbergia

1:8.0

MECH - CARPARK EXHAUST

FAN ROOM 33.9 m²

Project

MECH - CARPARK EXHAUST

OUT

Mixed-use Development & Community Centre

IN LINE OF TOWER E OVER

L IN EO

FT OW

Secure Bicycle Storage

ER

DO

34 Walker Street Rhodes NSW 2138

VE R FAN ROOM 46.9 m²

70 Bicycle Storage Spaces

Drawing Name 1

1

0603

0603

Basement 06

FUTURE CAR PARKING LINK

Date

1

0601

2

1

1

0602

0605

0602

20.03.2020

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0204

Floor Plan - Basement 06 1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


Carparking - By Level

Carparking - Summary

B01 Loading

LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING

3 33 2 38

B02

LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112 114 B03

CARSHARE MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

CARSHARE LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

2 8 70 13 22

Basement Storage Schedule 2 3 2 145 2 8 481 65 22

B07 B06 B05 B04 B03

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Bicycle Parking - By Level

116 116 116 105 86

8

B04 B05 B06 B07

35

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

35 35

FOR INFORMATION

113

539

Rev 9 11 14 15 18 23 25 27 29 31 34 39 40 52 53

730

115 B04

RES - STANDARD RESI - ADAPTABLE

93 13

Date 07.08.2017 21.08.2017 05.09.2017 14.09.2017 05.10.2017 19.10.2017 26.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 14.12.2017 12.06.2018 13.03.2020 20.03.2020

Revision

By

Chk.

FOR COORDINATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR COORDINATION FOR INFORMATION CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE FOR INFORMATION DRAFT MOD

106 B05

RES - STANDARD 105 RESI - ADAPTABLE 13

1 0605

1

118

0602

B06

RES - STANDARD 105 RESI - ADAPTABLE 13 118

MECH - CARPARK SUPPLY

121 730

FAN ROOM 35.6 m²

FAN ROOM 52.8 m²

6320

RES - STANDARD 108 RESI - ADAPTABLE 13

MECH - CARPARK SUPPLY

B07

BASEMENT 05

6100

5837.4 m²

FIRE STAIR 1

5660

1100

ELEC.

S.P.

OUT

FIRE STAIR 3

IN

1

TOWER D LIFT LOBBY 1:8.0

0601 1

TOWER E LIFT LOBBY

0601 COMM.

ELEC.

1:5.0

FIRE STAIR 2

6100

COMM.

LIFT PITT

5800

5800

3500

2000

Billbergia

3500

1:5.0

5800

MECH - CARPARK EXHAUST

1:8.0

FAN ROOM 33.9 m²

FT OW

Secure Bicycle Storage

ER

DO

5900

L IN EO

5900

OUT

Project

MECH - CARPARK EXHAUST

Mixed-use Development & Community Centre

IN LINE OF TOWER E OVER

34 Walker Street Rhodes NSW 2138

VE R FAN ROOM 46.9 m²

70 Bicycle Storage Spaces

Drawing Name 1

1

0603

0603

Basement 05

FUTURE CAR PARKING LINK

BASEMENT 05 Date

20.03.2020

1

0601

1

1

0605

0602

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0205

Floor Plan - Basement 05 1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


Carparking - By Level

Carparking - Summary

B01 Loading

LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING

3 33 2 38

B02

LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112 114 B03

CARSHARE MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

CARSHARE LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

Basement Storage Schedule 2 3 2 145 2 8 481 65 22

2 8 70 13 22

B07 B06 B05 B04 B03

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Bicycle Parking - By Level

116 116 116 105 86

8

B04 B05 B06 B07

35

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

35 35

FOR INFORMATION

113

539

Rev 9 11 14 15 18 23 25 27 29 31 34 39 40 52 53

730

115 B04

RES - STANDARD RESI - ADAPTABLE

93 13

Date 07.08.2017 21.08.2017 05.09.2017 14.09.2017 05.10.2017 19.10.2017 26.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 14.12.2017 12.06.2018 13.03.2020 20.03.2020

Revision

By

Chk.

FOR COORDINATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR COORDINATION FOR INFORMATION CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE FOR INFORMATION DRAFT MOD

106 B05

RES - STANDARD 105 RESI - ADAPTABLE 13

2

1

1

0602

0605

0602

118 B06

RES - STANDARD 105 RESI - ADAPTABLE 13 118

MECH - CARPARK SUPPLY

RES - STANDARD 108 RESI - ADAPTABLE 13 121 730

FAN ROOM 35.6 m² FAN ROOM 52.8 m²

MECH - CARPARK SUPPLY

B07

BASEMENT 04 5600.6 m²

RL -3.30 BIN WASH

BLD B GARBAGE RM 115.7 m²

FIRE STAIR 1

1100

ELEC.

S.P.

OUT

FIRE STAIR 3

IN

1

TOWER D LIFT LOBBY 1:8.0

0601 1

TOWER E LIFT LOBBY

0601 COMM.

ELEC.

1:5.0

FIRE STAIR 2

BIN WASH COMM.

GARB. LIFT

1500

4300

5800

5800

300

3500

2000

3500

300

Billbergia

6100

1:5.0

BLD B GARBAGE RM 106.8 m²

1:8.0

MECH - CARPARK EXHAUST

FAN ROOM 33.9 m²

4380

L IN EO

FT OW

Secure Bicycle Storage

Mixed-use Development & Community Centre

IN 5900

OUT ER

DO

Project

MECH - CARPARK EXHAUST

LINE OF TOWER E OVER

34 Walker Street Rhodes NSW 2138

VE R FAN ROOM 46.4 m²

67 Bicycle Storage Spaces

Drawing Name 1

1

0603

0603

Basement 04

FUTURE CAR PARKING LINK

BASEMENT 04 Date

1

0601

Floor Plan - Basement 04

2

1

1

0602

0605

0602

20.03.2020

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0206

1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


Carparking - By Level

Carparking - Summary

B01 Loading

LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING

3 33 2 38

B02

LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112 114 B03

CARSHARE MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

CARSHARE LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING MOTORBIKE RES - STANDARD RESI - ADAPTABLE RESI - VISITOR

2 8 70 13 22

Basement Storage Schedule 2 3 2 145 2 8 481 65 22

B07 B06 B05 B04 B03

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Bicycle Parking - By Level

116 116 116 105 86

8

B04 B05 B06 B07

35

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

35 35

FOR INFORMATION

113

539

Rev 9 11 14 15 18 23 25 27 29 31 34 39 40 43 44 45 48 50 51 52 53

730

115 B04

RES - STANDARD RESI - ADAPTABLE

1

93 13

2

1

106

0602

0602

0605

B05

RES - STANDARD 105 RESI - ADAPTABLE 13

Date 07.08.2017 21.08.2017 05.09.2017 14.09.2017 05.10.2017 19.10.2017 26.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 14.12.2017 12.06.2018 06.11.2019 19.11.2019 04.12.2019 29.01.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

Revision

By

Chk.

FOR COORDINATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR COORDINATION FOR INFORMATION CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

118 B06

RES - STANDARD 105 RESI - ADAPTABLE 13 118

FAN ROOM 35.6 m²

MECH - CARPARK SUPPLY

8 MOTORBIKE SPACES

6800

121 730

FAN ROOM 52.8 m²

3500

RES - STANDARD 108 RESI - ADAPTABLE 13

MECH - CARPARK SUPPLY

B07

BASEMENT 03 5673.0 m² 7 RESI VISITOR BICYCLE SPACES

RL -0.30

5900

IN 1:5.0

1:8.0

OUT

S.P.

FIRE STAIR 1

5590

TOWER D LIFT LOBBY

1100

ELEC.

S.P.

OUT

14 RESI VISITOR BICYCLE SPACES

6100

FIRE STAIR 3

IN

1

1:8.0

0601 1

TOWER E LIFT LOBBY

0601 COMM.

ELEC.

S.P.

FIRE STAIR 2

14 RESI VISITOR BICYCLE SPACES

COMM.

GARBAGE LIFT

5800

5800

5800

1:5.0

Billbergia

1:8.0

MECH - CARPARK EXHAUST

FAN ROOM 33.9 m²

Project

MECH - CARPARK EXHAUST

Mixed-use Development & Community Centre FT OW

LINE OF TOWER E OVER

5900

4380

L IN EO

ER

DO

34 Walker Street Rhodes NSW 2138

VE R FAN ROOM 46.9 m²

Drawing Name 1

1

RES. BULKY WASTE

0603

0603

Basement 03

139.1 m²

Date

20.03.2020

2 0602

1 0605 1 0602

1

0601

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0207

Floor Plan - Basement 03 1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


Carparking - By Level - B1 and B2 B01 Loading

LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING

3 33 2 38

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Carparking - Summary B1 and B2 LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING

3 2 145 5

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION

155

B02

LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112

Rev

114 152

1

MECH - CARPARK SUPPLY

0602

0605

0602

FAN ROOM 35.6 m² RECYCLED WATER PUMP ROOM 52.7 m²

2700 RCC FIRE STAIR 4

S.P.

BASEMENT 02 5509.8 m²

By

Chk.

FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR INFORMATION WORKSHOP 06-01 WORKSHOP 06-02 FOR COORDINATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

5970

FAN ROOM 52.8 m²

30.08.2017 05.09.2017 14.09.2017 04.10.2017 05.10.2017 09.10.2017 09.10.2017 19.10.2017 26.10.2017 31.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 12.12.201 14.12.2017 12.06.2018 06.11.2019 19.11.2019 04.12.2019 29.01.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

Revision

MECH - CARPARK SUPPLY

1

2

13 14 15 17 18 19 20 23 25 26 27 29 31 34 38 39 40 43 44 45 48 50 51 52 53

Date

RCC LIFT LOBBY

RL 2.70

VOID TO 1:5.0 RESIDENTIAL RAMP

S.P.

FIRE STAIR 1

ELEC.

S.P.

6200

FIRE STAIR 3

6000

GREASE ARRESTOR 16.3 m²

TOWER D LIFTS

1 0601

6150 1

TOWER E LIFTS COMM.

ELEC.

4900

FIRE STAIR 2

4900

S.P.

2600

0601

COMM.

5640

Billbergia 3100

6200

LIFT PIT

MECH - CARPARK EXHAUST

FAN ROOM 32.4 m²

RCC FIRE STAIR 5

Project

MECH - CARPARK EXHAUST

ER

DO

LINE OF TOWER E OVER

6200

6180

FT OW

6200

S.P.

L IN EO

Mixed-use Development & Community Centre 34 Walker Street Rhodes NSW 2138

VE R FAN ROOM 46.9 m²

Drawing Name

2700 1:8.0

1:5.0

1

5580

1 0603

0603

Basement 02

Date

20.03.2020

1

0505

2

1

1

0602

0605

0602

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0208

Floor Plan - Basement 02 1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


Carparking - By Level - B1 and B2 B01 Loading

LEI CNTR - DISABLED LEI CNTR - STANDARD LOADING

3 33 2 38

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Carparking - Summary B1 and B2 LEI CNTR - DISABLED LEI CNTR - SMALL CAR LEI CNTR - STANDARD LOADING

3 2 145 5

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION

155

B02

LEI CNTR - SMALL CAR 2 LEI CNTR - STANDARD 112

Rev

114 152

2 0602

1

0605

0602

RCC FIRE STAIR 20 GREASE ARRESTOR 12.5 m²

RCC FIRE STAIR 18 OSD STORAGE 44.1 m²

MECH - CARPARK SUPPLY

RCC FIRE STAIR 4

RAINWATER HARVESTING 27.0 m²

S.P.

05.09.2017 14.09.2017 22.09.2017 04.10.2017 05.10.2017 09.10.2017 09.10.2017 19.10.2017 26.10.2017 31.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 12.12.201 14.12.2017 12.06.2018 06.11.2019 19.11.2019 04.12.2019 29.01.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

Revision

By

Chk.

PRE DA MEETING FOR INFORMATION FOR BCA REVIEW FOR INFORMATION FOR INFORMATION WORKSHOP 06-01 WORKSHOP 06-02 FOR COORDINATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

MECH - CARPARK SUPPLY

RL 9.80

GREASE ARRESTOR 12.6 m²

IN

GREASE ARRESTOR 12.4 m²

OUT

1

14 15 16 17 18 19 20 23 25 26 27 29 31 34 38 39 40 43 44 45 48 50 51 52 53

Date

FAN ROOM 39.9 m²

RL 6.10

1:8

RCC LIFT LOBBY

GAS METER PLANTROOM 25.4 m²

1:6.5 1:8 AIR SUPPLY 29.4 m²

1:8.0

BUILDING MANAGER 22.4 m²

RESIDENTIAL SPEED RAMP

1:5.0

S.P.

S.P.

FIRE STAIR 1

GREASE ARRESTOR 12.5 m²

RL 6.10 ELEC.

S.P.

FIRE STAIR 3

1

TOWER D LIFTS

0601

RL 6.10

1

RCC WASTE 120.9 m²

0601

TOWER E LIFTS

RCC STORE 12.7 m²

RL 6.10

CHUTE

COMM.

ELEC.

S.P.

FIRE STAIR 2

COMM.

RCC LOADING

RES. GARB. COLLECTION

141.5 m²

Billbergia

331.4 m²

FAN ROOM 30.2 m²

RCC STORE 17.1 m²

RCC DELIVERY

MECH - CARPARK EXHAUST RCC FIRE STAIR 5 DOCK MANAGER 35.6 m² G

S.P.

M M

RCC GREASE ARRESTOR 10.8 m²

Mixed-use Development & Community Centre

FURNITURE DELIVERY L IN EO

POTABLE METER & PUMP ROOM 48.6 m²

RL 8.75

Sim

FT OW

ER

DO

VE R

WASTE PICK-UP

2 0209

Project

MECH - CARPARK EXHAUST

SWITCH ROOM 59.9 m²

LINE OF TOWER E OVER

34 Walker Street Rhodes NSW 2138

SUBSTATION

RL 6.10 TURN TABLE FOR 12.5m LONG VEHICLES

202.4 m²

RL 6.76

UNLOADING

RL 6.10

1:16.3

RAMP UP TO L1

RAMP UP FROM B2

Drawing Name

1

1 1:6.5

0603

1:8.0

0603

Basement 01 Loading

WASTE PICK-UP

2

0209

B01 Mezzanine

Date

1 : 200@A1

FUTURE RETAIL PARKING LINK SUBJECT TO SEPARATE DA

2 0602

1

0501

Floor Plan - Basement 01

20.03.2020

1

1

0605

0602

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0209

1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Rev

1

2

1

0501

0605

0602

16 18 19 20 23 25 26 27 29 31 34 38 39 40 42 43 44 45 46 47 48 50 51 52 53

GAUTHORPE ST

0602

1

Date

Revision

22.09.2017 05.10.2017 09.10.2017 09.10.2017 19.10.2017 26.10.2017 31.10.2017 07.11.2017 13.11.2017 21.11.2017 24.11.2017 12.12.201 14.12.2017 12.06.2018 23.10.2019 06.11.2019 19.11.2019 04.12.2019 18.12.2019 15.01.2020 29.01.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

By

Chk.

FOR BCA REVIEW FOR INFORMATION WORKSHOP 06-01 WORKSHOP 06-02 FOR COORDINATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 1 PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 5 CLIENT ISSUE PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

SUBJECT TO FUTURE DA

0-3 OUTDOOR PLAY

UP

MECH - CARPARK SUPPLY

S.P.

294.5 m²

MECH - CARPARK SUPPLY

STORE 17.5 m² STORE 13.3 m²

NAPPY CHANGE 17.8 m²

MECH - CARPARK SUPPLY

STORE 6.0 m²

TOILETS 21.7 m²

RL 11.50 STAFF 56.1 m²

MEETING 31.7 m²

0-2 PLAY

SLEEP 01 24.6 m²

53.7 m²

2-3 PLAY

0-2 PLAY 54.0 m²

142.7 m²

SLEEP 02 23.2 m²

STORE 10.6 m²

RL 12.20 LAUNDRY/STORE 17.4 m²

CAFE

RL 11.50 FH

STORE 19.9 m²

SFP

STORE 20.1 m²

S.P.

0507

BILLBERGIA CAFE

S.P.

202.1 m²

D. FR

COMMUNITY

EWIS

351.2 m²

LOBBY

WORKING KITCHEN

GARBAGE 8.1 m²

FH

94.7 m²

CHUTE S.P.

MARQUET ST

ELEC.

S.P. CIRCULATION 815.1 m²

KITCHEN 57.6 m²

0601

1

S.P.

101.9 m²

STORE 18.3 m²

S.P.

2

1

0503

S.P.

ACCESS 7.6 m²

0508

1

WALKER ST

STAFF WC 4.2 m²

FH

1

FH

0504

COMM.

LOBBY

ELEC.

91.6 m²

RECEPTION 19.1 m²

70.1 m²

RRC GFA Area Schedule Level Level 01 Level 02 Level 02.M Grand total: 3

STORE 10.2 m²

OFFICE 11.3 m² COMM. STORE 7.4 m²

STORE 17.1 m²

FEMALE STAFF 13.3 m²

MALE STAFF 10.7 m²

MECH - CARPARK EXHAUST

FIRE CONTROL ROOM

Billbergia

28.2 m²

WC 5.0 m²

FAMILY 10.7 m²

166.0 m²

STORE 14.9 m²

MALE 50.8 m²

FEMALE 36.9 m²

STORE 10.6 m²

MECH - CARPARK EXHAUST

213.4 m²

Project

S.P.

M M

3282.3 m² 5262.4 m² 1167.6 m² 9712.3 m²

STORE 6.4 m²

ACCESS 7.3 m²

A.H.I 3-5 PLAY

ACCESS 7.2 m²

Area

G TOILETS 19.7 m²

Mixed-use Development & Community Centre

A.H.I 3500

200.2 m²

1780

HATCHES TO SUBSTATION BELOW

34 Walker Street Rhodes NSW 2138

3-5 OUTDOOR PLAY BOH

0603

Drawing Name

5020

243.9 m²

1

Level 01

127.9 m²

1

0501

Floor Plan - Level 01 1 : 200@A1

1

1

0508

0502

2

1

1

0602

0605

0602

Date

20.03.2020

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0210

SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Rev

1

0507

2

2

A.H.I

CAFE

123.8 m²

74.8 m²

64.4 m²

ACCESS 7.2 m²

0602

1

SUBJECT TO FUTURE DA RL 17.50

MENS TOILET 43.2 m²

WOMENS TOILET 50.0 m²

7000

A.H.I

1

0501

0605

0602

15 16 18 19 20 23 25 26 27 31 34 38 39 40 42 43 44 45 46 47 48 50 51 52 53

Date 14.09.2017 22.09.2017 05.10.2017 09.10.2017 09.10.2017 19.10.2017 26.10.2017 31.10.2017 07.11.2017 21.11.2017 24.11.2017 12.12.201 14.12.2017 12.06.2018 23.10.2019 06.11.2019 19.11.2019 04.12.2019 18.12.2019 15.01.2020 29.01.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

Revision

By

Chk.

FOR INFORMATION FOR BCA REVIEW FOR INFORMATION WORKSHOP 06-01 WORKSHOP 06-02 FOR COORDINATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 1 PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 5 CLIENT ISSUE PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

RL 19.86

RECEPTION 1 9.2 m²

VOID

DECK 96.8 m²

DECK

LOBBY

50m RUNNING TRACK

739.5 m²

122.0 m²

101.7 m² DISPLAY 6.6 m²

0504

RECEPTION 2 7.0 m²

1

1

0503

1

0507

S.P. SAFE 6.2 m²

OFFICE 9.6 m²

S.P. MALE AMENITIES 25.7 m²

UP

S.P.

FH

ELEC.

FH

FH

2

S.P.

0508

D. FR FAMILY CHANGE M 7.2 m²

CRECHE

RRC GFA Area Schedule

COMMS 16.3 m²

142.0 m²

CIRCULATION 34.3 m² STORE 1.9 m²

1

Level

STORAGE 6.4 m²

COMM.

MULTI COURTS

FAMILY CHANGE F 7.2 m²

S.P.

FH

0601

LOCKERS 51.9 m²

1647.5 m² OFFICE 9.4 m²

Area

Level 01 Level 02 Level 02.M Grand total: 3

ELEC.

ASSESSMENT 14.0 m²

3282.3 m² 5262.4 m² 1167.6 m² 9712.3 m²

COMM.

FEMALE AMENITIES 27.1 m²

15250

3050

800 2590

15250

3050

Billbergia

100 100 WOMENS CHANGE 74.0 m²

GYMNASTICS CENTRE 250.1 m²

M M

G

TUMBLING TRAMPOLINE 22.5 m²

MECH - CARPARK EXHAUST

HEALTH CLUB 504.3 m²

ACCESS 7.2 m²

MECH - CARPARK EXHAUST

MENS CHANGE 73.4 m²

COURTS OFFICE / FIRST AID 26.8 m²

SUBSTATION EXHAUST 7.2 m²

HORIZONTAL BAR 2 22.0 m²

RUN UP SPRUNG FLOOR 22.5 m²

HORIZONTAL BAR 1 22.0 m²

CIRCULATION 5.5 m²

3050

Project

Mixed-use Development & Community Centre

SPRUNG FLOOR 36.0 m²

FOAM PIT 27.0 m²

34 Walker Street Rhodes NSW 2138

STORE 33.8 m²

1

STUDIO 1

STUDIO 2

STUDIO 3

148.6 m²

94.9 m²

74.1 m²

0603 TRAMPOLINE 76.8 m²

Drawing Name

Level 02

STORE 27.9 m² FREE PLAY AREA 73.1 m²

STORE 90.9 m²

STORE 16.2 m²

WALL HUNG BARS

1

1

0508

0502

Date

20.03.2020

2 0602

1

0501

Floor Plan - Level 02

1

1

0605

0602

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0211

1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Rev 44 47 48 49 50 51 52 53

0507 2

2

Date 19.11.2019 15.01.2020 29.01.2020 14.02.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

Revision

By

Chk.

PODIUM WORKSHOP 3 CLIENT ISSUE PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

0501 1 0605

1

1

0602

0602

VOID

VOID

SUBJECT TO FUTURE DA

VOID

VOID

RL 19.86 PEDESTRIAN BRIDGE TO RHODES STATION

VOID

VOID

RL 20.91

STAFF LUNCH 51.7 m²

1

STORE 10.6 m² FH

1

0507

ACCESS 7.3 m²

ELEC.

FH

FH

2

0503

S.P.

S.P.

0508

1

S.P.

UP

S.P.

FH

0504

VOID

D. FR

RRC GFA Area Schedule

VOID

Level

Area

1 0601

Level 01 Level 02 Level 02.M Grand total: 3

ELEC.

S.P.

FH

COMM.

FH

OFFICE 124.9 m²

MANAGERS OFFICE Redundant Room

COMM.

VOID

3282.3 m² 5262.4 m² 1167.6 m² 9712.3 m²

Billbergia

MECH - CARPARK EXHAUST MECH - CARPARK EXHAUST M M

G

STAFF MEETING 33.7 m²

Project

Mixed-use Development & Community Centre 34 Walker Street Rhodes NSW 2138

VOID

Drawing Name 1

Level 02 Mezzanine

0603 UP

1

1

0508

0502

Date

1

0501

Level 02.M

20.03.2020

Scale

1 : 200

Drawn

Chk.

BR

JP

Job No.

Drawing No.

4440

0211.M

1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Rev

0507

2

0501

1

1

0605

0602

9 11 12 14 15 18 19 20 23 25 26 27 31 34 38 39 40 43 44 45 48 50 51 52 53

0602

2

1

Date 07.08.2017 21.08.2017 28.08.2017 05.09.2017 14.09.2017 05.10.2017 09.10.2017 09.10.2017 19.10.2017 26.10.2017 31.10.2017 07.11.2017 21.11.2017 24.11.2017 12.12.201 14.12.2017 12.06.2018 06.11.2019 19.11.2019 04.12.2019 29.01.2020 26.02.2020 11.03.2020 13.03.2020 20.03.2020

Revision

By

Chk.

FOR COORDINATION FOR INFORMATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR INFORMATION WORKSHOP 06-01 WORKSHOP 06-02 FOR COORDINATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 6 FOR INFORMATION FOR INFORMATION FOR INFORMATION DRAFT MOD

PLANTERS - REFER TO LANDSCAPE ARCHITECT DETAILS

POOL ABOVE

MM CO

BB MECH

HYD. R

C ELE

VOID OVER

GLAZING

S HY

64.3 m²

VRF SERVICE PLANT ROOM

1 FIRE STAIR 7

FIRE STAIR 9 S.P.

0503

1

0507

S.P.

BB MECH

FIRE STAIR 10

FH

HYD

ELEC.

FH

2

S.P.

149.7 m²

D. FR RRC CHILLER PLANT 117.6 m²

1

TOWER D LIFTS

0601

RRC MECH

0601

327.0 m²

VOID OVER MULTI COURT CENTRE BELOW

S.P.

FH

1

HYD D. FR

ELEC DB

COMMS

HYD. RISER

FIRE PUMP ROOM 33.8 m²

FIRE STAIR 8 COMM.

MAIN COMMS ROOM 17.5 m²

MECH CP EXHAUST 100.8 m²

RL 24.50 DAS ROOM 25.0 m²

RL 24.50 CONCRETE BEAM OVER

Billbergia

MECH - CARPARK EXHAUST

HY D D. F R

HY

D

COMM. FIRE STORAGE TANK 84.5 m²

MECH - CARPARK EXHAUST

MECH CP EXHAUST

Project

RRC MECH

148.8 m²

M M

Mixed-use Development & Community Centre

G

225.1 m²

BLD E HOT WATER 20.0 m²

RRC HEATING HOT WATER 28.1 m²

1

TOWER D HOT WATER 22.6 m²

6M SETBACK ZONE 29.5 m²

RRC SMOKE EX. 18.9 m²

TOWER D HOT WATER 20.0 m²

FAN ROOM 34 Walker Street Rhodes NSW 2138

101.0 m² RRC DOMESTIC HOT WATER 19.4 m²

Drawing Name 6M SETBACK ZONE 28.3 m²

1

GLAZING

RL 24.50

TRAFFICABLE ROOF - MAINTENANCE

0603

RL 24.50

Level 03

4.0 m

6000

0603

4.0 m

0508

1 S.P.

FH

D

0504

PLANTERS - REFER TO LANDSCAPE ARCHITECT DETAILS

3.0 m

1

1

0508

0502

3.0 m

2 1 0602 0605

Date

Scale

Sheet Size

1 0602

24-32 WALKER ST

20.03.2020

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0212

SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

@ A1

Revision

/ 53


In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

1 BED 2 BED

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

3 BED

FOR INFORMATION

COMMUNAL Rev

PLANT

1 2 9 11 14 15 21 23 25 27 31 34 35 36 39 40 43 44 45 48 50 53

STUDIO

2 0602

0507

1

1

0605

0602

2

0501 1

Date 12.05.2017 25.05.2017 07.08.2017 21.08.2017 05.09.2017 14.09.2017 12.10.2017 19.10.2017 26.10.2017 07.11.2017 21.11.2017 24.11.2017 30.11.2017 08.12.2017 14.12.2017 12.06.2018 06.11.2019 19.11.2019 04.12.2019 29.01.2020 26.02.2020 20.03.2020

Revision

By

Chk.

WORKSHOP 01 WORKSHOP 02 FOR COORDINATION FOR INFORMATION PRE DA MEETING FOR INFORMATION FOR REVIEW FOR COORDINATION FOR INFORMATION CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE PODIUM WORKSHOP 2 PODIUM WORKSHOP 3 PODIUM WORKSHOP 4 PODIUM WORKSHOP 6 FOR INFORMATION DRAFT MOD

PV CELLS AT LEVEL BELOW

3.0 m

E.4.7 3 BED

ZONE FOR PV PANELS 140 m2

VOID TO LEVEL BELOW

2.0 m

2.0 m

3.1 m

VOID TO LEVEL BELOW

107.7m²

ZONE FOR PV PANELS 20 m2

ZONE FOR PV PANELS 140 m2

RL 29.40 D.4.6 1 BED 51.9m²

RL 29.40

E.4.6 1 BED

E.4.8 2 BED

52.4m²

72.5m²

1 FIRE STAIR 7 S.P.

2

0508

COMMUNAL OPEN SPACE REFER TO LANDSCAPE ARCHITECT DRWGS FOR DETAIL

COMMUNAL

D.4.5 2 BED

0601

71.5m²

VOID TO LEVEL BELOW

D.4.4 2 BED

1

FIRE STAIR 10

0503

1

0507

E.4.1 2 BED

53.5m²

70.7m²

1

FIRE STAIR 9

E.4.5 1 BED

106.0m²

77.5m²

TOWER D LIFT LOBBY

TOWER E LIFT LOBBY

1

0506

0505

1

RL 29.40

S.P.

FIRE STAIR 8

D.4.1 1 BED

RL 29.40

D.4.2 2 BED

51.9m²

83.4m²

0601

RL 29.40

60.3m²

D.4.3 1 BED

1

VOID TO LEVEL BELOW

0504

E.4.4 2 BED

E.4.2 2 BED

83.7m²

77.7m²

Billbergia

Project

Mixed-use Development & Community Centre 34 Walker Street Rhodes NSW 2138 E.4.3 2 BED Drawing Name

86.4m² 1

1

WIND MITIGATION SCREENING SHOWN DASHED

0603

VOID TO LEVEL BELOW

Level 04

4.0 m

4.0 m

0603

VOID

3.0 m 2 0602

1 0605

1

1

0508

0502

3.0 m Date 1 0602

24-32 WALKER ST

1

0501

Floor Plan - Level 04

20.03.2020

Scale

1 : 200

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0213

1 : 200@A1 SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


E Tower E Top 132.100 RL

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

EXTERNAL FINISHES AL01 AL02 AL03 AP01 AW01 CM01 CN01 CR01 FN01 GL01 GL02 GL03 LV01 PAL01 RF01 TR01

LEP HEIGHT RL 133.5 - 125m FROM RL 8.5 DCP ENVELOPE

Tower E Roof/ Plant 125.900 RL

LV01 FN01

Level 34 122.500 RL

GL01

Level 33 119.400 RL Level 32 116.300 RL

ALUMINIUM POWDERCOAT FINISH - DOOR ALUMINIUM ANODISED RHS BATTENS ALUMINIUM ANODISED RHS SOFFIT ALUMINIUM COMPOSITE PANEL WINDOW AWNING - ALUMINIUM POWDERCOAT METAL CLADDING SYSTEM - COPPER CONCRETE PRECAST - WHITE POLISHED CONCRETE RENDER ALUMINIUM FIN - ROSE GOLD GLAZING - CLEAR VISION GLAZING GLAZING - GLASS BALUSTRADE GLAZING - COLOUR BACK GLASS SPANDREL LOUVRES/PLANT SCREEN - ALUMINIUM PERFORATED ALUMINIUM SCREEN COPPER ROOF TERRACOTTA CLADDING

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Rev 14 18 22 25 26 27 33 34 35 39 40 53

AP01

Date 05.09.2017 05.10.2017 13.10.2017 26.10.2017 31.10.2017 07.11.2017 23.11.2017 24.11.2017 30.11.2017 14.12.2017 12.06.2018 20.03.2020

Revision

By

Chk.

PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE DRAFT MOD

Level 31 113.200 RL

AW01 Level 30 110.100 RL Level 29 107.000 RL

GL02

Level 28 103.900 RL Level 27 100.800 RL

D

Level 26 97.700 RL

87m DCP HEIGHT CONTROL

Level 25 94.600 RL Level 24 91.500 RL Level 23 88.400 RL

DCP ENVELOPE

Tower D Top 85.400 RL

Level 22 85.300 RL Level 21 82.200 RL

LV01 Tower D Roof/ Plant 79.400 RL

Level 20 79.100 RL Level 19 76.000 RL

FN01

Level 18 72.900 RL Level 17 69.800 RL

AP01

Level 16 66.700 RL

GL01 Level 15 63.600 RL

GL02

Level 14 60.500 RL

AW01 Level 13 57.400 RL

AP01

Level 12 54.300 RL

GL01 Level 11 51.200 RL

GL02

Level 10 48.100 RL

GL02

Level 09 45.000 RL

AP01

Level 08 41.900 RL

Billbergia

FN01

Project

FN01

Mixed-use Development & Community Centre

GL01

Level 07 38.800 RL

34 Walker Street Rhodes NSW 2138

SITE BOUNDARY

Level 06 35.700 RL Level 05 32.600 RL

SITE BOUNDARY

Drawing Name Level 04 29.500 RL

CM01 Level 03 24.500 RL

CN01

Elevation - North PAL01

CN01

Level 02.M 20.905 RL

PAL01

TR01 GL01

Level 02 17.500 RL

GL01

Pool Plant RL 14.400

GL01 Level 01 11.500 RL

TR01

B01 Mezzanine 8.750 RL

AL01

B01 Loading 6.100 RL

TR01 WALKER STREET

1

0210

Tower - North Elevation 1 : 250@A1

LEISURE CENTRE ENTRANCE

Date

Scale

20.03.2020

As indicated

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0501

TR01 LEISURE CENTRE AND RESIDENTIAL PARKING

MARQUET ST

SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


LEP HEIGHT RL 133.5 - 125m FROM RL 8.5

EXTERNAL FINISHES

E Tower E Top RL 132.100

DCP ENVELOPE AL01 AL02 AL03 AP01 AW01 CM01 CN01 CR01 FN01 GL01 GL02 GL03 LV01 PAL01 RF01 TR01

ALUMINIUM POWDERCOAT FINISH - DOOR ALUMINIUM ANODISED RHS BATTENS ALUMINIUM ANODISED RHS SOFFIT ALUMINIUM COMPOSITE PANEL WINDOW AWNING - ALUMINIUM POWDERCOAT METAL CLADDING SYSTEM - COPPER CONCRETE PRECAST - WHITE POLISHED CONCRETE RENDER ALUMINIUM FIN - ROSE GOLD GLAZING - CLEAR VISION GLAZING GLAZING - GLASS BALUSTRADE GLAZING - COLOUR BACK GLASS SPANDREL LOUVRES/PLANT SCREEN - ALUMINIUM PERFORATED ALUMINIUM SCREEN COPPER ROOF TERRACOTTA CLADDING

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Tower E Roof/ Plant RL 125.900

LV01

Rev

FN01

Level 34 RL 122.500

GL01

Level 33 RL 119.400 Level 32 RL 116.300

AP01

Level 31 RL 113.200

14 18 25 26 27 33 34 35 39 40 53

Date 05.09.2017 05.10.2017 26.10.2017 31.10.2017 07.11.2017 23.11.2017 24.11.2017 30.11.2017 14.12.2017 12.06.2018 20.03.2020

Revision

By

Chk.

PRE DA MEETING FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE DRAFT MOD

AW01 Level 30 RL 110.100 Level 29 RL 107.000

GL02

Level 28 RL 103.900 Level 27 RL 100.800

87m DCP HEIGHT CONTROL

D

Level 26 RL 97.700

LV01 Level 25 RL 94.600 Level 24 RL 91.500 Level 23 RL 88.400

DCP ENVELOPE Tower D Top RL 85.400

Level 22 RL 85.300 Level 21 RL 82.200

LV01 Tower D Roof/ Plant RL 79.400

FN01

Level 20 RL 79.100 Level 19 RL 76.000 Level 18 RL 72.900 Level 17 RL 69.800

AP01

Level 16 RL 66.700

GL01 Level 15 RL 63.600

GL02

Level 14 RL 60.500

FN01 AW01

Level 13 RL 57.400

AP01

Level 12 RL 54.300

GL01 Level 11 RL 51.200

GL02 FN01

GL02

Level 10 RL 48.100

AP01

Level 09 RL 45.000 Level 08 RL 41.900

FN01 GL01

Level 07 RL 38.800

SITE BOUNDARY

Level 06 RL 35.700

FN01 SITE BOUNDARY

Level 05 RL 32.600

CM01

Date

Scale

20.03.2020

As indicated

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0502

Sheet Size

@ A1

TR01 23-29 MARQUET ST PODIUM

GL01

MARQUET ST

Tower - South Elevation 1 : 250@A1

Drawing Name

Level 02.M RL 20.905

24 WALKER STREET VEHICULAR ENTRY PORTICO

Level 01 RL 11.500

B01 Loading RL 6.100

1

34 Walker Street Rhodes NSW 2138

Level 03 RL 24.500

CN01

B01 Mezzanine RL 8.750

0210

Mixed-use Development & Community Centre

Elevation - South

Level 02 RL 17.500 Pool Plant RL 14.400

Project

CM01

SITE BOUNDARY

CN01 PAL01

Level 04 RL 29.500

Billbergia

PROPOSED MARQUET ST PLAZA

WALKER STREET SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Revision

/ 53


E

LEP HEIGHT RL 133.5 - 125m FROM RL 8.5 Tower E Top RL 132.100

EXTERNAL FINISHES

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

ALUMINIUM POWDERCOAT FINISH - DOOR ALUMINIUM ANODISED RHS BATTENS ALUMINIUM ANODISED RHS SOFFIT ALUMINIUM COMPOSITE PANEL WINDOW AWNING - ALUMINIUM POWDERCOAT METAL CLADDING SYSTEM - COPPER CONCRETE PRECAST - WHITE POLISHED CONCRETE RENDER ALUMINIUM FIN - ROSE GOLD GLAZING - CLEAR VISION GLAZING GLAZING - GLASS BALUSTRADE GLAZING - COLOUR BACK GLASS SPANDREL LOUVRES/PLANT SCREEN - ALUMINIUM PERFORATED ALUMINIUM SCREEN COPPER ROOF TERRACOTTA CLADDING

FOR INFORMATION

LV01

Tower E Roof/ Plant RL 125.900 Rev

Level 34 RL 122.500 Level 33 RL 119.400

AW01

DCP ENVELOPE

GL01

Level 32 RL 116.300

GL03

Level 31 RL 113.200

GL02

Level 30 RL 110.100

FN01

14 18 25 26 27 33 34 35 39 40 53

Date 05.09.2017 05.10.2017 26.10.2017 31.10.2017 07.11.2017 23.11.2017 24.11.2017 30.11.2017 14.12.2017 12.06.2018 20.03.2020

Revision

By

Chk.

PRE DA MEETING FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE DRAFT MOD

Level 29 RL 107.000 Level 28 RL 103.900 Level 27 RL 100.800 Level 26 RL 97.700 Level 25 RL 94.600 Level 24 RL 91.500 Level 23 RL 88.400 Level 22 RL 85.300 Level 21 RL 82.200 Level 20 RL 79.100 Level 19 RL 76.000 Level 18 RL 72.900 Level 17 RL 69.800 Level 16 RL 66.700 Level 15 RL 63.600 Level 14 RL 60.500 Level 13 RL 57.400

AW01 Level 12 RL 54.300

GL01 GL03

Level 11 RL 51.200

GL02

Level 10 RL 48.100

FN01

Level 08 RL 41.900 Level 07 RL 38.800 Level 06 RL 35.700 Level 05 RL 32.600 RL 30.40

Level 04 RL 29.500

CN01

SITE BOUNDARY

GL01

Date

Scale

20.03.2020

As indicated

Drawn

Chk.

Level 01 RL 11.500

ME EK

JP

B01 Mezzanine RL 8.750

Job No.

Drawing No.

4440

0503

B01 Loading RL 6.100

1

0210

Tower - East Elevation 1 : 250@A1

Drawing Name

CN01

TR01

E RESIDENTIAL LOBBY

34 Walker Street Rhodes NSW 2138

Level 02.M RL 20.905

Pool Plant RL 14.400

LOADING & RETAIL ENTRY

Mixed-use Development & Community Centre

Level 03 RL 24.500

Level 02 RL 17.500

AL01

Project

Elevation - East

LV01

24-32 WALKER STREET

Billbergia

Level 09 RL 45.000

SITE BOUNDARY

AL01 AL02 AL03 AP01 AW01 CM01 CN01 CR01 FN01 GL01 GL02 GL03 LV01 PAL01 RF01 TR01

GAUTHORPE STREET SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


E

LEP HEIGHT RL 133.5 - 125m FROM RL 8.5

Tower E Top 132.100 RL

EXTERNAL FINISHES AL01 AL02 AL03 AP01 AW01 CM01 CN01 CR01 FN01 GL01 GL02 GL03 LV01 PAL01 RF01 TR01

Tower E Roof/ Plant 125.900 RL

Level 34 122.500 RL Level 33 119.400 RL Level 32 116.300 RL Level 31 113.200 RL

ALUMINIUM POWDERCOAT FINISH - DOOR ALUMINIUM ANODISED RHS BATTENS ALUMINIUM ANODISED RHS SOFFIT ALUMINIUM COMPOSITE PANEL WINDOW AWNING - ALUMINIUM POWDERCOAT METAL CLADDING SYSTEM - COPPER CONCRETE PRECAST - WHITE POLISHED CONCRETE RENDER ALUMINIUM FIN - ROSE GOLD GLAZING - CLEAR VISION GLAZING GLAZING - GLASS BALUSTRADE GLAZING - COLOUR BACK GLASS SPANDREL LOUVRES/PLANT SCREEN - ALUMINIUM PERFORATED ALUMINIUM SCREEN COPPER ROOF TERRACOTTA CLADDING

In accepting and utilising this document the recipient agrees that SJB Architecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose. The Builder/Contractor shall verify job dimensions prior to any work commencing. Use figured dimensions only. Do not scale drawings.

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

FOR INFORMATION Rev 14 18 22 25 26 27 33 34 35 39 40 53

Date 05.09.2017 05.10.2017 13.10.2017 26.10.2017 31.10.2017 07.11.2017 23.11.2017 24.11.2017 30.11.2017 14.12.2017 12.06.2018 20.03.2020

Revision

By

Chk.

PRE DA MEETING FOR INFORMATION FOR INFORMATION FOR INFORMATION RLC CONCEPT DESIGN CONSULTANT ISSUE FOR INFORMATION FOR INFORMATION FOR INFORMATION ISSUED FOR DA REVISED DA ISSUE DRAFT MOD

Level 30 110.100 RL Level 29 107.000 RL Level 28 103.900 RL Level 27 100.800 RL Level 26 97.700 RL

87m DCP HEIGHT CONTROL

Level 25 94.600 RL Level 24 91.500 RL

D

Level 23 88.400 RL

Tower D Top RL 85.400

Level 22 85.300 RL

DCP ENVELOPE

Level 21 82.200 RL Level 20 79.100 RL

LV01

Tower D Roof/ Plant RL 79.400

Level 19 76.000 RL Level 18 72.900 RL Level 17 69.800 RL Level 16 66.700 RL Level 15 63.600 RL Level 14 60.500 RL

GL03 FN01

GL02 GL01

Level 13 57.400 RL Level 12 54.300 RL

DCP ENVELOPE FOR 23-29 MARQUET ST

Level 11 51.200 RL Level 10 48.100 RL

Billbergia Level 09 45.000 RL Level 08 41.900 RL Level 07 38.800 RL

Project

Mixed-use Development & Community Centre

Level 06 35.700 RL

34 Walker Street Rhodes NSW 2138

Level 05 32.600 RL Level 04 29.500 RL

Drawing Name

CN01

RL 26.10

Elevation - West

Level 02.M 20.905 RL

GL01 CN01

SITE BOUNDARY

ME01 SITE BOUNDARY

Level 03 24.500 RL

Level 02 17.500 RL

Level 01 11.500 RL B01 Mezzanine 8.750 RL B01 Loading 6.100 RL

GAUTHORPE STREET

1

0210

Tower - West Elevation 1 : 250@A1

D RESIDENTIAL LOBBY

Date

Scale

20.03.2020

As indicated

Drawn

Chk.

ME EK

JP

Job No.

Drawing No.

4440

0504

PROPOSED MARQUET ST PLAZA

SJB Architects Level 2 490 Crown Street Surry Hills NSW 2010 Australia T 61 2 9380 9911 F 61 2 9380 9922 www.sjb.com.au

Sheet Size

@ A1

Revision

/ 53


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.