1 minute read

The MRF Gets a Makeover

In mid-March, the MRF staff worked overtime on a Friday and Saturday to perform environmental cleaning of the building, which has typically been done by an outside contractor. In order to save the city money, the staff performed the operations themselves.

The MRF is not a temperature-controlled building, and the material that is sorted creates a large amount of dust and other unclean areas. As you can see from the before and after pictures, the staff did an excellent job, and the MRF looks amazing. Thanks to the amazing MRF staff for the long hours and hard work.

This article is from: