Signature City Fall 2021

Page 13

PHOTO BY KIM SENG

Strong Stable

City’s Budget Will Sustain Quality of Life for Residents Written and Photographed by Candice Temple

Mary Circle/Dania Drive Potable Water U.S. HUD Community Development Block Grant, General Fund for Capital Improvement & Gas Tax Fund

“Coordination between the City Engineering & Planning and Zoning Departments will allow local neighborhoods to have access to much needed infrastructure, including potable water.” – Olivia Ellison, Planner

Mary Circle and Dania Drive have long needed infrastructure improvements. These neighborhoods are still served by well water and a septic system on undersized lots. The project includes providing potable water to the Mary Circle and Dania Drive communities. Right of way acquisition from the Palm Beach County and private residents is required and the roads will be repaved to the City’s standard. Project Budget: $1,162,290 FA L L 2021

13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.