Colgan Creek Park Play Equipment Replacement Options

Page 1

Colgan Creek Neighborhood Park Play Equipment Replacement Options

Virtual Neighborhood Meeting December 17, 2020

Jen Santos Deputy Director Parks

1


Santa Rosa Parks System Northeast

Northwest

Southeast Southwest

2


Boundary Map

3 Colgan Creek Neighborhood Park


Ages 5-12 Play Area

4 Damaged Tower Area


Background

• Park land was dedicated by the developer of the Summerhill area to the City in 1997 • A Master Plan of the approximately 2.6-acre Park was also produced in 1997 • Play equipment is original from the 1998 construction • December of that same year the Park name changed from Summerhill Park to Colgan Creek Park

5


1997 Master Plan

6


Process

• Secured funding through Park Development impact fees for • • • •

the Southeast Zone Cooperative Purchase process utilized to replace play equipment Local Recreation Equipment Distributor providing new play equipment options Acquire neighborhood input and feedback Finalize Cooperative Purchase and install new equipment

7


Play Equipment Replacement Options

Net Plex Play Structure

Hedra Play Structure

Net Plex System

Hedra Play System

Traditional Swings

Oodle Tire Swing

Crab Trap

Global Motion Sphere

Topsy Turny Spinner

Gyro Spinner 8


Net Plex Option

Colgan Creek Neighborhood Park

9


Net Plex Option

Colgan Creek Neighborhood Park

10


Net Plex Option

Colgan Creek Neighborhood Park

11


Hedra Option

Colgan Creek Neighborhood Park 12


Hedra Option

Colgan Creek Neighborhood Park 13


Hedra Option

Colgan Creek Neighborhood Park

14


Play Equipment Replacement Options Net Plex Play Structure

Colgan Creek Neighborhood Park

15 Hedra Play Structure

Colgan Creek Neighborhood Park


Next Steps

• Online survey will be posted to the City website by Friday, December 18 • The City will continue to collect neighborhood feedback until January 5th • A final design concept will be developed based on the data collected from surveys & comments and posted to the City website • The neighborhood preference based on data collected from surveys and comments will be posted to the Recreation and Parks web site at srcity.org/Park-Projects • Playground replacement purchase includes design, permits, demo of existing and installation of new

16


17


18


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.