Stony Point Road Corridor Study March 3, 2021 Community Meeting

Page 1

STONY POINT ROAD CORRIDOR STUDY FOR ACTIVE TRANSPORTATION MODES

Community Workshop – March 3, 2021


STUDY AREA

NORTH

1

2

3

Sonoma County Transportation Authority


STUDY AREA

NORTH

1

2

3

Sonoma County Transportation Authority


STONY PT. ROAD CORRIDOR A HIGH PRIORITY » 1 of 8 Corridor Studies from Bicycle & Pedestrian Master Plan Update 2018 » Top priority of Bicycle Pedestrian Advisory Board – high rate of severe bike/ped injury collisions » Major north-south access route for “Community of Concern” Sonoma County Transportation Authority


KEY CORRIDOR ISSUES • Separation between bike lanes and vehicle traffic • Shorten pedestrian crossing distances • Reduce speed of turning vehicles at intersections and ramps • Address vehicle/bicycle conflict points

Sonoma County Transportation Authority


PUBLIC OUTREACH » 2 Community Meetings (virtual) » Online Surveys » Social Media » Meetings with Bicycle & Pedestrian Advisory Board » August 2020, January 2021, March 2021

Sonoma County Transportation Authority


ISSUES FROM COMMUNITY MEETING #1 • Improve connection from Joe Rodota Trail to Cesar Chavez School on Sebastopol Rd. • Reduce potential conflicts between Joe Rodota Trail users and vehicles turning right from the EB off-ramp onto Stony Pt Rd. • Provide bicyclists with additional protection from right-turning drivers at intersections and driveways. • Install sturdy barriers in addition to the striped buffer to better protect bicycles from vehicle traffic. Sonoma County Transportation Authority


ONLINE SURVEY (237 RESPONSES) Questions included: • Travel purpose on Stony Point Road • Pedestrian safety concerns and comfort at study intersections • Preferred pedestrian crossing treatments • Bicycle safety concerns and comfort at intersections • Preferred bicycle design treatments Sonoma County Transportation Authority


ONLINE SURVEY (237 RESPONSES) Preferred Bicycle Design Treatments Treatment

Respondents Respondents Respondents Selecting Selecting 1 Selecting 2 1 or 2 (1=most comfortable, 5 = least comfortable)

Protected intersection

49%

19%

68%

Buffered bike lanes

37%

33%

70%

Bike lane striping through intersections

31%

23%

54%

Crossbike

27%

25%

52%

Green dashed bike lane striping (conflict zones)

27%

25%

52%

Sonoma County Transportation Authority


MAJOR CHANGES SINCE COMMUNITY MEETING #1 • Highway 12 on-ramps

• Raised crosswalks to slow traffic

• Highway 12 EB Ramps/Joe Rodota Trail Crossing • Eliminate lane on off-ramp • Curb extension to shorten crossing distance • No right turn on red onto Stony Point

• Stony Point/Occidental – Curb extension on NW corner Sonoma County Transportation Authority


Sonoma County Transportation Authority


BARRIER BETWEEN BIKES AND VEHICLE TRAFFIC

Sonoma County Transportation Authority


2

NORTH

1

3

5

4

6

Sonoma County Transportation Authority


SOUTH OF W. 3RD ST.

Sonoma County Transportation Authority


SOUTH OF W. 3RD ST. 7 6

5 2

1

3

4

5

8

Sonoma County Transportation Authority


SOUTH OF W. 3RD ST. - 3D VIEW

Sonoma County Transportation Authority


SOUTH OF W. 3RD ST. - 3D VIEW

Sonoma County Transportation Authority


SOUTH OF W. 3RD ST. - 3D VIEW

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE 11

15

9 12

9

14 13

11

15

10

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE B

11

15

A

9 12

9

14 13

11

D

C

15

10

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE B

11

15

A

9 12

9

14 13

11

D

C

15

10

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE

Sonoma County Transportation Authority


JOE RODOTA TRAIL-HIGHWAY 12 RAMPS

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE - 3D VIEW

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE - 3D VIEW

Sonoma County Transportation Authority


HIGHWAY 12 BRIDGE - 3D VIEW

Sonoma County Transportation Authority


NORTH OF SEBASTOPOL RD

Sonoma County Transportation Authority


NORTH OF SEBASTOPOL RD 17

18 20

18 16

19

21

Sonoma County Transportation Authority


NORTH OF SEBASTOPOL RD 17

18 20

18 16

19

21

Sonoma County Transportation Authority


MAINTAIN RIGHT TURN LANE

32

Sonoma County Transportation Authority


BUFFERED BIKE LANE TRANSITION

33

Sonoma County Transportation Authority


NORTH OF SEBASTOPOL RD 17

18 20

18 16

19

21

Sonoma County Transportation Authority


NORTH OF SEBASTOPOL RD 17

18 20

18 16

19

21

Sonoma County Transportation Authority


PROTECTED INTERSECTION

34

Sonoma County Transportation Authority


PROTECTED INTERSECTION

35

Sonoma County Transportation Authority


FUTURE – 2-WAY PATH

Sonoma County Transportation Authority


FUTURE – 2-WAY PATH

Sonoma County Transportation Authority


Sonoma County Transportation Authority


Sonoma County Transportation Authority


FUTURE – 2-WAY PATH

Sonoma County Transportation Authority


Sonoma County Transportation Authority


COMPLETING THE STUDY – NEXT STEPS » Present updated design to public (community meeting #2) » Collect Survey Results » Present to BPAB (March 18th) » Finalize Design and Report (May)

Sonoma County Transportation Authority


STONY POINT ROAD CORRIDOR STUDY FOR ACTIVE TRANSPORTATION MODES

Community Workshop – March 3, 2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.