Your Rebuilding Journey

Page 1

SIMPLIFYING THE PATH TO RECOVERY

YOUR REBUILDING JOURNEY

Additional information regarding the Santa Rosa rebuilding effort available online: SRCity.org/rebuild SonomaCountyRecovers.org


DEBRIS REMOVAL

DESIGN

REVIEW

Because the destruction of the fire is

A successful project needs plans. Whether

With your plans in place, the next step

dangerous, potentially hazardous to

you’re replicating your original structure

is to prepare your Building Permit

the health and safety of your and your

or designing an entirely new house, you’ll

for approval. Reviewing Submittal

community, a debris removal must

need to obtain the appropriate plans,

Checklist can help you understand

be completed by the Army Corps of

with all the necessary Code Upgrades to

and organize all the information

Engineers or a private contractor and

move forward safely and efficiently.

you need to get through the Review

approved by the City.

process as easily as possible.

Permits Issued (Common) Approved to get started, no changes needed.

Successfully Located Original Plans

Hire a Design Professional

Obtain Original Plans from the City Planning Department or original Architect of the plans.

YES

Work with Design Professional to redevelop plans to include all necessary Code Upgrades and desired enhancements.

Build using Existing Design

Unable to Locate Original Plans

Debris Removal

Obtain any required HOA Approvals

Build using New Design

Do you have an HOA?

NO

Prepare a Complete Submittal Packet We recommend Reviewing the Submittal Checklist with your Design Professional and Scheduling an appointment prior to submitting to the Rebuilding Permit Center

Work with your Design Professional to design your new home.

Issued with Deferred Submittals (Most Common) Approved to get started, but will require additional changes, info, and clarity.

Denied (Rare) Only if plans are significantly flawed or information is missing.

Full City Permit Review All required departments within the city will review your packet and provide guidance and feedback.

CONSTRUCTION & INSPECTIONS

DONE Congrats! You’ve made

Now you’re building. From grading to framing,

it through the

plumbing to electrical, we’re here to help you

process, now relax

build right. Periodic inspections, based on

and enjoy the

your type of construction, keep you and your

feeling of being

community protected.

home.

Phased Construction Your contractor will begin the construction process per their recommended schedule. Final Inspection

Periodic Inspections Throughout the process you contractor will need to request and pass milestone inspections.

Continued Submittals If there remain open items from your Review Process, you will work with your Design Professional to resolve in tandem to the construction and inspection process.

Welcome Home!

Typical Differed Submittals: Fire Sprinkler Plans, Water-efficient landscaping, and others.

Design a New Home Incomplete Packet

Submit to Rebuilding Permit Center for Review

Complete Packet

Hire a Design Professional

YOUR REBUILDING JOURNEY

3


FIND YOUR PATH TO REBUILDING: FAST TRACK If your new structure will be replicating the original footprint and building height, while meeting state and local fire code standards.

EXPEDITED If your new structure will have the same footprint or square-footage, but will alter the interior plan.

PRIORITIZED If your new structure is a major change, altering the footprint or square-footage of your original structure.

Call the Resilient Cities Department at 707-543-4649 if you have any questions.

WE’RE HERE TO HELP YOU AND YOUR PROJECT REBUILD FAST AND SUCCESSFUL!

YOUR REBUILDING JOURNEY

4