Chapter 10 – California Energy Commission
7-129 Time limitations
Amended following subsections: 7-129(b) to provide revised time limitations based on the cost of a project. 7-129(d) to include a description of when a project is considered abandoned. 7-129(d) Exception to limit the exception to paragraphs (a) and (b) so they do not apply to managed projects. Manage project time limitations would not apply as the durations are negotiated.
7-133 Fees
Amended following subsections: 7-133(a) to allow for projects with estimated construction cost of less than $250,000 to be invoiced at the rate of 2.0 percent of the estimated construction cost. 7-133(h) to remove collaborative review and replace phased review with integrated review. The fee of 1.95% is to be applied to integrated review.
7-145 Continuous inspection of the work
Clarified the requirement for the Inspector of Record to notify the office in writing when work is started and for the field record report to include the time and date of all correspondence with the contractor regarding incomplete work, potential deficiencies or deviation which require the contractor’s attention. Added additional requirements for the reports.
Chapter 10 – California Energy Commission
Please visit the California Energy Commission’s website for updates. energy.ca.gov/programs-and-topics/programs/building-energy-efficiencystandards/online-resource-center/overview