![](https://assets.isu.pub/document-structure/230320023958-df283e9a446ce74666293d74fc038bec/v1/37b19df133bc22b4c2a8f2813eab5787.jpeg?width=720&quality=85%2C50)
1 minute read
Pedestrian diversion plan
• We will continue to work with each individual business when we move the works to right up to the property boundary / shop door.
• Access to businesses will be maintained, however several pedestrian diversions / new accessways will be required due to the extremely close proximity of the works to the businesses, and for safety reasons. In some cases small bridges will be used.
• Not all businesses will be diverted simultaneously – we work in a staged approach to minimise pedestrian confusion/overwhelm.
• All of our usual construction effects mitigation measures will be in place and we will continue to work with the shop owners on wayfinding, signage and business support.
![](https://assets.isu.pub/document-structure/230320023958-df283e9a446ce74666293d74fc038bec/v1/cf241c772565f19cb8b8197e598fe728.jpeg?width=720&quality=85%2C50)
• Please bear with us – we are now on the home stretch.
![](https://assets.isu.pub/document-structure/230320023958-df283e9a446ce74666293d74fc038bec/v1/9bb7d7541d89e047dd288f2006eda119.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230320023958-df283e9a446ce74666293d74fc038bec/v1/d6eef5d4e4d102ac54071771955defd9.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230320023958-df283e9a446ce74666293d74fc038bec/v1/f7a31e2008ad1bcbd130cc8fa22de988.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230320023958-df283e9a446ce74666293d74fc038bec/v1/247d7204a41b7c2997f5245c88e48e68.jpeg?width=720&quality=85%2C50)