Wedge Cres DA amendment

Page 1

00 6,0

A 50 4,8

B

32 UNITS PROPOSED

1

SMH

3 STORIES GENERALLY WITH 2 STOREY END UNITS AND BASEMENT PARKING

567,800

00 8,1

S

C

SITE AREA = 3879 m2 , PLOT RATIO = 80% , MAX GFA = 3103 m2

00 6,7

00 6,0etback

H

30 UNITS (2 BEDROOM) @ 85.5 m2 + 2 UNITS (3 BEDROOM) @ 104.7 m2 = 2774 m2

567,825

Court

00 6,7

13

15

1,0 00

Mail Boxes

Unit 2

BLOC 4,55K0B VIS IT CAR OR PARK 3

BLOC VISIT K B CAR OR PAR K2

ADA PTAB LE

Court

1,000

FFL 56

568,432

8,575

Unit 2

3 000

E

Setb ack

ADA PTAB LE

4,850

UP P

G

Unit 6

7

1,000

Unit 1

BLOCK B

5,402

FFL 56

5,500

F 8,100

unlo adin area g

50 0

RA M

1,500

600

8,100

0

Unit 6

14

REGULATED TREE 12 M SPREAD

2 AD AP (GRO TABLE U UND N FLO ITS OR) FFL 568,5 75

2700

4,850

unlo adin area g

BLOC VISIT K B CAR OR PARK 1

3B

50

6,700

WATER METER PIT

Mail Boxes

F

5

6

SUBSTATION 568,550 GROUND MAT

E

513 68

00

Mail Boxes

5. LANDSCAPING MODIFIED TO MATCH ABOVE CHANGES. REFER LANDSCAPE ARCHITECT DRAWINGS

H 12

6,700

1,5 00

2,000

A

3C

8,650

8

5

568,503 1 000

SECTION 61

FFL 56 1.5 m 3

8,430 1.1 m3

WAS TE

3 500

COLORBOND FENCE WITH LATTICE TOP AND CLIMBER PANELS - REFER CONSTRUCTION DETAILS

WC

SEAT AND PAVING TO LANDSCAPE DETAIL

COLORBOND ROLLER DOOR TO WASTE ENCLOSURE 568,330

6,700

PP

11

12

14 1

3D

6,700 6,700

13

1,000

10

9

H

NEW 1800

SMH

568,563

4,550

G

CENTRAL GAS HOT WATER HEATERS

HIGH CO LORBOND FENCE

50

0

PP

6,700

A Su CT bs EW ta tio n

VEH ICL RAM E P

568

5

SUBSTATION CLEARANCE ZONE

6 00 8,1

6 96

568

800

B

H 568,150

11

it Un

g din loa un area

1

PP

6,700 568,233

5,500

740

it Un

00 5,5

00 6,7

KA OC R BL ITO ARK VIS LE P YC BIC CARPARK AND

00 6,7

10 9

4. UPPER FLOOR EAVES DETAIL MODIFIED. REFER ATTACHED DRAWINGS A17, A18 & A24

CR ES CE NT 1

568,134

SEAT AND PAVING TO LANDSCAPE DETAIL

50 4,8

A C5K0 R O5 BL4, ITO K 1 C VIS PAR R KA CA D BLOCITORK 2 VIS PAR R CA

DRIVEWAY LEVELS TO ENG DETAIL

9

00 1,0

0 ,50

3

00 35

LE HIC VE AMP R

00 2,4

8

Mail Boxes

00 1,0

8 56

m

00 10

22

19 0 60

SUBSTATION BY ACTEW - CONCRETE PLINTH, GROUND MAT AND CONDUITS BY BUILDER TO ACTEW DETAILS REFER TO ELECTRICAL DRAWINGS

00 6,7

568

00 6,7

L FF

1.5

00 2,4

EXISTING KERB CROSSING

WATER METER PIT

00 27

00 2,4

00 2,4

00 6,7

8

0

A AD

it 1 Un PTABLE

25

m

50 8,4 56 3

E ST WA

1.5

567,900

1.13 m

00 6,7

7

,4 68 L5 FF

WC

L FF

568

568,650

R OO RD LE E OL SUR D R LO ON ENC RB LO STE CO WA TO

00 6,7 568

0 1,5

ITS UN ) 5 ,42 LE OR 68 AB FLO L5 PT FF DA ND 2 A ROU (G

A AD

it 6 Un PTABLE

2 6

00 6,7

25

7

00 6,7

2

568,650

CENTRAL GAS HOT WATER HEATERS

3. PARKING AMENDED TO ALLOW BLOCK A & B TO BE SEPARATELY TITLED (SEPARATE DA) A: BLOCK A VISITORS INCREASED FROM 3 TO 4 B: 2 ADDITIONAL BLOCK A VISITOR PARKING SPACES ADDED C: 2 ADDITIONAL BLOCK B VISITOR PARKING SPACES RELOCATED D: 3 BLOCK B VISITORS PARKING SPACES DELETED AND REPLACED WITH LANDSCAPING

1

7

S OR SIT

0 80

2. BLOCK A WASTE ENCLOSURE CHANGED TO INCLUDE CLEANERS WC FACILITY (ALSO REFER TO DRAWINGS A04 & A25)

6

8,4 56

it Un

PP

1. WATER PITS ADDED ON WEDGE CRES. BOUNDARY.

0

Mail Boxes

Court

L FF

12

BLOCK A

R ITO VIS 6 K A ARK OC P R BL CAR ITO VIS 5 K A ARK OC P R BL CAR ITO VIS 4 K A ARK OC P R BL CAR ITO VIS 3 K A ARK 0 3 OC P BL CAR 15,0

00 6,7

00 2,5

5

CABARITA

it Un

00 2,5

0 1,3

00 2,5

VI

4

00 1,0

DA AMENDMENT REVISIONS

2,400

568

25 8,4 56

it Un

00 1,2

ING AV DP E AN CAP S S AT D 0 SE LAN 50 TO TAIL 2, DE

00 1,2

568

00 1,5

5 ,42

3A

3

1500 HIGH GALVANISED AND PAINTED STEEL OR POWDERCOATED ALUMINIUM HORIZONTAL SLAT FENCES WITH 70 MM SLATS / 30 MM GAPS

00 1,2

0

GALVANISED AND PAINTED STEEL OR POWDERCOATED ALUMINIUM HORIZONTAL SLAT PANELS WITH 70 MM SLATS / 30 MM GAPS, IN BRICKWORK COURTYARD WALLS

5

8 56

68 L5 FF

00 6,7

00 25

0 1,2

32 UNITS X 1 BICYCLE PARKING SPACE = 32 SPACES REQUIRED & PROVIDED

Court

5 ,42

2

30 UNITS (2 BEDROOM) X 1.5 SPACES RESIDENTS PARKING = 45 SPACES 2 UNITS (3 BEDROOM) X 2 SPACES RESIDENTS PARKING = 4 SPACES TOTAL 49 CAR SPACES REQUIRED & PROVIDED (45 IN BASEMENT + 4 ADAPTABLE UNIT CARPORTS ON SURFACE) 32 UNITS X 0.25 SPACES VISITOR PARKING = 8 SPACES REQUIRED & PROVIDED

18

8 56

Court

PARKING PROVISIONS

E

L FF

18

S

Mail Boxes

L FF

00 6,7

EP ST

Court

TOTAL GFA = 3102 m2

2,400 2,400

568

it Un

PS

4

25

E ST

00 6,7

00

25

1

8,4 56

Court

8 56

3 Court

L FF

PP

3

2,400

19

,4 68 L5 FF

Se

SMH

WASTE ENCLOSURES = 40 m2

DG WE

25 8,4 56

it Un ,5 68 L5 FF

Se

MIN 00 10 tback

00 7,4tback

6 STAIRWELLS X 30 m2 = 180 m2

Mail Boxes

00 6,7

L FF

IN

H CE HIG FEN 00 18 OND B W NE LOR CO

THE BERWICK

6 ROOFED CAR SPACES X 18 m2 = 108 m2

2

0M

D

21

0 10 tback Se

50 4,5

6,700

568,660

PP

14

Site Plan 1:200

General Notes All measurements are in millimetres Figured dimensions take precedence over scaled dimensions Contractor to verify all dimensions on site and seek instructions before proceeding if any discrepancies are found

Amendments

N

A B C D

14.07.11 12.09.11 18.12.12 16.01.13

ADDITIONAL DA AMENDMENT NOTES ADDED

Architecture

Planning

Interiors

Unit 9 Level 1 National Press Club Building Barton ACT 2600 T +61 2 6273 1003

/ 1 6 National Circuit F +61 2 6273 1005

Primary Nominee: David Clarke ACT Reg. No. 935 NSW Reg. 6904 ABN 79 721 296 847 Rev

Date

Description

DHCS Multi-Unit Residential Development Address Block 23 Section 61 Wedge Crescent, TURNER Drawing Site Plan Project

This drawing published 1/16/2013 10:43 AM

ISSUED FOR CONSTRUCTION WASTE ENCLOSURE LEVELS ALTERED, FORMER MSB & PATH DELETED WASTE ENCLOSURES & PARKING AMENDED. WATER METER PITS ADDED

Scale

Drawn

As Shown Date

GG

Checked

DC

1/16/2013

Project No.

10-400

Drawing No.

A 02

Issue

D


4,285

230 600

2,620

230

2,620

600

5,055

280

280

5,055

1,200

230

4,200

600

2,600

230

2,600

600

5,055

280

2,500

280

280

5,030

5,055

230

5,055

5,055

1,200

230

4,200

600

2,600

230

2,600

600

4,200

1,200

2,520 100 DIA DP

310

600

Bed 2

W02

W02

300

4,850

230

2,420

2,570

A

E

230

1,500

FALL

FALL

D10

store

2,050

2,400

B

G A 18

4,100

Kitchen

dw

ov

D10

F

100

8,100

store

100

FALL

5,500

D17

D04

store

D17

Unit 1 Dining ADAPTABLE

ov

90 DIA DP

SD

Dining ADAPTABLE

dw

170

FALL

Bed 1

Bed 1

W03

W03

r

Bed 2

Bed 2

W02

W02

r

r

D01

D01

Bed 1

Bed 1

W03

W03

4 A 15

3,950

C

shwr

50

D01

D05

D05

W L'dry

shwr

r

r

Bath

180

r

D03

hw

Bath

D01

Bed 2

4,550

Bed 2

VOID

F

D01

Bed 1

ELECT. METERS

W01

Unit 6

study

D02

D01

D01

D04

D17 D02

WC

W L'dry

Bath.

r

hw

3,420

Living

Kitchen

lin

Bath.

hw

160

F

D02

D04 D05

W L'dry

r

D02

lin

r

D03

D01

D05 D02

D03

WC

p

D01

p

store

D17

store

D04

D17

store

store

D04

store

D04

r

r

WC

D01

D06 D06

D02

shwr

EXHAUST DUCTS TO MECH DETAIL Bed 2 Bed 3

Bed 2

hw

Kitchen

F

D01

D05

W L'dry

r

Bath.

Bath.

D03

hw

Kitchen

F

W L'dry

store

D04

store

D04

p

p

D01

r

br

br

lin

D02

FAN

FAN

L'dry W

F

D01

Bed 3

Kitchen

Dining

1,390

4,370

4,550

D01

D06

c

D06

D03

Kitchen

WC

D11

Living

Unit 7

Dining

hw

lin

D02

WC

D02

22,160

D05

hw

r

D11

Living

Unit 12

Dining

D17

1 A2 2 F

p

Unit 13

Dining

D17

VOID IN GROUND FLOOR SLAB BELOW LANDING

D04

14,440

store

D04

store

A 15 3 8,100

Kitchen

Living

D01

Unit 18

D02

B

Unit 19

Living

230

D16

90 DIA DP

SD

Living

Dining

shwr

W01

SD

Living

Bath.

W01

D11

VOID

lin

SD

1,030

G A 18

D11

1,340

2,400

W01

VOID

350

350

W01

D11

3,335

230

D11

350

study

W01

3,335

D16

90 DIA DP

6 A2 3

W01

350

2,400

1,340

2,400

230

FALL

2,540 100 DIA DP

D18

230

56 8, FF 500 L

1,340

1,500

A 25 11

350

D10

3,335

store

350

D10

3,335

D16

90 DIA DP

FALL

1 A2 3

350

store

1,340

D01

FALL

230

D05

D16

2,540 100 DIA DP

L'dry W

6 METRE FRONT SETBACK LINE

c

250

310

FALL

230

470

1,340

2,560

350

2,090

3,335

FALL

350

2,560

3,335

FALL

FALL

350

VOID

14,940

2,500

230

4,200

600

1,340

90 2,120

230

FALL

2,540 100 DIA DP

2 A2 3

230

FALL

1,340

FALL

350

FALL

5 A2 3

FALL

FALL

470 2,770 230

3,335

90 DIA DP 2,090

2,560

2,560

A

3,600

6,000

6,000

6,700 280

00

365

D11

4,850

9

6,700

5,030

A 25 10

VOID

C

10

6,700

5,030

230

4,200

8

7

6,700

5,030

B A 17

2,500

A A 17

280

A 15 1

230

4,200

6

6,700

5,030

K A 18

280

L A 18 2,400

5,025

600

5

6,700

5,030

H A 18

280

600

230

4

3

2

1

2,500

1, 50 0

280

60 0

6,700

5,030

A C 17

6,700 330

HOSE COCK D22

DP D14

5,272

2,635

6,420

280

D 1,721 3,828

830

2

3,950

4,880

330

FALL

ROLLER DOOR - REFER DOOR SCHEDULE

7 METRE REAR SETBACK LINE 230

D15 900

FALL

350

231

DP

2,635

1.5 m3

4 A 25

448

1.5 m3

FW FALL

3

1,329

D15 FALL

WC

W07

1.1

EXTENT OF INSULATION TO UNDERSIDE OF FIRST FLOOR SLAB ABOVE SHOWN HATCHED

shwr

DP

3,950

LINE OF BUILDING OVER

FALL

Stair

FALL m

DP

350

8 A2 3

Terrace A 25 2

DP

900

FALL

W07

1,200

Ensuite

W04

W04

Ensuite

2,640

D09

shwr

FALL

1,939

3,830

A 25 3

FALL

FALL

Bed 1

D09

W02

230

1,720

r

D01

1,000

DP

470

DP

D13

D01

D13

FALL

D07

DP

Bed 1

W03

FALL

D08

FALL

D12

3 A2 3

r

W02

FALL

D07

FW D12

720 230

DP

W02

DP

D08

230 BRICK WALL TO 2150 ABOVE FFL

1,500 5,220 250

5,720

250

1,500

D

250

1,000

1 030

6,420

280

6,420

280

6,420

280

230 140

6,420

280

47,280

6,420

280

6,420

190

6,300

330

210

190

6,300

400

6,700

K A 18

6,700

6,700

9

4

6,700

7

6,700

6

6,700

3

6,700

8

2 A 15

5

H A 18

L A 18

1

6,700

2

1

6,700

A A 17

B A 17

1 A 25

Ground Floor Plan 1:100

General Notes All measurements are in millimetres Figured dimensions take precedence over scaled dimensions Contractor to verify all dimensions on site and seek instructions before proceeding if any discrepancies are found

Amendments

N

A B

14.07.11 12.09.11

C D E F G

20.10.11 24.10.11 05.12.11 19.12.12 16.01.13

Rev

Date

BATHS DELETED & BASIN TYPE REVISED. STUDY ADDED TO ADAPTABLE UNIT. UNIT NUMBERS REVISED WC ADDED TO WASTE ENCLOSURE ADDITIONAL DA AMENDMENT NOTES ADDED Description

DHCS Multi-Unit Residential Development Address Block 23 Section 61 Wedge Crescent, TURNER Drawing Ground Floor Plan - Block A Project

This drawing published 1/16/2013 10:46 AM

ISSUED FOR CONSTRUCTION SHAFTS DELETED, MAIN STAIRS MOVED, REAR BASEMENT STAIR LENGTHENED, SCREEN WALL ADDED, ADAPTABLE UNIT KITCHENS AND EXTENT OF TILES ALTERED

Architecture

Planning

Interiors

Unit 9 Level 1 National Press Club Building Barton ACT 2600 T +61 2 6273 1003

/ 1 6 National Circuit F +61 2 6273 1005

Primary Nominee: David Clarke ACT Reg. No. 935 NSW Reg. 6904 ABN 79 721 296 847

Scale

Drawn

As Shown Date

GG

Checked

DC

1/16/2013

Project No.

10-400

Drawing No.

A 04

Issue

G


B

A

D

2,400

4

PLASTERBOARD CEILINGS WITH R4.0 INSULATION BATTS THROUGHOUT UPPER STOREY

2 A 20

CONCRETE FLOOR SLABS TO ENGINEERS DETAIL

571,400

4

A

568,500

PLASTERBOARD CEILINGS WITH R1.5 ACOUSTIC BATTS THROUGHOUT INTERMEDIATE STOREYS

2,600

R1.5 RIGID BOARD INSULATION TO UNDERSIDE OF ALL EXPOSED CONCRETE SOFFITS

2,400

NATURAL GROUND LEVEL

NATURAL GROUND LEVEL

RAMP TO CIVIL ENG DETAIL

2,500

R.L 568.500 Ground Floor Level

B

GALVANISED AND PAINTED STEEL OR POWDERCOATED ALUMINIUM SCREEN PANELS

2,400

2,400

SUN SHADES TO DETAIL

R.L 571.400 First Floor Level

4째 ROOF PITCH

BRICK VENEER CONSTRUCTION GENERALLY WITH TIMBER STUDS, SARKING, 13 MM 'IMPACTCHECK' PLASTERBOARD LININGS AND R2.5 INSULATION THROUGHOUT (PLASTERBOARD TO BE 16 MM FIRESTOP ON ALL LOADBEARING WALLS SUPPORTING ROOF TRUSSES)

574,300

R.L 574.300 Second Floor Level

C

COLORBOND STEEL ROOFING ON 50 MM 'ANTICON' OR SIMILAR INSULATED SARKING BLANKET ON TIMBER BATTENS AND TRUSSES TO MANUFACTURERS DETAIL

2,400

C 1 A 20

2,300

D

CONCRETE FOOTINGS, COLUMNS, SLABS AND RETAINING WALLS TO ENGINEERS DETAIL

565,500

R.L 565.500 Basement Level

A

B

1:100

H

G

F

1:100

E

578,398

4 2,400

Boundary Line

577,241

2,400

Boundary Line

4

574,450

R.L 574.450 Second Floor Level

2,400

2,400

9 A 25

NATURAL GROUND LEVEL

4째 PITCH

2,400

DRIVEWAY

571,550

WASTE ENCL.

2,400

2,600

R.L 571.550 First Floor Level

568,650

568,430

R.L 568.650 Ground Floor Level

2,500

RAMP TO CIVIL ENG DETAIL

2,500

NATURAL GROUND LEVEL

3 A 20 565,650

R.L - 565.650 Basement Level

C

D

1:100

12

13

14

10

11

12

13

14

Boundary Line

11

Boundary Line

10

1:100

1 A 24

574,450

R.L 574.450 Second Floor Level

2,600

2,600

571,550

R.L 571.550 First Floor Level

NATURAL GROUND LEVEL

NATURAL GROUND LEVEL

568,650

R.L 568.650 Ground Floor Level

BASEMENT EXHAUST FANS TO MECH DETAIL 565,650

R.L - 565.650 Basement Level

E

F

1:100

General Notes All measurements are in millimetres Figured dimensions take precedence over scaled dimensions Contractor to verify all dimensions on site and seek instructions before proceeding if any discrepancies are found

Amendments

N

1:100

14.07.11 12.09.11

ISSUED FOR CONSTRUCTION WASTE ENCLOSURE & GROUND LEVELS ALTERED, FIRESTOP PLASTERBOARD NOTED TO LOADBEARING WALLS, TIMBER STUDS

C

12.12.12

D

16.01.13

AWNING ROOF AT SECOND LEVEL OMMITTED

Architecture

Planning

Interiors

SECOND FLOOR PERGOLA EAVES DETAIL CHANGED - DA AMENDMENT NOTE 4

Unit 9 Level 1 National Press Club Building Barton ACT 2600 T +61 2 6273 1003

/ 1 6 National Circuit F +61 2 6273 1005

Primary Nominee: David Clarke ACT Reg. No. 935 NSW Reg. 6904 ABN 79 721 296 847 Rev

Date

Description

DHCS Multi-Unit Residential Development Address Block 23 Section 61 Wedge Crescent, TURNER Drawing Sections 1 Project

This drawing published 1/16/2013 10:49 AM

A B

Scale

Drawn

As Shown Date

GG

Checked

DC

1/16/2013

Project No.

10-400

Drawing No.

A 17

Issue

D


1

2

3

4

5

6

7

8

9

CONCRETE PARTY WALLS / STAIRWELL WALLS TO EXTEND TO UNDERSIDE OF ROOF SHEETING WITH MINERAL WOOL PARTY WALL BATTS COMPRESSED UNDER ROOF SHEETING ONTO TOP OF WALL. ROOF TRUSSES SHALL NOT CROSS THROUGH CONCRETE WALLS 1 A 24

1 A 24

574,300

Boundary Line

R.L 574.300 Second Floor Level

R.L 571.400 First Floor Level

571,400

2 A 21

NATURAL GROUND LEVEL 568,500

R.L 568.500 Ground Floor Level 4 A 20 1 A 21

565,500

R.L 565.500 Basement Level

BLOCK A

G

1:100

COLORBOND STEEL ROOFING ON 50 MM 'ANTICON' OR SIMILAR INSULATED SARKING BLANKET ON TIMBER BATTENS AND TRUSSES TO MANUFACTURERS DETAIL

D

C

B

4° ROOF PITCH

A

D

C

B

BASEMENT EXHAUST DUCTS TO MECH DETAIL

A

4

2,400

PLASTERBOARD CEILINGS WITH R4.0 INSULATION BATTS THROUGHOUT

2,400

2,400

BRICK VENEER CONSTRUCTION WITH TIMBER STUDS, SARKING, 13 MM 'IMPACTCHECK' PLASTERBOARD LININGS AND R2.5 INSULATION THROUGHOUT R.L 574.300 Second Floor Level

BLOCK A

4° ROOF PITCH

12° PITCH 12 A 25

2,650

2,400

2,400

R.L 571.400 First Floor Level

R.L 568.500 Ground Floor Level

FAN

2,500

DP

CONCRETE FLOOR SLAB ON BRICKWORK FOUNDATION WALLS ON CONC FOOTINGS TO ENGINEERS DETAIL

7 A 22

CONCRETE FOOTINGS, COLUMNS, BEAMS, SLABS AND RETAINING WALLS TO ENGINEERS DETAIL

R.L 565.500 Basement Level

H

L

1:100

1:100 NOTES:

D

C

B

1. MINIMUM CONCRETE THICKNESSES SHOWN ON THESE DETAILS ARE FOR ACOUSTIC SEPARATION PURPOSES - SLAB THICKNESSES SHALL NOT BE REDUCED BELOW THESE MINIMUMS BY ENGINEERING DESIGN.

A

Boundary Line

3 A 21

2. CONSTRUCT FLOOR SLABS WITH 40 MM SET-DOWNS TO ALL BATHROOMS AND LAUNDRIES FOR TILING. ALL BATHROOM AND LAUNDRY FLOOR TILES ARE TO BE LAID ON SAND/CEMENT SCREED GRADED TO FALL TO FLOOR WASTES.

GALVANISED AND PAINTED STEEL OR POWDERCOATED ALUMINIUM SCREEN PANELS AND COURTYARD GATES

R.L 574.300 Second Floor Level

3. STEP-DOWNS OF MIN 75 MM, OR 1 BRICK COURSE, SHALL BE PROVIDED AT THE CAVITY LINE OF EXTERIOR WALLS AT ALL SLAB TRANSITIONS FROM INTERNAL FLOORS TO EXTERIOR BALCONIES AND PODIUMS.

SUN SHADES TO DETAIL

4. ALL BALCONY TILING SHALL BE GRADED TO FALL TO DRAINAGE OUTLETS. WATER SHALL NOT BE DRAINED OVER THE EDGE OF BALCONY SLABS. OUTSIDE EGES OF BALCONY TILING ARE TO FINISH AT LEAST 30 MM BELOW INTERIOR FLOOR LEVELS, TO ENSURE THAT WATER CAN OVERFLOW WITHOUT FLOODING THE APARTMENTS IF DRAINAGE OUTLETS BECOME BLOCKED.

12° PITCH 4° PITCH

R.L 568.500 Ground Floor Level

3 A 22

WASTE ENCL. STAIR WELL

TERRACE

2,650

NATURAL GROUND LEVEL

2,400

R.L 571.400 First Floor Level

5. DOWNPIPES FROM BALCONY DRAINAGE OUTLETS SHALL NOT BE EXPOSED ON SOFFITS OR WALLS. THEY SHALL BE FULLY CONCEALED. 6. ALL PARTITION WALLS WITHIN APARTMENTS TO BE LINED WITH 13 MM 'IMPACTCHECK' PLASTERBOARD. 7. SPLIT-SYSTEM REVERSE-CYCLE AIR CONDITIONING UNITS SHALL BE INSTALLED IN EACH APARTMENT IN THE LOCATIONS SHOWN. ONLY THE FOLLOWING BRANDS SHALL BE USED - DAIKIN, MITSUBISHI, TOSHIBA, FUJITSU, SAMSUNG, HITACHI. NO OTHER BRANDS WILL BE CONSIDERED. CAPACITY TO BE APPROX 6 KW COOLING / 7 KW HEATING.

LINTEL TO ENG DETAIL R.L 565.500 Basement Level

K General Notes All measurements are in millimetres Figured dimensions take precedence over scaled dimensions Contractor to verify all dimensions on site and seek instructions before proceeding if any discrepancies are found

1:100 Amendments

N

A B C D

14.07.11 12.09.11 12.12.12 16.01.13

Architecture

Planning

Interiors

Unit 9 Level 1 National Press Club Building Barton ACT 2600 T +61 2 6273 1003

/ 1 6 National Circuit F +61 2 6273 1005

Primary Nominee: David Clarke ACT Reg. No. 935 NSW Reg. 6904 ABN 79 721 296 847 Rev

Date

Description

DHCS Multi-Unit Residential Development Address Block 23 Section 61 Wedge Crescent, TURNER Drawing Sections 2 Project

This drawing published 1/16/2013 10:52 AM

ISSUED FOR CONSTRUCTION WASTE ENCLOSURE & GROUND LEVELS ALTERED, FIRESTOP PLASTERBOARD NOTED TO LOADBEARING WALLS, TIMBER STUDS, SHAFTS DELETED AND STAIR MOVED AWNING ROOF AT SECOND LEVEL OMMITTED SECOND FLOOR PERGOLA EAVES DETAIL CHANGED - DA AMENDMENT NOTE 4

Scale

Drawn

As Shown Date

GG

Checked

DC

1/16/2013

Project No.

10-400

Drawing No.

A 18

Issue

D


TYVEC 'HOMEWRAP' SARKING FLEXIBLE SEALANT TO MATCH GROUT COLOUR

COLORBOND ROOFING ON 50mm ANTICON BLANKET ON ROOF STRUCTURE TO ENGINEERS DETAIL

WEEPHOLES EVERY 3rd PERPEND COLORBOND FLASHINGS

PROPRIETARY GLAZED BALUSTRADE SYSTEM TYVEC 'HOMEWRAP' SARKING

STEEL CHANNEL EDGE BEAM TO ENGINEERS DETAIL

FALL

200

COLORBOND CLADDING

ENDS OF PANS TURNED UP

100

ALCOR FLASHING

50 300

75

COLORBOND FLASHING COLORBOND FLASHING COLORBOND FASCIA

BRICKWORK COLORBOND ROOFING ON 50 MM ANTICON BLANKET ON STRUCTURE TO ENG DETAIL

13 MM 'IMPACTCHECK' PLASTERBOARD WALL LININGS ON 28 MM STEEL FURRING CHANNELS WITH POLYESTER ACOUSTIC INSULATION BLANKET

FC SOFFIT FC SOFFIT

PAINTABLE SEALANT BEAD

TOP CHORD OF TRUSSES TO MANUFACTURERS DETAIL BRICKWORK

200 MM 'DINCEL' CONCRETE PARTY WALL 110 50 90 GALVANISED SHELF ANGLE TO ENG DETAIL

Roof Upper Edge Detail

4

Balcony Edge Detail

7

1:10

Wall Section Detail

10

1:10

1:10

PLASTERBOARD CEILING

13 MM 'IMPACTCHECK' PLASTERBOARD WALL LININGS ON 28 MM STEEL FURRING CHANNELS WITH POLYESTER ACOUSTIC INSULATION BLANKET

250 110 50 90

VERTICAL CORRUGATED COLORBOND CLADDING ON SARKING ON TOP HAT BATTENS

4

ALCOR FLASHING

CERAMIC TILES WITH FALL AWAY FROM BUILDING

1:10 COLORBOND APRON FLASHING ENDS OF PANS TURNED UP

200

3mm FOLDED ALUMINIUM ROOF SHEET

FIRE CAULKING

FC BULKHEAD

FC SOFFIT

30 X 12 TIMBER BEAD

WEEPHOLES EVERY 3rd PERPEND

20

DINCEL WALL

ALCOR FLASHING

25mm O SPITTER

FC SOFFIT PERGOLA RAFTERS 150 X 50 @ APPROX 450 CTS

GALVANISED AND PAINTED STEEL OR POWDERCOATED ALUMINIUM PERGOLA

HOT-DIP GALVANISED SHELF ANGLE TO ENG DETAIL

13mm PLASTERBOARD SUSPENDED FLUSH CEILINGS WITH MIN R1.5 BATT ACOUSTIC INSULATION TO LOWER STOREY CEILINGS

30 X 12 TIMBER BEAD BRICKWORK 110

FIRE CAULKING

850

5 50

HOT-DIP GALVANISED SHELF ANGLE TO ENGINEERS DETAIL

150 PFC

TYVEC 'HOMEWRAP' SARKING

90

WEEPHOLES EVERY 3rd PERPEND

FORMED CONCRETE SLAB TO ENGINEERS DETAILS WITH MIN 200mm CONCRETE THICKNESS GENERALLY & 40mm SET DOWNS FOR WET AREA TILING (CONCRETE THICKNESS MIN 160mm UNDER WET AREA SET DOWNS)

FALL

BRICKWORK

TYVEC 'HOMEWRAP' SARKING

BRICKWORK

WEEPHOLES

Wall Section Detail

1

PLASTERBOARD LINING ON 90mm TIMBER STUD FRAMING WITH MIN R2.5 BATT INSULATION

TYVEC 'HOMEWRAP' SARKING

50 90

110

250

Wall Section Detail

Wall Section Detail

8

1:10

50 110 50 13 320

Wall Section Detail

11

1:10

13

1:10

110 250

CONCRETE SLAB TO ENGINEERS DETAILS

1:10

BRICKWORK MIN 2 RIBS

COLORBOND FLASHING

CERAMIC TILES

TYVEC 'HOMEWRAP' SARKING

110mm DINCEL WALL

COLORBOND FASCIA

WEEPHOLES EVERY 3rd PERPEND

FALL FC SOFFIT ACRYLIC TEXTURE FINISH

OUTRIGGERS

50 X 50 COLORBOND ANGLE TRIM

ALL WALL INSULATION TO EXTEND TO UNDERSIDE OF SLAB ABOVE

STRIP PLASTIC FACE OFF DINCEL WALL TO PROVIDE SUITABLE BONDING SURFACE WHEREVER RENDERED OR APPLIED FINISH REQUIRED

3

Rear Podium Edge Detail 1:10

General Notes All measurements are in millimetres Figured dimensions take precedence over scaled dimensions Contractor to verify all dimensions on site and seek instructions before proceeding if any discrepancies are found

30 X 12 TIMBER BEAD

TIMBER STUD WALL FRAMING

6

15 200mm DINCEL WALL

TIMBER STUD FRAME

COLORBOND CLADDING WITH VERTICAL RIBS

200

STEEL TOP-HATS

FLUSH JOINTED FIBRE CEMENT BOARD CLADDING (BLUE BOARD OR SIMILAR) WITH APPLIED TEXTURE FINISH

Wall Section Detail

9

1:10

Amendments

N

TYVEC 'HOMEWRAP' SARKING

FLUSH PLASTERBOARD CEILING WITH BATT ACOUSTIC / THERMAL INSULATION - REFER TO TYPICAL WALL SECTIONS

70

TRUSSES TO MANUFACTURERS DETAIL

FC SOFFIT INSULATION NOT REQUIRED ON BAND BEAMS OR UNDER EXTERIOR AREAS

13mm 'IMPACTCHECK' PLASTERBOARD

75

Brick Veneer Wall Section Detail

COLORBOND ROOFING ON 50 MM ANTICON BLANKET

75

2

ALUMINIUM SLIDING DOOR WITH SUBSILL (NOTE: RECESS INTO SLAB EDGE TO FORM FLUSH THRESHOLD FOR WHEELCHAIR ACCESS AT GROUND FLOOR ADAPTABLE UNITS)

Roof Eaves Detail

Wall Section Detail

12

1:10

1:10

19.07.11 12.09.11

ISSUED FOR CONSTRUCTION STUDS CHANGED TO TIMBER, FIRESTOP PLASTERBOARD NOTED TO LOADBEARING WALLS

C

12.12.12

D

16.01.13

AWNING ROOF OMMITTED

Architecture

Planning

Interiors

SECOND FLOOR PERGOLA EAVES DETAIL CHANGED - DA AMENDMENT NOTE 4

Unit 9 Level 1 National Press Club Building Barton ACT 2600 T +61 2 6273 1003

/ 1 6 National Circuit F +61 2 6273 1005

Primary Nominee: David Clarke ACT Reg. No. 935 NSW Reg. 6904 ABN 79 721 296 847 Rev

Date

Description

DHCS Multi-Unit Residential Development Address Block 23 Section 61 Wedge Crescent, TURNER Drawing Construction Details 2 Project

This drawing published 1/16/2013 10:55 AM

A B

Scale

Drawn

As Shown Date

GG

Checked

DC

1/16/2013

Project No.

10-400

Drawing No.

A 24

Issue

D


COLORBOND 'KLIPLOCK' OR SIMILAR ROOFING

Face brickwork Austral "Asphalt"

Colorbond "Woodland Grey" roofing and roller door

Face brickwork Austral "Asphalt"

Colorbond "Woodland Grey" fascia

COLORBOND GUTTER REFER TO ROOF PLAN

Powdercoated aluminium slats 70 mm slats with 30 mm gaps Dulux "Azure Grey Satin"

Applied finish Dulux"Crust"

STEEL PURLINS TO ENG DETAIL

COLORBOND FLASHING

COLORBOND FASCIA

4째 ROOF PITCH

STEEL FRAMED BULKHEAD WITH 'BLUEBOARD' FC CLADDING

HEADER COURSE

FFL

300

2,100

940 FFL

DP

1,200

2,400 FFL

ROLLER DOOR DRUM

FFL

VOID OVER BASEMENT

Waste Enclosure A - SW Elevation

1

Steel post

Waste Enclosure A - NE Elevation

2

1:100

Waste Enclosure A - NW Elevation

3

1:100

4

1:100

Waste Enclosure A - SE Elevation 1:100 BRICKWORK

Face brickwork Austral "Asphalt"

Colorbond "Woodland Grey" roofing and roller door

Face brickwork Austral "Asphalt"

COLORBOND DOWNPIPE REFER TO ROOF PLAN

Face brickwork Austral "Asphalt"

2,520

2,100

2,400

COLORBOND ROLLER DOOR

Applied finish Dulux"Crust"

2

CONCRETE SLAB AND FOOTINGS TO ENG DETAIL WITH FALL TO FLOOR WASTE

FALL

FALL

FALL

2,100

2,400

FW

FFL

FFL

FFL

FFL

DP

Waste Enclosure B - S Elevation

5

Powdercoated aluminium slats 70 mm slats with 30 mm gaps Dulux "Azure Grey Satin" 600 600

1,630

1,200

480

1,630

230

1,200

480

Header course

Waste Enclosure B - E Elevation

Waste Enclosure Section

9

1:100

1:20

2

Gate and side panel from powdercoated aluminium slats - 70 mm slats with 30 mm gaps Dulux "Azure Grey Satin" 600

1,630

230

600

600

1,500

1,000

500

Header course

Header course

1,500

900 600

1,500

Header course

1,630

8

1:100

Cement Render Dulux "Pearl Ash Quarter"

4,200 230

Waste Enclosure B - W Elevation

7

1:100

Face brickwork Austral "Asphalt"

4,200

230

Waste Enclosure B - N Elevation

6

1:100

FFL

FFL

Courtyard Wall Front Elevation

10

11

1:50

Courtyard Wall Side Elevation 1:50

172 (2 x BRICK COURSES)

POWDERCOATED ALUMINIUM SLATTED PANEL 1,430

350

REINFORCED CONCRETE CAPPING SLAB PROPRIETARY ALUMINIUM LETTERBOXES TO SELECTION

LETTERBOXES

BRICKWORK 700

1,200

FACE BRICKWORK FFL

350

400 100

CEMENT RENDER WITH GAL EXANGLES AND EDGE BEADS

428

600

1,500

900

230

TEXTURE FINISH

CEMENT RENDER WITH GAL EXANGLES TO CORNERS

FOOTING TO ENG DETAIL FOOTING TO ENG DETAIL

Front Elevation

12

Courtyard Wall Section 1:20

General Notes All measurements are in millimetres Figured dimensions take precedence over scaled dimensions Contractor to verify all dimensions on site and seek instructions before proceeding if any discrepancies are found

13

Side Elevation

Section

Letterbox Details 1:20 Amendments

N

A B C D

26.07.11 12.09.11 18.12.12 16.01.13

Architecture

Planning

Interiors

Unit 9 Level 1 National Press Club Building Barton ACT 2600 T +61 2 6273 1003

/ 1 6 National Circuit F +61 2 6273 1005

Primary Nominee: David Clarke ACT Reg. No. 935 NSW Reg. 6904 ABN 79 721 296 847 Rev

Date

Description

DHCS Multi-Unit Residential Development Address Block 23 Section 61 Wedge Crescent, TURNER Drawing Waste Enclosure and Miscellaneous Details Project

This drawing published 1/16/2013 10:57 AM

ISSUED FOR CONSTRUCTION WASTE ENCLOSURE AND GROUND LEVELS ALTERED WASTE ENCLOSURE AMENDED DA AMENDMENT NOTE ADDED

Scale

Drawn

As Shown Date

GG

Checked

DC

1/16/2013

Project No.

10-400

Drawing No.

A 25

Issue

D


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.