Por Clem t f o ensH lio olzh uber
Clemens Holzhuber Dec. 10th 1987, Vienna
clemens@holzhuber.at +43 699 182 00 888 clemens.holzhuber.at
Curriculum Vitae 2014
Master Degree in Architecture (DI) University of Technology, TU Vienna
2012
Exchange Semester in Stockholm Royal Institute of Technology KTH
July 2011 2011
since 2008
Software Languages Interests
Visiting School Singapore Architectural Assosiation AA London Exchange Semester in Nanjing, China South East University SEU several Internships B+M Architects Frank + Partner Vogelauer Architects ArchiCAD, AutoCAD, Rhino, Sketch Up Adobe Photoshop, Illustrator, InDesign German, English, Italian Traveling, Sailing (Skipper), Skiing (Instructor), Tennis, Golf, Piano
architecture moves everybody some concious, many unconcious, some more, other even more architecture affects everyone everyone affects architecture architecture affects culture culture affects architecture architecture affects politics politics affect architecture architecture affects nature nature affects architecture architecture affects architecture architecture affects architecture Clemens Holzhuber
Portfolio Architecture A1
Naschquartier
A2
Start Up Office Lisboa
A3
Cemetery Skogskyrkog책rden
A4
Nature Hotel Noarootsi
A5
Der Rahmen
Installations I6
LoosFit Stockholm
I7
Chop Stick Wall Singapore
Interrior / Design D8
Schatzkammer Zwettl
D9
Chess
A1
Naschquartier Vienna Masterthesis 2014 mixedused complex focus on housing focus on public space
The current situation on the location Linke Wienzeile 26-30 shows a poor design. Despite the great location next to Naschmarkt and GumpendorferstraĂ&#x;e the existing park is very unfrequented. This seems to be the result of a two storey office building which does not fit at all and the firewalls of the surrounding buildings. This studies aim is it to show new possibilities for this area and produce one specific design, which corresponds to the surrounding buildings and uses the existing qualities. The proposed concept will enhance the quality of the public space despite the higher density of buildings. The clear-cut geometric draft should fit into the environment and round up the composition of the streetscape. To complete the design there will be detailed relations to the identity of the city of Vienna.
The map from 1770 shows the site outside the city of vienna.
Since then it became part of the inner city and is located in a quite dense neighborehood with very little green spaces.
Nu me rou sne ss mo de ls we re bu ild of ma ny dif fer en t sce nar ios . Th ese sho w the imp act on the his tor ic sur rou ndin g and for m a gre at ba sis for tal ks.
important infill on the Wienzeile
new connection between MariahilferstraĂ&#x;e and Naschmarkt
enhance qualities of the park
As a result of the situational needs and the model analyses of the best construction volumen, the completion of a stand-alone building with strong connections to the surroundings seems to fit perfect for the construction site. The central park can be reached through two entrances from the side and one big opening from the northern side. From both sides, north an south there are big stiars desigend to invite people to ascend to the walkabout on the rooftop.
GSEducationalVersion
s-
m eu us op sh
M e
b ro
e rd
Ga
op
n Ku
Sh
t
po
e std
r ge
La
fé Ca M
op
um
e us
Sh
op
Sh
op
Sh
p
o Sh fé Ca STG 10 / 170 30
tns Ku fé Ca op
Sh
op
Sh
by
b Lo
fé Ca r de
rrä
h Fa
he
c Kü
hrt
fa Zu
ahrt
sg Au
ge
ara
fg Tie
ge
ara
fg Tie
t
ran
tau
s Re
The basement is to be used for shops and cafés who will vivify the central park even more. The most northern part is rised for one level, as a result of the topographie. The southern wing between Naschmarkt and the park will house a new hotel, which functions as a filter.
All stories above are used eighter for apartments in the west and east wing, or offices in the north wing and of course the hotel rooms in the south, which are orientated both sides, to the Naschmarkt and into the park. While the apartments are mainly directed into the park, depending on theire level in the west wing.
GSEducationalVersion
r
a min Se m rau
fĂŠ Ca
en
art
erg
int
W 6 40 0 33
en
art
erg
int
W
CafĂŠ GSEducationalVersion
406 330
Wintergarten
Terrasse
Seminar raum
Exteritority is not architecture. Interitority is not architecture. GSEducationalVersion
Architecture exists in how exteritority and interitority are connected. Sou Fujimoto
On the rooftop there will be a puplic walkaround, which offers places to relax, cafĂŠs, a unique view over Vienna. During night the round will be lighted genlty by indirect lights around the sittig possibilities and along the balustrade.
Appartments in the west wing (left floorplan) vary in their type and orientation depending on the 5 meter wide stairs inside the courtyard. Those situated under the stairs are orentated both sides and partly 2 stories high, while all appertment above are orientaed to the west with private loggias. In the east wing (right floorplan) all appartment are of the same kind and vary only in size. Most of them have their privat loggia or balcony. Due the construction it is easy do change size and function depending on the usage of every floor. Under the great stair wich leads to the walkaround on the roof, there will be a museum located.
View over the park from north to south.
Star Up Office
Lisboa 2012 open space start up office
Portugals actual economic situation forces every year a huge number of very well educated young people to leave their hometown and emigrate to other countries. This of course doesn´t help the portugese problems and the situation gets worse and worse. My concept is to creat a start up office, where this young high motivated people can find a platform to start a business in their own country.
A2
A Site B Bus /Train Station C Ferry Terminal D Entrence to city center E Market hall
The location of the site, close to the city center, but also next to the train station, bus terminals and ferry ports seems to be perfect.
Entwurfstrategie
außen Innen
innen & außen
Innen
außen
innen & außen
Konventionell conventional
shifting border fließende between Grenzeinside zw innen anduoutside außen blending several verschneiden layers mehrerer Hüllen
decrease the verkleinern der cover shell "Deckhülle"
Moderne B端ro - Elemente
To design a new creative office it was important to define some modern office modules as a first step.
How do poeple nowadays work. How is it possible to foster the creative proces with the building or interior.
Schnitt 1 1 - 200 The result is an office complex which is created by intersecting volumes in different size, which generates a high variety in the possibility to use the existing space.
hnitt 2 1 - 200
People can work in groups, on their own in individual boxes, international in conference rooms, build models or prototypes in the workshop, do resaerch in the library and present their ideas in the presentation room. They can also find a cafe and a fitnes center to relax, if a break is needed.
1 1
offener Arbeitsbereich
offener Arbeitsbereich
Tischbo
xen
xen
Tischbo 211 60
offener Arbeitsbereich
Chillbereich
Meetingbereich
211 80
Gaderobe H Tanzraum
Box
Gaderobe D Meetingraum
Video Conference
Bibliotheksturm
211 60
Fitnessstudio
2
2
offener Arbeitsbereich
Chillbereich Meetingraum
Terrasse Box
Terrasse
offener Arbeitsbereich
Box Rutsch
e
Box
Bibliotheksturm
Bibliotheksturm
offener Arbeitsbereich
Bastelraum Dunkelk. Meetingraum
Kopierr.
offener Arbeitsbereich
WC H 70 211
Fotostudio
70 211
211 70
WC D
WC D
schwarz
weiß
Box
Box
Box
offener Arbeitsbereich
WC H
Lokal
Lokal
offener Arbeitsbereich
Rutsch
e
1
1
OG1 - 200
OG2 1 - 200
1
Box Box
Kopierr.
Bastelr. Video Conference offener Arbeitsbereich
n
boxe
Tischbo
xen
Tisch
offener Arbeitsbereich
Box
Box
WC D
Box
offener Arbeitsbereich
WC H E
Box Fahrr
WC D
r
äde
Bibliotheksturm
E
2
WC H
E
Meetingbereich
Müllr.
Tisch
Fahrräde r
offener Arbeitsbereich
A
boxe
Box
Rutsche
n
offener Arbeitsbereich
Lager
Box
Fahrräder
E
Bibliotheksturm
Box
Chillbereich Kopierr.
WC D
E
WC H
Chillbereich
Meetingbereich
2 Bar
Lokal
Fahrräder
E E
WC D
Steg
Bar
Präsentationsr.
Video Conference
Rutsche
Küche
Bibliotheksstiege Lokal offener Arbeitsbereich
WC H
The Nature Hotel
Noarootsi building and landscape design 2012 hotel spa restaurant
The Nature Hotel is designed for people who want to enjoy a few days on the great beauty spot on the Ramsi coast in Noarootsi. People who want to slow down and relax solitary with the nature. The concept is simple: each room is located on the site to generate the greatest privacy. Every room has eighter its own sauna, or a private wooden hot tub. This depends on the location, whether it is near the sea or in the forest. This enables an exclusive stay for the guests but also an artistic addition to the beautiful landscape. The existing soviet buildings will be renovated gently and used as a cafĂŠ/lounge and check in as well. In the landscape the roomboxes will appear more like an art installation, than a hotel. This is made possible by the small size of each box, as well as by the materiality of corten steel, with is changing with the time and becoming evermore part of the nature.
A3
The main idea is, to give people who live in big cities the possibility to slow down and enjoy the great diversity of the beautiful nature in Ramsi, Noaroosti, Estonia.
The site is located direct at the coast but also next to the pine forest. Guests have to park their car before they enter the forest. To walk the last 1000 meter to the check in is already part of the slow-down idea. All rooms are located and orientated to generate an untouched view into the nature.
The two existing buildings from the time of Sovjet occupation, will be renovated gently and used as reception respectively as cafĂŠ or lounge.
The sauna unit is placed on the beach. It is partly under ground, and lifted up to 1,5 meters over ground. The idea is to appreciate the landscape in sauna and bathroom, and enjoy the quiet during a rest in the room.
Located in the forest is the unit with the hot tub. To generate more privacy it is lifted up in the trees. The room itself is very basic, on it´s rooftop is the private wooden hot tub.
Depending of the location of the room, it will have a wooden hot tub (in the forest),
or a sauna (next to/in the sea) with a private pier to give the possibility of a bath after the sauna.
A4
Skogskyrkog책den, the woodland cementery Stockholm architecture and landscape design 2013 cemetery extension
This site is located at the southern end of Stockholms cemetery Skogskyrkog책rden. Today this area is wasteland. According to the concept, that life goes on and there should always be an entrance and a separate exit, so someone never has to go back, all the existing chapels on the cemetery are designed, but not the cemetery itself. The aim of this projct is to change this and creat an equal exit to the great entrance in the north.
Location of Skogskyrkog책rden in Stockholm
Studio - Clemens Holzhuber
The Continuation
Landscape & Architecture Studio - Clemens Holzhuber
Plans of the four existing chapels
Location of the cementery
Materials
Materials
a new EXIT / ENTRACE for Skogskyrkog책rden
a new CHAPEL in the southern part
creating an open space before the exit
Pavillon & Colonnade for funerals with spraded ahses Diagrams
1.
2.
3.
4.
Plan 1.500
Landscape - Section & Elevation 1.500
The concept is based on four different ideas: A small pavillon in the forest, where people will have the possibility to spread ashes 2. A new chapel, with a special prayer room for muslims 3. The colonnade next to the chapel with the function of the headstone for those whos ashes got spread out 4. The new exit/entrance, which is a bit higher to get a nice overview 1.
00
A
B B
B
A
Roofto Second Floor - Plan 1.200
A-A
Sectio
Ground Floor - Plan 1.200
A
966 200
B Ground Floor - Plan 1.200
A
A
Rooftop - Plan 1.200 B
B
A
Second Floor - Plan 1.200
Rooftop - Plan 1.200
B-B Section A - A 1.200
Section B - B 1.200
A5
Der Rahmen
Wien architecture and urban design 2012 reorganisation public square
It is hard to define the Schwedenplatz of Viennas inner city. On one hand its part of the first district, on the other hand its the gate to the second district. It is one of the most important traffic junctions and therefore more of a crossing area, rather than a square in the proper sense. The aim of this urban concept was to clear this chaotic situation and generate an urban square which is recognized as one. As the result of an quite simple idea is the design rather eclectic: By concentrating the square inside a frame-like structure which shelters all the existing funcions.
KONZEPTlDEE
7
8
A 8
6
1
1
2
5
4
3
ngstrasse Wien 1/10`000
lnventar Schwedenplatz Morzinplatz Each part of the Ringstraße has its own center with some important institution Komposition Ringstrassen-Abschnitte > Mittelachse ersitätsring or building,der on Franz - Josephs - Kai the Schwedenplatz builds the center. Under Abfallcontainer 18x Altglassammlung 2x Kleidersammlung this aspect it plays an even4 more im-/ Opernring Stubenring Kärntnerring 6 Dr.-Karl-Renner-Ring / Universitätsring Abfalldepot Strassenkehrer 11x - Postsparkasse, 1904-06 - Staatsoper, 1861 - Rathaus, 1872 Postdepot portant role as part of the composition - Kriegsministerium, 1909-13 - Burgtheater, 1874 of the Ringstraße. 5 Burgring Parkring / Schubertring -Stadtpark, 1862
Schubertring / Schwarzenbergplatz - Palais Schwarzenberg, 1697-28 - Heldendenkmal der Roten Armee, 1945
- Michaelertrakt, 1889-93 - Neue Hofburg, 1881-1913 - Burgtor, 1821 - Naturhistorisches Museum, 1871 - Kunsthistorisches Museum, 1871 - Ehemalige Hofstallungen, 1725 / Museumsquartier, 1998-2001 - Flakturm Stiskaserne, 1944
Abfallkübel 51x
7
Elektrokasten 17x
Hydrant 2x
Schottenring - Ehemalige Börse, 1871
Werbesäule 11x
Werbetafel 7x
Waage
Telephonzelle 5x
Trinkbrunnen 2x
Fahrradständer 36x
CityBike-Station 20 Fahrräder
Geländer A 18x 2m
Sitzbank A 77x
Sitzbank B 8x
Verkehrsschild 38x
Ampel 20x
Haltestelleschild Bus & Tram 19x
Strassenlampe A 58x
Strassenlampe B 20x
Tramleitungsmast 19x
Inventary list of all existing functions.
Komposition der Ringstrassen-Abschnitte > Mittelachse 1
2 3
4
Stubenring - Postsparkasse, 1904-06 - Kriegsministerium, 1909-13
Parkring / Schubertring -Stadtpark, 1862
KONZEPTlDEE
6 Dr.-Karl-Renner-Ring / Universitätsring A Franz-Josefs-Kai wie die Ringstrasse - Rathaus, 1872 Burgtheater, 1874 Abschluss der lnneren -Stadt
Kärntnerring / Opernring - Staatsoper, 1861
5
Schubertring / Schwarzenbergplatz - Palais Schwarzenberg, 1697-28 - Heldendenkmal der Roten Armee, 1945
Burgring - Michaelertrakt, 1889-93 - Neue Hofburg, 1881-1913 - Burgtor, 1821 - Naturhistorisches Museum, 1871 - Kunsthistorisches Museum, 1871 - Ehemalige Hofstallungen, 1725 / Museumsquartier, 1998-2001 - Flakturm Stiskaserne, 1944
7
Schottenring
88
Bildung einer Mitte des Franz-Josefs-Kais am Schwedenplatz Morzinplatz:
Franz-Josefs-Kais 8 Bildung einer Mitte des - Ehemalige Börse, 1871 A Franz-Josefs-Kai wie die Ringstrasse am Schwedenplatz Morzinplatz: Abschluss der lnneren Stadt
A
8
- Schaffung eines Platzes - Fassen des Raumes
lnventar Schwedenplatz Morzinplatz
- Schaffung eines Platzes Denkmal an die Opfer des Faschismus
Abfallcontainer 18x
Altglassammlung 2x
Kleidersammlung
Abfalldepot Strassenkehrer 11x
Postdepot
Abfallkübel 51x
Elektrokasten 17x
Hydrant 2x
Werbesäule 11x
Werbetafel 7x
Waage
Telephonzelle 5x
Trinkbrunnen 2x
Fahrradständer 36x
CityBike-Station 20 Fahrräder
Geländer A 18x 2m
- Fassen des Raumes Tankstelle
Einfahrt Tiefgarage
Ausfahrt Tiefgarage
Auf-/Abgang Tiefgarage 3x
Ein-/Ausgang U-Bahn
Ein-/Ausgang U-Bahn / Imbissbude 5x
Imbissbude 3x
Haltestelle Bus 3x / Tram 2x
Geländer B 4x 18m
Lüung Tiefgarage 6x
Lüung U-Bahn 2x Sitzbank A 77x
Sitzbank B 8x
Verkehrsschild 38x
Ampel 20x
Strassenlampe A 58x
Strassenlampe B 20x
Haltestelleschild Bus & Tram 19x
Tramleitungsmast 19x
Varianten Entwurf Denkmal an die Opfer des Faschismus
Tankstelle
Entwurf nach dem Ringstrassen-Wettbewerb 1858 1/10`000 aus: Die Preisgekrönten Entwürfe zur Erweiterung der Inneren Stadt Wien, 1859
Einfahrt Tiefgarage
Ausfahrt Tiefgarage
Auf-/Abgang Tiefgarage 3x
Ein-/Ausgang U-Bahn
Ein-/Ausgang U-Bahn / Imbissbude 5x
Imbissbude 3x
Haltestelle Bus 3x / Tram 2x
Geländer B 4x 18m
Lüung Tiefgarage 6x
Lüung U-Bahn 2x
& Tram 19x
x
Baum 95x
Baum 95x
ol la nd st ra ss e H
ai -K fs se Jo zan Fr
e ck rü rb to z l Sa
DER RAHMEN
Ta bo rs tr as se
Ta bo rs tr as se
D B A C
ot en tu rm
B
F ranz- J osefs- K a i
F ranz- J osefs- K a i
R
ot en tu rm
B
C
F ranz- J osefs- K a i
R
C
A
B
st ra ss e
ot en tu rm R
A
e ss
a
u
e ss
Sch we den brü cke
a
u
a tr
st ra ss e
M
-A rc
S lre
M
-A rc
a tr
Sch we den brü cke
C
e ck rü rb to lz Sa
S lre
Bezug zum Donaukanal
e ck rü rb to lz Sa
Sch we den brü cke
ol la nd st ra ss e
A
H
e ss
st ra ss e
u
a tr
ai -K fs se Jo zan Fr
ai -K fs se Jo zan Fr
M
a
-A rc
S lre
H
ol la n
ds Ta tr as bo se rs tr as se
DER RAHMEN
Der Säulengang S tefansD om
S tefansD om
S tefansD om
C
Situation 1/2`000
0
B B
A
Situation 1/2`000
0
A
100 m
B
N
A Ruprechtskirche
0
A
Der Rahmen Einfassung Platz und Donaukanal
B
Schwedenplatz 95 Bäume / Schwedenbrücke / Tor zum 2. Bezirk
B
Schwedenplatz 95 Bäume / Schwedenbrücke / Tor zum 2. Bezirk
C
Der kleine Rahmen Anlegestelle TwinCityLiner
A
232 m 60 S.
B
Der Rahmen Einfassung Platz und Donaukanal
Situation 1/2`000
145 m 38 S.
258 m 68 S.
B B
A m 100
B
N
B
- umlaufender Rundgang
- halb lnnenraum / halb Ausse
Bezug zum Donaukanal
A
Entfernung Marienbrücke
B
`Brückenkopf ` Marienbrücke
C
Näherrücken Platzkante an den Kanal
D
Verbreiterung Kai auf der Sonnenseite
uerschnitt 1/500
Mögliche Verbindung des unteren und oberen Lokals
Auf- / Abgang
D
D B A
C Auf-/Abgang
A
Auf-/Abgang
A
Der Säulengang
Auf-/Abgang
A
A
grosse Öffnungen
B
kleine Durchgänge
C
Brücken über den Donaukanal
Schiffanlegestelle TwinCityLiner 3 Fenster
C
Umfang Innen: 755 m 197 Säulen
B
A
A
L
Bahn steig U
B
A 145 m Anpassung B 38 S. U-Bahnstation U1 / U4
232 m 60 S.
4
A B
B with two pedestrian bridges is both, an important link between the 1st The closed roundwalk B and the 2nd district, and the missign link to the Donaukanal, which suddenly becoomes part of the sqare. 120 m A 258 m Ruprechtskirche
68 S.
B B
C
31 S.
A
Abgang Kanal
A Abgang Kanal
A
l l
Haltestelle Strassenbahn
l
l
Sitzbank
Abgang Tiefgarage
Infrastruktur Platz
Haltestelle Strassenbahn
A
l
Sitzbank
Lokal / Geschä� Pro Einheit 20m2
A
Abgang Tiefgarage Brunnen
l
A
Abgang Tiefgarage
l Taxistand
A Abgang U-Bahn
Abgang Kanal
A
l
l
A
Haltestelle Strassenbahn
A
Abgang Kanal
Abgang Kanal / Schiff / U-Bahn
Haltestelle Strassenbahn
A
Abgang U-Bahn
l L Li U-Bahn
95 Bäume
197 S채ulen
Steppengras
1.50 m
5.00 m
3.00 m
3.50 m
5.00 m
St체tze 0.40 x 0.40 m
8.00 m
Schnitt / Ansicht Rahmen 1/100
Kante Platz / Donaukanal
10.00 m
4.60 m
U-Bahn Linie 4
Neue Raumschicht 6.20 m
Kai 8.00 m
Donaukanal
Schnitt Kante 1/100
I6
Loose Fit
Stockholm architectural technology 2012
Digital fabrication essentially allows architects to explore how geometry can interface with matter through machinic processes. It deals with the actual production of assemblies, objects and material finishes as a mode of design. This seminar engages in the design and construction of a full-scale installation as well as in the practice, history and discourse of digital fabrication. It focuses on a specific material that is not commonly associated with digital fabrication: Textile. Textile surfaces in architecture typically wrap an inner mass and require the support of an armature. The installation exploits the loose fit and between two material systems - soft textile and rigid armature. This involves transitions from design work guided by geometric precision to less controlled modes of working that rely on the live manipulation of material. Ultimately, a loose fit is characterized by the use of an excessive amount - rather than a minimum - of material in the production of thickened surfaces as well as layered spaces.
Scale 1:3 KTH Royal Institute of Technology, School of Architecture, Stockholm Graduate elective seminar - Fall 2012
Drawings|
LOOSE FiT
Armature: CNC-cut 12 mm MDF The great amount of different joints allows a maximum of variety in fixing the surface
LOOSE FiT
JOiNTS & FiNiSH
30 cm
30 cm
JOiNT CHALLENGES - Create interesting effects on the surface. - Strength within the joint to carry the surface load. - A visible joint needs to be a nice looking joint. - Connection to the armature according to function and design. - Keeping the foam rubber sheet intact to maintain strength in material. - Design goes hand in hand with material properties of MDF and foam rubber.
-up 3 | Tests with different linear density points
-up 4 | Tests with different random density points
Mock-up 5 | Testing with possible joints & armature
Mock-up 6 | Tests with painting the surface
Surface: 8000 x 3600 x 15 mm foam rubber
oyal Institute of Technology, School of Architecture, Stockholm ate elective seminar - Fall 2012
2555.09
tion | General idea what the installation might look like
3665.59
I7
Chopsticks
Singapore AA Workshop 2011
Within the contrived urban setting of Singapore the AA visiting workshop will investigate surplus as a shift in design strategy. Linking multiple scales, from the individual to the supply chain, and looking at how the excessive availability of goods has transformed needs into excess, we will generate new forms and uses emerging from ordinary mass-production. Looking at the reversed engineering of everyday life will ultimately reveal this link with the global as a web of relations contained in our hand.
DEVELOPMENTDEVELOPMENT
DEVELOPMENT
AA
AA
BB
BB
CONTROL - HEIGHT - SPREAD AREA - VERTICAL CURVATURE
Schatzkammer Zwettl
Zwettl Exibition design 2011
The Austrian monastery Zwettl was looking for new possibilities to present their valuable treasures. Therefore they offered two small rooms inside the historic building of the diocese.
D8
The well thought-out design allows the most possible space for visitors. Both of the small rooms offer enough space to enjoy the exhibits, as well as walk around or take a rest on the benches inside the bays.
The materiality of the showcases is carefully chosen to even enhance the brilliance of each exhibit. Showcase: Beton Cire Floor: local Oak Wood Light: indirect from the bottom
D9
Chess
2013
Chess, the most eminent board game, in classic design, puristic, sober. The materiality concrete and wood, makes the very special surface feel of figures and board as well. Every single piece is hand made, thus unique. Inbuild magnets ensure an even better foothold. For more information and pictures check: http://clemens.holzhuber.at/Chess.htmlt
Chess is no game, chess is strategy.
Chess is imagination and creativity.
Contact
DI Clemens Holzhuber clemens@holzhuber.at +43 699 182 00 888 clemens.holzhuber.at
clemens@holzhuber.at
+43 699 182 00 888
clemens.holzhuber.at
All content and design and layout are protected by copyright of Clemes Holzhuber.