Architecture Portfolio Clemens Holzhuber

Page 1

Por Clem t f o ensH lio olzh uber


Clemens Holzhuber Dec. 10th 1987, Vienna

clemens@holzhuber.at +43 699 182 00 888 clemens.holzhuber.at


Curriculum Vitae 2014

Master Degree in Architecture (DI) University of Technology, TU Vienna

2012

Exchange Semester in Stockholm Royal Institute of Technology KTH

July 2011 2011

since 2008

Software Languages Interests

Visiting School Singapore Architectural Assosiation AA London Exchange Semester in Nanjing, China South East University SEU several Internships B+M Architects Frank + Partner Vogelauer Architects ArchiCAD, AutoCAD, Rhino, Sketch Up Adobe Photoshop, Illustrator, InDesign German, English, Italian Traveling, Sailing (Skipper), Skiing (Instructor), Tennis, Golf, Piano


architecture moves everybody some concious, many unconcious, some more, other even more architecture affects everyone everyone affects architecture architecture affects culture culture affects architecture architecture affects politics politics affect architecture architecture affects nature nature affects architecture architecture affects architecture architecture affects architecture Clemens Holzhuber


Portfolio Architecture A1

Naschquartier

A2

Start Up Office Lisboa

A3

Cemetery Skogskyrkog책rden

A4

Nature Hotel Noarootsi

A5

Der Rahmen

Installations I6

LoosFit Stockholm

I7

Chop Stick Wall Singapore

Interrior / Design D8

Schatzkammer Zwettl

D9

Chess



A1

Naschquartier Vienna Masterthesis 2014 mixedused complex focus on housing focus on public space

The current situation on the location Linke Wienzeile 26-30 shows a poor design. Despite the great location next to Naschmarkt and GumpendorferstraĂ&#x;e the existing park is very unfrequented. This seems to be the result of a two storey office building which does not fit at all and the firewalls of the surrounding buildings. This studies aim is it to show new possibilities for this area and produce one specific design, which corresponds to the surrounding buildings and uses the existing qualities. The proposed concept will enhance the quality of the public space despite the higher density of buildings. The clear-cut geometric draft should fit into the environment and round up the composition of the streetscape. To complete the design there will be detailed relations to the identity of the city of Vienna.


The map from 1770 shows the site outside the city of vienna.

Since then it became part of the inner city and is located in a quite dense neighborehood with very little green spaces.


Nu me rou sne ss mo de ls we re bu ild of ma ny dif fer en t sce nar ios . Th ese sho w the imp act on the his tor ic sur rou ndin g and for m a gre at ba sis for tal ks.


important infill on the Wienzeile

new connection between MariahilferstraĂ&#x;e and Naschmarkt

enhance qualities of the park

As a result of the situational needs and the model analyses of the best construction volumen, the completion of a stand-alone building with strong connections to the surroundings seems to fit perfect for the construction site. The central park can be reached through two entrances from the side and one big opening from the northern side. From both sides, north an south there are big stiars desigend to invite people to ascend to the walkabout on the rooftop.


GSEducationalVersion


s-

m eu us op sh

M e

b ro

e rd

Ga

op

n Ku

Sh

t

po

e std

r ge

La

fé Ca M

op

um

e us

Sh

op

Sh

op

Sh

p

o Sh fé Ca STG 10 / 170 30

tns Ku fé Ca op

Sh

op

Sh

by

b Lo

fé Ca r de

rrä

h Fa

he

c Kü

hrt

fa Zu

ahrt

sg Au

ge

ara

fg Tie

ge

ara

fg Tie

t

ran

tau

s Re

The basement is to be used for shops and cafés who will vivify the central park even more. The most northern part is rised for one level, as a result of the topographie. The southern wing between Naschmarkt and the park will house a new hotel, which functions as a filter.


All stories above are used eighter for apartments in the west and east wing, or offices in the north wing and of course the hotel rooms in the south, which are orientated both sides, to the Naschmarkt and into the park. While the apartments are mainly directed into the park, depending on theire level in the west wing.

GSEducationalVersion

r

a min Se m rau

fĂŠ Ca

en

art

erg

int

W 6 40 0 33

en

art

erg

int

W


CafĂŠ GSEducationalVersion

406 330

Wintergarten

Terrasse

Seminar raum

Exteritority is not architecture. Interitority is not architecture. GSEducationalVersion


Architecture exists in how exteritority and interitority are connected. Sou Fujimoto

On the rooftop there will be a puplic walkaround, which offers places to relax, cafĂŠs, a unique view over Vienna. During night the round will be lighted genlty by indirect lights around the sittig possibilities and along the balustrade.



Appartments in the west wing (left floorplan) vary in their type and orientation depending on the 5 meter wide stairs inside the courtyard. Those situated under the stairs are orentated both sides and partly 2 stories high, while all appertment above are orientaed to the west with private loggias. In the east wing (right floorplan) all appartment are of the same kind and vary only in size. Most of them have their privat loggia or balcony. Due the construction it is easy do change size and function depending on the usage of every floor. Under the great stair wich leads to the walkaround on the roof, there will be a museum located.

View over the park from north to south.


Star Up Office

Lisboa 2012 open space start up office

Portugals actual economic situation forces every year a huge number of very well educated young people to leave their hometown and emigrate to other countries. This of course doesn´t help the portugese problems and the situation gets worse and worse. My concept is to creat a start up office, where this young high motivated people can find a platform to start a business in their own country.


A2


A Site B Bus /Train Station C Ferry Terminal D Entrence to city center E Market hall


The location of the site, close to the city center, but also next to the train station, bus terminals and ferry ports seems to be perfect.

Entwurfstrategie

außen Innen

innen & außen

Innen

außen

innen & außen

Konventionell conventional

shifting border fließende between Grenzeinside zw innen anduoutside außen blending several verschneiden layers mehrerer Hüllen

decrease the verkleinern der cover shell "Deckhülle"


Moderne B端ro - Elemente

To design a new creative office it was important to define some modern office modules as a first step.


How do poeple nowadays work. How is it possible to foster the creative proces with the building or interior.

Schnitt 1 1 - 200 The result is an office complex which is created by intersecting volumes in different size, which generates a high variety in the possibility to use the existing space.


hnitt 2 1 - 200

People can work in groups, on their own in individual boxes, international in conference rooms, build models or prototypes in the workshop, do resaerch in the library and present their ideas in the presentation room. They can also find a cafe and a fitnes center to relax, if a break is needed.


1 1

offener Arbeitsbereich

offener Arbeitsbereich

Tischbo

xen

xen

Tischbo 211 60

offener Arbeitsbereich

Chillbereich

Meetingbereich

211 80

Gaderobe H Tanzraum

Box

Gaderobe D Meetingraum

Video Conference

Bibliotheksturm

211 60

Fitnessstudio

2

2

offener Arbeitsbereich

Chillbereich Meetingraum

Terrasse Box

Terrasse

offener Arbeitsbereich

Box Rutsch

e

Box

Bibliotheksturm

Bibliotheksturm

offener Arbeitsbereich

Bastelraum Dunkelk. Meetingraum

Kopierr.

offener Arbeitsbereich

WC H 70 211

Fotostudio

70 211

211 70

WC D

WC D

schwarz

weiß

Box

Box

Box

offener Arbeitsbereich

WC H

Lokal

Lokal

offener Arbeitsbereich

Rutsch

e

1

1

OG1 - 200

OG2 1 - 200

1

Box Box

Kopierr.

Bastelr. Video Conference offener Arbeitsbereich

n

boxe

Tischbo

xen

Tisch

offener Arbeitsbereich

Box

Box

WC D

Box

offener Arbeitsbereich

WC H E

Box Fahrr

WC D

r

äde

Bibliotheksturm

E

2

WC H

E

Meetingbereich

Müllr.

Tisch

Fahrräde r

offener Arbeitsbereich

A

boxe

Box

Rutsche

n

offener Arbeitsbereich

Lager

Box

Fahrräder

E

Bibliotheksturm

Box

Chillbereich Kopierr.

WC D

E

WC H

Chillbereich

Meetingbereich

2 Bar

Lokal

Fahrräder

E E

WC D

Steg

Bar

Präsentationsr.

Video Conference

Rutsche

Küche

Bibliotheksstiege Lokal offener Arbeitsbereich

WC H


The Nature Hotel

Noarootsi building and landscape design 2012 hotel spa restaurant

The Nature Hotel is designed for people who want to enjoy a few days on the great beauty spot on the Ramsi coast in Noarootsi. People who want to slow down and relax solitary with the nature. The concept is simple: each room is located on the site to generate the greatest privacy. Every room has eighter its own sauna, or a private wooden hot tub. This depends on the location, whether it is near the sea or in the forest. This enables an exclusive stay for the guests but also an artistic addition to the beautiful landscape. The existing soviet buildings will be renovated gently and used as a cafĂŠ/lounge and check in as well. In the landscape the roomboxes will appear more like an art installation, than a hotel. This is made possible by the small size of each box, as well as by the materiality of corten steel, with is changing with the time and becoming evermore part of the nature.


A3


The main idea is, to give people who live in big cities the possibility to slow down and enjoy the great diversity of the beautiful nature in Ramsi, Noaroosti, Estonia.


The site is located direct at the coast but also next to the pine forest. Guests have to park their car before they enter the forest. To walk the last 1000 meter to the check in is already part of the slow-down idea. All rooms are located and orientated to generate an untouched view into the nature.


The two existing buildings from the time of Sovjet occupation, will be renovated gently and used as reception respectively as cafĂŠ or lounge.


The sauna unit is placed on the beach. It is partly under ground, and lifted up to 1,5 meters over ground. The idea is to appreciate the landscape in sauna and bathroom, and enjoy the quiet during a rest in the room.

Located in the forest is the unit with the hot tub. To generate more privacy it is lifted up in the trees. The room itself is very basic, on it´s rooftop is the private wooden hot tub.


Depending of the location of the room, it will have a wooden hot tub (in the forest),


or a sauna (next to/in the sea) with a private pier to give the possibility of a bath after the sauna.



A4

Skogskyrkog책den, the woodland cementery Stockholm architecture and landscape design 2013 cemetery extension

This site is located at the southern end of Stockholms cemetery Skogskyrkog책rden. Today this area is wasteland. According to the concept, that life goes on and there should always be an entrance and a separate exit, so someone never has to go back, all the existing chapels on the cemetery are designed, but not the cemetery itself. The aim of this projct is to change this and creat an equal exit to the great entrance in the north.


Location of Skogskyrkog책rden in Stockholm


Studio - Clemens Holzhuber

The Continuation

Landscape & Architecture Studio - Clemens Holzhuber

Plans of the four existing chapels

Location of the cementery

Materials

Materials

a new EXIT / ENTRACE for Skogskyrkog책rden

a new CHAPEL in the southern part

creating an open space before the exit

Pavillon & Colonnade for funerals with spraded ahses Diagrams


1.

2.

3.

4.

Plan 1.500

Landscape - Section & Elevation 1.500


The concept is based on four different ideas: A small pavillon in the forest, where people will have the possibility to spread ashes 2. A new chapel, with a special prayer room for muslims 3. The colonnade next to the chapel with the function of the headstone for those whos ashes got spread out 4. The new exit/entrance, which is a bit higher to get a nice overview 1.


00

A

B B

B

A

Roofto Second Floor - Plan 1.200

A-A

Sectio


Ground Floor - Plan 1.200

A

966 200

B Ground Floor - Plan 1.200

A

A

Rooftop - Plan 1.200 B

B

A

Second Floor - Plan 1.200

Rooftop - Plan 1.200

B-B Section A - A 1.200

Section B - B 1.200



A5

Der Rahmen

Wien architecture and urban design 2012 reorganisation public square

It is hard to define the Schwedenplatz of Viennas inner city. On one hand its part of the first district, on the other hand its the gate to the second district. It is one of the most important traffic junctions and therefore more of a crossing area, rather than a square in the proper sense. The aim of this urban concept was to clear this chaotic situation and generate an urban square which is recognized as one. As the result of an quite simple idea is the design rather eclectic: By concentrating the square inside a frame-like structure which shelters all the existing funcions.


KONZEPTlDEE

7

8

A 8

6

1

1

2

5

4

3

ngstrasse Wien 1/10`000

lnventar Schwedenplatz Morzinplatz Each part of the Ringstraße has its own center with some important institution Komposition Ringstrassen-Abschnitte > Mittelachse ersitätsring or building,der on Franz - Josephs - Kai the Schwedenplatz builds the center. Under Abfallcontainer 18x Altglassammlung 2x Kleidersammlung this aspect it plays an even4 more im-/ Opernring Stubenring Kärntnerring 6 Dr.-Karl-Renner-Ring / Universitätsring Abfalldepot Strassenkehrer 11x - Postsparkasse, 1904-06 - Staatsoper, 1861 - Rathaus, 1872 Postdepot portant role as part of the composition - Kriegsministerium, 1909-13 - Burgtheater, 1874 of the Ringstraße. 5 Burgring Parkring / Schubertring -Stadtpark, 1862

Schubertring / Schwarzenbergplatz - Palais Schwarzenberg, 1697-28 - Heldendenkmal der Roten Armee, 1945

- Michaelertrakt, 1889-93 - Neue Hofburg, 1881-1913 - Burgtor, 1821 - Naturhistorisches Museum, 1871 - Kunsthistorisches Museum, 1871 - Ehemalige Hofstallungen, 1725 / Museumsquartier, 1998-2001 - Flakturm Stiskaserne, 1944

Abfallkübel 51x

7

Elektrokasten 17x

Hydrant 2x

Schottenring - Ehemalige Börse, 1871

Werbesäule 11x

Werbetafel 7x

Waage

Telephonzelle 5x

Trinkbrunnen 2x

Fahrradständer 36x

CityBike-Station 20 Fahrräder

Geländer A 18x 2m

Sitzbank A 77x

Sitzbank B 8x

Verkehrsschild 38x

Ampel 20x

Haltestelleschild Bus & Tram 19x

Strassenlampe A 58x

Strassenlampe B 20x

Tramleitungsmast 19x

Inventary list of all existing functions.


Komposition der Ringstrassen-Abschnitte > Mittelachse 1

2 3

4

Stubenring - Postsparkasse, 1904-06 - Kriegsministerium, 1909-13

Parkring / Schubertring -Stadtpark, 1862

KONZEPTlDEE

6 Dr.-Karl-Renner-Ring / Universitätsring A Franz-Josefs-Kai wie die Ringstrasse - Rathaus, 1872 Burgtheater, 1874 Abschluss der lnneren -Stadt

Kärntnerring / Opernring - Staatsoper, 1861

5

Schubertring / Schwarzenbergplatz - Palais Schwarzenberg, 1697-28 - Heldendenkmal der Roten Armee, 1945

Burgring - Michaelertrakt, 1889-93 - Neue Hofburg, 1881-1913 - Burgtor, 1821 - Naturhistorisches Museum, 1871 - Kunsthistorisches Museum, 1871 - Ehemalige Hofstallungen, 1725 / Museumsquartier, 1998-2001 - Flakturm Stiskaserne, 1944

7

Schottenring

88

Bildung einer Mitte des Franz-Josefs-Kais am Schwedenplatz Morzinplatz:

Franz-Josefs-Kais 8 Bildung einer Mitte des - Ehemalige Börse, 1871 A Franz-Josefs-Kai wie die Ringstrasse am Schwedenplatz Morzinplatz: Abschluss der lnneren Stadt

A

8

- Schaffung eines Platzes - Fassen des Raumes

lnventar Schwedenplatz Morzinplatz

- Schaffung eines Platzes Denkmal an die Opfer des Faschismus

Abfallcontainer 18x

Altglassammlung 2x

Kleidersammlung

Abfalldepot Strassenkehrer 11x

Postdepot

Abfallkübel 51x

Elektrokasten 17x

Hydrant 2x

Werbesäule 11x

Werbetafel 7x

Waage

Telephonzelle 5x

Trinkbrunnen 2x

Fahrradständer 36x

CityBike-Station 20 Fahrräder

Geländer A 18x 2m

- Fassen des Raumes Tankstelle

Einfahrt Tiefgarage

Ausfahrt Tiefgarage

Auf-/Abgang Tiefgarage 3x

Ein-/Ausgang U-Bahn

Ein-/Ausgang U-Bahn / Imbissbude 5x

Imbissbude 3x

Haltestelle Bus 3x / Tram 2x

Geländer B 4x 18m

Lüung Tiefgarage 6x

Lüung U-Bahn 2x Sitzbank A 77x

Sitzbank B 8x

Verkehrsschild 38x

Ampel 20x

Strassenlampe A 58x

Strassenlampe B 20x

Haltestelleschild Bus & Tram 19x

Tramleitungsmast 19x

Varianten Entwurf Denkmal an die Opfer des Faschismus

Tankstelle

Entwurf nach dem Ringstrassen-Wettbewerb 1858 1/10`000 aus: Die Preisgekrönten Entwürfe zur Erweiterung der Inneren Stadt Wien, 1859

Einfahrt Tiefgarage

Ausfahrt Tiefgarage

Auf-/Abgang Tiefgarage 3x

Ein-/Ausgang U-Bahn

Ein-/Ausgang U-Bahn / Imbissbude 5x

Imbissbude 3x

Haltestelle Bus 3x / Tram 2x

Geländer B 4x 18m

Lüung Tiefgarage 6x

Lüung U-Bahn 2x

& Tram 19x

x

Baum 95x

Baum 95x


ol la nd st ra ss e H

ai -K fs se Jo zan Fr

e ck rü rb to z l Sa

DER RAHMEN

Ta bo rs tr as se

Ta bo rs tr as se

D B A C

ot en tu rm

B

F ranz- J osefs- K a i

F ranz- J osefs- K a i

R

ot en tu rm

B

C

F ranz- J osefs- K a i

R

C

A

B

st ra ss e

ot en tu rm R

A

e ss

a

u

e ss

Sch we den brü cke

a

u

a tr

st ra ss e

M

-A rc

S lre

M

-A rc

a tr

Sch we den brü cke

C

e ck rü rb to lz Sa

S lre

Bezug zum Donaukanal

e ck rü rb to lz Sa

Sch we den brü cke

ol la nd st ra ss e

A

H

e ss

st ra ss e

u

a tr

ai -K fs se Jo zan Fr

ai -K fs se Jo zan Fr

M

a

-A rc

S lre

H

ol la n

ds Ta tr as bo se rs tr as se

DER RAHMEN

Der Säulengang S tefansD om

S tefansD om

S tefansD om

C

Situation 1/2`000

0

B B

A

Situation 1/2`000

0

A

100 m

B

N

A Ruprechtskirche

0

A

Der Rahmen Einfassung Platz und Donaukanal

B

Schwedenplatz 95 Bäume / Schwedenbrücke / Tor zum 2. Bezirk

B

Schwedenplatz 95 Bäume / Schwedenbrücke / Tor zum 2. Bezirk

C

Der kleine Rahmen Anlegestelle TwinCityLiner

A

232 m 60 S.

B

Der Rahmen Einfassung Platz und Donaukanal

Situation 1/2`000

145 m 38 S.

258 m 68 S.

B B

A m 100

B

N

B

- umlaufender Rundgang

- halb lnnenraum / halb Ausse


Bezug zum Donaukanal

A

Entfernung Marienbrücke

B

`Brückenkopf ` Marienbrücke

C

Näherrücken Platzkante an den Kanal

D

Verbreiterung Kai auf der Sonnenseite

uerschnitt 1/500

Mögliche Verbindung des unteren und oberen Lokals

Auf- / Abgang

D

D B A

C Auf-/Abgang

A

Auf-/Abgang

A

Der Säulengang

Auf-/Abgang

A

A

grosse Öffnungen

B

kleine Durchgänge

C

Brücken über den Donaukanal

Schiffanlegestelle TwinCityLiner 3 Fenster

C

Umfang Innen: 755 m 197 Säulen

B

A

A

L

Bahn steig U

B

A 145 m Anpassung B 38 S. U-Bahnstation U1 / U4

232 m 60 S.

4

A B

B with two pedestrian bridges is both, an important link between the 1st The closed roundwalk B and the 2nd district, and the missign link to the Donaukanal, which suddenly becoomes part of the sqare. 120 m A 258 m Ruprechtskirche

68 S.

B B

C

31 S.

A


Abgang Kanal

A Abgang Kanal

A

l l

Haltestelle Strassenbahn

l

l

Sitzbank

Abgang Tiefgarage

Infrastruktur Platz

Haltestelle Strassenbahn

A

l

Sitzbank

Lokal / Geschäî†? Pro Einheit 20m2

A

Abgang Tiefgarage Brunnen

l

A

Abgang Tiefgarage

l Taxistand

A Abgang U-Bahn


Abgang Kanal

A

l

l

A

Haltestelle Strassenbahn

A

Abgang Kanal

Abgang Kanal / Schiff / U-Bahn

Haltestelle Strassenbahn

A

Abgang U-Bahn

l L Li U-Bahn

95 Bäume


197 S채ulen

Steppengras

1.50 m

5.00 m

3.00 m

3.50 m

5.00 m

St체tze 0.40 x 0.40 m

8.00 m

Schnitt / Ansicht Rahmen 1/100


Kante Platz / Donaukanal

10.00 m

4.60 m

U-Bahn Linie 4

Neue Raumschicht 6.20 m

Kai 8.00 m

Donaukanal

Schnitt Kante 1/100



I6

Loose Fit

Stockholm architectural technology 2012

Digital fabrication essentially allows architects to explore how geometry can interface with matter through machinic processes. It deals with the actual production of assemblies, objects and material finishes as a mode of design. This seminar engages in the design and construction of a full-scale installation as well as in the practice, history and discourse of digital fabrication. It focuses on a specific material that is not commonly associated with digital fabrication: Textile. Textile surfaces in architecture typically wrap an inner mass and require the support of an armature. The installation exploits the loose fit and between two material systems - soft textile and rigid armature. This involves transitions from design work guided by geometric precision to less controlled modes of working that rely on the live manipulation of material. Ultimately, a loose fit is characterized by the use of an excessive amount - rather than a minimum - of material in the production of thickened surfaces as well as layered spaces.



Scale 1:3 KTH Royal Institute of Technology, School of Architecture, Stockholm Graduate elective seminar - Fall 2012

Drawings|

LOOSE FiT

Armature: CNC-cut 12 mm MDF The great amount of different joints allows a maximum of variety in fixing the surface

LOOSE FiT

JOiNTS & FiNiSH

30 cm

30 cm

JOiNT CHALLENGES - Create interesting effects on the surface. - Strength within the joint to carry the surface load. - A visible joint needs to be a nice looking joint. - Connection to the armature according to function and design. - Keeping the foam rubber sheet intact to maintain strength in material. - Design goes hand in hand with material properties of MDF and foam rubber.


-up 3 | Tests with different linear density points

-up 4 | Tests with different random density points

Mock-up 5 | Testing with possible joints & armature

Mock-up 6 | Tests with painting the surface

Surface: 8000 x 3600 x 15 mm foam rubber

oyal Institute of Technology, School of Architecture, Stockholm ate elective seminar - Fall 2012

2555.09

tion | General idea what the installation might look like

3665.59




I7

Chopsticks

Singapore AA Workshop 2011

Within the contrived urban setting of Singapore the AA visiting workshop will investigate surplus as a shift in design strategy. Linking multiple scales, from the individual to the supply chain, and looking at how the excessive availability of goods has transformed needs into excess, we will generate new forms and uses emerging from ordinary mass-production. Looking at the reversed engineering of everyday life will ultimately reveal this link with the global as a web of relations contained in our hand.



DEVELOPMENTDEVELOPMENT

DEVELOPMENT


AA

AA

BB

BB

CONTROL - HEIGHT - SPREAD AREA - VERTICAL CURVATURE



Schatzkammer Zwettl

Zwettl Exibition design 2011

The Austrian monastery Zwettl was looking for new possibilities to present their valuable treasures. Therefore they offered two small rooms inside the historic building of the diocese.


D8


The well thought-out design allows the most possible space for visitors. Both of the small rooms offer enough space to enjoy the exhibits, as well as walk around or take a rest on the benches inside the bays.



The materiality of the showcases is carefully chosen to even enhance the brilliance of each exhibit. Showcase: Beton Cire Floor: local Oak Wood Light: indirect from the bottom




D9

Chess

2013

Chess, the most eminent board game, in classic design, puristic, sober. The materiality concrete and wood, makes the very special surface feel of figures and board as well. Every single piece is hand made, thus unique. Inbuild magnets ensure an even better foothold. For more information and pictures check: http://clemens.holzhuber.at/Chess.htmlt


Chess is no game, chess is strategy.


Chess is imagination and creativity.



Contact

DI Clemens Holzhuber clemens@holzhuber.at +43 699 182 00 888 clemens.holzhuber.at


clemens@holzhuber.at

+43 699 182 00 888

clemens.holzhuber.at

All content and design and layout are protected by copyright of Clemes Holzhuber.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.