Gold ore direct leaching circuit

Page 1


National Cooperative of Artisanal and Industrial Gold Prospectors of South Sudan

GOLD ORE DIRECT LEACHING CIRCUIT Ore processing site

The hopper of 7 m3 with the tray feeder

Crushing 1 Jaw crusher ЩДП-2,5х9

0-40 mm 20t/h Impact-centrifugal crusher ДЦ-1,0

5-40mm 40 t/h 0-40 мм, 60 т/ч

Unbalanced-throw screen ГИС-41

0-5 mm 20 t/h The storage hopper of 20 m3 with the belt feeder 0-5 mm 20 t/h

Grinding complex КИ-1,6

Silo 30 m3

Crushed ore 0-0,1 mm 20 t/h is directed for cyanide procedures

Source material 0-200 mm, 20 t/h


The plant for the preparation of reagent solutions Department for the preparation of milk of lime

Department for the preparation of sodium cyanide solution

Lime

Sodium cyanide NaCN

1 Storage hopper 2 Storage agitation tank 3 Pump Device to open and empty the barrels with NaCN (Andreyev’s apparatus)

1

Н2О

Supply tank Н2О Milk of lime (CaO+Н2О) 10% solution of cyanide (NaCN+Н2О) 3 2

Tank to dissolve sodium cyanide


Crushed ore 0-0,1 mm; 20 t/h; Gold concentration: 5 g/t

Н2О

Agitation tank

(pachuka)

Pulp S:L=1:1,5 37,4 m3/h

High-speed screen mesh 0,63 х 0,63

10% solution of cyanide (NaCN+Н2О), Milk of lime (CaO+Н2О) to produce рН=10-11

Tanks for preliminary cyanidation The period of procedure: 2 hours

рН=10-11

Время прохождения: 2 часа. Pulp S:L=1:1,5 37,41 m3/h

Sorbent: activated carbon (85% - regenerated, 15% - fresh), It is fed towards the pulp. The averaged consumption is 70 kg/h (0,11 m3/h)

CIL process tanks The period of procedure: 6 hours

To cyanide procedure

Solution return to desorption

Н2О

High-speed screen mesh 0,63 х 0,63 mm

Carbon to reactivation 70 kg/h - losses

Resin 0,11 m3/h Water solution

NaCN – 0,1% NaOH – 1% Eluate 0,11 m3/h

3-5% solution of HCl

Frame filter press

Column for washing with HCl (to remove calcium carbonate) 10 hours

Gold cathode

Н2О

Pulp to decontamination Frame filter press

To the tailing dump

3-5% solution of HCl

+1 spare column

Desorption (elution) column 60 hours

Electrolyzer

thickener

Pulp with sorbent

Column for washing out the sludge 10 hours

Regeneration division. It works once in 4 days. The capacity of the columns is 12 m3 Fluxing agents Calcium oxide: quartz sand: borax = 1:1,6:9,7

W=20-25%

Vacuum Nutchfilter

Resistance furnace 2-3 hours; T=400-500С

Electrolytic compartment works once in 4 days. Furnaces - once in 10-20 days. Печи раз в 10-20 суток

Induction furnace T=1200-1250С Melting time: 1,5-2 h Dore gold


Before being directed into the technological process carbon is moistened in the alkaline solution.

Carbon reactivation division

Fresh carbon Up to 15% (10 kg/h)

Carbon to reactivation 70 kg/h

Activated carbon 70 ะบg/h

Tube-type rotating furnace with electrical heating Unbalancedthrow screen

Off-grade carbon (up to 15%) It is stockpiled.

No. Auxiliary equipment 1 2 3 4 5 6 7 8 9 10 11

The equipment for storing, debagging, preparing and dosing the reagents Compressor plant Mechanical repair department Elevated water tank Fuel storage area Electric supply station Console room with the control system Assay laboratory Warehouses Motor vehicle garage The site for decontamination and cleaning

Sorbent bin

Quantity, pcs. 1 1 1 1 2 2 1 1 9 1 1