ASTQB CODE: CTAL Exam Name: ASTQB ISTQB Advanced Level
Click the link below to buy full version as Low as $39
http://www.testsexpert.com/CTAL.html
Type
Microsoft
1
IBM
Demo
HP Cisco Oracle Instant download after purchase
http://www.testsexpert.com/CTAL.html
Symantec
Question: 1 According to ISTQB syllabus, systems of systems; I. Contain interconnected hardware, software applications and communications. II. Include big bang merging of independent collaborating systems to avoid creating the entire system from scratch. III. Can be less reliable than individual systems IV. Characteristics include; long duration of projects, version management and regression tests at systems of systems level. A. I, II and IV are true. B. I, II are true and III is false. C. I, III, and IV are true, II is false. D. II,III and IV are true, I is false.
Answer: C Question: 2 Select the correct statement; A. Testing processes are interconnected and related to activities like requirements engineering, software development, etc. B. Testing tasks cannot be concurrent. C. Requirements engineering and software testing are two isolated activities. D. Testing activities / processes do not have to be aligned to the chosen software development lifecycle model.
Answer: A Question: 3 Which of the following statements are false? I. Test execution starts when the system entry criteria are met (or waived) and test execution ends when exit criteria are met. II. System test environment creation might start during system design in V-model III. Long term prospects needs to be considered when selecting test process or tools. IV. Daily/weekly scrum meetings are part of agile testing method.
Microsoft
2
IBM
HP Cisco Oracle Instant download after purchase
http://www.testsexpert.com/CTAL.html
Symantec
A. I and II and false. B. II, III and IV are false C. I, II, III are false D. None of them are false
Answer: D Question: 4 System test closure activities occur; I. After system exit criteria are met. II. After acceptance testing is over. III. After all project activities are finished. IV. After the execution of all test cases. A. I,II and IV are true B. II and IV are true C. I,II, III are true D. All of them are true
Answer: C Question: 5 Which of the following statements are true? I. Early test planning and later test execution is an activity of sequential software development model II. Change and configuration management are not needed for software testing activities. III. Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done. IV. System test planning and project planning could occur concurrently in V-model. A. I, II and III are true. B. II, III and IV are true. C. I, III and IV are true. D. I and III are true.
Answer: C Question: 6 Microsoft
3
IBM
HP Cisco Oracle Instant download after purchase
http://www.testsexpert.com/CTAL.html
Symantec
According to ISTQB syllabus, characteristics of systems of systems are; I. Long duration of projects II. Multiple levels of integration III. Need for Maintenance Testing IV. No formal development lifecycle or milestones. A. I, II true, III and IV false. B. I, II, III true, IV false. C. II, III IV true, I false. D. All of the above are true.
Answer: B Question: 7 Which of the following is true about safety critical systems? A. System failures could be life threatening. B. The supplier of the safety critical system is not liable for any damage caused by the system. C. Testing proves that there are no failures or defects in the system. D. Traceability to regulatory requirements and compliance is not necessary.
Answer: A Question: 8 Select the correct statements about safety critical systems; I. Risk management reduces the likelihood and / or impact of a risk. II. Failure Mode and Effect Analysis (FMEA) technique is used mainly for safety critical systems. III. All safety critical systems are subject to sector specific regulations only. IV. Full traceability from requirements to evidence is required in some safety critical systems. A. I, II, IV true, III false B. II,III, IV true, I false C. I, IV true, II, III false D. All of the above true
Answer: A Microsoft
4
IBM
HP Cisco Oracle Instant download after purchase
http://www.testsexpert.com/CTAL.html
Symantec
Question: 9 Select the correct statement regarding test planning and control A. Test controlling is a one-time activity that will occur at the beginning of the test effort. B. Test planning includes identifying test activities and resources required for the test effort. C. Complex relationships (many to many, one to many) cannot exist among test conditions, test cases and test procedures. D. Risk and Test coverage is not a metric for test planning and control.
Answer: B Question: 10 Select the correct statement; I. Comparing actual progress against the plan is part of Test Controlling activity. II. Updating the test plan if needed is part of test controlling activity. Ill. Prioritization criteria identified during risk analysis should be applied only during test execution. IV. Test conditions are identified by analyzing the test basis and test objectives. A. I and IV true. II and II false. B. I, II and IV true. III false. C. I, II and III true. IV false. D. II, III and IV true. I false.
Answer: B
Microsoft
5
IBM
HP Cisco Oracle Instant download after purchase
http://www.testsexpert.com/CTAL.html
Symantec
ASTQB CODE: CTAL Exam Name: ASTQB ISTQB Advanced Level
Click the link below to buy full version as Low as $39
http://www.testsexpert.com/CTAL.html Microsoft
Cisco
IBM
HP
Other
MCTS 70-336 70-337
CCNA 640-911 642-998 642-997 642-902
IBM Lotus
00M-244 000-M60
AIS
MBS 70-332
CCNP 642-832 642-813 642-825 642-845
LOT-442 000-M44
MCAS 77-602
CCSP 642-627 642-637 642-647 642-545
000-444 000-910
MCSE 70-281 70-282
CCIE 350-001 350-018 350-029 350-060
COG-105 COG-185
MCSA 2003 70-620
DATA CENTER 642-972 642-973 642-974 642-975
000-005 000-032
70-323 9L0-063 9L0-010 9L0-517 HP2-E53 70-321 650-179 E20-533 00M-646 MB2-876 646-206 9L0-412 MB6-884 220-701 650-196 3305 MB6-871 HP2-Z22 9L0-518 9A0-146 HP2-H23 000-184 1Z0-527 HP2-B91 000-781 M70-201 N10-004 7004 HP3-X11 312-50v8
70-462
98-361
MB3-861
77-601 77-604 70-284
70-461 70-680
70-463
MB3-862
77-605 70-285
70-291
Microsoft
6
IBM
LOT-403 000-M62
IBM Mastery
000-M43 000-M45
HP0-311
HP0-M28
HP0-A25
HP0-M30
APC
HP2-K10 HP2-B93
HP0-M98 HP0-H22
Solutions Expert
MASE HP0-J33 HP0-M48 HP0-M49 HP0-M50
IBM Cognos
ASE
000-640 000-913 COG-180 COG-200
IBM Specialist
000-015 000-042
HP0-066 HP0-781
HP0-082 HP0-782
CSE
HP0-090 HP0-277
HP0-276 HP0-760
HP Cisco Oracle Instant download after purchase
http://www.testsexpert.com/CTAL.html
Symantec