natural resource manager, listed a number of items the park staff have completed in the past year.
They include:
Aaron | adobestock.com
Joel Topham, Roaring River
n Power washing all the decking on Deer Leap n Renovation of cabin No. 7, including new flooring and shower n Painted 15 lower-level bathrooms at the Inn n Upgraded seven PTAC units at the Inn n In shower house 3, painted new flooring that is less slippery, redid fans, put in two new hot water heaters and upgraded the electrical panel n Completed two controlled burns, one in the pollinator area and another in Ketchum Hollow East n New campsite signs installed for people to more quickly determine campsite amenities
For more information about Roaring River State Park, people may visit www.mostateparks.com/park/ roaring-river-state-park
30
| Welcome to Roaring River 2022
Construction at Hatchery Completed Park Ready for Opening Day