CONNOR TICHES ARCHITECTURE PORTFOLIO
CONTACT
SKILLS
24 MCCLELLAN ST, AMHERST MA 01002
CONNOR TICHES
EDUCATION
AUTOCAD
UNIVERSITY OF
SKETCHUP
MASSACHUSETTS
REVIT
AMHERST
RHINO
3.5/4.0
2014
2017
2013
2014
2009
2013
ILLUSTRATOR PHOTOSHOP
CTICHES@UMASS.EDU
INDESIGN
KEENE STATE COLLEGE
RENDERING
3.8/4.0
MODELLING CARPENTRY
978-846-1857
WESTFORD ACADEMY
DRAFTING
3.1/4.0
EXPERIENCE
EXCHANGE
JONES WHITSETT ARCHITECTS
Intern
2016
2017
YESTERMORROW DESIGN BUILD SCHOOL, VERMONT
Fall
2015
2016
2017
2014
2017
Assisted with the completion of constuction documents on a large scale elementary school project
Worked collaborativly to design and build a sustainable tiny home for a client
Experience with documenting and modeling existing conditions
Studied Vermont vernacular architecture and culture
Created presentation documentation for LEED accreditation
Gained wood working skills product research
Design work in restoration of historic buildings Product Research
UMASS DESIGN ACADEMY
INVOLVEMENT teaching assistant
Summer 2016
ARCHITECTURE TEACHING ASSITANT
Worked with high school students in a 3 week immersive architecture
Design I - Design II
initiated the undergraduate teaching assistant program
program Assisted a professor in teaching architecture studios focused on
Taught drafting, model making and conceptual design
exploration and implementation of conceptual design and technical
HADLEY GARDEN CENTER
Sales
2015
2016
UMASS AMHERST AIAS CHAPTER Involved with student Revit-Photoshop-Rhino tutorial sessions
Horticulture and customer service experience
D.J DOHERTY GENERAL CONTRACTING
Member
Apprentice
2013
2015
BOLTWOOD PROGRAM
Volunteer
Spring 2014
Acted as a activity coordinator for adults with specail needs
Worked over two summers to build several lakehouses in New England
CAMP FATIMA SPECAIL NEEDS WEEK
Learned basics of building construction technique
CAMP FATIMA Guided children ages 5-10 in a summer camp setting
2012
2015
Supervised 12-20 year olds with special needs through a week long Counselor
2011
sports program
2015
ART ALL-STATE
Participant Selected by my highschool professors to particate in a public
Developed interpersonal and leadership skills
Counselor
art installment project
Spring 2012
00 table of contents 01
INDEPENDENT STUDY
06
amherst mixed use
02
07
PRofessional
yestermorrow tiny house
03
08
Bosko And admira memorial
FALLING WATER ANAYLSIS
04
09
ars aevi museum
COSTA RICA HOUSE
05
10
umass liner building
ART
01 conceptual analysis
MY current project is an exploration of the idea of closing the gap underhill house, Underhill Vt
between food production and its final destination. this design is a model for Making sustainably sourced and maintained food available while decreasing the footprint of the average home. I am focusing on the application and innovation of timberframing as well as the users perception of space and integration of sustinable systems. typical embodied energy chain TRACTOR CO2
100%
GREY WATER
COLLECTION AND RE-USE
2000+ square
DIESEL CO2
REFRIGERATION ENERGY
DIESEL CO2
PRESERVATION ENERGY
CO2
CO2 OR ENERGY
100% OF ENERGY
feet 4 residents
COLLECTED FROM THE SUN
LIVE & LEARN RESIDENTS
Proposed embodied energy chain ENERGY
FARM TO TABLE
60% OF FOOD GROWN ON SITE
860
880
840
820
800
N S
01 concept models
01 sketches
02 PROFESSIONAL WORK
A RENDERING OF THE GRANBY ELEMENTARY SCHOOL, GRANBY MA. PRODUCT OF JONES WHITSETT ARCHITECTS
02 LEED QUALITY VIEWS
GRANBY ELEMENTARY, GRANBY MA
8
2 D3
6 1/8"
1'-6"
= 1'-0" 3" = 3"1'-0"
3" = 1'-0"
3
A
5
HARDWOOD CAP ABOVE
COLUMN @ COMMON AREA 119
D3
4
11 7/8"
1/2"
1 1/2" = 1'-0"
FIELD APPLIED ALUMINUM TRIM
2
(E) STEEL TUBE
G6
8
FOLDING PARTITION WALL DETAIL 5/8" GWB
OT/PT 112 LARGE
3" = 1'-0"
D5
1 1/2" RIGID INSULATION
GLAZING TO WRAP EDGE OF BRICK
2"
SPRAY FOAM INSULATION
HARDWOOD CAP ABOVE
LOCK STRIKE AND PADLOCK HASP
1 1/2" RIGID INSULATION
E5
B
2 1/4" AMBASSADOR BRICK
9"
2
4 4
2
4
4
PREFINISHED METAL WALL EX INSIDE CORNER FLASHING CASEWORK ASSEMBLY
1/2" ACOUSTIC WALL PANEL
SENSORY 9 112A
1/2" EXTERIOR GYPSUM SHEATHING
8"
C
DECORATIVE METAL PROFILE
286'-2" LARGE FORMAT TILE TO GWB DWG
3" = 1'-0"
E3
OT/PT 112
5/8" GWB
D3 A706
C1
MEMBRANE ROOFING (ON REVERSE SIDE)
3.5e
1 1/2" = 1'-0"
5/8" GWB 3 5/8" METAL STUD
CERAMIC TILE PROFILE
3" = 1'-0"
A
ROOF HATCH
T.O.S. GYM 300'-4"
5
4
SENSORY 112A
ACCORDIAN WALL
MISC. DET WEATHER SWEEP
38-5/8" X 3
2X3 @ 16" O.C. W/ INSULATION TIGHT BETWEEN
FLASH MEMBRANE UP MINIMUM HEIGHT +2" TO ROOF WARRANTY REQUIREMENTS
5
VAPOR RETARDER
ROOF MEMBRANE ROOF MEMBRANE
B.O 28
5/8" EXTERIOR GRADE
VAPOR RETARDER PLYWOOD 5/8" GWB
2
2
1/2" CEMENT BOARD
EXPOSED FOLDING PARTITION WALL @DECORATIVE OT/PTMETAL
F6
7/8" FURRING CHANNEL
SHEET METAL EDGE FASCIA
F
2
CLEARANCE AS REQUIRED BY UNIT SKYLIGHT MANUFACTURER
FLASHING SYSTEM
FLANGE WOOD BLOCKING, TYP.
ALUMINUM "J" REGLET,
5/8" GWB
CURB SEAL TAPE
6
1 1/2" = 1'-0"
SUNSHADE SECTION 3" = 1'-0"
CASEWORK ACOUSTIC CEILING TILE
1/2" EXTERIOR GYPSUM SHEATHING
DETAIL @ Ie/5
8"
F
9 3/4"
THERMAL BREAK COVER
CRICKET AS REQUIRED
8"
E1
RIGID FOAM INSULATION
5/8" GWB
WEST ELECB.O.D. RECEPTICLE - SEE
F5
WOOD BLOCKING, TYP.
2
WOOD BLOCKING, TYP.
3.5e
A510
5/8" GWB
F5
4" RESILIENT BASE
E6
PARAPET PLAN DETAIL @ Ie/5 3" ACOUSTIC STEEL ROOF 1 1/2" = 1'-0"
5/8" GWB
5/8" GWB
5/8" J CASING BEAD ELECTRONIC SHADES AT GYMNASIUM ONLY
F8
ACCORDIAN WALL DETAIL 3" = 1'-0"
LARGE FORMAT TILE TO GWB 3" = 1'-0"
METAL WALL PANEL 3" MINERAL WOOL INSULATION
DECK CONTINUOUS WELDED ANGLE
3 5/8" METAL STUD
2x4 AT 16" O.C. W/ INSULATION TIGHT BETWEEN STEEL L ANGLE
6
FASTENERS BY WINDOW SHADE MNFR
3 5/8" METAL STUD
2
PARAPET @ Ie/6
Ie
3
5/8" GWB
E1
1/2" CEMENT BOARD
2
SET HEADS IN SEALANT AND COVER
CERAMIC TILE
2.5e
BRACING AS REQ
2 1/4" MODULAR BRICKUNIT SKYLIGHT
3 5/8" METAL STUD
6
MEMBRANE ROOFING (N) GLAZED THIN BRICK ALUMINUM "J" REGLET, EXPOSED
1/8" GAP BETWEEN SUNSAHDE AND MASONRY
7/8" FURRING CHANNEL
UTILITY CHASE
287'-4"
8"
3" = 1'-0"
2
12
CONTINUOUS OUTSIDE CORNER METAL FLASHING 5/8"B.O.D. GWB 1/2" CEMENT BOARD EAST
2
12
LARGE FORMAT TILE TO THIN BRICK
5/8" J CASING BEAD E5 4" RESILIENT BASE
6
SEALANT
12
1 1/2" RIGID INSULATION
2
E
7"
ELEC RECEPTICLE - SEE DWG
4
2"
E
SHADE MNFR
2 1/4" MODULAR BRICK
4
1/2" CEMENT BOARD
4
AND COVER
CERAMIC TILE DECORATIVE METAL PROFILE
GLAZING TO WRAP EDGE OF BRICK
HEIGHT OF HATCH DETERMINED BY ROOF MEMBRANE REQUIREMENTS. G.C. TO COORDINATE.
3 5/8" METAL STUD
METAL WALL PANEL BACKER ROD W/ SEALANT
1/2" CEMENT BOARD
(N) GLAZED THIN BRICK
1'-6"
6
1/2" EXTERIOR GYPSUM SHEATHING
PREFINISHED METAL WALL PANEL JAMB ROOF HATCH FLASHING ASSEMBLY
2'-2 1/8"
(N) GLAZED THIN BRICK
4
2
C8
Drawn By: LW/KW/MC
2
2
11.21.2016 As indicated
Scale:
3
2
1417
5
CASEWORK
3" = 1'-0"
1/2" EXTERIOR GYPSUM SHEATHING
FX
Project:
6" METAL STUD
PREFINISHED METAL WALL INSIDE CORNER FLASHING ASSEMBLY
THERMALLY BROKEN COVER 2 1/4" MODULAR BRICK
1 1/2" RIGID INSULATION 8 FORMAT TILE TO ART TILE
ESCHUTCHEON PLATE BY WINDOW SHADE MNFR
AHDE AND MASONRY
MISC. DETAILS
A510
CASEWORK
CERAMIC TILE (ART TILE) 3" RIGID INSULATION DECORATIVE METAL PROFILE
LARGE FORMAT TILE TO THIN BRICK
1 1/2" MINERAL WOOL INSULATION
3 5/8" METAL STUD
9 3/4"
9 1/4"
WOOD BLOCKING, TYP.
1 1/2" = 1'-0"
5/8" GWB
DECORATIVE METAL Je PROFILE
1 1/2" = 1'-0"
2" EXPANSION JOINT
DETAIL @ A/1, ROOF - TOP MASONRY COURSE
CERAMIC TILE
(N) GLAZED THIN BRICK
1'-6"
3" = 1'-0"
EJ @ WALL
EPDM GASKET (ALLKe AROUND COVER)
LARGE FORMAT CERAMIC TILE
1/2" CEMENT BOARD WALL/MULLION CONNECTION @ RENOVATION 6 7
D3
C6
(E) MARBLE PANEL
Revisions:
ADJUSTABLE PARTITION CLOSURE
Ke
1/2" CEMENT BOARD MORTAR BED 9
2.5e
3 5/8" METAL STUD
1 1e
BACKER ROD W/ SEALANT
Date:
Revisions:
CASEWORK
G3B
CASEWORK
1 1/2" = 1'-0"
Ke
1417PREFINISHED METAL WALL 11.21.2016PANEL JAMB FLASHING ASSEMBLY As indicated
Drawn By: LW/KW/MC
(E) COLUMN, PTD.
C5
Ie
2
4
S14B
Date: WOOD BLOCKING, TYP. Scale:
ALUMINUM "J" REGLET, EXPOSED
CASEWORK
3
CASEWORK
1 1/2" = 1'-0"
ASSEMBLY Project: METAL WALL PANEL
8
2
FOLDING PARTITION WALL DETAIL
TILE CORNER DETAIL
WALL DETAIL
ADJUSTABLE
2 1/4" MODULAR BRICK
2
C8
PREFINISHED METAL WALL
5/8" GWB
3" = 1'-0"
EJ @ ROOF
2"INSIDE EXPANSION JOINT CORNER FLASHING
1/2" ACOUSTIC WALL PANEL PARTITION CLOSURE
DECORATIVE METAL PROFILE 1 1/2" RIGID CASEWORK 3 5/8" METAL STUD INSULATION
7
5
D
1 1/2" CERAMIC = 1'-0" TILE (ART TILE)
6
FLUID APPLIED MEMBRANE AIR BARRIER
Y WINDOW SHADE MNFR
G6
4"
CK
LARGE FORMAT 9 1/4" G5 3" = 1'-0" METAL PANEL TERMINATES INTO EDGE OF MASONRY 9"
3" = 1'-0"
1
1/2" CEMENT BOARD
= 1'-0"
C5
DETAIL @ De/4.5e
4
2
3 5/8" METAL STUD
FX
LARGE FORMAT TILE TO ART TILE
D5 TILE3" DETAIL CERAMIC
ROOF EDGE JOGS AT CORNER Je
4
G3
1 1/2"
DETAIL @ A/1
2
N
1 1/2"
WALL/MULLION CONNECTION @ RENOVATION D3 3" = 1'-0" COLUMN @PLAN COMMON AREA 119 LARGE FORMAT TILE CORNER SUNSHADE DETAIL G3 G5
C3
FLUSH MOUNT METAL
FLUID APPLIEDDe MEMBRANE AIR BARRIER
G3B
3"S16C = 1'-0"
1 1/2"
C1
N
3/4"
LARGE FORMAT CORNER GUARD CERAMIC TILE
CERAMIC TILE 1/2" CEMENT BOARD
3/4" PLYWOOD
8
NE AIR BARRIER
1 1/2"
5/8" GWB
Ke
CASEWORK
CASEWORK
1/2" CEMENT BOARD MORTAR BED
3 5/8" METAL STUD
2
PARAPET @ A/1
C1
1 1/2"
(E) STEEL TUBE
S18B
6 1/8"
C
5/8" GWB 5/8" GWB
FLUSH MOUNT METAL CORNER GUARD
3/8"
8
2
FIELD APPLIED 3 5/8" METAL STUD 3/4" ALUMINUM TRIM
4.5e
PREFINISHED METAL WALL INSIDE CORNER FLASHING ASSEMBLY 5/8" GWB
WOOD BLOCKING, TYP.
A706
C
1 1/2" = 1'-0"
F8
HARDWOOD TRIM CASEWORK
4
EDGE OF BRICK PARAPET ABOVE ACCORDIAN
3" = 1'-0"
5/8" GWB
EJ @ WALL
3" = 1'-0"
FOLDING PARTITION WALL @ OT/PT
5/8" GWB
D3
G6B
ACCORDIAN WALL DETAIL
F8
3" = 1'-0"
F6 1 1/2" RIGID INSULATION 3 5/8" METAL STUD
C6
FOLDING PARTITION WALL @ OT/PT
F6
SEALANT
A706
2
DETAIL @ VESTIBULE MULLION DETAIL @ De/4.5e 3" = 1'-0" C5 B3 3" = 1'-0"
4X
4 3/16"
393 E State St., Granby, MA 01033
4"
1 13/16"
(E) COLUMN, PTD.
TO GWB
2
F5
1 1/2" = 1'-0"
EXTERIOR GRADEACOUSTIC BACKER CEILING TILE ROD AND MEMBRANE
A.0
4
BLOCKING, ESCUTCHEON PLATE BY TYP. LARGE FORMAT TILE WINDOW SHADE MNFR SET IN 3" = 1'-0" SEALANT AND ADHERED TO MASONRY 3/4" PLYWOOD
1/2" EXTERIOR GYPSUM SHEATHING
2
3" = 1'-0"
B5
ALUMINUM "J" REGLET, 5/8" GWB EXPOSED
De
1 1/2" MINERAL WOOL 1'-4" INSULATION
4
FX
Granby Elementary School Granby Schools
DECORATIVE METAL PROFILE
LARGE FORMAT TILE TO GWB WOOD
3.5eF5
8"
5/8" GWB
1
DETAIL @ C.3/1
4
AND SUNSHADE
3.5e
7/8" FURRING CHANNEL
5/8" 4XGWB
4
8"
5/8" GWB
CERAMIC TILE
2
1/8" GAP BETWEEN EXPOSED HARDWOOD TRIM MASONRY
7/8" FURRING CHANNEL
ADJUSTABLE PARTITION CLOSURE
3 5/8" METAL STUD 5/8" GWB
1 1/2" = 1'-0"
WOOD BLOCKING, TYP.
4
(E) CONSTRUCTION 1/2" EXTERIOR GYPSUM SHEATHING T.O.S. RENO 2" EXPANSION JOINT WOOD BLOCKING, CUT TO 286'-8" FIT.
EJ @ ROOF - EXISTING/DEMO
A6
3 1/2"
DECORATIVE METAL ALUMINUM "J" REGLET, PROFILE
2" EXPANSION JOINT C.3 FLUID APPLIED MEMBRANE AIR BARRIER S14B
2" EXPANSION JOINT
2
VAPOR RETARDER
7 2 6 5(12
T.O.S. RENO 286'-8"
2
1/2" CEMENT BOARD 3 5/8" METAL STUD
SET HEADS IN SEALANT MEMBRANE ROOFING AND COVER CERAMIC TILE
1 1/2" RIGID INSULATION
BOARD
1 1/2" RIGID INSULATION
393 E State St., Granby, MA 01033
ALUMINUM "J" REGLET, EXPOSED
1/2" EXTERIOR GYPSUM 1/2" UNDERLAYMENT
WOOD BLOCKING, CUT TO SHEATHING FIT.
CUT & REMOVE (E) METAL FASCIA @ EXPANSION JOINT 3" RIGID INSULATION
ACCORDIAN WALL
HSS
VAPOR RETARDER
(E) ROOF MEMBRANE
CLOSED CELL SPRAY FOAM (E) MARBLE PANEL INSULATION
Granby Elementary School Granby Schools
8"
1e
8
5/8" GWB
8"
MEMBRANE ROOFING
4" RESILIENT BASE
8
7 2 6 5(12
1e
3 ACCORDIAN WALL
BACKER 1/2"ROD EXTERIOR GYPSUM W/ SEALANT SHEATHING
INSULATED TRANSLUCENT PANEL
4.5e
7
10" METAL STUD 5/8" GWB
1/2" CEMENT BOARD
4 3/16"
4" RESILIENT BASE
1/2" COVER BOARD
8
5/8" GWB
A.0
2
DWG
1'-0"
ACOUSTIC CEILING TILE
10" METAL STUD
ADJUSTABLE PARTITION CLOSURE
G6B
ROOF MEMBRANE
ACOUSTIC CEILING TILE
8
MASONRY CORBELING FASTENERS BY WINDOW 1/2" CEMENT BOARD SHADE MNFR.
1/2" EXTERIOR GYPSUM SHEATHING
A
ACOUSTIC WOOD CEILING
8
4
2
3" = 1'-0"
DWG ELEC RECEPTICLE - SEE
MEMBRANE ROOFING
1 13/16"
1/2" EXTERIOR GYPSUM MEMBRANE ROOFING SHEATHING
DETAIL @ VESTIBULE MULLION
B3
5/8" GWB
0'-6 1/8"
7
EJ @ ROOF - EXISTING/DEMO
7/8" FURRING CHANNEL
1 1/2" = 1'-0"
3 5/8" METAL STUD
286'-8"
1 1/2" = 1'-0" 3 5/8" METAL STUD
DETAIL @G3BC.3/1
BRACING AS REQ
T.O.S. RENO WOOD BLOCKING, TYP.
1'-0"
EDGE FASCIA ESCUTCHEON PLATE BY 1/2" CEMENT BOARD WINDOW SHADE MNFR SET IN BOARD 1/2" CEMENT CONCEALED-FASTENER SEALANT AND ADHERED TO ELEC RECEPTICLE SEE METAL-WALL PANEL MASONRY
B5
WOOD BLOCKING, TYP. 5/8" GWB
FX
METAL (N) GLAZED THIN BRICK (N)SHEET GLAZED THIN BRICK
B
A6
C.3
3" = 1'-0"
3" = 1'-0"
6
1/2"
2"
2"
1/8" GAP BETWEEN MASONRY AND SUNSHADE
B
5/8" GWB
CLOSURE LARGE FORMAT TILE TO THIN BRICK LARGE FORMAT TILE TO THIN BRICK E5
E5
SENSORY 112A
1e 3 5/8" METAL STUD
WOOD BLOCKING, TYP.
HSS
DECORATIVE METAL PROFILE
5
5
SENSORY 112A
CERAMIC TILE
ADJUSTABLE PARTITION
SET HEADS IN SEALANT AND COVER
A
DECORATIVE METAL PROFILE
CERAMIC TILE
GLAZING TO WRAP EDGE OF BRICK EDGE OF BRICK
OT/PT 112
OT/PT 112
7 2 6 5(12 3 5/8" METAL STUD 6
T.O.S. RENO 286'-8"
4
INSULATED TRANSLUCENT
(N) GLAZED THIN BRICK PANEL (N) GLAZED THIN BRICK GLAZING TO WRAP
FASTENERS BY WINDOW SHADE MNFR.
SEALANT
BACKER ROD W/ SEALANT
4
4
1/2" CEMENT BOARD
CASEWORK
2
NFR
YY
3
3
1/2" CEMENT BOARD
3
2
2
2
9"
CASEWORK
2
1
A
1/2" EXTERIOR GYPSUM SHEATHING
ADJUSTABLE PARTITION CLOSURE
0'-6 1/8"
BRACING AS REQ
CASEWORK
4
1
9 1/4"
CUT & REMOVE (E) METAL FASCIA @ EXPANSION JOINT
3 5/8" METAL STUD
CASEWORK
6 1/8"
A
9"
HARDWOOD CAP ABOVE
6 1/8"
NFR
3" = 1'-0"
G3B 9 1/4"
Je
WOOD BLOCKING, TYP.
3 5/8" METAL STUD
2
Je
HARDWOOD CAP ABOVE
LARGE FORMAT TILE TO ART TILE
D5
WOOD BLOCKING, CUT TO FIT.
2 1/4" MODULAR BRICK
7/8" FURRING CHANNEL
3/8"
3" = 1'-0"
(E) ROOF MEMBRANE
3 5/8" METAL STUD
DECORATIVE METAL PROFILE
3" = 1'-0"
02 GRANBY ELEMENTARY DETAILS D3
1e
CERAMIC TILE (ART TILE)TO ART TILE LARGE FORMAT TILE 1/2" ACOUSTIC WALL PANEL
D5
2
LARGE FORMAT CERAMIC TILE
3" = 1'-0" Ke
WALL/MULLION CONNECTION @ RENOVATION
11 7/8"
D3
ROOF MEMBRANE 1" RIGID INSULATION
SIMILAR EXPOSED CEILING CON
A
C5
SKYLIGHT DETAIL GYM (CLASSROOM SIM) 1 1/2" = 1'-0"
METAL WALL PANEL 3" MINERAL WOOL 5/8" GWB INSULATION
02 GARDEN THEARTER RESTORATION RD
PROVIDE MIN 8" CONTINUOUS FLASHING AT BUILDING EXTEND EXISTING STEEL ANGLE BRACE FOR SIGN BOARD TO SUPPORT NEW SIGNAGE
GENERAL NOTES:
NEW EPDM ROOFING OVER EXISTING WOOD, STEEL DECK & FRAME. ROOF TO PITCH TOWARD EXISTING DRAIN.
5
ROOF PLAN
RE-USE & RESTORE EXISTING CORNER PANELS
1/8" = 1'-0"
3'-1"
NEW SIGN PANEL AT FRONT NEW SIGN RESTORE PREVIOUSLY EXISTING THEATER MARQUEE
NEW SIGN BOARD AT FRONT AND SIDES
REPAINT EXISTING DECORATIVE PEDIMENT WINDOW. REPAIR CRACKED OR BROKEN GLAZING
9 19'-116"
6'-0"
NEW BACK LIT SIGN BOARD 10" LINES
METAL CHANNEL LETTERS WITH NEON LIGHTING
10'-05 8"
RE-STORE AND RE-USE EXISTING CORNER PANELS AT RESTORED CANOPY
COFFER, PRIME AND PAINT TRIM AT PERIMETER
NEW SIGN PANEL WITH BACK LIT SIGN BOX, EACH SIDE. PROVIDE & PAINTED MDO CEILING 10' 6" ABOVE SIDEWALK
REPLACE DAMAGED CAST STONE SILL PATCH AND REPAIR EXISTING CAST STONE PILASTER
4
6
ADD NEW SIGN BELOW CAST STONE BAND
ELEVATION AT CANOPY- WEST
PAINTED CIRCULAR CENTER PANEL WITH LED CHASE LIGHTS. PRIME AND PAINT WOOD TRIM FRAME.
REFLECTED CEILING PLAN 1/8" = 1'-0"
EXISTING DECORATIVE STONE TRANSOM TO REMAIN
1/8" = 1'-0"
PATCH AND REPAIR EXISTING CAST STONE PILASTER
PROPOSED REPAIRS TO
NEW SIGN TO RESTORE PREVIOUSLY EXISTING THEATER MARQUEE
1) ALL WINDOWS AT SECOND FLOOR TO BE REPLACED WITH NEW DOUBLE GLAZED WOOD WINDOWS TO MATCH EXISTING PROFILES 2) REGLAZE FIRST FLOOR WITH NEW STOREFRONTS - MATCH EXISTING THIN PROFILE IF POSSIBLE
CONSU
PATCH AND REPAIR DAMAGED CAST STONE SILL
REPAIR PARAPET
PROJEC DATE: SCALE: DRAWN
REVISIO
PATCH AND REPAIR CORNER REPLACE MISSING MARBLE PANEL
7
RESTORE / REPLACE MARBLE AND GRILLE
NORTH ELEVATION 1/8" = 1'-0"
RESTORE / REPLACE MARBLE AND GRILLE
CAULK AND REPAIR JOINT AT MARBLE
REPLACE DAMAGED MARBLE PANEL AND REPAIR CORNER
REPLACE MISSING MARBLE PANEL RESTORE / REPLACE MARBLE AND GRILLE REPOINT MARBLE CORNER PANEL
PAINT AND RESTORE ORIGINAL CEILING
PATCH AND REPAIR CORNER
RESTORE / REPLACE MARBLE
RESTORE / REPLACE MARBLE
REPLACE MISSING MARBLE PANEL
PATCH AND REPAIR EXISTING CAST STONE PILASTER
A
03 ADMIRA AND BOSKO MEMORIAL ADMIRA AND BOSKO WERE TWO OF THE MOST INFLUENTIAL VICTIMS OF THE WAR IN SARAJEVO. THIS PROPOSAL FOR THEIR MEMORIAL IS BASED IN THE IDEA OF DIRECTIONALLY ENFORCED MEMORY, DISSIPATING WATER FALLS AND CHANGES IN PERSPECTIVE that ENGAGE THE VIEWER AND DISCONNECT THEM FROM THE WORLD ABOVE.
03 SITE CONTEXT SARAJEVO, BOSNIA AND HERZEGOVINA Originaly settled by the Illyrians for its seclusion, the Dinaric Alps have protected the valley of Sarajevo and had allowed many civilizations to safely flourish.
SECLUSION
Civilizations continued to thrive in the valley of Sarajevo due to the area’s proximity to a rich water source.
MILJACKA RIVER
HOT SPRINGS
CONNECTION TO THE REGION
Romans moved into the area attracted by the natural sulfuric thermal
Despite its geographic seclusion, Sarajevo remains connected to the surrounding
springs in the southwestern part of the Sarajevo plains. The area was
region through various growing cities and a complex road and river system that they
later known as Vrh-Bosna and housed a Slavic citadel from 1263-1429.
use to export cars, tabacco, textiles and furniture.
03 MEMORIAL BACKGROUND RESEARCH DRAWING LINES FROM TRAGEDY The pain of the war could be felt ALL over Bosnia. By intersecting these tragedies ON a point on the prospective site, one is presented with a holistic understanding of the weight of the atrocities committed during the war while occupying a single space.
BOSNIA AND HERZEGOVINA
03 CONTEXT AND FORM
VO AJE
CITY
TER
CEN
SAR
A NJ
BA
VR A
IC
AN
M
NCIL
COU
T
S
KO
TER
INIS
M OF
RO
T
EN
IAM
RL PA
TE
OVO
N SO
VIL
ALIS SET
KA
JAC
MIL
N
CHANGING THE ANGLE
USING DEPTH TO REINFORCE
BISECTING THE GAP WITH A
FLANKED BY WATER ON EITHER
TO DISORIENT AND THEN
THE NOTION OF SEPERATION
BRIDGE CREATES THE FEELING
SIDE THE VIEWER WILL BECOME
RE-OREINT
FROM THE OUTSIDE WORLD
OF SUSPENSION WITHIN THE
ENCOMPASSED BY THE SOUND
VOID
OF FALLING WATER, REINFORCING THE FEELING OF DISSOCIATION
-15’ plan
N
03 CONCEPT THE IDEA OF THE PROJECT WAS TO USE WATER TO CREATE A SENSE OF TENSION BETWEEN TWO OPPOSING SIDES WHILE SUSPENDING THE VIEWER IN THE MIDDLE. THIS GIVES THE ILLUSION OF BEING CAUGHT BETWEEN TWO SIDES AS BOSKO AND ADMIRA WERE IN THEIR FINAL MOMENTS. ALLOWING CONTINUOUSLY FLOWING WATER TO FALL OUT OF SIGHT OF THE VIEWER REINFORCES THE IDEA OF SOMETHING BEING GONE BUT NOT FORGOTTEN.
04 ARS AEVI CONTEMPORARY ART MUSEUM
SARAJEVO, BOSNIA AND HERZEGOVINA
THIS PROPOSAL FOR THE ARS AEVI ART COLLECTION WAS BASED IN THE GESTURAL MOTION OF IMPACT AND DISPERSION. THE VIEWER IS GIVEN AN AMBIGOUS PERCEPTION OF THE LOFTED VOLUMES AS THEY APPROACH THE BUILDING. UPON ENTERING, THE VIEWER IS FORCED DOWNWARDS INORDER TO RE-ORIENT THEMSELVES WITHIN THE SPACE. THE VIEWERS UNDERSTANDING OF SPACE IS BOTH INTRIGUED AND LIMITED BY THE VARIOUS SEPARATIONS WITHIN THE EXPANSES OF THE VOLUME.
04 PROGRAMMATIC DIAGRAM THE PROGRAM FOR MY ARS AEVI MUSUEM PROPOSAL IS CENTRALIZED AROUND A FIVE STORY ATRIUM THAT ACTS AS A REVOLVING POINT FOR ALL THE MUSEUM’S EXHIBITS. THIS ALLOWS FOR THE VIEWER’S EYE TO TRAVEL BETWEEN FUTURE AND PAST EXHIBITS AS THEY JOURNEY VERITCALLY THROUGHT THE BUILDING.
Exhibits Circulation Core Bathroom Shipping/ Receiving Upper Lobby Store Offices Classrooms Kitchen
Cafe
east elevation
south elevation
north elevation
west elevation
+24’ floor
+12’ floor
PRATO
SARAJEVO
VENICE
PODGORICA
RENDEZ
WIEN
TEMPORARY
TEMPORARY
UTILITIES
LJUBLJANA
TEMPORARY
n
ISTANBUL
-20’ floor
0’ floor
BOLOGNANO
CLASS 1
CLASS 2
OFFICES
UPPPER LOBBY LOWER LOBBY
AUDITORIUM
MILANO
KITCHEN
TEMPORARY UTILITIES
CAFE
STORE
SHIPPING / RECIEVING TEMPORARY
n
04 ARS AEVI SECTION MODEL
05 LINER BUILDING
PARKING GARAGE ADDITION UNIVERSITY OF MASSACHUSETTS, AMHERST
THE CONCEPT OF THIS PROJECT WAS TO MARRY THE PARKING GARAGE AT THE UNIVERSITY OF MASSACHUSETTS, AMHERST WITH A LINER BUILDING THAT APPLIED A PROGRAM SUITABLE TO THE CAMPUS. THE FACADE OF THE BUILDING WAS BASED IN THE IDEA OF A FLEXURE WHICH MIMICKED THE PLAYFUL STRUCTURE AND LIGHT-PLAY OF FOUNTAIN GRASS. THE GROUND FLOOR ACTED AS A “NOISY SPACE” BY HOUSING A STUDENT-RUN FOOD CO-OP. THE THREE FLOORS ABOVE FEATURE 10’ X 10’ STUDY PODS SUITABLE FOR GROUP AND INDIVIDUAL WORK. THE PODS ARE INTERCONNECTED BY 4’ BRIDGES IN ORDER TO PRESERVE THE EFFECT OF VERTICAL AND HORIZONTAL PHENOMENAL TRANSPARENCY THERFORE CREATING A HOLISTIC UNDERSTANDING OF THE SPACE.
05 liner building model the ungulating wood flexures allow light to flow through the form AS THEY BEND SLIGHTLY AND PROGESS TO ONE SIDE. FOLLWING THAT FORM INSET WOOD IN THE FLOOR FOLLOWS THE FORM AND BRIDGES THE GAP TO THE NEXT MODULE.
05 liner building
wooden connection
filtered vs no filter
incremental flexing
FLoors 02-04
FLoor 01
n
06 AMherst mixed-use a proposal for a mixed- use complex in downtown amherst featuring an organic food co-op, shops, an auditorium, exhibition spaces and affordable housing units. The design was focused on creating a mews for pedestrian use in conjunction with various easily accessible green roof spaces in order to maximize the utility of the site.  
06 site context
AMherst massachussetts
n
06 amherst mixed-use
Co-op
West
east elevation
west elevation
06
floor 01
n
06
floor 02
Restaurant section
Reflected ceiling plan
an array of drop ceilings varying in translucency filter light
n
06 amherst mixed-use model
07 yestermorrow tiny house a semEsteR-long design build program focused in sustainable tiny house design which culminated in this living and academic space for a teacher at marlboro college. a modern take on the classic gable, this house was built off site on the yestermorrow campus and then shipped and lifted onto footings in putney, vermont.  
07 yestermorrow tiny house
08 Falling water abstact model
section
plan
elevation elevation
08 falling water site reinterpretation THE PROJECT WAS BASED ON THE ANALYSIS OF A PRECEDENT. I SYNTHESIZED FALLING WATER INTO AN EXPLODED AND ABSTRACTED MODEL MADE FROM WOOD AND MATTE BOARD. I FOCUSED ON HIGHLIGHTING ELEMENTS OF ELONGATION AS WELL AS THE VERTICAL RELATIONSHIP BETWEEN PLANES.
09 COSTA RICA HOUSE
09
THIS PROJECT IS A PROPOSAL FOR THE OWNER OF AN ADJACENT BED AND BREAKFAST in san ramon, costa rica. tHE HOUSE ITSELF IS PROGRAMMED TO SUPPORT THE CLIENT, HIS DAUGHTER, as well as SLEEPING QUARTERS FOR SOMEONE TO USE WHEN WATCHING OVER THE HOUSE DURING THE SUMMER MONTHS. THE FORM OF THE BUILDING EMULATES THE structure OF THE PASSION FRUIT FLOWER in the way that all of the program stems out from a central node. each part of the program was positioned so that its primary viewing angle was different from the other spaces around it.
01 plan
02 plan
10 art
TREE BARK ABSTRACTION - ACRYLIC ENTRY - GRAPHITE
MUMS THE WORD - GRAPHITE
REFLECTION OF A STILL LIFE - ACRYLIC AND INK