LOCAL AUTHORITY
GRANT APPROVED â‚Ź
CARLOW Co Cl - 1. Ped. Crossing at Hacketstown Dispensary CARLOW Co Cl - 2. Footpath from Ballyellen to Goresbridge CARLOW Co Cl - 3. Ped. Crossing Tullow Community School CAVAN Co Cl 1. Cootehill
30,000
CAVAN Co Cl 2. Chapel Rd., Bailieborough
30,000
CAVAN Co Cl 3. Main Street, Kingscourt
30,000
CLARE Co Cl 1. Ennis Looped Walk CLARE Co Cl 2. Strand Line Kilkee CLARE Co Cl 3. Killaloe
30,000
30,000
30,000
30,000
30,000
40,000
BRIEF DESCRIPTION OF PROJECT Provision of a pedestrian activated pelican crossing facility with associated civil works, road signage and road markings. Provision of a footpath link between the Ballyellen community and Goresbridge Provision of a pedestrian activated pelican crossing facility with associated civil works, road signage and road markings. Realignment of kerbing to reduce junction width. Provision of 3 uncontrolled pedestrian crossings. Provision of a raised pedestrian crossing with flashing amber beacons together with associated speed cushions on the approaches and advance warning signage. Provision of a raised controlled pedestrian crossing, alteration to existing kerb lines together with associated marking and signage. Extension of public lighting provision along the Ennir Link Road Looped Walk Extension of public lighting along the Strand Line Kilkee Stg.2 Creation and enhancement of pedestrian access points in Killaloe
CORK Co Cl 1. Brigown, Mitchelstown
28,000
CORK Co Cl - 2. Maulbaun Passage West
45,000
CORK Co Cl - 3. Leap Village
30,000
DONEGAL Co Cl - 1. Dungloe and Rathmullen DONEGAL Co Cl - 2. Ballyshannon and Letterkenny DONEGAL Co Cl - 3. Killea
30,000
GALWAY Co Cl - 1. Monivea and Tuam Road
30,000
GALWAY Co Cl - 2 Old Church Street and Davis Street in Athenry Town
30,000
35,000
30,000
Construct footpath (1.5m wide and 170m long) with associated public lighting along the side of the public road on the approach to Mitchelstown soccer club. Footpath, traffic calming and pedestrian crossing facilities adjacent to St Peter's Community School and Passage West Primary School. Construct 250 linear metres of new footpaths in Leap Village with associated civil works. Upgrade and refurbishment of 350m of footways in the towns of Dungloe and Rathmullen Upgrade and refurbishment of 225m of footways in the towns of Ballyshannon and Letterkenny Construction of approx 140m of footpath appraching and across the bridge (in the control of Donegal CC) at the border. In the event of approval DRDNI Roads Service will progress works on the Derry side. Improvement works at Monivea and Tuam Road Junction in Athenry to improve access to two schools in vicinity and encourage ped. And bicycle access and usage. Provision of traffic flow controls at the junction of Old Church Street and Davis Street in Athenry Town.
GALWAY Co Cl - 3. Weir Road in Tuam
40,000
KERRY Co Cl 1. Rock Rd.,/New Road Killarney KERRY Co Cl 2. Ped. Crossing at Countess Rd. Kilkenny Borough Cl - 1. Greens Bridge to Johns Green Ped Link (2 phase project)
40,000
Kilkenny Borough Cl - 2. Granges Road to Dean Street Cycle & Ped, Link, LAOIS Co Cl - 1. Station Rd, Portarlington
30,000
LAOIS Co Cl - 2. Ped. Crossing at Rathdowney LAOIS Co Cl - 3. Footpaths at Craiguecullen and Doonane TBF LEITRIM Co Cl 1. Canal Bank Walkway at Drumshambo
30,000
22,000
60,000
30,000
30,000
30,000
Provision of pedestrian footpath along the Weir Road in Tuam to facilitate safer pedestrian movement. Pedestrian crossing north of the junction of Rock Rd and New Road Ped crossing at Countess Road to facilitate children atending Ballycasheen National school Provision of 300m of cycleway along with new crossing points to link the existing cycle infrastructure from the schools in the western areas of the city with the city centre. Provision of bike parking areas and newly constructed bus stops. 300m of cycleways
Repair of footpaths and provision of cycle lanes between town and tennis club and primary school and train station at Portarlington. Provision of controlled ped crossing a Schoil Bhride primary school. Connection to existing footpaths (details provided) to improve safety for pedestrians and cyclists to shops, schools and amenities. Project in partnership with Waterways Ireland includes for the upgrading of the walkway along the canal bank between Acres Lake Amenity
on the southern side of Drumshambo and Blackrock Bridge on the Northern side. LEITRIM Co Cl 2. Extension of footpaths at Dromod Village LEITRIM Co Cl 3. Footpath at Breda Housing Estate, Carraigallen LIMERICK Co Cl - 1. Extension of existing temporary employment contracts.
30,000
LONGFORD Co Cl - 1. Granard
30,000
LONGFORD Co Cl - 2. Park Road
30,000
LONGFORD Co Cl - 3. Lanesborough Centre
30,000
30,000
90,000
Provision of a section of footpath from Dromod Village to the residential areas on the outskirts. Provision of section of footpath from Breda Housing Estate in Carraigallen to the local school and church ú Improvements to existing cycle lanes. ú Installation of cycle parking units. ú Improvements and maintenance works on the Great Southern Trail (cycle track). ú Footpath Improvements. ú Provision of Bus Shelters. ú Improvements to pedestrian crossings and footpaths Installation of new footpaths along the public road R-194 at Granardkill Td to allow pedestrian access from Granard town to residential areas. These works shall link two sections of existing footpaths at this location. Upgrade approx. 350m of footpath along the Park Road, Longford Town (Public road no. UP03010) Reconstruction and improvement of existing footpaths in Lanesborough Centre from the Shannon Bridge and Community Centre to the village centre, to incorporate the installation of
cycle stands. Also the construction of pedestrian/cycle facilities from Community centre to the river bank/car park area. LOUTH (Ardee Town Council) 3. Ardee Town Boundary LOUTH (Drogheda Borough Council) 1. Newtown Road LOUTH (Dundalk Town Council) 2. Town Centre Bicycle Parking (9 locations) MAYO Co Cl - 1. Louisburg
33,000
Installation of Pedestrian Crossings at 3 locations within the Ardee Town Boundary.
30,000
Newtown Road - St Joseph's Secondary School (Target School) 0.15km cycle track to connect to existing cycle track; provision of bike shelter. Supply and installation of cycle parking facilities and associated signage at 9 town centre locations where non currently exist.
MAYO Co Cl 3. Ballinrobe
30,000
MAYO Co Cl - 2. Belmullet
30,000
MONAGHAN - 1. Bus stop Carrickmacross
31,836
MONAGHAN - 2. Set down area Carrickmacross
22,530
28,000
30,000
54km. Of cycle friendly roads 20 bike parking spaces 100m of cycle lane & footpath 100 m of wall building 800m. of cycle lane 20 Bike parking spaces Construct new footpath to join existing footpath to bus stop; construct a new lay-by off the public carriageway; relocate road gullies, locate bus shelter and new road markings. Linked to Proposal 1 above. Construct new lay-by off the public carriageway for car to pull in and set-down; consruc footpath to bus stop, relocate road gullies, new road markings.
NORTH TIPP - 1. Roscrea
70,000
NORTH TIPPERARY- 2, Thurles L-4126 (footpath) OFFALY Co Cl 3. Birr
50,000
OFFALY Co Cl 2. Edenderry Town OFFALY Co Cl 1. Tullamore
30,000
ROSCOMMON Co Cl - 1. New Tuam Rd., Monksland
30,000
ROSCOMMON Co Cl - 2. Abbeytown Rd.
30,000
SLIGO Co Cl 1. Ped crossing Sligo Town
30,000
SLIGO Co Cl - 2. Lough Gill Loop Cycle Route
29,850
30,000
30,000
Provision of designated bus parking area in Roscrea to facilitate tourist bus and provide pedestrian linkage will the established trail in Roscrea. Provision of footpath along the L-4126 from the junction of the R600/L-4126 to the junction of the L-4126/L-8020. Lighting on the river walk in Birr from Bridge Street to Mill Island Park, Birr. Proposal is part of Birr Public Realm Plan. Provision of three pedestrian crossings on JKL street in Edenderry Town cente. Provision of cycle parking in Tullamore Town at key locations - details provided. Also the construction of a new footpath connecting the new library to a town centre car park. Provision of two controlled pedestrian crossings on the New Tuam Rd/R362 in Monksland (50km/hr urban regional road). Provision of a controlled pedestrian crossing on the Abbeytown Road/N63 outside the CBS Secondary School. Upgrading of existing pedestrian crossing at Scoil Ursula and provision of controlled pedestrian crossing at Mercy Primary and Secondary Schools. Signposting and mapping of a 40km cycle route around Lough Gill straddling both counties Sligo and Leitrim, to include parking along the
route.
SLIGO Co Cl - 3. Bike parking at Sligo's beaches and tourist attractions
28,500
SOUTH TIPP - 1. Cycle Racks Carrick-on-Suir SOUTH TIPPERARY Co Cl - 2. Bus Shelter on Pill Road/Ped. Crossing New Lane
30,000
SOUTH TIPPERARY Co Cl -
25,000
3. Zebra Crossing, Clonmel WATERFORD Co Cl - 1. Davitts Quay
WATERFORD Co Cl - 2. Ducks Pool
30,000
21,000
41,894
Provision of bicycle parking and signage at all Sligo's Blue Flag beaches, Green Coast Award Beaches, main towns and tourist destinations/places of interest Provision of 48 bike racks for installation at three locations around Carrock-on-Suir Installation of bus shelter on Pill Road used in particular by commuting students attending Waterford IT. (â‚Ź12,000) Creat ion of pedestrian priority corridor on New Lane (â‚Ź18,000) Provision of zebra crossing facility at the Sisters of Charity Primary School, Clonmel incorporating raised table, signage/markings/disabled parking bay for use at school and adjacent medical centre. 150m long accessible pedestrian route linking existing public/private car parks and local service offices to the main access route to the Town Centre and shopping area. Including signaled pedestrian crossing and 50m of newly marked walkway. 600m long dual direction cycle way linking new railway track cycle/walk development to local schools/sports grounds and residential areas. Including pedestrian/cycle crossing.
WESTMEATH Co Cl - 1. Bus Shelter at Moate WESTMEATH Co Cl - 2. Killucan and Rathwire WEXFORD Co Cl - 1. Drumgold, Enniscorthy
29,000
Installation of a bus shelter in Moate
75,000
Killucan/Rathwire - extension of public footpath to link the two village.
33,000
WEXFORD Co Cl - 2. Ryland Rd, Bunclody WEXFORD Co Cl - 3. Michael Rd. Gorey
30,000
Provision of footpath in Drumgold, Enniscorthy connecting an established residential areas to the local shop. Provision of 200 m. of footpath connecting town to the local cemetary
TOTAL
25,000
2,023,610
Installation of raised platform at Michael's Road, Gorey including signage, road markings adjacent to Loretto School.