Construction manager Magazine February 2021

Page 5

constructionmanagermagazine.com

News story for CM? Email neil@atompublishing.co.uk

NEWS

Project report: How Kent contractor Jenner built unique suspended concrete bowls for Folkestone skatepark F51. See p32

BAM in race to lay foundations for British Antarctic Survey building A team of 20 construction workers from BAM, Ramboll and Sweco have arrived by ship in Antarctica to continue constructing the Discovery Building at the British Antarctic Survey’s (BAS) Rothera Research Station. They have just weeks to finish the pre-cast concrete foundations, ground floor slab, rock anchors and stub columns, as well as drainage and the perimeter wall, before winter arrives in March.

New construction minister appointed after just one month Anne-Marie Trevelyan has become the latest construction minister, replacing Kwasi Kwarteng after just one month following his appointment as business secretary.

Robertson Group to help make Edinburgh net zero

Balfour in retrofit first to slash emissions on £1.5m piling rig Balfour Beatty has successfully retrofitted a £1.5m piling rig in use on HS2 to bring it in line with the latest EU Stage V emissions requirement. The six-month pilot of the retrofit solution was carried out by UK company Eminox on a Balfour Beatty-owned Junttan PM20, which was rated at Stage IIIA. It is thought to be the first EU Stage V equivalent retrofit solution in Europe.

Robertson Group has joined with five other Edinburgh businesses to sign a pledge to help Edinburgh reach its target of net zero emissions by 2030. Launched by the Edinburgh Climate Commission, the Edinburgh Climate Compact commits firms to actions including retrofitting owned buildings and decarbonising operations, prioritising sustainable travel, and a switch to zero-emissions company vehicles. CONSTRUCTION MANAGER FEBRUARY 2021 | 5

04_05.CMFeb21.newsopener_scW.indd 5

18/01/2021 19:00


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Training & Recruitment Quality control with Persimmon Life following a career change EDI at Colas Inclusion in the workplace

4min
pages 58-60

A listed Mayfair refurb project

2min
page 57

Diary dates

7min
pages 55-56

Inside Birmingham’s Exchange

1min
page 54

Constructing 22 Bishopsgate

3min
pages 51-53

Benefiting from R&D tax relief

3min
page 49

Expert insights into MMC

1min
page 50

Community Virtual visit to Alexander Stadium

2min
page 48

Digital working and productivity Training enters the digital age Sopra Steria’s competency portal

4min
pages 44-45

The technology behind building high Folkestone’s curvy skatepark F51’s suspended skate bowls

7min
pages 32-35

CPD Understanding asphalt paving How technology is updating practice

9min
pages 36-41

Managing projects online

5min
pages 42-43

Helmets and head injuries

14min
pages 20-25

Offsite adapts to the lockdown Super-skinny skyscrapers

8min
pages 28-31

Precast delivers in a pandemic

4min
pages 26-27

Renovations at the British Museum Curo’s temporary roof construction

4min
pages 18-19

Contractors’ vaccination policies

2min
page 10

Mace’s journey to net zero

4min
page 11

Profile CLC co-chair Andy Mitchell Construction is critical to recovery

8min
pages 14-17

News in pictures

1min
page 4

Caroline Gumble on quality

4min
page 12

Covid-related contract disputes

3min
page 7

CIOB Quality Guide sets standards

3min
page 6

6 Meet a member: Sam Fowkes

1min
page 5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.