CIOB COMMUNITY
constructionmanagermagazine.com
MMC
Gen up on modern build methods
“The speakers will discuss and identify benefits of the various systems in comparison to traditional methods”
An expert panel will compare the details of MMC systems in this Chelmsford Hub presentation
The Chelmsford Hub is staging an insight into modern methods of construction (MMC) this month. A panel of speakers will introduce the use of i-Sip, i-FAST and Hybrid Structural Solutions. They will provide a brief overview of the product, case studies and new products in development. Experts include Innovare director Gareth Ellison, Arthur Pescher from Bond Bryan Architects and Mid Group client solutions director Emily King. The speakers will discuss and identify benefits of the various systems in comparison to traditional methods in terms of time, cost, safety and environmental impact. They will look at project case studies, evaluate the results and cover the testing and certification credentials of the products. There will also be an opportunity for a Q&A. ● The talk takes place on 2 February from 12-1pm. To book visit the CIOB events page online or email hhosking@ciob.org.uk. Appointment
Wates offsite role for member Dan Sadler to lead expansion of Prism manufacturing business
Wates Construction has appointed CIOB member Dan Sadler to the role of offsite manufacturing director, to lead the expansion and development of Prism, its award-winning offsite manufacturing business in Coventry.
Sadler (pictured) was previously operations director for Wates Construction in the Midlands. Prism has been a part of Wates Construction since its acquisition of Shepherd Engineering Services in 2015.
Its offsite MEP services have been used on projects including the Institute for Advanced Automotive Propulsion Systems (IAAPS) in Bristol, the Royal College of Surgeons in London and the Wellington Place development in Leeds.
50 | CONSTRUCTION MANAGER FEBRUARY 2021
CM Community Feb2021_scW.indd 50
18/01/2021 16:53