Construction Mining Magazine Dec-Jan 2021

Page 15

Mining

Debmarine Namibia’s Diamond Vessel Fitted with a Helideck Debmarine Namibia’s latest additional recovery vessel has started to take a perfect shape after the installation of the helideck in Damen Mangalia Shipyard, Romania. Helideck with the diameter of 22.8m with a total weight 49.2 tonnes will be the largest in the Debmarine Namibia fleet and designed to accommodate helicopters of different specifications such as AW101, Sikorsky S92, and Sikorsky S-61 (MTOW 15600kg). The new vessel will be fitted with deck integrated latest technology firefighting system, deck helicopter navigation lighting with circle and ‘H’ marking on top as per CAP 437 - standards for offshore helicopter landing areas. The latest development is an indication that the vessel is nearing construction completion and ready for pilot ocean launch end of this month and geared for its maiden voyage to Cape Town, South Africa for mission equipment fitting early next year. The mission equipment consist of the recovery tool and processing plant of which parts of the steel works are being manufactured in Walvis Bay.

Helideck being installed on the newly constructed Debmarine Namibia Additional Mining Vessel number 3 (AMV3)

Construction & Mining Magazine - December 2020 - January 2021 Edition

15


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.