On behalf of the developer, we provide you with the latest updates as of July 2018 from the Aura construction site.

taken place below: • Reduced level excavations / rock break out to Phase 1 + 2 complete • Phase 1 + 2 foundations complete, lift base and retaining walls ongoing • Phase 1 lift core complete, retaining wall works complete & lift shaft works ongoing • Phase 2 + 3 lift core base ongoing • Phase 1 steelwork installation complete to Level 6 • Phase 2 steelwork installation complete to Level 6 • Phase 1 metal decking and concrete upper floor works complete to Level 6 • Phase 2 metal decking works ongoing • Drainage installations to Phase 1 due to commenced • Tower crane 1 operational • Tower crane 2 to be erected in September 2018 The key dates for construction are: Phase 1 • Demolition

Complete

• Practical Completion

Q3 2019

Phase 2 + 3 • Demolition

Complete

• Practical Completion

Q1 2020

www.csiprop.com

Dear Investor,

Work is continuing well on the Aura site. Please see a summary of the works that have


Student Accommodation

Progress Update July 2018

www.csiprop.com

AURA


Student Accommodation

Progress Update April2018 2018 July

www.csiprop.com

AURA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.