Opto House Block B UK Student Accommodation Investment
Progress Update March 2017
www.csiprop.com
UK Student Accommodation Investment
Progress Update March 2017
Exclusive Marketing Agent:
pto House Block B
Opto House
Opto House
Dear Investor, On behalf of the developer, we are pleased to provide
Works are progressing well on site and reported on target for completion September 2017. A summary of works to date include:
you with the latest construction news and
- All piling works have been completed, cropped and tested
images from the Opto House
- Ground beams and pile caps complete
construction site, Luton.
- Beam and block ground floor complete
- Below ground drainage complete - Steel frame complete - Steel decking and concrete floors complete - Basement drainage complete with basement external walls and slab complete - Face brickwork complete - Cladding rails complete - Windows installation complete - Dry lining 1st fix complete - M + E 1st fix complete - Joinery, furniture and decoration teams commenced and complete on Level 5 - Plastering complete on Levels G -1 - Flooring and decoration progressing on Levels 2 - 3 ready for furniture delivery 20th April
www.csiprop.com
UK Student Accommodation Investment
pto House Block B
Progress Update March 2017
www.csiprop.com
UK Student Accommodation Investment
Progress Update March 2017
pto House Block B
Opto House
www.csiprop.com
UK Student Accommodation Investment
Progress Update March 2017
pto House Block B
Opto House
www.csiprop.com
UK Student Accommodation Investment
Progress Update March 2017
pto House Block B
Opto House
www.csiprop.com
UK Student Accommodation Investment
Progress Update March 2017
pto House Block B
Opto House
www.csiprop.com
UK Student Accommodation Investment
Progress Update March 2017
pto House Block B
Opto House