Corrinne's Portfolio

Page 1

CORRINNE FONG

Design Portfolio | 2020

01


02


CONTENTS

04 06 15 18 22 26 20 36 42

Abstract Boundary Street - Townhouses Woods Road - Townhouses Wyndham Christian Collage Cherry Road - Apartments Newquay Lot 9 - Multi-Residential Garfield - Townhouses Normanby - Apartments Banksia - Low Rise Multi- Residential

03


04


ABSTRACT

People | Context | Space I believe great design should prioritize all three above mentioned criteria – People, Context and Space. As good designers, we can manipulate space and maximise area to produce elegance of comfort. People utilizing the spaces should inform its program, circulation, and feel of various spaces. Its context would inform the style, form, and presence. This therefore will result in a building or space that is unique, responsive, elegant, and most importantly serves the users needs that will be occupying them daily.

Communication Technical drawings have always added another layer into the design process and is something I appreciate. With knowledge in characteristics in materials, it allows me to produce effective designs and construct great buildings. Visual design is about communication. Architecture is just that. Through applied principles, incorporating design considerations, space, complimenting hues, layout, it will to everyone; it should be able to speak for itself an elevate the art of living.

05


BOUNDARY STREET

Under Construction | 2IC Townhouses 10-16 Boundary Street, South Melbourne. 17m AUD - 2,100m2

06


Boundary Street is constructed as a concrete structure with light weight façade, 4 storeys, 25 townhouses located in South Melbourne. Within the documentation team, I facilitated communications between the client and contractors that enabled the decision to variate from lightweight to concrete construction. That said, this required myself to conduct significant structural information gathering to enable the design model process. As a core member, I partook in important client consultations. It was decided to construct the project from lightweight to concrete construction. Following this decision, structural information played a large role in the design model due to columns locations affecting the design intent. Documentation of wall types, concrete set-out plans and general set-out plans including coordination with services’ consultant drawings. I attended to the stair structure to work alongside with the requirements from town planning and Australian standards. Through this process, it has allowed me to attend services’ consultant meetings to determine allocations of structure, civil and mechanical options, maintaining and providing a better understanding of the structure and the processes required to adapt the updated information for the new design model.

Image by DKO Architecture

SITE BOUNDARY EF-08 +18,500 5 Roof

+17,143

W 07-2:02

W 07-2:01

LEVEL 4 SFL +15,370

2,280 180

WW 27-3-02

W 27-3:02

WW 27-2-02

W 27-2:02

WW 27-1-02

W 27-1:02

LEVEL 3 SFL +12,270

3,000

W 27-2:01

LEVEL 2 SFL +9,170

100 W 27-1:03

2,600

W 07-1:01

W 27-1:01

W 27-G:02

+4,100 D G-19

NGL +2,450

EF-04

NGL +2,450

EF-03

EF-03

EF:04

EF-03

EF-06

W 27-G:01

GROUND SFL +2,970

D G-18 NGL +2,410

NGL +2,400

NGL +2,380

NGL +2,450

NGL +2,450

+6,070 1 Level 1

370

W 07-G:02

GROUND SFL +2,970 NGL +2,270 +2,350 NGL +2,410

THISTLETHWAITE STREET

+9,170 2 Level 2 +8,340

3,100

W 07-G:03

2,730

W 01-G:03

3,100

2,730

W 01-G:04

+12,270 3 Level 3

+6,900 LEVEL 1 SFL +6,070

100

W 07-1:02

1,030

WW 07-1-02

400

125 375 W 07-1:03

1,600

WW 01-1-03

1,025

W 01-1:03

3,100

WW 07-2-02

3,100

W 07-2:03

3,100

125 375 W 01-2:02

W 01-2:04

1,600

WW 01-2-03

1,000

W 01-2:05

+15,370 4 Level 4

400

WW 27-3-02

1,130

W 07-3:01

1,000

W 07-3:02

3,130

+17,250

2,000

955 2,600

3,100 3,100

2,600 2,600

3,100

EF-15

+16,750

+5,600

3,100 +2,970 0 Ground

WW 07-3-02

100

LEVEL 1 SFL +6,070

W 01-1:04

370

+6,070 1 Level 1

WW 07-4-02

W 08-3:01

L

4,300 PROPRIETARY SOLAR PANELS

EF-01

+16,600

100

LEVEL 2 SFL +9,170

W 01-2:06

400

+9,170 2 Level 2

EF-14

100

LEVEL 3 SFL +12,270

+16,350

WW 01-3-03

400

+12,270 3 Level 3

D D13+16,550

WW 01-4-03

W 01-3:03

BUILDING B BEYOND

+17,635

1,100

2,075

180 1,895

LEVEL 4 SFL +15,370

EF-09

K

4,300

570

GT-01

J

4,300

3,100

EF-07

H

4,300

2,700

EF-11

+17,250 +16,550 +16,519 +16,220

400

+15,370 4 Level 4

+17,445

G

4,300

3,130

EF-07

+18,500 5 Roof

+17,445

F

4,300

3,100

EF-15

E

4,300

1,750

PROPRIETARY SOLAR PANELS

D

4,300 PROPRIETARY METAL SCREEN EF-04

125 375

EF-09

C

4,300

1,600

4,300

1,255

B

SITE BOUNDARY

A

EF-04

EF-06

MEWS

NGL +2,370 NGL +2,370

EF-04

EF-06

EF-03

+2,970 0 Ground +2,370

8 BOUNDARY ST SINGLE STOREY RENDERED BRICK BUILDING

North Elevation

07


Images by Ridz

Image by DKO Architecture

08


THISTLETHWAITE STREET 8

D04

STAIR

BIN PICKUP

1,272

FOYER

D04

TH25 A7148

BR-01

Storage (1.74m3)

NBN DB

SFL +2,850

L'DRY

Storage (1.74m3)

SFL +2,850

Storage (1.74m3)

D02

SFL +2,850

INFILL LIGHTWEIGHT FLOOR

BR-01

L'DRY

DB

CAR SPACE

PUMP

W 24-G:02

+2,920

STUDY

W 24-G:03

FFL +3,000 SFL +2,970 +2,550

TH21 A7140

D09 BR-01

FFL +3,000 SFL +2,970 CINEMA / HOME OFFICE

150H KERB TO DRIVEWAY END

D16 +3,100

BR-01 CAR +2,850 SPACE

D09

TH22 A7142

2.16

01 A3003

FFL +3,000 SFL +2,970 CINEMA / HOME OFFICE D07

D06

+2,950 D04

GAS METERS

2000L WATER TANK

WC

FOYER

2 A3101

2.79

2.78

2.68

2.65

2.58

2.47

2 A3102

GALVANISED IRON FENCE

ROLLER DOOR H-RL 5.33

2.68

2.60

TBM. RL 2.755 RIVET IN B/STONE

BLUESTONE PAVING 2.52

2.70

2.70

2.74

2.71

2.69

2.70 2.55

2.48 2.47

CHANGE OF GRADE

Ground Floor General Arrangement Plan

.8 3

2.46

2.27

01 A3002

W 22-G:01

9.79

EP

D17

2.57

GATE

1 A3102

PRIVATE OPEN SPACE

2.86

2.37

2.08

2.31

2.20

2.10

2.35

7.88

EP

8.46

2.56

2.56

6.77

2.37

2.30

2.29 2.28

2.39

2.39

2.67

PARAPET RL 7.86 2.69 2.70 2.70

1 A3101

2.79

NBN

PALING FENCE

APPROX BUILDING LOCATION

PARAPET RL 6.90

GUTTER RL 5.65

BRICK FENCE

8 BOUNDARY ST SINGLE STOREY RENDERED BRICK BUILDING

2.24

2.20

2.12

2.11 2.13 2.16

781 2.60

DB

SKYLIGHT ABOVE

NBN NBN

SKYLIGHT SKYLIGHT ABOVE ABOVE

DB NBN

SKYLIGHT SKYLIGHT ABOVE ABOVE

DB NBN

SKYLIGHT SKYLIGHT ABOVE ABOVE

DB

PUMP

NBN

WC D07

D06

FFL +3,000 D01 SFL +2,850

GARAGE

SS

STAIR

2000L WATER TANK

TH23 A7144

D05 2000L WATER TANK PUMP

2000L WATER TANK

L'DRY DP DP

PUMP 2000L WATER TANK

PUMP

CAR PARKING

SFL +2,850

BIN STORE

WC

2000L WATER TANK

+2,850

6,205

D07

2000L WATER TANK

D05

PA RL RAP 7.83 ET

TH26 A7150

STAIR

DB

BR-01

STAIR

D01

D05

D11

CINEMA / HOME OFFICE

D06

STAIR

D04 FOYER

FFL +3,000 SFL +2,970

BIN PICKUP

TH27 A7152

D06

BIN PICKUP

D01 DB NBN

2.41

BR-01

D06

2.37

4,207

ID VO E OV AB

FOYER

DRIVEWAY

D14 FFL +3,000 SFL +2,970

D11

D11

STAIR

D11

D01

DRIVEWAY W 25-G:02

PUMP

STAIR

FOYER DRIVEWAY W 26-G:02

D14 FFL +3,000 SFL +2,970

DB NBN

1:20~1:30

W 27-G:03

TH20 A7138

D09

D05

D12 FOYER DRIVEWAY

2.33

FFL +3,000 SFL +2,970

BR-01 +2,850

H-R DOO L 4. R 95

BIN PICKUP

W 24-G:01

CAR SPACE

#DrgID 2 #LayID A3100

D03

CINEMA / HOME OFFICE FFL +3,000 SFL +2,970

W H IND S-R -RL OW L 5. 6.45 10

BIN PICKUP

D09 BR-01

BIN PICKUP

BIN PICKUP

W 25-G:01

TH19 A7136

SKYLIGHT ABOVE

8,210 W 26-G:01

1,239

2.41 2.34

2000L WATER TANK D03

+2,850

CAR SPACE

+2,800 A3006 01

AVENUE

CAR WAIT ZONE

1 : 20 GRADE UP

D17

FOYER FFL +3,000 SFL +2,970

ME RKIN TE G R

WC

D05

6,739

2.28

2.22

D07

2000L WATER TANK 727x1117mm CAR SIZE

D17

9,640 01 A3007

5,091

SKYLIGHT SKYLIGHT ABOVE ABOVE

DB

STAIR

DB

D17

2.13 2.21

FFL+3,000 SFL+2,970

D06 FOYER

PUMP

D17

1 : 20 RAMP

SFL +2,360 SFL +2,802 GATE 617

PA

CINEMA / HOME OFFICE

TH18 A7134

D09 +2,850 D05

W 12-G:02

DB

D14 DP

D04 FOYER

D17

+2,975

2.12

CINEMA / HOME OFFICE

BR-01

BR-01

6,249

PERMEABLE PAVING

W 12-G:01

+2,720

3,074

2.38

FFL +3,000 SFL +2,970

TH17 A7132

D09

NBN

39.10 m2

1,039

FFL +3,000 SFL +2,970

BIN PICKUP

D17

1 : 10 RAMP

W 27-G:01

WC D07

D06

WC

LETTERBOXES TH08 - TH26

2 A3101

DB

863

CAR SPACE

WC

2000L WATER TANK

+2,850 CAR SPACE

D07

2000L WATER TANK

133 THISTLETHWAITE STREET SINGLE STOREY BRICK BUILDING

STAIR

STAIR

NBN

FOYER

CINEMA / HOME OFFICE

D06

1 A3100

NBN

FFL +3,000 SFL +2,970

TH16 A7130

D09

SKYLIGHT SKYLIGHT ABOVE ABOVE

+2,850

GLE

K

2.24

2.26

PUMP

FFL +3,000 SFL +2,970

D05

IAN

W 27-G:02

2.38

2.40

2.42

PUMP

CAR SPACE

D04

+2,830

TR

CINEMA / HOME OFFICE

BR-01

BIN PICKUP

MEWS

TH15 A7128

D09 BR-01

+2,770

FOYER / HOME OFFICE

D14

2.17

2.14

BIN PICKUP BIN PICKUP 81

+2,850

CAR SPACE

WC

D07

D06

BR-01

D01

W 11-G:01

ms

04 A5002

2.17

2.16 2.29

2.48

GLE IAN E TR IN HTL SIG

BIN PICKUP

D05

SKYLIGHT SKYLIGHT ABOVE ABOVE

D14

D07

WC

NBN

INE

2.28 2.22

2.10

STAIR

2000L WATER TANK

NBN

HTL

500

2.10

FOYER

SIG

EST. FFL 2,400

2.09

D04

2000L WATER TANK

SKYLIGHT SKYLIGHT ABOVE ABOVE

STAIR

2,419

4,300

STAIR

D04

90

DB

DB

DB

FFL +3,000 SFL +2,970

D14

4,300

2.16

05 A5003 STAIR

D01 FOYER / HOME OFFICE

FFL +3,000 SFL +2,970

D06 D05

D05

CAR SPACE

CINEMA / HOME OFFICE

TH14 A7126

D09 CAR G/F SPACE SFL +2,850

TOWER CRANE FOOTING

3000L UGRT

BR-01

W 10-G:01

RAMP 1 : 20~ 1:32

BIN PICKUP

D14

W 09-G:01

+2,850

CAR SPACE

D01 FOYER / HOME OFFICE

AC

FFL +3,000 SFL +2,970

BR-01

BIN PICKUP

D14

W 08-G:01

D06

FFL +3,000 SFL +2,970

SFL +2,830

SKYLIGHT ABOVE

SV

FFL+3,000 SFL+2,970

PUMP

PUMP

CINEMA / HOME OFFICE

TH13 A7124

D09 BR-01

D04 FOYER

STAIR

BR-01 D01

FOYER / HOME OFFICE

SFL +2,850

CAR SPACE

PARAPET RL 8.82

EXH T/A

D07

PUMP DB

GV

D14

W 07-G:01

STAIR

BR-01

FFL +3,000 SFL +2,970

TH12 A7122

D07

NBN

STAIR

D01 FOYER / HOME OFFICE

WC

WC

D07

3000L UGRT

PUMP

+2,850

CAR SPACE

LV BIN PICKUP 12-G:01 D11

DP

NBN

STAIR

CAR SPACE

3000L +2,850 UGRT

PUMP

RAMP 1 : 20~ 1:29

GV

WC

D06

FOYER

D06

NBN

NBN

CAR SPACE

3000L +2,850 UGRT

PUMP

TH11 A7120

WC

D07 D06

DB

DB

DB

2.45 2.38

+2,850

TH10 A7118

05

LV 11-G:01 D11

BIN PICKUP

2000L WATER TANK

D05

SFL +2,800

D16

D16

MAIN WATER

FOYER

PERMEABLE PAVING

01 A3009

2.22

3000L UGRT

D01

FFL +3,000 SFL +2,970

GATE

D17

2,000

4,300

PUMP

WC

D07

W 13-G:02

D17a

1,272

A3008 01 A3004 01

8.42 m2

LV 10-G:01 D11

BIN PICKUP

D06

BR-01 BR-01

VER

2.32

TH09 A7116

WC

D07 D06

FOYER / D14 HOME OFFICE

3,500

4,300

TH08 A7114

WC D07

LV 09-G:01 D11

BIN PICKUP

NBN

2.45 2.23 2.27

2.14 2.18

W 07-G:02

LV 08-G:01 D11

D06

4,300 4,300

2.37

2.35

BIN PICKUP

NBN

2.26

2.36

TH07 A7112

2.32

A3001 01 36

+3,404

BIN PICKUP

2.36

2.26

2.18

TP

2.34

LV 06-G:01

LV 05-G:01

BIN PICKUP

PERMEABLE PAVING

LANE

8.42 m2

LV 07-G:01 D11

500

PROPOSED CROSSO

STREET

01 A3005

PERMEABLE PAVING

+2,850 CAR SPACE

ER EXISTING CROSSOV REMOVED TO BE PARTIALLY

2.33

LV 04-G:01

BIN PICKUP

+2,777 D14

GATE

+2,800

2.15

4,300

2.42

CAR PARKING

BOUNDARY

LV 03-G:01

BIN PICKUP

GAS METER: 2000L x 600W x 2100H

BIN PICKUP

D17

L

D11

6,015

LV 01-G:01

BIN PICKUP

2000L UGRT

G

1 A3101

D07

46.35 m

F

J

WC

2

W 07-G:03

H

D07 WC

D11

PUMP WATER TANK

150H KERB TO DRIVEWAY END

E

#DrgID 2 #LayID A3100

D07 WC

D11

D16 W 13-G:01

EXISTING DRIVEWAY TO BE REINSTATED

TBM RL.2.365 RIVET IN CONCRETE

D17

SFL +2,970

D16

TOP OF KERB +2,950

D

2.37

2.50

2,000 MAIN ELEC.

PUMP

6,470

2.45

GAS METERS

2.35

2.17 2. 29

2.19

4,300

W 01-G:02

D07 WC

D11

2000L

D11

1:65 RAMP

D16

D02 W 01-G:03

C

2.23

2.24 NBN

NBN

PUMP

BR-01

CAR +2,850 SPACE

D06

D06

PUMP

+2,500

3000L UGRT

DB

+2,850 CAR SPACE

D06

PUMP

DB

3000L UGRT

TH06 A7110

1 : 10 RAMP

3,131

D01 STAIR

STAIR

GAS METERS

FFL +3,000 SFL +2,970

TH05 A7108

BR-01

W 06-G:02

8 VISITOR BIKE PARKS

2.49 NBN

NBN

+2,850 CAR SPACE

D06

FOYER / HOME OFFICE

D01 STAIR

DB

+2,850 CAR SPACE

L'DRY

+2,850

3000L UGRT

DB

2.45

2.42

2.40

2.38

2.42 2.41 2.49

2.51

2.49

W 01-G:04 2.35

4,300

2.33

2.23 2.20

INVERT OF KERB EDGE OF BITUMEN

BLUESTONE KERB

3000L UGRT

D07

TH04 A7106

BR-01

D14

FFL +3,000 SFL +2,970 D01

STAIR

+2,490

SFL +2,461

W 06-G:01

FOYER / D14 HOME OFFICE

FFL +3,000 SFL +2,970 D01

TH03 A7104

BR-01 LIFT

D17 SFL +2,787

EXISTING CROSSOVER TO BE REMOVED

PARKING METER

LOW HEIGHT SHRUBS TO LANDSCAPE ARCHITECT

PROPOSED CROSSOVER

D17

SFL +2,461 SFL +2,787 W 05-G:01

FOYER / D14 HOME OFFICE

FFL +3,000 SFL +2,970

STAIR

D01

CAR SPACE

INFILL LIGHTWEIGHT FLOOR FFL +3,000 SFL +2,850

SFL +2,461 SFL +2,787 W 04-G:01

FOYER / D14 HOME OFFICE

FFL +3,000 SFL +2,970

TH01 A7100

BR-01

DB NBN

FUTURE DUAL RETICULATION SYSTEM CONNECTION PROVISIONS, REFER HYDRAULIC SERVICES DRAWING

500

2.36

ES 2.41

2.42

2.41 2.45

1,212

W 01-G:01

D17

SFL +2,461 SFL +2,787 W 03-G:01

UP

FFL +3,000 SFL +2,970

B

4,300

D17

SFL +2,461

D12a

D07

2.36

2.45

D17 SFL +2,787

W 01-G:05

A5001 01

2.20

2.23

2.33

P EL

2.36

2.32

2.19

2.32 2.19

2.22

9.92

2.22

01 A5000

2.25 2.37 2.24

2.27

2.27

2.35 2.32

2.26

2.39

2.22 2.32

EP 2.26

2.32

2.22

NA TB IL M. IN RL BIT 2.4 UM 3 EN SV

A

TP

3,500

BITUMEN FOOTPATH

TP

1 A3100

9,850 PROPOSED SEMI-MATURE TREE - REFER LANDSCAPE ARCHITECTS PLANS

03 A5002

7,550

500

9

2 A3102

7

4,500

PUMP

A3000 01

6 4,500

PUMP

5

4,500

PUMP

4 4,500

PUMP

3 4,500

1 A3102

2 2,750

LINE MARKING

2.49

1

Images by Ridz

09


Images by Ridz

10

Image by DKO Architecture


4 F

E

+18,500 SFL Roof

+18,500 SFL Roof

FCL+17,920

W 07-4:01

FCL +17,800

LANDING

ROOF TERRACE 807

FFL+15,520 +15,370 SFL Level 4

TYP.

188

FCL +14,800

3,100

RISER: 178 GOING: 250 2R + G = 606

CORRIDOR

MIN.

1,000

MIN.

2,000

FCL+14,800

865

MASTER

FFL +15,400

+15,370 SFL Level 4

1,000

3,100

FCL+14,800

FFL +15,400

FFL+12,300

+12,270 SFL Level 3

CORRIDOR TYP.

182

2,000

MIN.

865

RISER: 182 GOING: 250 2R + G = 615

MIN.

FFL+9,200

+9,170 SFL Level 2

FCL +8,500

RISER: 182 GOING: 250 2R + G = 615

3,100

2,000

+9,170 SFL Level 2

FCL +8,700

DINING

MIN.

1,000

1,000

TYP.

182

MIN.

LIVING

FFL +9,200

FCL +8,500

865

3,100

FCL+8,700

03 A7860

1,000

1,000

3,100

BEDROOM 2

FCL +11,700

FCL +11,700

3,100

FCL+11,700

FCL+11,600

FFL +12,300

+12,270 SFL Level 3

FFL+6,100

+6,070 SFL Level 1

FFL +6,100

+6,070 SFL Level 1

FCL +5,600

+2,970 SFL Ground

Stair Section 01

10 A7860

TYP.

2,268

CAR SPACE

REFUSE ROOM

1,103

MIN.

2,000

1,316

182

RISER: 182 GOING: 250 2R + G = 615

3,100

FOYER 865

3,100

FCL+5,600

+3,000

+2,970 SFL Ground

FFL +3,000

FFL +2,880

Stair Section 02

11


C C

B B

A A

4,300 4,300

4,300 4,300

SOLAR PANELS SOLAR PANELS +18,500 +18,500

METAL ROOF METAL ROOF SARKING & INSULATION SARKING & INSULATION STRUCTURAL ROOF STRUCTURAL ROOFDETAILS FRAMING TO ENG'S FRAMING TO ENG'S DETAILS +17,490 +17,490

+17,250 +17,250 SERVICES SERVICES

+16,350 +16,350

STAIR STAIR

ROOF TERRACE ROOF TERRACE

1,000 1,000

PLANTER PLANTER

SSL+15,370 SSL+15,370 LEVEL 4 LEVEL 4

FFL+15,500 FFL+15,500

CONCRETE BEAM TO CONCRETE BEAM TO ENG'S DETAILS ENG'S DETAILS

4 4

1000MM DEEP PLANTER BOX 1000MM DEEP PLANTER BOX IN FOLDED METAL IN FOLDED METAL SUPPORTED ON STUD WALL SUPPORTED ON STUD WALL PROTECTION BOARD TO ALL PROTECTION BOARD TO ALL SIDES AND BASE OF PLANTER SIDES AND BASE OF PLANTER

PLASTERBOARD CEILING PLASTERBOARD CEILING

TANKING CONSISTING OF DRAINAGE TANKING CONSISTING DRAINAGE CELL & FILTER FABRIC OF & WATERPROOF CELL & FILTER FABRIC & WATERPROOF MEMBRANE. REFER LANDSCAPE MEMBRANE. REFER LANDSCAPE ARCHITECTS DRAWINGS ARCHITECTS DRAWINGS INSULATION INSULATION STRUCTURAL CONCRETE STRUCTURAL SLAB TO ENG'SCONCRETE DETAILS SLAB TO ENG'S DETAILS

Typical Part Roof Section TYP. PART ROOF SECTION TYP. PART ROOF SECTION 1:50 1:50

BRADFORD ANTICON 60 REFLECTIVE BLANKET TO BRADFORD ANTICON REFLECTIVE BLANKETR1.3 TO UNDERSIDE OF ROOF 60 SHEETING TO ACHIEVE UNDERSIDE OF ROOF SHEETING TO ACHIEVE R1.3 SARKING SARKING EF-20 LYSAGHT KLIPLOCK ROOFING@ 3° PITCH EF-20 LYSAGHT KLIPLOCK ROOFING@ 3° PITCH EF-04 COLORBOND PARAPET CAPPING EF-04 COLORBOND PARAPET CAPPING

EF-04 EF-04 300mm W x 100mm D BOX GUTTER ON GUTTER 300mm x 100mmWITH D BOX@GUTTER ON GUTTER BOARD W SUPPORT 1:100 FALL BOARD SUPPORT WITH @ 1:100 FALL

TOP OF PARAPET+18,500 TOP OF PARAPET+18,500

3º PITCH 3º PITCH

STRUCTURAL ROOF FRAMING. STRUCTURAL ROOFDRAWINGS FRAMING. REFER TO STRUCTURAL ENGINEERS REFER TO STRUCTURAL ENGINEERS DRAWINGS CROSS BRACING TO STRUCTURAL ENG. DRAWINGS CROSS BRACING TO STRUCTURAL ENG. DRAWINGS 13mm THK. MR PLASTERBOARD CEILING LINING 13mm THK. MROVER PLASTERBOARD CEILING LINING FIXED PROPRIETARY CSR RONDO OVER PROPRIETARY CSR RONDO SUSPENDEDFIXED SYSTEM. PAINT FINISH AS SCHEDULED SUSPENDED SYSTEM. PAINT FINISH AS SCHEDULED

FCL+17,900 FCL+17,900

CS:09 CS:09

CH PIT H 27º PITC 27º

BRADFORD ANTICON 60 REFLECTIVE BLANKET TO BRADFORD ANTICON REFLECTIVE BLANKETR1.3 TO UNDERSIDE OF ROOF 60 SHEETING TO ACHIEVE UNDERSIDE OF ROOF SHEETING TO ACHIEVE R1.3 TOP OF PARAPET+17,143 TOP OF PARAPET+17,143

WT:77 WT:77 NOTCH / CUT OUT RB1 TO NOTCH / CUT OUTBOX RB1GUTTER TO ACCOMMODATE AND ACCOMMODATE BOX GUTTER AND RAINWATER HEAD CONNECTION RAINWATER HEAD CONNECTION EF-21 EF-21

EF-21 EF-21

POWDERCOATED ALUMINIUM POWDERCOATED ALUMINIUM FRAMED GLAZED DOOR SYSTEM. FRAMEDDOOR/WINDOW GLAZED DOORSCHEDULE SYSTEM. REFER REFER DOOR/WINDOW SCHEDULE

FALL FALL

WT-54 WT-54

ROOF ROOF TERRACE TERRACE

FFL+15,500 FFL+15,500

2,721 2,721

2,553 2,553

865 MIN 865 MIN

EF-08 EF-08

2,400 2,400

TOWNHOUSE TOWNHOUSE TH27 TH27 NOTE: INTERNAL ARTIFICIAL NOTE: INTERNAL ARTIFICIAL LIGHTING TO BE CONFIRMED LIGHTING TO BE CONFIRMED

Lightweight RoofROOF Section Detail DE-04 TH27 SECTION DE-04 TH27 LIGHTWEIGHT LIGHTWEIGHT ROOF SECTION DETAIL DETAIL 1:20 1:20

12

FFL+15,500 FFL+15,500


1,030

545

404

TREAD

32

STRINGER

817

60 STRINGER

123TREAD

42

60

250

TREAD

32

250

182

182

123 250

28 0

MIN.

865 MIN.

865

28 0

28 0

Stair Detail 01 Elevation Stair Detail 01 Elevation 1:20 F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 1:20 TIMBER

60

320

TREAD

32 TREAD

13 13

09 F-12 75 x 45mm ALPINE OAK HANDRAIL. ALL EDGES TO BE SANDED AND SEALED

Stair Connection Detail

Stair Connection Detail 02 1:5

F-12

100 MIN.

32 817 42

STRINGER

250 33 13 TREAD 45

13

250

33

49

3

MIN.

32

STRINGER

70

VOID

36

880

12

45

13

3

3

12X 5 MM FLAT BAR PC FINISH

08 A7800

STEEL PLATE NOM 50X50MM 3mm THK WITH STEEL STANCHION CFW TO FIXING PLATES

F-12 @ NOM 900 CTS. WALL PLATE FIXED REAR STUD WALL PB OVER 70 x 70mm ALPINE OAK POST50WITH 2PACTOFINISH.

14

CONNECTION DETAIL TBC WITH BUILDER F-14 16mm DIA. METAL BALUSTADE WITH 280 x 42mm ALPINE OAK STRINGER MECH. FIX TO F-14 FINISH. ROUTER PC PANEL PLASTERBOARD OVER. CUT 16mm DIA. METAL POWDERCOAT BALUSTADE WITH PLASTERBOARD TO FULL SURROUND OF STAIR TIMBER TO TOP SIDE OF STAIR POWDERCOAT FINISH. ROUTER STRINGER. SPACED 120mm CENTER TREAD. CONNECTION DETAIL TBC WITH BUILDER 16 TIMBER TO TOP SIDE OF STAIR F-17 17 STRINGER. SPACED 120mm CENTER NOM. 50 x 20mm ALUMINIUM ANGLE 280 x 32mm TREAD. FINISH TO MATCH F-14 TIMBER 11 F-06HANDRAIL ELEVATION DETAIL MECH FIX TO SLAB, FLOORING OVER 16mm DIA. METAL BALUSTADE WITH NOM. 50 x 20mm ALUMINIUM ANGLE F-14 POWDERCOAT 1:5 FINISH. ROUTER TIMBER TO MECH FIX TO SLAB, FLOORING OVER 16mm DIA. METAL BALUSTADE TOP SIDE OF STAIR WITH STRINGER. SPACED 120mm F-06

05 TIMBERStair POWDERCOAT FINISH. ROUTER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER

TIMBER FLOOR FINISH AS SPECIFIED 75 100 F-06 MIN. 42 FLOOR 70 FINISH 13 50 13 TIMBER AS SPECIFIED

F-17

F-17

F-12

45

STINGER

CL ALPINEVOID OAK POST TO CONCRETE SLAB EDGE FIXING COUNTERSINK FIXINGS FIXING COLOUR ALPINE OAK POST TO CONCRETE SLAB EDGETO MATCH SURROUND 09 FIXING COUNTERSINK FIXINGS FIXING COLOUR F-12 TO MATCH SURROUND 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH

40

280

STRINGER

280 x 42mm STRINGER WITH 2PAC FINISH

100

G/F Wall Mount Handrail Detail 1:5

F-14 2 16mm DIA. STEEL BALUSTERS, 120mm SPACED POWDERCOAT FINISHED. SECURELY FIXED. FIXING TO FLOOR TBC BY BUILDER TIMBER HANDRAIL OVER

FCL +8,500

NOTCH TO STRINGER

POWDERCOAT FINISH

04

6

F-14

42

15

Detail 05CENTER Plan 1:20

280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER

280EDGES x 32mm TREAD. FINISH TO MATCH F-06 75 x 45mm ALPINE OAK HANDRAIL. ALL TIMBER TO BE SANDED AND SEALED

Stair Detail Plan

BALUSTER TO FLOOR FIXING TBC BY BUILDER BALUSTER TO FLOOR FIXING TBC BY BUILDER

70 x 70mm ALPINE OAK POST WITH 2PAC FINISH. SAND ALL SIDES TO ACHIEVE SMOOTH FINISH. MECH FIX TO STRINGER

32

280

STRINGER

F-12 F-12 75 x 45mm ALPINE OAK HAND 5 RAIL.ALPINE ALL EDGES BE SANDED 280 x 42mm OAKTOSTRINGER F-12 AND SEALED. 2PAC FINISH 2804x 42mm ALPINE OAK STRINGERWITH 2PAC FINISH 16mm DIA. METAL BALUSTADE WITH WITHF-14 2PAC FINISH

F-12

FIXING PLATES

VOID

805 30 FIXING TBC CLEAR SECURELYF-12 FIXED TO FLOOR. 70 x 70mm ALPINE70 OAK POST 42 WITH 2PAC 13mm PLASTERBOARD. PAINT STRINGER SMOOTH BYFINISH. BUILDER SAND ALL SIDESVOID TO ACHIEVE 838 402PAC x 40mm METAL SECURELY FINISH AS SCHEDULED 70 x 70mm ALPINE OAK POST WITH FINISH. FIX PLATE. TO STRINGER 75FIXEDMECH 961 TO PLASTERBOARD. PROVIDE FINISH. SAND ALL SIDES TO ACHIEVE SMOOTH STAIR WIDTH ADDITIONAL NOGGING FOR SECURE FINISH. MECH FIX TO STRINGER CL FIXING FOR HANDRAIL

10

33 13 45

6

F-14

30 x 30mm METAL PLATE. F-12 16mm DIA. STEEL 12 81120mm SECURELY FIXED TO BALUSTERS, POWDERCOAT FINISHED. UNDERSIDESPACED OF HANDRAIL

32

60 122 60

P50 SHADOW LINE F-02 CEILING F-14 16mm DIA. METAL BALUSTADE WITH ANGLE TO EDGE OF POWDERCOAT FINISH. ROUTE TIMBER TO TOP PLASTERSTOP PLASTERBOARD SIDE OF STAIR STRINGER. SPACED 120mm CENTER

32 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND STRINGER. CTS TO TREAD

5

75

F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER

7

4

13 5008 13 F-12 F-12 75 x 45mm ALPINE OAK TIMBER HANDRAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC NOM 12x 5 MM FLAT BAR METAL FINISH HANDRAIL BRACKET CFW TO

43

280 x 42mm STRINGER WITH 2PAC FINISH

8 F-14

3 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED

CL

13mm PLASTERBOARD DIRECT STICK TO SLAB EDGE

FINISH. ROUTER TIMBER TO 11 F-14TOPPOWDERCOAT SIDE OF STAIR STRINGER. SPACED 120mm F-14 CENTER 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY U/SALPINE OAK HAND RAIL. ALL EDGES TO 75 TO x 45mm 10 BE SANDED AND SEALED. 2PAC FINISH TREAD ANDEA STRINGER. CTSSECURELY TO TREAD 25mm x 3mmTHK. STEEL MECH. FIXED TO U/S F-17 AD AND STRINGER. CTS TO TREAD 9 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER

01 3

F-04

F-12

16mm DIA. METAL BALUSTADE WITH

11

40

13

NOTCH TO STRINGER NOTCH TO STRINGER F-17 280 x 32mm TREAD. FINISH TO MATCH 7 F-06 TIMBER 42 0 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER F-14

13

33

13

50

F-12 BALUSTER TO FLOOR FIXING TBC BY x 45mm ALPINE OAK HANDRAIL. NOMINAL F-12 BUILDER DEPTH75SHOWN TO BE SANDED AND 75 x 45mm ALPINEALL OAKEDGES HANDRAIL. CONCRETE ALL EDGES TO BESEALED SANDED AND SLAB SEALED

33

28 0

POWDERCOAT FINISH. ROUTE 30 250 TO TOP SIDE OF STAIR STRINGER. MAX 120mm CTS m DIA. METAL TIMBER BALUSTADE WITH POWDERCOAT FINISH. ROUTE BER TO TOP SIDE OF STAIR STRINGER. MAX 120mm CTS

13

13

50

MIN.A7861

TREAD

TIMBER FLOOR FINISH AS SPECIFIED

50

STRINGER

280

123

ALPINE OAK POST TO CONCRETE SLAB EDGE F-14FIXING COUNTERSINK FIXINGS FIXING COLOUR TO MATCH SURROUND 16mm DIA. METAL BALUSTADE WITH

75

F-06

MIN.

2

F-12 70 x 40mm ALPINE OAK POST WITH 2PAC FINISH BOLTED M16 (TBC) TO STEEL PLATE

NOM. 50 x 20mm ALUMINIUM ANGLE. MECH FIX TO SLAB, FLOORING OVER

100

13

280

STRINGER

42

EQ EQ

60

NOM. 4 x 10mm ALUMINIUM BLADES / REBATE TO STAIR TREAD. NOM. 2mm ABOVE FINISH TREAD

125 MAX. GAP

182

32

1

280 x 42mm ALPINE OAK STRINGER MECH. FIX TO PC PANEL PLASTERBOARD OVER. CUT PLASTERBOARD TO FULL SURROUND OF STAIR TREAD. CONNECTION TBC WITH BUILDER

F-14

16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTER TIMBER TO TIMBER FLOOR BOARDS. SPACED 120mm CENTER

F-14

25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND STRINGER. CTS 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED TO TREAD

F-14

F-14

150

32

CL

F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTER TIMBER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER

32

25

FINISH. MECH FIX TO STRINGER

SPACED AS SHOWN

13

20

280 x 42mm 2PAC FINISH 45 WITH x 75mm TIMBER HANDRAIL. ROUTER F-12 F-12STRINGER

TIMBER TO UNDERSIDE OF BALUSTER,50 280 x 32mm FINISH TO 45 x TREAD. 75mm70TIMBER HANDRAIL. ROUTER x 70mm ALPINE OAK POST WITH 2PAC FINISH. SAND ALL SIDES TO ACHIEVE SMOOTHSPACED AS SHOWN MATCH F-06 TIMBER TIMBER TO UNDERSIDE OF BALUSTER,

CL

75

F-12

EQ EQ

F-12 F-12 280 x 42mm STRINGER WITH 32 280 x 42mm STRINGER WITH 2PAC FINISH 2PAC FINISH F-12

75 50

13

20

70

33 13 45

42

42

F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTE TIMBER TO TOP SIDE OF STAIR 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTE TIMBER TO TOP SIDESTRINGER. OF STAIR MAX. 120mm CTS STRINGER. MAX. 120mm CTS

STRINGER

60

280

STRINGER

MAX.

MAX.

4 x10mm NOM. ALUMINIUM BLADES / REBATE TO STAIR TREAD. ALL/ ON 2mm NOM. ABOVE FINISH TREAD 10mm NOM. ALUMINIUM BLADES REBATE TO STAIR TREAD. ALL ON 2mm NOM. ABOVE FINISH TREAD

12

F-12

122

MAX.

08 A7800

60

120

120

122

F-12 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH

120 MAX. 120

13

12

F-12 280 x 42mm STRINGER WITH 2PAC FINISH 11 280 x 42mm STRINGER WITH 2PAC FINISH F-14 F-12 11 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO F-14 70 x 70mm ALPINE OAK POST WITH 2PAC FINISH. 10 14 SANDED AND SEALED. 2PAC 75 x 45mm ALPINEBE OAK HAND RAIL. ALL EDGES TOFINISH CONNECTION DETAIL TBC WITH BUILDER 10 BE SANDED AND SEALED. 2PAC FINISH 280 x 42mm ALPINE OAK STRINGER MECH. FIX TO 9 F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 PC PANEL PLASTERBOARD OVER. CUT PLASTERBOARD TO FULL SURROUND OF STAIR 9 TIMBER F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TREAD. CONNECTION DETAIL TBC WITH BUILDER 8 16 15 TIMBER F-17 17 F-14 8 280 x 32mm TREAD. FINISH TO MATCH 16mm DIA. METAL BALUSTADE WITH F-14 7 F-06 TIMBER FINISH. ROUTE TIMBER TO TOP 16mm DIA. METAL POWDERCOAT BALUSTADE WITH SIDE OF STAIR STRINGER. SPACED 120mm 7 POWDERCOAT FINISH. ROUTE TIMBER TO TOP CENTER SIDE OF STAIR STRINGER. SPACED 120mm 05 Stair Detail 056 Plan CENTER 6 1:20 F-12 75 x 45mm ALPINE 1,030OAK HAND 5 RAIL. ALL545 EDGES TO BE404 SANDED 49 32 OAK HAND F-12 75 x 45mm ALPINEAND 5 TREAD RAIL. ALL EDGES TO BESEALED. SANDED2PAC FINISH 4 F-12 AND SEALED.F-14 2PAC FINISH 16mm DIA. METAL BALUSTADE WITH 75 x 45mm ALPINE OAK HANDRAIL. ALL EDGES 4 TO BE SANDED AND SEALED POWDERCOAT FINISH TO MATCH F-17 280 x 32mm TREAD. FINISH DIA.F-06 METAL BALUSTADE WITH F-14 16mm TIMBER FLOOR FINISH FINISH POWDERCOAT 60

250

4 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER F-14 16mm DIA. METAL BALUSTADE WITH 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER POWDERCOAT FINISH

F-14 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND STRINGER. CTS TO TREAD

42

09

F-12 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH 12

250

45

STINGER

12

42

Stair Tread Detail

F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTE TIMBER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER

5

36

880

VOID

Stair Detail Plan

6

150

30 70 250

VOID

75

F-14 2 16mm DIA. STEEL BALUSTERS, 120mm SPACED POWDERCOAT FINISHED. SECURELY FIXED. FIXING TO FLOOR TBC BY BUILDER

75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH

NOM.

01

7

F-17

MIN.

280

8

32

STRINGER

STAIR WIDTH

100

STRINGER

9

NOM. 4 x 10mm ALUMINIUM BLA / REBATE BLADES TO STAIR TREAD. NO NOM. 4 x 10mm ALUMINIUM 2mm ABOVE FINISH TREAD / REBATE TO STAIR TREAD. NOM. 04 2mm ABOVE FINISH TREAD

280 x 42mm STRINGER WITH 2PAC FINISH

75

60 122 60

1

49

838 961

VOID STRINGER

CL

F-12 280 x 42mm STRINGER WITH 2PAC FINISH 11 F-14WITH 2PAC FINISH 280 x 42mm STRINGER 10

6

805

CL

30

32

5

CLEAR

42

75

F-12 F-12

25

4

70

02

50

25

32

SPACED POWDERCOAT FINISHED. SECURELY FIXED TO FLOOR. FIXING TBC BY BUILDER

42

12

3

50

F-12 F-14 75 x 45mm ALPINE OAK TIMBER HANDRAIL. ALL 25 x TO 25mm x 3mmTHK. STEEL 2PAC F-14 EDGES BE SANDED AND SEALED. EA MECH. FIXED SECURELYFINISH 25 x 25mm x 3mmTHK. TOSECURELY U/SSTEEL TREAD AND STRINGER. EA MECH. FIXED VOID F-14 TO U/S TREAD AND STRINGER. CTS TO TREAD 16mm DIA. STEEL BALUSTERS, 120mm CTS TO TREAD

02

25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND 25 x 25mm x 3mmTHK. STEEL EA MECH. CTS TO TREAD FIXED SECURELY STRINGER. TO U/S TREAD AND STRINGER. CTS TO TREAD

F-14 16mm DIA. METAL BALUSTADE F-14 POWDERCOAT FINISH. 16mm DIA. METAL WITH BALUSTADE ROUTER TIMBER TO TOP SIDE O WITH POWDERCOAT FINISH. STAIR ROUTER TIMBER TO TOPSTRINGER. SIDE OF SPACED 120m STAIR STRINGER. CENTER SPACED 120mm CENTER

125 MAX. GAP

120

2

32

125 MAX. GAP

60

CL

120

123

125 MAX. GAP

CL

NOM. 4 x 10mm ALUMINIUM BLADES CL CL / REBATE TO STAIR TREAD. NOM. 2mm ABOVE FINISH TREAD

F-17

30

1

280 x 42mm ALPINE OAK STRINGER MECH. FIX TO PC PANEL PLASTERBOARD OVER. CUT

F-12 PLASTERBOARD TO FULL SURROUND OF STAIR TREAD. CONNECTION TBCWITH WITH BUILDER 280 x 42mm STRINGER F-12 2PAC FINISH 280 x 42mm STRINGER WITH 32 F-122PAC FINISH 70F-17 x 40mm ALPINE OAK POST WITH 2PAC FINISH BOLTED M16 (TBC) TO STEEL PLATE F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER 01 280 x 32mm TREAD. FINISH TO A7861 MATCH F-06 TIMBER 08

F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 280 x 32mm TREAD. FINISH TO250 MATCHTIMBER F-06 TIMBER

32

F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER FLOOR FINISH

F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTER TIMBER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER

32

F-12 75 x 45mm ALPINE OAK F-12 2PAC 75 x 45mm ALPINE HAND OAK RAIL WITHFINISH 50 2PAC 25 HAND RAIL WITH FINISH F-14 16mm DIA. METAL BALUSTADE F-14 WITH POWDERCOAT FINISH. 16mm DIA. METAL ROUTER BALUSTADE TIMBER TO TOP SIDE WITH POWDERCOAT OF FINISH. 32 STAIR STRINGER AND ROUTER TIMBER TO TOP SIDE BOTTOM SIDE OF HAND RAIL. OF STAIR STRINGER AND SPACED BOTTOM SIDE OF HAND RAIL. 120mm CENTER SPACED 120mm CENTER

32

49

NOM. 50 x 20mm ALUMINIUM ANGLE. MECH FIX TO SLAB, FLOORING OVER TIMBER FLOOR FINISH AS SPECIFIED

13 50

MIN.

13

3

75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED

F-12 NOM 12x 5 MM FLAT BAR METAL HANDRAIL BRACKET CFW TO FIXING PLATES

33

F-12

50

F-12 280 x 42mm STRINGER WITH 2PAC FINISH 280 x 42mm STRINGER WITH 2PAC FINISH 30 x 30mm METAL PLATE.

BALUSTER TO FLOOR FIXING TBC BY BUILDER DEPTH SHOWN NOMINAL

CONCRETE SLAB

13 13

11

3

MIN.

NOM.

F-01 ALPINE OAKPLASTERBOARD POST TO CONCRETE SLAB EDGE STICK TO 13mm DIRECT F-01 FIXING COUNTERSINK FIXINGS FIXING COLOUR TO MATCH SURROUNDSLAB EDGE 13mm PLASTERBOARD DIRECT STICK TO SLAB EDGE

75

F-06

100

F-14

40

CEILING SYSTEM SHOWN INDICATIVE ONLY ALLOW STRUCTURE FOR FACE CEILING SYSTEM SHOWN INDICATIVE FIXING ONLY ALLOW STRUCTURE FORPLASTEBOPARD FACE PLASTEBOPARD FIXING NOM.

280

STRINGER

32

TREAD

150

16mm DIA. METAL BALUSTADESECURELY WITH TO U/S TREAD AND STRINGER. CTS POWDERCOAT FINISH. ROUTER TIMBER TO TO TREAD TIMBER FLOOR BOARDS. SPACED 120mm CENTER

SECURELY FIXED TO

12

81


WOODS ROAD

Town Planning | 2IC Residential 190 Woods Road, Truganina

14


4,200 5,000

16,00 0

T08

Bed 2

2,300

3.6 x 3.0m

L'dry 1.1 x 2.0m

T01

DOWN

TH11 A: 126.20 m2

10 9

Garage 5.6 x 6.0m

4,500

17 16 15 14 13 12 11

T01

1

TH10 A: 130.00 m2

2 3 4 5

T01

Road

1 2 3 4 4 5

Bed 4 4.0 x 4.0m

4.1 x 1.8m

5

TH04 A: 149.82 m2

T01

3 4 5

T01

4

UP

1 2 3

5

5

4

Bath 2.8 x 1.9m

L'dry

4,700

DOWN

1.1 x 2.0m 17 16 15 14 13 12 11

Garage 6.3 x 7.0m

6,790

Road

DOWN

10 9

8 7 6 5 4 3 2 UP 1

5

Bath 4.1 x 1.8m

Garage 6.3 x 7.0m

STAGE 6C 5,500

Bed 2 3.6 x 3.0m

5

4

4,200

3.6 x 3.0m 4

3

Garage 6.3 x 7.0m

A: 5,142.56 m2

Garage 6.3 x 7.0m

4.1 x 1.8m

5,000

Bed 1

Bed 4 4.0 x 4.0m

4.1 x 1.8m

Garage 4.1 x 6.0m

3

2

Bath

4.0 x 4.0m

Bath

Garage 4.1 x 6.0m

Road Stage 6C

2

1

1,349 5,502

Bed 4

1

1,083

16,000

4.0 x 4.0m

4.1 x 1.8m

5

Garage 6.3 x 7.0m

Bed 4 4

Bath 4.1 x 1.8m

DOWN

4.0 x 4.0m

T01 TH17 A: 206.70 m2

4.0 x 4.0m

Bath

3

5 4

3

L'dry 2.1 x 1.9m

Bath

2.8 x 1.9m

2

4 3

2

Bath 2.8 x 1.9m

Garage 6.3 x 7.0m

Bed 4

Bed 4

2

1

2.1 x 1.9m

TH01 A: 163.96 m2

UP

L'dry

4.1 x 1.8m

Garage 6.3 x 7.0m

T08

3.0 x 3.0m

Bath 1

4.1 x 1.8m

T01

Garage 6.3 x 7.0m

Garage 6.3 x 7.0m

5

Bath

TH02 A: 130.00 m2

Bed 1

5

5

3.0 x 3.0m

4

4

4.0 x 4.0m

3

3

Bed 1

2

2

TH03 A: 130.00 m2

Bed 4

1

1

Bath 4.1 x 1.8m

Bed 4 4.0 x 4.0m

T01

4

4.0 x 4.0m

4.1 x 1.8m

Garage 6.3 x 7.0m

TH16 A: 130.00 m2

T04 TH05 A: 90.00 m2

Bed 4

Bath

Garage 6.3 x 7.0m

1

Bath

2

5

5

3

4

4.1 x 1.8m

Garage 6.3 x 7.0m

T04 TH06 A: 90.00 m2

2

3

Bath 4.1 x 1.8m

1

2

4.0 x 4.0m

T01

T01 TH07 A: 149.93 m2

Bed 4 4.0 x 4.0m

Bath

3

1

5,500 1,351

Bed 4

TH15 A: 130.00 m2

TH08 A: 129.91 m2

Bed 4 4.0 x 4.0m

1,351

2

TP30 0 02

T01

Garage 6.3 x 7.0m

4.1 x 1.8m

1

Bath

T01 TH14 A: 130.00 m2

TP30 0 01

TH09 A: 130.08 m2

Bed 4 4.0 x 4.0m

1

2.8 x 1.9m

3

Bath

T01 TH13 A: 130.00 m2

2

Bed 1 3.6 x 3.0m

1

TH12 A: 144.61 m2

4,500

8 7 6 5 4 3 2 UP 1

7,317

Garage 5.6 x 6.0m

2,300

847 1,425

DOWN

Bath 3.4 x 1.8m

3.0 x 3.1m

5

5

4

L'dry

2.1 x 2.1m

Bath

Bath

3.4 x 1.8m

3.4 x 1.8m

UP 5

4

1

3

2

Bed 2

UP

5

3

2

L'dry

8 7 6 5 4 3 2 1

UP

5

Bed 1

Bed 1

4.0 x 3.5m

4.0 x 3.5m

Garage 5.6 x 6.0m

UP

2

1

6,000

L'dry 2.1 x 2.1m

UP

L'dry 2.1 x 2.1m

Bath

3

Bath

3.4 x 1.8m

2

UP

1

3.4 x 1.8m

1

Bed 1

Bed 1

4.0 x 3.5m

4.0 x 3.5m

Bed 1

Bed 1

4.0 x 3.5m

4.0 x 3.5m

05 TP30 0

Garage 5.9 x 5.5m

Bath 3.4 x 1.8m 5

4

3

4

3

2

UP

Garage 5.6 x 6.0m

L'dry 2.1 x 2.1m

Bath 3.4 x 1.8m

5

4

1

1,000

5

5

4

4

3

2

UP

UP

Powder 1.9 x 1.0m

DOWN 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP

1.8 x 2.9m 1.9 x 1.8m

3

2

1

Ensuite Robe

1

Bed 1

Bed 1

4.0 x 3.5m

4.0 x 3.5m

Bed 1 4.4 x 3.6m

Kitchen 2.7 x 4.4m

Living / Dining 5.8 x 5.5m

1.1 x 2.0m

T12

T12

T12

T12

T12

T12

T12

T12

T09

TH21 A: 130.06 m2

TH22 A: 130.00 m2

TH23 A: 130.00 m2

TH24 A: 149.92 m2

TH25 A: 129.81 m

TH26 A: 130.00 m2

TH27 A: 126.50 m2

TH28 A: 120.35 m2

TH29 A: 296.63 m2

11,800

04 TP300

5,000

2,300

4,500

3.6 x 3.0m

Bath 2.8 x 1.9m

91110

Bed 1 3.6 x 3.0m

DOWN 17 16 15 14 13 12

T15

L'dry 2.1 x 2.1m

4

3

2

UP

1

TH20 A: 145.50 m2

L'dry

2.1 x 2.1m

4

3

2

1

Garage 5.6 x 6.0m

DOWN

TP300 03

L'dry 2.1 x 2.1m

Bath 3.4 x 1.8m

Bed 1

Bath 3.1 x 1.5m

Garage 5.6 x 6.0m

DOWN

L'dry 2.1 x 2.1m

DOWN

DOWN

DOWN

Bed 3 3.5 x 3.1m

T03 TH19 A: 130.00 m2

DOWN

3.5 x 3.1m

Garage 5.6 x 6.0m

Garage 5.6 x 6.0m

5,500

Garage 5.6 x 6.0m

7,194

Bed 3

1,003

Garage 5.6 x 6.0m

847

Garage 5.6 x 6.0m

DOWN

DOWN

3.0 x 3.1m

DOWN

5

4

3

1,000

Bed 1

3.1 x 1.5m

1,290

2

Bath

UP

1

T03 TH18 A: 130.00 m2

Stage 6c Ground Floor Plan

This is an visionary townhouse development, part of a local masterplan for central shopping centre development located in Truganina. The focal point is the town centre located in the centre of the masterplan. Stage 6c consists of 29 townhouses located south east of the local town centre and stage 7 consisting of 64 townhouses located to the north of the town centre. My role was to produce a town planning package under the direction of the project architect. This entailed model design, design and develop the floorplans, sections and elevations utilizing Archicad software. Coupled with skilled experience in documentation, my knowledge in materials, construction builds and building code requirements, it allowed me to produce effective and efficient designs, approved by the project architect.

15


UP 4

3

2

UP 4

3

2

1

T04

T07

TH15 A: 90.00 m2

TH23 A: 120.00 m2

Terrace

Bed 2

2.0 x 3.4m

3.4 x 3.4m

Terrace

Bed 2

2.0 x 3.4m

3.4 x 3.4m

DOWN

2.0 x 3.4m

T07 TH16 A: 120.00 m2

UP

1.0 x 1.5m

Terrace

Bed 2

2.0 x 3.4m

3.4 x 3.4m

500

Bed 1

Terrace

3.3 x 1.8m

3.3 x 1.8m

Terrace Garage 5.6 x 6.0m

Bath

Terrace

1.0 x 1.5m

L'dry

1.0 x 1.5m

Bath

DOWN

Bath

DOWN

Terrace

3.3 x 1.8m

3.3 x 1.8m

Bath 2.7 x 2.4m

DOWN

UP

T07

T07

TH38 A: 120.00 m2

Bed 1

3.3 x 1.8m

Terrace 3.3 x 1.8m

Bed 2

Terrace 2.0 x 3.4m

Bed 2

Terrace

3.4 x 3.4m

2.0 x 3.4m

Bed 2

Terrace

3.4 x 3.4m

2.0 x 3.4m

1.0 x 1.5m

Bath 2.7 x 2.4m

3.5 x 3.6m

Garage 5.6 x 6.0m

3.5 x 3.6m

2.7 x 2.4m

8,742

1,5

1,500

3.4 x 3.4m

L'dry

DOWN

L'dry

1.0 x 1.5m

98 7

11 10

DOWN 17 16 15 14 13 12

T14

T14

TH17 A: 149.48 m2

TH25 A: 180.01 m2

DOWN 17 16 15 14 13 12

8 7 6 5 4 3 2 1

6 5 4 3 2 1

UP

UP

8 7 6 5 4 3 2 1

DOWN 17 16 15 14 13 12

+9,000 3 Level 3

+6,000 2 Level 2

+3,000 1 Level 1

±0 0 Ground Floor

Townhouse Elevation 01

500

562

2,472

500

Stage 7 Ground Floor Plan

16

2.0 x 3.4m

1.0 x 1.5m

Terrace Garage 5.6 x 6.0m

Terrace

L'dry

3.5 x 3.6m

Garage 5.6 x 6.0m

Terrace

Bed 1

Bed 2 3.4 x 3.4m

UP

L'dry

1.0 x 1.5m

2.7 x 2.4m

Bed 1

Bed 1 Garage 5.6 x 6.0m

UP

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Bath 2.7 x 2.4m

3.3 x 1.8m

3.5 x 3.6m

DOWN

1.0 x 1.5m

3.5 x 3.6m

Garage 5.6 x 6.0m

3.5 x 3.6m

2.7 x 2.4m

L'dry

Bed 1

3.3 x 1.8m

2.7 x 2.4m

L'dry

Bath 2.7 x 2.4m

DOWN

3.5 x 3.6m

Garage 5.6 x 6.0m

Terrace

Bed 1

Bath

5,500

TH37 A: 120.00 m2

T07

T07

TH30 A: 120.07 m2

TH39 A: 120.00 m2

TP301 03

DOWN

L'dry 1.0 x 1.5m

T07 TH24 A: 120.00 m2

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace

500 Garage 5.6 x 6.0m

T07

T07

T07

T07

TH31 A: 140.00 m2

TH40 A: 140.11 m2

T07

T07

TH32 A: 120.00 m2

TH41 A: 120.07 m2

Bed 2

Terrace

3.4 x 3.4m

2.0 x 3.4m

T07

T07

TH33 A: 120.00 m2

TH42 A: 120.00 m2

11 109

5,500

L'dry

1.0 x 1.5m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

UP

3.4 x 3.2m

500

Bed 2 3.4 x 3.4m

UP

TH08 A: 147.23 m2

Bed1

L'dry

3.3 x 1.8m

Bed 1

2.0 x 3.4m

1.0 x 1.5m

TH29 A: 120.00 m2

Terrace

3.5 x 3.6m

Terrace

11 109

T13

Garage 5.6 x 6.0m

Bath 2.7 x 2.4m

DOWN

Bath 2.7 x 2.4m

TH22 A: 140.02 m2

1

5

DOWN

5

1,000

TP301 02

UP

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

T07

UP

Bed 1

3.3 x 1.8m

11 109

UP

3.0 x 3.0m

3.5 x 3.6m

Garage 5.6 x 6.0m

Terrace

2.0 x 2.5m

Bed 1

Bath L'dry

T06 TH07 A: 90.00 m2

Bath 1.8 x 2.1m

8 7 6 5 4 3 2 1

3.4 x 3.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

5

4

3

2

1

Bed 4 3.0 x 3.4m

Bed 2

2.0 x 3.4m

T07

TH14 A: 90.00 m2

3.0 x 3.0m

2.8 x 1.9m2.1 x 1.9m

Garage 5.5 x 6.0m

Bath

Bed 1

DOWN

UP

L'dry

Terrace

Bed 2 3.4 x 3.4m

L'dry

3.5 x 3.6m

Garage 5.6 x 6.0m

3.5 x 3.6m

1,500

TH21 A: 120.08 m2

T04

DOWN

Garage 4.1 x 6.0m

1.8 x 2.1m

1.0 x 1.2m

Bed 1

3.3 x 1.8m

2.7 x 2.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

5

4

3

2

1

Bath

3.0 x 3.4m

Terrace

DOWN

06 TP301

2.0 x 3.4m

1.0 x 1.5m

2.8 x 1.9m2.1 x 1.9m

3.3 x 1.8m

UP

Terrace

L'dry

Bath L'dry

TH06 A: 105.00 m2

Garage 5.5 x 6.0m

Bed 4

Garage 4.1 x 6.0m

T06

Terrace

3.3 x 1.8m

Garage 5.6 x 6.0m

TH36 A: 120.00 m2

TH28 A: 120.00 m2

Terrace

Bed 1

Bath

T07

T07

UP

Bed 2 3.4 x 3.4m

T07

UP

TP301 01

9,016

UP

UP

L'dry 1.0 x 1.2m

1.0 x 1.5m

2.0 x 3.4m

UP

2.0 x 3.4m

05 TP301

3.4 x 3.4m

TH12 A: 120.00 m2

3.4 x 3.4m

2.7 x 2.4m

3.5 x 3.6m

Garage 5.6 x 6.0m

Garage 5.6 x 6.0m

Terrace

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

UP

Terrace

Bed 2

2.0 x 3.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

DOWN

3.3 x 1.8m

L'dry

Bath

Bed 1

Bed 1 3.5 x 3.6m

DOWN

1.0 x 1.5m

Terrace

TH13 A: 120.00 m2

Terrace

Bath

Bed 2 3.4 x 3.4m

L'dry

1.0 x 1.5m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

DOWN

5

4

3

2

1

Bath 2.7 x 2.4m

3.5 x 3.6m

Garage 5.6 x 6.0m

3.3 x 1.8m

2.7 x 2.4m

TH35 A: 159.24 m2

DOWN 17 16 15 14 13 12

DOWN

UP

Bed 1

T06

DOWN

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

4

3

2

1

5

UP UP 4

3

2

5

1

Bed 2

1,500

TH05 A: 105.26 m2

2.7 x 2.4m

L'dry

T07

T07 TH26 A: 159.20 m2

TH27 A: 120.00 m2

Terrace

T07 TH20 A: 120.00 m2

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 DOWN

Bath 2.7 x 2.4m

1.8 x 2.1m

2.7 x 2.4m

3.5 x 3.6m

Garage 5.6 x 6.0m

Garage 5.6 x 6.0m

Bed 1 3.5 x 3.6m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

5

4

3

2

1

Bed 1 3.5 x 3.6m

Garage 5.5 x 6.0m

3.4 x 3.4m

UP

3.0 x 3.0m

1.0 x 1.5m

T07

Bath

Bath

Bed 2

2.0 x 3.4m

TH11 A: 90.00 m2

Bed 1

L'dry

Bed 4

Terrace

UP

UP

3.3 x 1.8m

1.8 x 2.1m

3.0 x 3.4m

T07 TH19 A: 120.00 m2

T04

L'dry

Terrace Garage 5.6 x 6.0m

Bath

Bed 1

3.3 x 1.8m

2.0 x 3.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

3.0 x 3.0m

Bath L'dry

T06 TH04 A: 104.98 m2

Terrace

Bath

Terrace

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Bed 1

2.8 x 1.9m2.1 x 1.9m

2.8 x 1.9m2.1 x 1.9m

1.0 x 1.2m

3.4 x 3.4m

Bed 2 3.4 x 3.4m

UP

UP

TH10 A: 90.00 m2

DOWN

L'dry

3.0 x 3.4m

Bed 2

2.0 x 3.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Garage 4.1 x 6.0m

Garage 5.5 x 6.0m

Terrace

L'dry

1.0 x 1.5m

T04

TH03 A: 105.00 m2

1.8 x 2.1m

1.0 x 1.2m

TH18 A: 127.71 m2

DOWN

DOWN

5

4

3

2

1

Garage 4.1 x 6.0m

L'dry 1.0 x 1.5m

T07

T07

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

L'dry

1.0 x 1.5m

Bath L'dry

T06

Garage 5.5 x 6.0m Bath

2.0 x 3.4m

DOWN

UP

L'dry 1.0 x 1.2m

Bed 4

Terrace

DOWN

3.3 x 1.8m

1.8 x 2.1m

3.0 x 3.4m

Bed 2 3.4 x 3.4m

TH09 A: 120.00 m2 DOWN

DOWN

DOWN

5

4

3

2

1

Terrace

TH02 A: 90.00 m2

Bath

3.0 x 3.4m

Bath 2.7 x 2.4m

3.5 x 3.6m

Garage 5.6 x 6.0m

T06

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Bed 1 Garage 5.5 x 6.0m

UP

UP

L'dry

933

1.8 x 2.1m

Bath 2.7 x 2.4m

DOWN

UP

Terrace 3.3 x 1.8m

1.0 x 1.2m

Bed 4

Bed 4

Bed 1 3.5 x 3.6m

Garage 5.6 x 6.0m

Bath

3.0 x 3.4m

2,750 488

STAGE 7

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

TH01 A: 118.51 m2

Garage 5.5 x 6.0m

DOWN

2

1

5

4

3

T06

DOWN

UP

L'dry 1.0 x 1.2m

Bed 4

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

5,500 1,071

TP302 09

T14

T14

TH34 A: 179.95 m2

TH43 A: 194.96 m2


TP302 09

11 10

UP

T14

DOWN 17 16 15 14 13 12

T11

Bed1

TH60 A: 150.00 m2

3.4 x 3.2m

8 7 6 5 4 3 2 1

T13 TH68 A: 160.09 m2

Garage 5.6 x 6.0m

8 7 6 5 4 3 2 1

1,530

UP 1

4

3

5

2 2

1

5

4

3

UP 3

UP 2

5

1

2

5

1

4

3

UP 4

3

UP 2

5

1

1

4

3

2

5

UP 4

3

L'dry 1.0 x 1.2m

Garage 5.6 x 6.0m

Bed 4 3.0 x 3.4m

DOWN

2

500

1

5,500

Bath 2.0 x 2.5m UP

Bed1 3.4 x 3.2m

862

260

500

TH52 A: 190.00 m2

500

1.8 x 2.1m

Garage 5.5 x 6.0m

1.8 x 2.1m

2.0 x 2.5m

DOWN 17 16 15 14 13 12

UP

Bath

Bath

TH67 A: 90.00 m2

109

T14 TH43 A: 194.96 m2

1.0 x 1.2m

T06 Garage 5.5 x 6.0m

5

2.0 x 3.4m

3.0 x 3.4m

L'dry

UP

3.4 x 3.4m

TH51 A: 120.00 m2

11 109

T14 TH34 A: 179.95 m2

8 7 6 5 4 3 2 1

3.0 x 3.4m

DOWN

91110

Terrace

Bed 4

Bath UP

4

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP

1

5

4

3

2

UP UP 5

4

3

2

1

UP

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP

TP301 03 06 TP301

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 5

4

3

2

1

UP UP 5

4

3

2

1

Bath 2.7 x 2.4m

5

3.5 x 3.6m

Bed 2

TH59 A: 90.00 m2

98 7

6 5 4 3 2 1

1.0 x 1.2m

T06 T07

Bed 1

Bath L'dry

3

L'dry 1.0 x 1.5m

2

3.3 x 1.8m

1

3.3 x 1.8m

3.0 x 3.0m

2.8 x 1.9m2.1 x 1.9m

Terrace

Garage 5.6 x 6.0m Garage 5.6 x 6.0m

Bed 4

1.8 x 2.1m

Garage 5.5 x 6.0m

1.8 x 2.1m

4

Garage 5.6 x 6.0m

Terrace

5,500

3.0 x 3.4m

Bath

T06 TH66 A: 90.00 m2

Garage 5.5 x 6.0m

Bed 4 3.0 x 3.4m

TH50 A: 90.00 m2

Bed 1

Bath L'dry

TH58 A: 90.03 m2

Bed 4

Bath 1.8 x 2.1m

DOWN

L'dry

1.0 x 1.2m

T06 T04

UP

Garage 5.6 x 6.0m

Garage 4.1 x 6.0m

L'dry 1.0 x 1.2m

5

UP

1.0 x 1.5m

TH49 A: 90.00

4

DOWN

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

L'dry

T04

3.0 x 3.0m

3

Bed 1 3.5 x 3.6m

Garage 4.1 x 6.0m

2

Bath 2.7 x 2.4m

2.8 x 1.9m2.1 x 1.9m DOWN

1

3.4 x 3.4m

5,500

UP

Bed 2

2.0 x 3.4m

5.6 x 6.0m

3.3 x 1.8m

1.0 x 1.5m

Terrace

Terrace

500

L'dry

1.0 x 1.2m

Garage 5.5 x 6.0m

Garage 5.5 x 6.0m

UP

T07 TH42 A: 120.00 m2

Garage 5.6 x 6.0m

3.0 x 3.4m

L'dry 1.0 x 1.2m

T06 TH65 A: 90.00 m2

Bath

TH57 A: 89.97 m2

Bed 1

3.0 x 3.4m

Bath

1.8 x 2.1m

5

T07 TH33 A: 120.00 m2

T06

L'dry

1.0 x 1.5m

Bath L'dry

Bed 4

1.8 x 2.1m

Garage 5.5 x 6.0m DOWN

1.8 x 2.1m

T07 TH48 A: 120.00

2

UP

2.0 x 3.4m

2.0 x 3.4m

1

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace

Garage 4.1 x 6.0m

Terrace

4

DOWN

DOWN

3.3 x 1.8m

Bed 1 3.5 x 3.6m

L'dry

Terrace Garage 4.1 x 6.0m

5.6 x 6.0m

Bed 4 3.0 x 3.4m

Bed 2 3.4 x 3.4m

T06 TH64 A: 90.00 m2

Garage 5.5 x 6.0m

Bed 4

Garage 5.6 x 6.0m

Terrace

Bath 2.7 x 2.4m

3

Bath 2.7 x 2.4m

Bed 1 3.5 x 3.6m

5

3.4 x 3.4m

Garage 5.6 x 6.0m

Bath

DOWN

L'dry

1.0 x 1.2m

T06 TH56 A: 90.00 m2

Garage 5.6 x 6.0m

L'dry 1.0 x 1.2m

2

Bed 2

2.0 x 3.4m

3.3 x 1.8m

3.3 x 1.8m

1.0 x 1.5m

Terrace

TH47 A: 120.00 m2

1

T07 TH41 A: 120.07 m2

2.0 x 3.4m

4

UP

T07 TH32 A: 120.00 m2

Terrace

3

DOWN

Bed 2 3.4 x 3.4m

Garage 5.6 x 6.0m

Terrace

3.5 x 3.6m

L'dry

Bath 2.7 x 2.4m

UP

3.4 x 3.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace 2.0 x 3.4m

2.0 x 3.4m

T07

Bed 1 3.5 x 3.6m

Bed 1

Garage 5.5 x 6.0m

UP

T07 TH40 A: 140.11 m2

Bath 2.7 x 2.4m

1.0 x 1.5m

Bed 4 3.0 x 3.4m

1.8 x 2.1m

1.8 x 2.1m

5

DOWN

L'dry

1.0 x 1.5m

3.3 x 1.8m

Garage 5.6 x 6.0m

Bath

Bed 4 3.0 x 3.4m

4

T07 TH31 A: 140.00 m2

Bed 2

Terrace

Garage 5.6 x 6.0m Garage 5.6 x 6.0m

Bed 1

1.0 x 1.2m

Garage 5.5 x 6.0m Bath

T06 TH55 A: 90.00 m2

3

UP

2.0 x 3.4m

Terrace

3.3 x 1.8m

3.5 x 3.6m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace

Terrace

TH63 A: 90.00 m2

T04 TH46 A: 90.00 m2

3.0 x 3.0m

L'dry

2

Bath 2.7 x 2.4m

L'dry

T06

Bath 1.8 x 2.1m

Bed 1

Bath L'dry

2.8 x 1.9m2.1 x 1.9m

L'dry 1.0 x 1.2m

Garage 5.5 x 6.0m

Bed 4 3.0 x 3.4m

UP

DOWN

L'dry

1.0 x 1.5m

Garage 4.1 x 6.0m

Garage 5.6 x 6.0m Garage 5.6 x 6.0m

Bed 4 3.0 x 3.4m

Garage 5.5 x 6.0m DOWN

TH54 A: 90.00 m2

1

3.4 x 3.4m

T06

T06 TH62 A: 90.00 m2

DOWN

L'dry

1.0 x 1.2m

5

TH39 A: 120.00 m2

Bed 2

2.0 x 3.4m

3.0 x 3.0m

DOWN

Bath 1.8 x 2.1m

L'dry

4

TH30 A: 120.07 m2

Terrace

Bed 1

2.8 x 1.9m2.1 x 1.9m

Garage 5.5 x 6.0m

1.0 x 1.2m

3

T07

TH45 A: 90.00 m2

2

UP

1,500

T07

Garage 4.1 x 6.0m

Bed 1 3.5 x 3.6m

T04

1

Bath 2.7 x 2.4m

Bed 4 3.0 x 3.4m

1.8 x 2.1m

1.8 x 2.1m

3.0 x 3.4m

UP

3.4 x 3.4m

TH53 A: 90.00 m2

UP

Bed 2

2.0 x 3.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

8,742 1,500

Terrace

2.0 x 3.4m

Terrace TH38 A: 120.00 m2

T06

TH44 A: 120.00 m2

4

UP

T07

T07 TH29 A: 120.00 m2

Garage 4.1 x 6.0m

L'dry

1.0 x 1.5m

Bath L'dry

Bath

Bed 4

T07

3

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace

2.0 x 3.4m

Garage 5.6 x 6.0m Garage 5.6 x 6.0m

Terrace 3.3 x 1.8m

1.0 x 1.5m

2.0 x 3.4m

1

3.5 x 3.6m

DOWN

L'dry

DOWN

Terrace

2

3.4 x 3.4m

Garage 4.1 x 6.0m

Bed 1

Bed 2 3.4 x 3.4m

5

2.0 x 3.4m

Terrace 3.3 x 1.8m

Bath 2.7 x 2.4m

TH37 A: 120.00 m2

TH28 A: 120.00 m2

Bath 2.7 x 2.4m

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

UP

T07

T07

2.0 x 3.4m

3.3 x 1.8m

1.0 x 1.5m

Bed 2

Bed 1 3.5 x 3.6m

Garage 5.6 x 6.0m

DOWN 17 16 15 14 13 12 11

L'dry

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace

Terrace

Garage 5.6 x 6.0m

Garage 5.6 x 6.0m Garage 5.6 x 6.0m

Terrace

DOWN 17 16 15 14 13 12

3.5 x 3.6m

DOWN

1.0 x 1.2m

Garage 5.5 x 6.0m Bath

Bed 1

2.7 x 2.4m

DOWN

3.4 x 3.4m

DOWN

Bed 2

2.0 x 3.4m

TH36 A: 120.00 m2

TH27 A: 120.00 m2

L'dry

T06 TH61 A: 90.00 m2

DOWN

Terrace

3.3 x 1.8m

DOWN

T07

T07

Bath

Garage 5.6 x 6.0m

Terrace

DOWN

UP

2.0 x 3.4m

1.0 x 1.5m

Garage 5.6 x 6.0m

DOWN

L'dry

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Terrace

Bed 1 3.5 x 3.6m

DOWN

5,498 1,001

A: 13,001.56 m2

Bath 2.7 x 2.4m

DOWN

3.4 x 3.4m

DOWN

Bed 2

2.0 x 3.4m

DOWN

Terrace

DOWN

TH35 A: 159.24 m2

TH26 A: 159.20 m2

DOWN

T07

T07

2.0 x 3.4m

1,335

Stage 7

Terrace

+9,000 3 Level 3

+6,000 2 Level 2

+3,000 1 Level 1

±0 0 Ground Floor

Townhouse Elevation 02

17


WYNDHAM CHRISTIAN COLLAGE Design Documentation | 2IC Technology Block 418 Ballen Road, Wyndham Vale

18


As an extension to the existing school, this engagement consisted of designing and creating an allowance of a technology allotment for an approximate housing of 200 students for the school’s students. Appointed as the 2IC, I oversaw the production for design documentation and collaborated with multiple consultants. With on-site visitation, this allowed better understanding of project communication, specific requirements and ensuring my client’s needs were met. This project was indefinitely a pivotal engagement in terms of my learning expansion. Thus, it allowed me to understand users’ requirements such as student’s height which was reflected on the bench top heights and materials for durability. Neighbouring the technology block, there was a further requirement for a tensil roof to the sports court. This required me to approach various manufacturers, engage and collaborate together for design constructions and ensuring costs were within the allocated budget.

C

D

8,464

3,232

E

F

8,464

40

B

A3102 S-01

7 7,619

A3101 E-02

WATER TANK 10,000L

+37,748

1

+39,050

7,813

W W-01 7

8

+39,450

7,000

DP

WATER TANK 10,000L

D D-01

DP

MUSIC

W W-14

FOOD TECH

D D-02

D D-22

DP

DW

7,813

1

W W-02

D D-03

D D-21

2 DP

ART STORE

2

D D-04 FOOD TECH

MUSIC STORE

SCIENCE STORE

STORE

WM/DR

FR

10,515

W W-13

DP

FR

D D-05

D D-20

8

ARTS

W W-03

SCIENCE

D D-19

D D-06

DP

10,515

39,860

A

DP

1 m2

3

3

MULTI-PURPOSE COURTS

CLASS 3

W W-04 D D-07

D D-18

4

D D-16

D D-08

36,100 7,862

DP

4

D D-17

W W-11

7,864

E-03 A3100

CLASS 1

DP

CLASS 2

W W-05

CLASS 4

7,862

DP

37

+37,244

7,864

A3100 E-01

CORRIDOR

W W-12

A3102 S-02

DP

DP

D D-15

8,183

W W-10 DP

W W-07 D D-13

STAFF

W W-09

M JUNIOR TOILETS

F JUNIOR TOILETS A3102 S-03

DW

CLEANERS

DP

9

B

FR

6

BUILDING 1A

5

D D-14 COMMS

8,183

5

2,536

W W-08

D D-23

D D-09 E-04 A3101

D D-10

D D-11

DDA WC

D D-12

DP

6 +37,000 5,000

+37,850

A3102 S-01

+37,390

W W-06 D D-24

9

3,232

8,464

C A

D

BALUSTRADE

8,464

F

E +37,200

Ground Floor General Arrangement Plan

19


FLASHING TO BE INSTALLED AT BUILDING JUNCTION AS NECESSARY TO WEATHERPROOF AND SEAL. COLOUR TO MATCH METAL SHEET CLADDING. REFER TO FINISHES SCHEDULE

METAL SHEET ROOF AS SCHEDULED INSTALLED TO MANUFACTURER'S SPECIFICATIONS 20° PI TC

ROOF RAFTER AS PER STRUCTURE ENGINEER'S DWG

H

SARKING AS PER SPECIFICATIONS SAFETY MESH UNDERLAY AS PER SPECIFICATION

METAL SHEET CLADDING AS SCHEDULED INSTALLED TO MANUFACTURER'S SPECIFICATIONS

ROOF BEAM AS PER STRUCTURAL ENG'S DWGS 20° FA CEILIN LL G

SARKING AS PER SPECIFICATIONS

FLASHING TO BE INSTALLED AT BUILDING JUNCTION AS NECESSARY TO WEATHERPROOF AND SEAL. COLOUR TO MATCH METAL SHEET CLADDING. REFER TO FINISHES SCHEDULE

CL-02 REFER TO A2300 PSPs FOR EXTENT

OUTSIDE

CEILING VOID

METAL SHEET PANEL AS SCHEDULED INSTALLED TO MANUFACTURER'S SPECIFICATIONS. REFER TO EXTERNAL FINISHES SCHEDULE

W W-04

FLASHING TO BE INSTALLED AT BUILDING JUNCTION AS NECESSARY TO WEATHERPROOF AND SEAL. COLOUR TO MATCH METAL SHEET CLADDING. REFER TO FINISHES SCHEDULE STEEL ROOFING, REFER TO EXTERNAL FINISHES SCHEDULE SARKING

9° PITCH

SAFETY MESH AS PER SPECIFICATION

REFER TO A6300 FOR WALL EXTENT

TIMBER BEAM REFER TO STRUCTURAL ENGINEER'S DWG

CEILING SPACE

ROOF TRUSS, REFER TO STRUCTURAL ENGINEER'S DWG

Roof to Wall Detail

20

HALLWAY


4,429

4,429 7,509

7,509

9° PITCH

+40,930

400

+38,650

BRK001

800

+37,850

2,280

1,880

+40,930

800

+38,650

+37,850

D D-01 BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE

E

3,232

8,464

+45,360 PITC

H

5

6

9° PITCH

7,864

7,862

8,183

7,509

10,515

BOX GUTTER CLB003

4,429

4

42,270

CLB001

9° PITCH

4,429

3

+40,930

40,930

+40,930

+38,650

PDC001

+37,850

+37,850

2,280

+38,650

PDC001 +45,350

W W-12

C

4,270

+41,080

CLB001

D

W W-11

W W-10

E

W W-09

F

+40,930

PDC001

+38,850

+38,850

BRK001 CLB004

CLB004

+37,850

NGL+37,500

3,232

8,464

PDC001

PDC001

W W-19

CLB001

BOX GUTTER CLB003

2

1

40,930 7,813

2,278

10,515

W W-08

800

+38,850

3,078

PDC001 7,864

+37,850

PDC001

42,270

CLB001

9° PITCH

+41,080

2,670

7,862

3

CLB003

7,500

4

510

5

8,183

1,342

4,320

CLB001 METAL SHEET CLADDING

CLB001 6

+45,350

H

PITC

3,080

20°

7,500

8,464

West Elevation 1:50

E-01

150

CLB003

REFER TO DETAIL FOR WINDOW HOOD W W-13

W W-14

7,500

CLB001 PITCHED ROOF AT 20°

BOUNDARY LINE

+37,850

PDC001

South Elevation

+40,450

PDC001 BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE 1 BRK001

PDC001

BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE

+40,930

CLB001

PDC001

410

CLB003

WATER TANK

PDC001

D D-01

CLB001

North Elevation

PDC001 BRK001

800

PDC001

CLB004 DOWNPIPE

D D-24 W W-06

PDC001

+38,850

2,670

800

+45,350 +37,850

BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING 1A STAGE BRK001

1,880

PDC001

1,000

PDC001

400

W W-08 +38,850

800

2,278

PDC001

3,078

BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING 1A STAGE BRK001

ALU. PANEL. REFER D TO WINDOW DETAILS D-24FOR EXTENT PDC001 W W-06

PDC001 PDC001

W W-18

W W-17

W W-16

W W-05

W W-04

W W-03

+38,850

+37,850

CLB004 DOWNPIPE+45,350 +44,606

W W-15

CLB003 CLB001 PITCHED ROOF AT 20°

GUTTER CLB001

+40,930

PITCHED ROOF AT 5°

1,930

150

+40,780

W W-02

BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE 1 BRK001

+38,850

CLB001 1,000

BRK001 METAL CLADDING

CLB004

CLB004 +37,850

WATER TANK REFER TO SERVICES ENG'S DWG FOR EXTENT

West Elevation

East Elevation 1:50

1

2

3

7,813

4

10,515

PDC001

5

7,864

PDC001

PDC001

6

7,862

PDC001

PDC001

PDC001

8,183

PDC001

PDC001

PDC001

PDC001

4,270

+45,350

+45,350

CLB001 PITCHED ROOF AT 20°

CLB001

REFER TO DETAIL FOR WINDOW HOOD W W-09

+40,930

PDC001

+38,850

2,670

W W-10

W W-11

W W-12

+38,850

BRK001 CLB004

CLB004

+37,850

1,000

+37,850

W W-13

W W-14

PDC001

410

+40,450

BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE 1 BRK001

+41,080

CLB001

+40,930

CLB001

150

CLB003 CLB003

WATER TANK

7,500

E-03

NGL+37,500

East Elevation E-01

West Elevation 1:50

6

5

8,183

4

7,862

PDC001

PDC001

3

2

7,864

PDC001

1

10,515

7,813

ALU. PANEL. REFER TO WINDOW DETAILS FOR EXTENT PDC001

PDC001

21

+45,350 +44,606

CLB001

W W-19

W W-18

W W-17

W W-16

W W-05

W W-04

W W-03

W W-15

CLB003 CLB001 PITCHED ROOF AT 20°

GUTTER CLB001

+40,930

PITCHED ROOF AT 5° BRK001 METAL CLADDING BRICK VENEER WALL UP TO SILL

150

+40,780

1,930

7,500

20°

8,464

3,080

2

CLB003 510

3,232

+45,360

+45,350

C

7,509

7,813

D

8,464

H

+41,080

2,670

E

PITC

CLB001 METAL SHEET CLADDING

CLB001

F

7,500

4,320

20°

1

1,342

8,464

F

BOUNDARY LINE

D

BOUNDARY LINE

C

W W-02 +38,850

CLB001

+37,850


CHERRY ROAD

Design Documentation | Documentator Low-rise apartments 1616-1622 Burwood Highway, Belgrave, VIC. 1,465m2

22


Located at Belgrave amongst single dwelling townhouses, nestles a low-rise apartment block. The project contains 11 apartments with a precast concrete construction build. As part of the documentation team, my responsibility was to oversee the town planning endorsement set. This consisted of ensuring requirements such as set-backs were met, window glazing for over-looking and other design constraints. In addition, I had to build the file set-up for design documentation as well as wall types to be prepared for design documentation. Client consultations and discussions pertaining to construction, faรงade materiality and other various integral matters on fire and acoustic constraints in conjunction with the neighbouring buildings has allowed me to strengthen my skills in grasping the importance of continual client communication through the whole process from concept to design documentation.

Image by DKO Architecture

15

14 3,250

13 5,050

12 3,675

11 2,735

10 2,450

9 4,280

8 5,060

7 2,300

6 5,905

5 2,615

4 2,450

3 6,215

2 2,380

1 8,650

Roof

3,270

150

SSL+94,750

SSL+91,480

3,100

Level 2

SSL+88,380

3,100

Level 1

SSL+85,280

3,440

Ground

SSL+81,840 Basement

North Elevation

23


ImagesbyIrelandBrownConstructions

24

Image by DKO Architecture


89 .24R

87 .7T

86 .8B

85 .608

D 00-41

87 .55B

86 .200

4,400

FALL

D 00-34

86 .295

BED 01

FW

D 00-32 D 00-33

BED 03

BED 02

W 00-12

D 00-40

D 00-39

FW

W 00-10

A: 53.8 m2

86 .685 W 00-08

6,010

FALL

W

R 700

00-09 R 700 R 700

W 00-11

D 00-31

87 .529

D 00-42

86 .611

DP

NBN

LIVING/DINING

87 .438

W 00-13

C4

86 .564 86 .755

SCULLERY

C4

BATH

D 00-43

86 .616

86 .303

FW

2,540

E-02 A3001

86

FW

WIR

G03 G03 A: 140.7 m2

D 00-45

E-03 A3000

W 00-07

A: 185.7 m2

D 00-37

BED 02

E

+87,375

87 .428

D 00-44

BED 03

TRELLIS OVER

KITCHEN FW

87 .561

86 .073

FW

FALL

FW

D G04 G04 00-30 A: 163.9 m2

D 00-35

D 00-38 BATH

S

86 .483

FALL

85 .910 85 .903

86 .083

85 .609 ELEC 1,800 x 500

D 00-25

ENS

86 .734

87 .48F

89 .98T

86 .050

85 .410

3,816 1,250

85 .318

1,250 R 900

+85,780

W

KITCHEN

86 .829

700

W

D 00-46

P.O

+86,591

FW

FW

SCULLERY

+86,548

LDY

FW

D 00-24

D 00-36

FW

D 00-47

DP

D 00-26

FW

3,090

85 .230

4,200

W 00-24

W 00-06

D 00-28

86 .6 86 29 .629

D 00-52

BED 01

FW

ENS

FW

86 86.437 .441

85 .627 85 .118

4,700

R 900

W 00-15

ImagesbyIrelandBrownConstructions 84 .960

FALL

3,370 10

D 00-55

W 00-16

WIR

NBN

W 00-14

1,000

(0.4 7)

85 .096

A: 53.7 m2

(0.0 8)

85 .454

D 00-12

C4 LV 00-24

D 00-13

FW

LDY

9

R 700

W

D 00-11

FIP 1.2x.8x1

85 .550

7,765

84 .537

D 00-08

6

BED 02

D WIR 00-56

D 00-27

WIR

D 00-22 D 00-23

FW

FW

NBN

BED 01

ENS

FW

KITCHEN

REF. RISER 1,050x150

D 00-10

FW

C3

R 700

2,912

D 00-21

FW

NBN

H .52

FW

G05 G05 A: 143.6 m2

D 00-14

PUSH BUTTON TO EXIT

LOBBY

WM 1x.7

84 .920

FW

BATH

D 00-15

BED 03

FFL +85,300 SSL +85,280

8

D 00-54

84 .755

84 .653

86 .5B

87 .45T

86 .32B 87 .22T

D 00-59 D 00-47

D 00-49

FW

BATH

SD

7

C6

ENS

R 700 D 00-20

FW

W 00-01

RECESSED FLOOR MAT

D 00-60

FALL

FW

D 00-19

C4

CP G .7x.6 B

C5

D C5 00-48

FALL

FW

W 00-04

D 00-18

D 00-16

W 00-23

D 00-07

F.52

85 .161

84 .866

D 00-65

D 00-51

BED 03

W 00-03

BED 01

FW

5,207

FW

LDY

4,906

84 .317

BATH

FW

D 00-61

KITCHEN

C2

C4

R 700

87

84 .920

P.O.S.

5,975

+86,138

13

7,765

84 .840 84 .375

8383 .8.964 .925 44

1,500 1,850 2,300 3,105

FW

G02 G02 A: 148.7 m2

D 00-57

85

16

P.O.S.

+85,780

W 00-05

BED 02

ENTRY COURT

FW

AUTO SLIDING DOOR

G01 G01 A: 151.8 m2

LIVING/DINING

R 900 D 00-17

FFL+85,300

D 00-64

FALL

D 00-58

W 00-17

+84,904

3,250

86

+85,175

RAMP 1:10

KITCHEN

23.3 m2

931

1,940

D 00-63

NBN

FW

M PIT

Basement Ramp

15

5,050

FW

D 00-62

SCULLERY

W 00-18

+85,025 SD

R 900

RAMP 1:10

C7

DP

+84,719

14

W

3,675

A: 58.4 m2 W 00-02

+85,175

FW

DP

E-01 A3000

BED 03

FALL

84

1,490

C4

BED 02

W 00-19 D 00-66

A: 69.7 m2

J

W 00-22

C4

1 A3100

13

2,735

FW

+84,905

G

LANDING

+85,025

12

D 00-69 ENS

D 00-67

23.1 m2

3,280

TELECO

10,299

RAMP 1:20

11

BED 01

C2

+84,805

H

88 .94R

87 .2T

1:20 WALKWAY

+84,632

W 00-21

FW

SR Z

83 .999

+84,632

86 .030

84 .377

84 .430

83 .778 83 .772

4,080

ACCESS COVER OSD TANK

1,200 LANDING

12,000L OSD tank below ground (TBC)

LV 00-23

11,544

E-04 A3001

12

2,450

85 .346

1:20 WALKWAY

RAMP 1:20

WIR

A: 90.0 m2

K

+84,235

W 00-20

F

11

4,280

W

NBN 1,600 x 500

SD

84 .160

D 00-06

JUNCT

E

10 W

5,060

W

87 .04T

18,828 LANDING

+84,236

D 00-68

D

9

2,300

GAS 1.5x1.5x1.8

ION PIT

C

8

W

86 .3B

87 .18E

RAMP 1:20

7

84 .850

83 .701

8383.6 .67770

83 .816

83 83 .808 .823

83 .615

D 00-04

W

5,905

P.O.S.

R 700

83 .568

TP Z

+83,900

+83,900

D 00-05

2,615

Garage

1:20 WALKWAY

WATER METER 5,000 x 1,000 x 600H D 00-03

900

1:10

SURCHARGE PIT

4,235

LANDING

HYD 1.85x.8x1.5 83 .940

83 83.542 .428

D 00-01

D 00-02 1:10 1:10 +83,800

3,275

B

6

2,450 P.O.S.

87 .042

83 .592 83 .520

83 .308

83 8383.483 83.3 .366 00 83 .392 .255 89 .345 83 .229

TIMBER PALING FENCE TO MIN 1800mm 1,006 1:10

6,215 Brick

+83,713

83 .527

A

5

W

2,380

84

LIGHT

4

86 .99T

3

8,650

POLE AND

87 .95T

89 .02

2

86 .10B

83 .346

83 .117

10.69

1

85

82 .889

Image by DKO Architecture

W

Ground Floor General Arrangement Plan

25


NEWQUAY LOT 9

Contract Documentation | Documentator 17-Storey Mixed-Use Development 9 Newquay Promenade, Docklands 97m AUD - 2660m2

26


A new multi-residential located in Docklands, building A as apartments with lofts and building B as service apartments for Quest. My tasks were to update and coordinate construction drawings with information produced by consultants, updating drawings to follow shop drawings, facade details and to participate in documenting RFIs. By doing so, it allowed me to have a better knowledge of the project procurement procedure and methods. During contract administration, I was responsible for site building defects inspection, concentrating on internal rooms and corridors following documentation drawings and looking at the finishes for signs of defects logging each defect with the builder and client.

Images by KH Studio

Image by DKO Architecture

27


Image by DKO Architecture

28


AA

AB

S01

AC

3,820

AD

A3100

5,730

E01 A1100

AE

6,850

AF

7,380

S02 A3102

AG

7,000

AH

4,130

AJ

6,750

AK

3,120

7,170

51,950 (BUILDING A) 6,750

2,176

Planter -B

WA 509

WA 513

DP

WA 508

DDA REQ. 2070x1540

FW

FE

FW

3,000

DP

450 5,940

320 Planter -A

Planter -A

4,575 450 5,010

1,830 450 920 5,010

LEVEL NUMBER LEVEL NUMBER

1,830 920

AC

SITE BOUNDARY 50.00m 153°05'40"

2,340

DCB 507

SP

DB 507A

DP

WB 509

DP

WB 510

FW

D 01

506B Q22B

D 02

WB 511 AC

FW

9,450

8

D 02

F-02

DB 508

D 03

SP WM

D 03

D 01

506A Q22B

D 03

D 03 D 02

WB 508

AC

509A Q22H

D 01

WM

WM

WB 507

DP

FW

F-02

DB 509A

DDA REQ. 2070x1540

SP

DB 507B

DB 506B

WB 512

AC

WB 513

DP

FW

AC

FW

507A Q22C

DP

D 03

508 Q12D

D 03

507B Q22C

AC

D 03

DB 509B

FE

300X350

DCB 510

WB 519

WM

DB 506A

FE DCW DHW

SP

505A Q22L

DB 510

DP

SP

DCB 509

7

FW

DP WB 520

509B Q22H

FW

DP

D 03

D 03 F-02

WB 506

AC FW

DCB 505

WB 521 DP

WDB 506

510 Q11A

511B Q22K DB 511B

ELEC

WDB 505

REF

7,200 8,350

WB 505 WB 504

GAS

505B Q22L 504B Q22F

AC

DCB 504

DB 505A

D 03

9

DB 511A

DCB 506

F-02

D 02

DP

SFL +20,350 FFL +20,370

#LayID

DB 505B

COMMS

FACADE GLAZING WALL. REFER TO DRAWING AB6011

WB 522

ONLY

7,200

CORRIDOR

DB 504 DB 504B

FW

S05 A3108 FACADE GLAZING WALL. REFER TO DRAWING AB6011

LOCATION OF DESK AND TV TO

DP DPAPARTMENT 1307

14,410 (BUILDING B)

STAIR B1 CP EXHAUST

D 04

D 01

VENT

DB 504A

504A Q22F

AC

AB4001 LIFT

DDA REQ. 2070x1540

AC DP

WM

6

SP

D 02

9

DP

DP

WB 514

WB 517

WB 516

AC FW

FW

WB 515

AC

FW

DP

DP

FW

AC

DP

FW

WB 518

3,000

SP

1,609

FW

DCB 508

DP

SP

2,930 FW

WDB 504

BATHROOM

PRESS

DB 503B

503B Q22E

D 03

19,675

E08 A1106

WB 523

511A Q22K

PRESS

CORE B1

D 03

FW

2,450

5 E02 A1100

FACADE SETOUT

1,809

DB 503A

FW

DP

DCB 503

503A Q22E

WB 503

WDB 503

D 02

DCB 501

AC

8

DP

FW

1,550

450

9,450

DB 501

300X350

SP

9,925

25,305 (BUILDING B)

FW

4

FW

AC

WDA 501

19,675

DP DCB 502

DP

WB 502

3,450

AC

SP

DB 502

DP

FW

DB

AC 3,430

1,950

501 Q12B

FW

HOUSE KEEPING

FW

5:01 2A WDA 502

DP

S04 A3106

E05 A1104

F-02

WB 501

D WA 13 501

WB 524

1,770

5,480

6,130

502 Q12A

D 12 D 12

FW

DP

FW

SP

WDA 503

AC

WDB 501

AA7129

FW

WA 502

APARTMENT

D 12

FW FW

DP

WB 526

DP

D 13

DP

AC

FW

WB 527

6

450

DB

WDA 504

WDB 502

S05 A3108

5:09 1D

WA 532

3,774

6

DP

5:08 1C

D 12

DB

SITE BOUNDARY 49.99m 333°05'20"

9,926

FW

DP

7

AC

19,675 19,675

E08 A1106

FW

5 E02 A1100

450

2,450

WB 525

655

1,830

6,550

AC

DP

450

3,450

E06 A1104

E04 A1102

DP

FW

SITE BOUNDARY 50.00m 153°05'40"

1,950

AC

SP

4

FW

AC

WDA 501

WB 524

2,340

6,130

DP

D WA 13 501

5:01 2A WDA 502

DP

FW

A1106

5

WDA 503

S04 A3106

D 12 D 12

501 Q12B

FW

HOUSE KEEPING

4

AA7129

E05 A1104

F-02

550

APARTMENT

DB

AC

DB

FW

AC

FW

502 Q12A

6

D 13

D 12

DP

FW

DP

WB 526

DP

WDB 501

SP

S04 A3106

5:09 1D

FW

WA 502

DB

AC

WDA 504

WDB 502

5,480

D 12

3

WA 503 FW

D 13

DP

AC

FW

WB 527

DP

FW

DA 501

WA 532

3,774

WB 525 FW

AC

E04 A1102

DDA REQ. 2070x1540

DP

WA 504

5:08 1C

3,430

5

9,926

AC FW

D 12

AC

SITE BOUNDARY 49.99m 333°05'20"

6,550

655

1,830

4

DDA REQ. 2070x1540

DCA 501

DA 509

E06 A1104

550

D 13

DCA FE 502

DP

FW

WA 505 AC

SFL +20,050 FFL +20,080

AA4001

PRESS

12,900

13,891

S04 A3106

1,609

CORE A1

WDA 505 E07 A1106

2 5:02 1A

D 12

S299 #LayID

DA 502

1,999

STAIR A1

D 13

DP

WDA 506

WA 506

PF-21

DA 508

DB

5:07 1E

DP

LEVEL NUMBER

AA7138

WA 531

FACADE GLAZING WALL. REFER TO DRAWING AA6011

3

FW

DP

895

BIN CHUTE

S03 A3104

DA 503

DDA REQ. 2070x1540

DCA 504

1,610

DCW GAS FE

D 13

TOWNHOUSE

D 13 DA 504

LEVEL NUMBER

DHW

COMMS

ELEC

5:15M THB

D 12

5:03 L 2G

SSL +20,050

D 13

S299 #LayID

DCA 505

1

D 16

AC

DA 507

DB

D 12

WA 530

FACADE GLAZING WALL. REFER TO DRAWING AA6011

DA 515

D 13

D 13

5:14M THA

SSL +20,050

DA 505

DCA DCA DCA DCA 508 507 503 506

D 12

AC

DB

D 12

DB

24,745

DA 514

D 13

5:13M THA WA 529

FE

DCA 509

5:04 L 2F

D 13 DA 506

S299 DCA DCA #LayID 511 510

D 12

D 16

SSL +21,550

5:05 L 2F

SSL +20,050

D 13

SSL+20,050

SSL +21,550

D 16

AC

1,609

DA 513

DP

D 12

SSL +20,050

DA 510

DCA 513

2070x1540

WA 528

5:06 L 2F

FH

DCA 512

D 13 DA 511

DA 512

FW

5:10 L 2F

SSL+20,050

D 13

D 13

D 12

D 16

D 16

RELIEF

SSL+20,050

WA DDA REQ. 527

2

D 12

PRESS

5:11 L 2F

SSL+20,050

WA 526

S03 A3104

D 12

D 16

DB

7,590

5:12 L 2H

D 12

AC

8,590

STAIR A2

D 16

450

550

Planter -B

WA 510

895

DP

FW

2,650

DP

WA 512

FW

WA 511

1,975

FW

WA 514

FW

930

FW

450

WA 515

1,800

Planter -A Planter -A

7,590

DP

1,546 543

1,129

1,800

Planter -A

WA 517

500

4,685

DP

ID

3,545

24,905 (BUILDING A)

1,800

VO WA 518

100 20 20

2,176

Planter -A

FW

WA 516

450

450

1,129

FW FW

6,350

5,480

974

1,800

Planter -A

FW

450

12,900

450

10,335

3,175

5,480

2,176

3,175

10,335

DP

450

1,800

AC

3,150

Planter -A

WA 520

DP

450

SITE BOUNDARY 53.28mPlanter 63°05'20" -A

Planter -A

FW

FW

WA 521

WA 523

2,230

2,176

WA 519

FW

Planter -A

DP

AC

550

WA 524

450

1,800

Planter -A

FW FW

895

2,650

954

945

1,800

WA 522

Planter -B Planter -B

1

29

3,130

2,095

2,176

450

AC

1,936

1,800

6,350

AC

4,050

AC

1,548 188

2,950

AC

256

450

AC

3,495

FW

SITE BOUNDARY 53.28m 243°05'40"

450

1,250

BA

3,500

5,890

3,765

3,360

BB

450

12,729

6,850

AC

4,100

S01

A3100

450

3,356

6,640

450

10,025

BE

450

7,770

BF

10,790

6,750

E03 A1102

AD

AG

S02 A3102

3,120

AH

7,170

AJ

430

AK

Ground Floor General Arrangement Plan

29


GARFIELD

Design Documentation | 2IC Townhouses 37-38 Shelley Street, Richmond Victoria.

30


TITLE BOUNDARY

TITLE BOUNDARY

A set of opulent townhouses located in Richmond with red brick faรงade responding to the local context. I was responsible to review and revise the design documentation drawings based as per client requirements and adhere to budget restrictions and building requirements from the BCA. I researched on windows that not only required to maintain design aesthetics but also fit into the fire and ESD requirements. Notably, the details for the brick faรงade was challenging given that it provides zero structural support for the building. This therefore required consistent interaction with structural engineers to produce a viable solution yet maintain maximum yield to the townhouses.

RL+27,440

RL+25,720

MAX. 9m

RL+25,440

2,900

ROOF TERRACE FFL

3,180

ROOF

MAX. 10.5m

RL+22,540

2,800

9,000

2,800

10,500

SECOND FFL

RL+19,740

2,800

2,800

FIRST FFL

RL+16,940

GROUND FFL

+16,720

BASEMENT FFL

2,650

2,650

NGL

+14,290

BASEMENT FFL

North Elevation

31


Image by DKO Architecture

32


Image by DKO Architecture

33


+27,220

RL+25,940

T.O ROOF

3,440

2,963

3,400

T.O ROOF

DINING / KITCHEN RL+22,540

RL+22,540

KITCHEN / DINING

DINING / KITCHEN RL+22,370

KITCHEN / DINING RL+22,300

+22,300

SECOND FFL

GROUND FFL

NGL +17,080

BATH RL+16,950

ENS. RL+19,620

RL+19,550

BATH RL+16,870

BASEMENT FFL

Section 01

BATH RL+16,800

BASEMENT RL+13,950

ENS.

+19,550

FIRST FFL

2,750

BATH RL+17,040

ENS. RL+19,700

NGL +16,720

+16,800

GROUND FFL

2,850

2,400

2,750 RL+17,040

ENS. RL+19,790

FIRST FFL

2,750

10,500

RL+22,450

2,500

2,400

2,750

9,000

10,500

SECOND FFL

RL+19,790

34

MAX. 10.5m

+25,740

+13,950

BASEMENT FFL


BED 1

1,050

BED 1

1,050

BED 1

BATH

BATH

95°45'

1,095

1,242

1,690 185°49'

4,630 NBN.35x.1x.6

1,053

95°45' NBN.35x.1x.6

NBN.35x.1x.6

NBN.35x.1x.6

18,290

BED 1

BATH

BATH

TH01

TH02

+16,940

TH03

+16,940

43.49 m2

+16,940

45.03 m2

SB .3x.1x.6

SB .3x.1x.6

TH04

+16,940

45.03 m2

NBN.35x.1x.6

12,340 6°11'

HOME OFFICE / FLEXI

L

45.12 m2

SB .3x.1x.6

BATH

SB .3x.1x.6

R

HOME OFFICE / FLEXI

R

G

G

+16,940

1:20

G

+16,940

R

G

45.40 m2

+16,940

RAISED OUTDOOR AREA 12.27 m2

G

G

R

R

G

HOME OFFICE/ FLEXI

HOME OFFICE / FLEXI

R

6°11'

+17,480

GAS 1,600x600x2,000

1:20

47.56 m2

39.53 m2

1:20

SWITCH 1,800x450x2,100

SB .3x.1x.6

R G

FIP

+17,040

+16,800

HOME OFFICE/ FLEXI

17,480 186°07'

R G

HOME OFFICE/ FLEXI

SB .3x.1x.6

R

45.40 m2

SB .3x.1x.6

+16,940

HOME OFFICE/ FLEXI

+16,940

1:4 - 7,200mm

STACKED WATER & CHECK METER ASSEMBLY BELOW PLANTER 1,500 x 500 x 800

TH09 SB .3x.1x.6

HOME OFFICE / FLEXI

SB .3x.1x.6

47.24 m2

+16,940

TH06

TH07

BATH

BATH

BATH

NBN.35x.1x.6

NBN.35x.1x.6

NBN.35x.1x.6

BATH

TH08

186°11'

12,940

CAR PARK DOOR 2m2 OPENINGS

TH05

6,320

BED 1 BED 1

BED 1 1:8 - 3,000mm

BED 1

NBN.35x.1x.6

18,390 276°16'30"

4,560

276°16'30"

Ground Floor Plan

35


NORMANBY RD

Design Documentation | 2IC Mixed-use Residential Development 75m AUD - 1,210m2

36


Normanby road is a 40 story multi-residential building with hotel branded by Marriott from the ground floor to level 18 consisting of 193 hotel rooms, a common area including an outdoor pool and 111 apartments across level 19 to 39. The curtain wall façade is particularly unique given that it consisted of triangle planes at different angles to complete the building’s facade. I coordinated the hotel rooms and apartment rooms to identify and adopt a strategy, program, and process to enable project delivery. The timely completion and communication of accurate and comprehensible documents that includes the required drawings, wall type schedule, door type schedule and the works of a CAD manager. I was to coordinate all consultants and the required input to be placed into the drawings to provide the tender drawing set.

Images by Ridz

Image by DKO Architecture

37


Site Boundary

Site Boundary +131,780 Core Lid

3,400

+130,800

+128,380 Machine Room

3,550

+125,800

2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 3,250 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 3,250

+124,830 Roof +121,580 Level 39 +118,640 Level 38 +115,700 Level 37 +112,760 Level 36 +109,820 Level 35 +106,880 Level 34 +103,940 Level 33 +101,000 Level 32

+98,060 Level 31 +95,120 Level 30 +92,180 Level 29 +89,240 Level 28 +86,300 Level 27 +83,360 Level 26 +80,420 Level 25 +77,480 Level 24 +74,540 Level 23 +71,600 Level 22 +68,660 Level 21 +65,720 Level 20 +62,470 Level 19 +59,530 Level 18 +56,590 Level 17 +53,650 Level 16 +50,710 Level 15 +47,770 Level 14 +44,830 Level 13 +41,890 Level 12 +38,950 Level 11 +36,010 Level 10

+33,070 Level 9

4,000

+30,130 Level 8 +26,130 Level 7

3,650

+23,880

1,000

+19,380 Level 5

1,400

+22,480 Level 6

+7,380 Level 1

Woodgate Street +2,000 Ground

North Elevation

38

17,380

CANOPY

4,140 5,425

+10,380 Level 2

6,325 5,080

+13,380 Level 3

20,480

+16,380 Level 4

Normanby Road


Image by DKO Architecture

39


Site Boundary

Site Boundary

+130,800

Core Lid

+131,780 Core Lid

+128,380 +125,800 Machine Room +124,830 Roof

39

+121,580 Level 39

38

+118,640 Level 38

37

+115,700 Level 37

36

+112,760 Level 36

35

+109,820 Level 35

34

+106,880 Level 34

33

+103,940 Level 33

32

+101,000 Level 32

31

+98,060 Level 31

30

+95,120 Level 30

29

+92,180 Level 29

28

+89,240 Level 28

27

+86,300 Level 27

26

+83,360 Level 26

25

+80,420 Level 25

24

+77,480 Level 24

23

+74,540 Level 23

22

+71,600 Level 22

21

+68,660 Level 21

20

+65,720 Level 20

19

+62,470 Level 19

18

+59,530 Level 18

17

+56,590 Level 17

16

+53,650 Level 16

15

+50,710 Level 15

14

+47,770 Level 14

13

+44,830 Level 13

12

+41,890 Level 12

11

+38,950 Level 11

10

+36,010 Level 10 +33,070 Level 9 +30,130 Level 8 +26,130 Level 7

+19,380 Level 5

GLAZED AWNING FIRE HYDRANT BOOSTER ENCLOSURE FACADE GLAZING

SHOP

NORMANBY RD FOOTPATH

+16,380 Level 4 +13,380 Level 3 +10,380 Level 2

380

+7,380 Level 1

000

+2,000 Ground

West Elevation

40

17,380

20,480

1,000

1,400

+22,480 Level 6

LEVEL 1

FIRE HYDRANT BOOSTER CABINET

1,300

Roof

1,800

Machine Room

RL +500

EST NGL +2,000

Lobby Section Detail

HYDRANT BOOSTER INDICATIVELY SHOWN


1

2

3

14,965

448

2,252

3,605

4

6,100

5

14,700

6

6,450

12,500

7 3,250

250

SITE BOUNDARY

D

EF-21

EF-11

PLANTERS

PLANTERS

EF-21

PLANTER

EF-21

EF-21

PLANTER

PLANTER

DOOR CONTROL

CAR STACKER LOADING PENETRATION

DOOR CONTROL

CONC PUMP

D06 10B

D06 10D

D06 10C

D06 10E

POOL DECK 06:01

PRE-FUNCTION 06:03

FUNCTION 06:04

FFL +22,510 SFL +22,480

EF-24

FFL +22,510 SFL +22,480

+22,480 ACC. WC 06:14

FHR

FEMALE WC 06:12 EF-11

H

D06 22B

D06 22G LV066-22A

HYD 06:23

H GAS B E

R

D06 22D

W

FFL +22,510 SFL +22,480

HYD

L

HYD

D06 22E

D06 22F

HYD

D06 22G

D06 22J

SFL +20,840

Custom Text

1

2

3

4

5

6

7

8 9

HOTEL LIFTS

D06 22K

SERVICE

APT LIFTS

KE

FENCE

FHR

CORRIDOR 06:22

D06 22L D06 21A

17 16 15 14 13 12 11 10

PLANTER

D06 03C

D06 20A

SFL +22,480 EGRESS STAIR 01 06:20

FB

D06 03B

D06 03A

STAIR PRES.

5,250

D06 12A

H

D06 22C

D06 15A

DOOR CONTROL

STAIR PRES.

D06 22A

W066-W-07

DOOR CONTROL

MALE WC 06:15

D06 14A

D06 13A

B

LV066-20A

ACC. WC/SHR 06:13

STAIR RELIEF.

FFL +22,500 SFL +22,480

EF-22

FB

EGRESS STAIR 02 06:21

SFL+23,7609 10 8

7

11 12 13 14 15 16 17 6

5

4

3

2

1

D06 22I

LV066-22B

SFL+22,480

STAIR RELIEF.

POOL SFL +20,730

EF-09A

EF-09A

A

HOIST

POOL SIDE BAR 06:02 FFL +22,510 SFL +22,480

1,515 116 SITE BOUNDARY

7,040

NORMANBY ROAD

EF-39

C

OUTDOOR LOUNGE 06:10 FFL +22,500 SFL +22,380

D06 10A

D06 01B

3,033

260

CRANE

OUTDOOR LOUNGE 06:01

HOIST

SITE BOUNDARY

D06 01A

EF-09A

LV066-21A

6,840

EF-19

D06 22H

BER

EN

CH

ELEC 06:09 ER

KIT

OAR

S

ER

UT

BY

D06 10F

EF-13

KITCHEN 06:05

D06 05A

OTH

STORE 06:11

YO

LA

FW

LDER

EF-11

SITE BOUNDARY

5/F Common Area General Arrangement Plan

Image by DKO Architecture

41


BANKSIA

Design Documentation | 2IC Apartments 40.0m AUD - 4,040m2

42


Banksia is part of a master plan designed by DKO architecture located in Clayton South, Melbourne. It is a 9-storey building with 2 basement levels, both acting as the car park including bike parking, storage and services. The building is a concrete structure with a precast facade typical and window wall facade system to the north and west corner. My responsibility was to coordinate and the design development phase. The initial task was for me to reproduce the town planning documentation into a detailed design documentation coordination model. My responsibilities also extended to coordination of wall types considering fire ratings, acoustic values and waterproofing. From this, I learnt to adopt relevant consultants’ reports and requirements into elements of the building as well adoption based on construction method and buildability.

Image by DKO Architecture

43


1

2

3

8,940

4

5,530

5

3,500

6

8,670

7

5,010

8

6,650

9

4,200

10

7,500

11

5,870

5,605

1,450

4,400

+86,900 10 Story

2,550

3,100

+82,500 9 Roof

1,450 2,550

W A6-24

EF-14

EF-06 BT-01

EF-01

W A6-23

W A6-22

EF-06

EF-04 BT-05

EF-02

EF-04

BT-04

W A6-21

W A5-24

BT-01

W A5-22

W A5-21

2,550

W A5-23

BT-05

BT-04

BT-01

550

BT-01

W B4-31

W B4-29

BT-01

W A4-22

W A4-21

BT-04

W A3-24

W A3-26

W A3-23

BT-01

W A3-22

W A3-21

2,550

W B3-29

+65,000

BT-04

BT-05

W A4-23

BT-05

550

550 W B3-31

BT-04

19,769

BT-01

W B3-32

W A4-24

W A4-26

2,550

W B4-32

BT-01

EF-13

BT-05

BT-04

BT-01

550

BT-05

W B2-38

W B1-40

W B1-38

W B2-36

W B2-37

W B2-35

W B2-34

W B2-33

W B2-32

W B2-31

W B1-32

W B1-31

W B2-30

EF-12

EF-14

W BG-13

W B1-34

W B1-33

RL +56,540

945

+51,100

South Elevation

SCR-01

SCR-01

EF-05

REFE R TO

W BG-11

EF-04 EF-06

W BG-10

EF-14

W BG-30

W BG-09

W BG-08

W BG-29

RL+56,300

TOW RL +55,290

BT-03

EF-04

BT-06

EF-10

EF-04

W A2-23

W A2-22

BT-05

W A2-21

BT-04

W A1-24

W A1-23

BT-01

W A1-22

W A1-21

+58,800 BT-04

W BG-07

BT-01

EF-08

SCR-03 BT-03

RL +56,800

EF-17 +54,635

SCR-03 BT-03

EF-07

EF-14

TOW RL+55,290 +54,538

EF-05

BT-01

W A1-26

BT-05

EF-01

EF-13

PE LANDRGOL SCAPA E DR AW ING +58,800

EF-04

+54,439

RL +54,267

+54,083

W B1-30

EF-06 EF-15

W BG-12

EF-04

+54,100

EF-04

EF-06 BT-05

W BG-14

EF-04

550

EF-06

BT-05

W B1-35

281

BT-04

BT-04

SCR-05 EF-15

W B1-36

550

SCR-05

SCR-05 EF-04

W B1-37

2,550

EF-08 BT-01

BT-05

W A2-24

W A2-26

2,550

W B2-40

BT-04

TIMBER SEAT

44

EF-04

EF-04

BT-04

TOW RL +54,870 +54,500 0 Ground

EF-02

550

550 2,550 W B3-33

W A6-26

EF-14

W A5-26

3,100

W B4-33

W B3-35

EF-14

BT-04 EF-09

BT-01

7,650

3,100

1,450 1,450

3,100

W B4-35

EF-01

W B5-29

BT-05

1,650

19,600

EF-09

W B5-31

BT-05

EF-02

EF-06

EF-04

W B5-32

BT-04

1,450

3,100

EF-02

EF-04

BT-01

BT-04

1,450

3,100

W B6-29

BT-05

1,450

3,100

W B6-31

BT-04

2,350

3,200

W B6-32

EF-04

W B5-33

350

+57,700 1 Level 1

EF-14

BT-05

1,650

+60,800 2 Level 2

W B6-33

EF-06

W B5-35

1,650

+63,900 3 Level 3

EF-04

2,550

EF-14

EF-02

BT-04

1,450

3,100

W B6-35

EF-14

+77,400

EF-14 550

1,350

EF-02

1,650

+70,100 5 Level 5

+67,000 4 Level 4

EF-01

1,650

+73,200 6 Level 6

EF-10

BT-05

1,650

+76,300 7 Level 7

PERGOLA E DRAWING SCAP TO LAND REFER

EF-04

2,550

3,100

BT-01 +77,400

550

+79,400

+79,400 8 Level 8

EF-05

EF-01

+54,532

W AG-18

W AG-17

EF-04 EF-06

W AG-16

W AG-15

TOW RL +55,290

TOW RL+55,290

EF-05

EF-05

EF-11 TOW RL +55,290 RL +54,925

RL +54,850

+54,779

+54,715 +54,620

EF-14

BT-03

EF-04

EF-05

GS-02

RL +55,026


Image by DKO Architecture

45


4

5

6

8,670

7

5,010

8

6,650

W A1-42

AC STUDY

W A1-07 NBN

820

DT03

W A1-08 920 DT05

W A1-09 820

DT01

COMMS

W A1-11

ELEC

BATH BT-19A FW

FE GAS

PLANTER

W A1-12

W A1-13

WM

SR

DT27 DT01

W A1-14

DT03

820

820

W A1-15

DT01

2. 79

97°49'20"

W A1-16 W A1-17

DT01 DT01

W A1-18

NBN

DT03

DT03

820

FE

820

RT-01

STUDY

RT-01

3,0 00

W A1-20

DT04

DT01

920

DT04

NBN

920

DT05

W A1-19

BATH FW BT-17A 920

A1.09 3A

2,191

5.44

DT03 W A1-22

FW

BATH BT-18

FW

6. 4 0

AC

920

BALCONY FFL +57,800 W A1-43

DP/FW

820

DT03

LT-11 W A1-23

EF-23

BT-05

W A1-24

BT-01

64.28m

BED 01

DT27

DT03

820

KITCHEN TYPE 17

FW

DP/FW PLANTER

W A1-26

BT-01

SITE BOUNDARY

820

DT01

DT01 FE

A: 94.46 m2

CORRIDOR A

DT27 DT03

820

DT01 W A1-37

DT26

FW BEDROOM 01

A1.08 2.2B

BATH BT-18 FW 820

BALCONY FFL +57,800

SCR-05

Ground Floor General Arrangement Plan

FW BATH BT-20A

RT-01 RT-01

920

DP/FW W B1-30

DT03 820

FW

KITCHEN TYPE 05

920 W B1-31

LT-08

FW

BT-05

AC

W B1-32

DT03

820

LIVING

DT03

W B1-33

BT-01

W A1-44

FW

FFL +57,800

BALCONY FFL +57,800

W B1-34

FW BATH BT-01

FW BATH BT-01

DT01

DP/ FW

DT03

W A1-33

820 W A1-32

DP

BALCONY

BT-06 SCR-01

W B1-36

FW

DT03 820

FW

SCR-01 PLANTER ACCESS GATE TO MATCH BALUSTRADE SYSTEM NOM. 1.7m HIGH

BT-05

AC

LT-04

LT-04

RT-01 RT-01

920

KITCHEN TYPE 08

BG.09 L TH.1

LIVING

W B1-35

BT-05

46

DINING

J01

W A1-34

LIVING AC

BED 01

DT04

DT03

BG.08 L TH.1

FW

BED 02

ING ER DRAW A OV E OL AP RG SC PE LAND R TO FE RE

W B1-29

AC

DP/FW PLANTER

W B1-38

W A1-31

W A1-45

ER A OV OL RG PE

KITCHEN TYPE 08 NBN

DP

BALCONY FFL +57,800

A1.10 2.1A

DT03

BALCONY

AC

NBN

BED 02

820

820

A1.07 2.1A

DT04

W B1-27

BALCONY

DT03

ST

FW

KITCHEN TYPE 04

BT-01

BATH BT-03A

KITCHEN TYPE 04

W A1-25

DT04

LT-02

DT15

BALCONY

W B1-28

DT03 DT05

SCR-01

W A1-28

W B1-26 DT03

820

DT03

820

DT01

FW BATH BT-10 920

FW

820

BALCONY FFL +57,800

FW

FFL +57,800

DT15

EF-23

A1.11 2.1B

LT-01

DP

FFL +57,800

SCR-01

FW

FW

B1.10 2.2E

DT01

DT15

BT-03

PLANTER

BT-03

FFL +57,800 PE RG OL A OV ER

EF-23

W B1-40

920 DT04

FW

W A1-27

W B1-25 DT01 DT01 FE

920

DT04

SCR-01

W B1-37

DT04

920

BED 01

RT-01

DT06

W B1-39

AC 2,257

BALCONY FFL +57,800

BT-04

RT-01

BATH BT-15A

DT03

820 W B1-41

DP/FW

BT-01

PLANTER

920

DT03

W B1-44

W B1-43 W B1-42

8,218

H

820

KITCHEN TYPE 17

UP

KITCHEN TYPE 04

BATH BT-01 FW

KITCHEN TYPE 04

NBN

DT03

W B1-54

BT-05

SFL +57,720

LT-04

A1.06 2.1A

DT15

PLANTER

BUILDER TO ALLOW FOR PERFORATED MESH FENCE BACKING TO APARTMENTS A1.06 & A1.07 TO 1.5m ABOVE FFL

BED 02

DT03

B1.09 2.2B

FFL +57,800

FW

FW

KITCHEN TYPE 05

FW

BATH BT-18 FW 820

J

FW BATH BT-20A

DT27

7,205

NBN

LT-08

EXTERIOR GATES TO BE LOCKABLE. REFER DOOR TYPE SCHEDULE

SCR-01

NBN

KITCHEN TYPE 04

G

DP/FW

EF-23

EGRESS STAIRS 01

920

FFL +57,800

BT-03

AC

DT03

BALCONY

PLANTER

BT-03

DT03

AC

W A1-46

DT15

LT-13

FW BATH BT-01

BIN CHUTE A: 5.66 m2

FH

820

BED 02

SCR-01

REFER TO LANDSCAPE ARCH FOR INTENT. ALLOW FOR EXTERIOR LIGHTING.

BALCONY

B1.11 2.1E

RT-01 RT-01

W A1-30

W B1-23

W B1-24

SCR-01

BED 01

W A1-29

DT01

DP

820

DT03 820

W B1-45

NBN

BALCONY FFL +57,800

LT-01

DT20

DT21

PLANTER

BT-03

DT15

KITCHEN TYPE 04

B1.08 2.1A

BT-01

LIFT

FW

COURTYARD

W B1-53

FFL +57,800

FW

EF-23

920

EXH

DT25

DT05

KITCHEN TYPE 02

BT-04

DT04

FFL +57,720 SFL +57,700

LAUNDRY

W B1-22

PLANTER

DT15

A1.01 2.1B

KITCHEN TYPE 04

920 DT04

A1.05 1A

DP/FW

BALCONY FFL +57,800

DT21

CP EXH NBN

920 DT04

BT-03

BALCONY

BATH BT-01 FW

DP/FW

DP W A1-35

DT03

DT04 920 W A1-38 FFL +57,800

SCR-01

KITCHEN TYPE 04

LT-04 AC

W A1-36

BALCONY

PLANTER

AC

B1.12 2.1A

FW BATH BT-01

DT03

W A1-39

W B1-14

SCR-01 PLANTER

FFL +57,800 SFL +57,600

BED 02 FW

BED 02 W B1-55

DT04

NBN

920

AC SCR-01

920 DT05 DT03

LT-01

CR

1:40 WALKWAY

BT-03

AC

FW BATH BT-03A

FW

KITCHEN TYPE 04

AC

DT15

PLANTER

BT-03

BATH FW BT-17A

BATH BT-01 FW

W B1-16

W B1-17

FW BED 01

DT03 820

920

DT04

W A1-40

DT01

DT04

920

DT05

DT04

W B1-19

AC

COMMS

920

DT04

EGRESS STAIRS 02

NBN

DT03

DT03

DT27

820

DT03

BED 01

820

DT03

DT03

820

820

DP/FW

PREFAB PLANTER. REFER TO LANDSCAPE ARCH. DRAWINGS FOR INTENT

RT-01 RT-01

DT01

W B1-47

53.55

RT-01 RT-01

SCR-01

DT15

PLANTER

DT03

FW

FFL +57,800

FFL +57,800

820

A1.04 2.1A

BALCONY

FW

RT-01

920

LT-04

EXHAUST DISCHARGE

W B1-21 FE

W B1-48

BATH BT-01 FW

RT-01 RT-01

PENDING STRUCTURE REVIEW

FFL +57,800

SCR-01

FW

F

BALCONY

DP

PLANTER

LIVING

BALCONY

EXH W B1-20

820

AC

W A1-47

DT15

BED 01

W B1-15

W DP/FW B1-18

1:40 WALKWAY

BT-03

BATH BT-18

FW KITCHEN TYPE 17

BED 02

EXTERIOR GATES TO BE LOCKABLE. REFER DOOR TYPE SCHEDULE

FW

RT-01

DT04

FW

BATH BT-20A FW

DINING

EXHAUST DISCHARGE

LIVING FH

BED 01

FW

NBN

NBN

820

B1.02 1B

DINING

LT-04

DT03

RT-01 RT-01

BATH BT-23A

BEDROOM 01

B1.01 1A

SFL +57,720

CR

KITCHEN TYPE 02

A1.02 3B

920

W A1-41

LT-08 NBN

DP

RT-01

FW

920 DT03

W A1-10

AC

820

920

W B1-13

DT03

820 820

DT03

BALCONY FFL +57,800

FW

FW

BED 02

BED 01

FW BATH BT-19A

KITCHEN TYPE 02

DP

KITCHEN TYPE 04

DP/FW

LT-01 LAUNDRY

UP

BIN CHUTE

GAS

W B1-49

8,200

EF-23

J01

DT20

DT20

CORRIDOR B

A: 93.21 m2

PLANTER

DP/FW

SFL +57,720

DT27

FH

EXH

DT01

DT26

DT01

FW

820

820

DT03

ELEC

SERVICES

LT-04

W B1-46

DT03

DT01 820

W B1-52

DT04 DT03

LIFT

FFL +57,720 SFL +57,700

B1.07 2.1A

6,970

820

LT-05 820

DT03

2,360

NBN

W B1-51

FW

LT-09

AC

SCR-01

FW

DT01

W A1-05

W A1-04

KITCHEN TYPE 05

FE

SCA

UP

BATH BT-14

820

BALCONY FFL +57,800

W B1-56

PLANTER

FW

BATH FWBT-09A

NBN

7,050

DT20

SFL +57,720

LIFT

FW

BT-05

FW

DT01

BATH BT-07A FW

B1.06 2.2A

WW B1-06

920

BATH BT-25

FW

DP/FW

LT-11

FW

DT05

LT-05

ST

DT27

W B1-50

BT-01

820 DT03 820 DT03 DT06

BATH FW BT-08A

FW

FW

DT03

D

DT03

820

DT03

7,490

NBN

DT03

BALCONY FFL +57,800

WW B1-05

BATH FW BT-07A

BALCONY FFL +57,800

EF-23

A1.03 2.2B

820

FW BATH BT-18

ACCESS GATE TO MATCH BALUSTRADE SYSTEM

LT-12

PENDING STRUCTURAL ENG'S REVIEW

BO DP/ FW

FW

W A1-06

BT-01

BT-05 DP/FW PLANTER

DT03

NOM. 1.7m HIGH

ING OVER DRAW OLA APE PERG NDSC LA R TO REFE

NBN

AC

DT04 820

BATH BT-12 FW

W A1-03

W A1-01

DP /FW

W B1-12

B1.03 2.2C

NBN

DT04 820

FW

ST

BT-01

BALCONY FFL +57,800

DP/FW

NBN

WW B1-04

NBN

FW

BT-02

BALCONY FFL +57,800

BALCONY FFL +57,800

BT-06

W B1-09

BATH BT-18 FW 820

5,605

RT-01 BT-05

PLANTER TO BE DETAILED MATCH PRECAST & HOOD DETAIL

AC

DP/FW

PENDING STRUCTURE REVIEW

B1.04 2.2J

KITCHEN TYPE 07

B

E

DP/FW

W B1-06

PLANTER

W B1-10

BALCONY FFL +57,800 W B1-05

W B1-11

BT-04

W B1-07

WW B1-01 OF FW

AC

AC

W B1-01

W B1-04

DP/

W B1-03

W B1-02

W B1-08

BT-04

B1.05 2.2D

C

1.5m HIGH WIND SCREEN AS PER WIND ENG'R REPORT

BT-07 EF-23

BT-02

WW B1-02

BALCONY FFL +57,800

11

5,870

W A1-02

WINDOW HOOD WW B1-03

10

7,500

WINDOW HOOD

2. 87

A

9

4,200

97°44'20"

DT26

68.05

DT01

3,500

DT27 DT27

3 5,530

DT03

2 8,940

NBN

1

92

RT-01 W A1-21

6.40


FALL

ROPE ACCESS TO FACADE TO FUTURE DETAIL AND SHALL BE APPROVED BY ARCHITECT PRIOR TO FINALISATION OF TENDER

1,100

REINFORCED PRECAST CONCRETE PANEL BALUSTRADE WITH INTEGRAL COLOUR IN CLASS 2 FINISH AS SCHEDULED APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP INTO 20MM x 200MMH REBATE IN CONCRETE PANEL. REFER SPECIFICATION.

25MM X 75MM X 10MM THICK RECTANGULAR STEEL OVERFLOW POPS, PROTRUDING 10MM BEYOND PRECAST CONCRETE SPANDREL PANEL TO EACH WINDOW BALCONY DRAINAGE OUTLET, IN APPLIED FINISH AS SCHEDULED, ALIGNED VERTICALLY & HORIZONTALLY ACROSS FAÇADE, TO FUTURE ARCHITECT’S DETAIL

FALL MAX 1:100

ROOF SFL

350

RL 76,300

CONCRETE SOFFIT, WHITE RENDER FINISH AS SCHEDULED CH 2700 AFFL

LIVING

BALCONY

THERMAL INSULATION TO UNDERSIDE OF CONCRETE ROOF SLAB. REFER ESD REPORT.

LIVING

1,000

11

BALCONY

APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS. REINFORCED PRECAST CONCRETE PANEL BALUSTRADE WITH INTEGRAL COLOUR IN CLASS 2 FINISH AS SCHEDULED

200

LEVEL 2 SFL

150

200

125

25MM X 75MM X 10MM THICK RECTANGULAR STEEL OVERFLOW POPS, PROTRUDING 10MM BEYOND PRECAST CONCRETE SPANDREL PANEL TO EACH WINDOW BALCONY DRAINAGE OUTLET, IN APPLIED FINISH AS SCHEDULED, ALIGNED VERTICALLY & HORIZONTALLY ACROSS FAÇADE, TO FUTURE ARCHITECT’S DETAIL

CH 2700 AFFL 13MM PLASTERBOARD CEILING FLUSHSET, SQUARESET CORNICES, REFER FINISHES SCHEDULES.

CONCRETE SOFFIT RENDER FINISH AS SCHEDULED

RETURN PLASTEROARD TO FORM BLIND PELMET, FINISH AS SCHEDULED

PAVERS ON POD SUPPORTS, REFER FINISHES SCHEDULES. 10MM GAP TO WALLS, BALUSTRADES AND GLAZING FRAME. STEEL RHS FRAMING STRUCTURE, CONCEALED BEHIND & SUPPORTING WINDOW WALL PARAPET, ALIGNED TO WINDOW MULLIONS/TRANSOMS/ HEAD FRAMES ETC, IN APPLIED FINISH AS SCHEDULED, TO FUTURE ARCHITECT’S & STRUCTURAL ENGINEER’S DETAIL

100MM DEEP FRONT GLAZED BALCONY WINDOW SYSTEM AND GLAZING AS SCHEDULED

100

LEVEL 1 SFL

FALL

FALL

REINFORCED CONCRETE HOB 200Hx300W, REFER CSPS 50-60MM RIVER PEBBLE BALLAST OVER CONCRETE FLOOR SLAB FALLING INTO RAINWATER OUTLET TO ROOF SLAB, GREY COLOUR AS SCHEDULED

150MM DEEP FRONT GLAZED WINDOW WALL SYSTEM EXTENDING OVER BALCONY TO FORM BALUSTRADE AND CONCEAL STEEL FRAMING BEHIND

ROOF RAINWATER OUTLET AND O/F TO RETICUALTE INTO GYM CEILING 200

APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP ONTO HOBS. OVERFLOW AND PUDDLE FLANGE TO DP TO RUN VERTICALLY (NO BENDS) IN BALCONIES

ENGINEERED TIMBER FLOOR WITH UNDERLAY, REFER FINISHES SCHEDULES AND ACOUSTIC REPORT.

APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP ONTO HOBS. 1,050

MDF ON PACKER FIXED TO 100X100 HOB CONCEALING SUBSILL TO AW WINDOWS/DOORS TO PROVATE BALCONIES/TERRACES, REFER FINISHES SCHEDULES FOR SKIRTING.

RL 57,700

ALUMINIUM FRAMED FULLY GLAZED BALUSTRADE, REFER FINISHES AND BALUSTRADE SCHEDULES.

BALCONY

150

LIVING

1,000

RL 60,800

150MMH POWDERCOATED FLANGELESS AND SASHLESS LOUVRES TO GYM FACADE, INTEGRATED INTO WINDOW WALL SYSTEM

CH 2500 AFFL

REFER PLANS AND WALL SCHEDULE FOR WALL TYPES

CH 2600 AFFL THERMAL INSULATION BOARD PAINTED TO UNDERSIDE OF CONCRETE ROOF SLAB, REFER ESD REPORT

13MM PLASTERBORD CEILING FLUSHSET, SQUARESET CORNICES, REFER FINISHES SCHEDULES.

GROUND CARPARK

GYM

CORRIDOR

REFER FINISHES SCHEDULES FOR SKIRTING. LARGE FORMAT TILES TO CORRIDOR. TILING OVER LEVELLING SCREED WITHIN 30MM REBATE IN CONCRETE FLOOR SLAB AS SCHEDULED

RL 54,500

LARGE FORMAT TILES TO WALKWAY. TILING OVER LEVELLING SCREED REBATED INTO PAVING SLAB SCHEDULED .

ALUMINIUM FRAMED WINDOW, REFER ELEVATIONS, ACOUSTIC & ESD REPORTS, FINISHES SCHEDULE AND MANUFACTURER'S SPECS.

BLOCKWORK WALL. REFER TO PLANS AND WALL SCHEDULE FOR TYPES AND LININGS.

ACOUSTIC FLOOR WITH UNDERLAY, REFER FINISHES SCHEDULES AND ACOUSTIC REPORT.

GROUND FLOOR SFL

STAINLESS STEEL TRENCH GRATE DOUBLE BRICK, SOLDIER COURSE TO TOP IN FINISH AS SCHEDULED

APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP ONTO HOBS. UV RESISTANT. PAVING STONES ON SCREED LAID TO FALL ON SLAB, REFER FINISHES SCHEDULES. 10MM GAP WALLS, BALUSTRADES AND GLAZING FRAME. SETDOWN IN CONCRETE SLAB TO ALLOW FOR GYM FLOORING SYSTEM. REFER TO STRUCT. ENG. DWGS.

TOW RL +54,922 DRAINAGE CELL WATERPROOF MEMBRANE.

FALL

DPC

AG. DRAIN, REFER CIVIL, LANDSCAPE AND HYDRAULIC DESIGN.

BLOCKWORK WALL. REFER TO PLANS AND WALL SCHEDULE FOR TYPES AND LININGS.

BASEMENT 1 CARPARK

100MMH x 110MM DEEP CONCRETE HOB ALONG PERIMETER OF GROUND FLOOR WALKWAY AND PRIVATE TERRACES, UNDER BRICK PLANTER WALLS

THERMAL INSULATION BOARD PAINTED IN BLACK, REFER ESD REPORT CAPPING BEAM. REFER TO STRUCT. ENG. DWGS.

BASEMENT 1 FIRE PUMP ROOM

SHOTCRETE WALL WITH XYPEX ADMIX. REFER TO STRUCT. ENG. DWGS. STRIP DRAIN, PRODRAIN OR SIMILAR. WEEP HOLE.

SPOON DRAIN CONCRETE SLAB. REFER TO STRUCT. ENG. DWGS. RL 51,100

BASEMENT 1 SFL

300

SHOTCRETE WALL WITH XYPEX ADMIX. REFER TO STRUCT. ENG. DWGS. PROOFEX ENGAGE WATERPROOF MEMBRANE OR SIMILAR TO BASEMENT 2. REFER TO STRUCT. ENG. DWGS.

BASEMENT 2 CARPARK

CONCRETE WALL ON PROOFEX ENGAGE. REFER TO STRUCT. ENG. DWGS. WATERSTOP

TOPPING SLAB ON PROOFEX ENGAGE. REFER TO STRUCT. ENG. DWGS. CONCRETE SLAB. REFER TO STRUCT. ENG. DWGS. RL 48,250

BASEMENT 2 SFL

Facade Section

47


THANK YOU

Corrinne Fong 0413 667 117 corrinnefong@gmail.com

48


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.