ABSTRACT
People | Context | Space I believe great design should prioritize all three above mentioned criteria – People, Context and Space. As good designers, we can manipulate space and maximise area to produce elegance of comfort. People utilizing the spaces should inform its program, circulation, and feel of various spaces. Its context would inform the style, form, and presence. This therefore will result in a building or space that is unique, responsive, elegant, and most importantly serves the users needs that will be occupying them daily.
Communication Technical drawings have always added another layer into the design process and is something I appreciate. With knowledge in characteristics in materials, it allows me to produce effective designs and construct great buildings. Visual design is about communication. Architecture is just that. Through applied principles, incorporating design considerations, space, complimenting hues, layout, it will to everyone; it should be able to speak for itself an elevate the art of living.
05
BOUNDARY STREET
Under Construction | 2IC Townhouses 10-16 Boundary Street, South Melbourne. 17m AUD - 2,100m2
06
Boundary Street is constructed as a concrete structure with light weight façade, 4 storeys, 25 townhouses located in South Melbourne. Within the documentation team, I facilitated communications between the client and contractors that enabled the decision to variate from lightweight to concrete construction. That said, this required myself to conduct significant structural information gathering to enable the design model process. As a core member, I partook in important client consultations. It was decided to construct the project from lightweight to concrete construction. Following this decision, structural information played a large role in the design model due to columns locations affecting the design intent. Documentation of wall types, concrete set-out plans and general set-out plans including coordination with services’ consultant drawings. I attended to the stair structure to work alongside with the requirements from town planning and Australian standards. Through this process, it has allowed me to attend services’ consultant meetings to determine allocations of structure, civil and mechanical options, maintaining and providing a better understanding of the structure and the processes required to adapt the updated information for the new design model.
Image by DKO Architecture
SITE BOUNDARY EF-08 +18,500 5 Roof
+17,143
W 07-2:02
W 07-2:01
LEVEL 4 SFL +15,370
2,280 180
WW 27-3-02
W 27-3:02
WW 27-2-02
W 27-2:02
WW 27-1-02
W 27-1:02
LEVEL 3 SFL +12,270
3,000
W 27-2:01
LEVEL 2 SFL +9,170
100 W 27-1:03
2,600
W 07-1:01
W 27-1:01
W 27-G:02
+4,100 D G-19
NGL +2,450
EF-04
NGL +2,450
EF-03
EF-03
EF:04
EF-03
EF-06
W 27-G:01
GROUND SFL +2,970
D G-18 NGL +2,410
NGL +2,400
NGL +2,380
NGL +2,450
NGL +2,450
+6,070 1 Level 1
370
W 07-G:02
GROUND SFL +2,970 NGL +2,270 +2,350 NGL +2,410
THISTLETHWAITE STREET
+9,170 2 Level 2 +8,340
3,100
W 07-G:03
2,730
W 01-G:03
3,100
2,730
W 01-G:04
+12,270 3 Level 3
+6,900 LEVEL 1 SFL +6,070
100
W 07-1:02
1,030
WW 07-1-02
400
125 375 W 07-1:03
1,600
WW 01-1-03
1,025
W 01-1:03
3,100
WW 07-2-02
3,100
W 07-2:03
3,100
125 375 W 01-2:02
W 01-2:04
1,600
WW 01-2-03
1,000
W 01-2:05
+15,370 4 Level 4
400
WW 27-3-02
1,130
W 07-3:01
1,000
W 07-3:02
3,130
+17,250
2,000
955 2,600
3,100 3,100
2,600 2,600
3,100
EF-15
+16,750
+5,600
3,100 +2,970 0 Ground
WW 07-3-02
100
LEVEL 1 SFL +6,070
W 01-1:04
370
+6,070 1 Level 1
WW 07-4-02
W 08-3:01
L
4,300 PROPRIETARY SOLAR PANELS
EF-01
+16,600
100
LEVEL 2 SFL +9,170
W 01-2:06
400
+9,170 2 Level 2
EF-14
100
LEVEL 3 SFL +12,270
+16,350
WW 01-3-03
400
+12,270 3 Level 3
D D13+16,550
WW 01-4-03
W 01-3:03
BUILDING B BEYOND
+17,635
1,100
2,075
180 1,895
LEVEL 4 SFL +15,370
EF-09
K
4,300
570
GT-01
J
4,300
3,100
EF-07
H
4,300
2,700
EF-11
+17,250 +16,550 +16,519 +16,220
400
+15,370 4 Level 4
+17,445
G
4,300
3,130
EF-07
+18,500 5 Roof
+17,445
F
4,300
3,100
EF-15
E
4,300
1,750
PROPRIETARY SOLAR PANELS
D
4,300 PROPRIETARY METAL SCREEN EF-04
125 375
EF-09
C
4,300
1,600
4,300
1,255
B
SITE BOUNDARY
A
EF-04
EF-06
MEWS
NGL +2,370 NGL +2,370
EF-04
EF-06
EF-03
+2,970 0 Ground +2,370
8 BOUNDARY ST SINGLE STOREY RENDERED BRICK BUILDING
North Elevation
07
Images by Ridz
Image by DKO Architecture
08
THISTLETHWAITE STREET 8
D04
STAIR
BIN PICKUP
1,272
FOYER
D04
TH25 A7148
BR-01
Storage (1.74m3)
NBN DB
SFL +2,850
L'DRY
Storage (1.74m3)
SFL +2,850
Storage (1.74m3)
D02
SFL +2,850
INFILL LIGHTWEIGHT FLOOR
BR-01
L'DRY
DB
CAR SPACE
PUMP
W 24-G:02
+2,920
STUDY
W 24-G:03
FFL +3,000 SFL +2,970 +2,550
TH21 A7140
D09 BR-01
FFL +3,000 SFL +2,970 CINEMA / HOME OFFICE
150H KERB TO DRIVEWAY END
D16 +3,100
BR-01 CAR +2,850 SPACE
D09
TH22 A7142
2.16
01 A3003
FFL +3,000 SFL +2,970 CINEMA / HOME OFFICE D07
D06
+2,950 D04
GAS METERS
2000L WATER TANK
WC
FOYER
2 A3101
2.79
2.78
2.68
2.65
2.58
2.47
2 A3102
GALVANISED IRON FENCE
ROLLER DOOR H-RL 5.33
2.68
2.60
TBM. RL 2.755 RIVET IN B/STONE
BLUESTONE PAVING 2.52
2.70
2.70
2.74
2.71
2.69
2.70 2.55
2.48 2.47
CHANGE OF GRADE
Ground Floor General Arrangement Plan
.8 3
2.46
2.27
01 A3002
W 22-G:01
9.79
EP
D17
2.57
GATE
1 A3102
PRIVATE OPEN SPACE
2.86
2.37
2.08
2.31
2.20
2.10
2.35
7.88
EP
8.46
2.56
2.56
6.77
2.37
2.30
2.29 2.28
2.39
2.39
2.67
PARAPET RL 7.86 2.69 2.70 2.70
1 A3101
2.79
NBN
PALING FENCE
APPROX BUILDING LOCATION
PARAPET RL 6.90
GUTTER RL 5.65
BRICK FENCE
8 BOUNDARY ST SINGLE STOREY RENDERED BRICK BUILDING
2.24
2.20
2.12
2.11 2.13 2.16
781 2.60
DB
SKYLIGHT ABOVE
NBN NBN
SKYLIGHT SKYLIGHT ABOVE ABOVE
DB NBN
SKYLIGHT SKYLIGHT ABOVE ABOVE
DB NBN
SKYLIGHT SKYLIGHT ABOVE ABOVE
DB
PUMP
NBN
WC D07
D06
FFL +3,000 D01 SFL +2,850
GARAGE
SS
STAIR
2000L WATER TANK
TH23 A7144
D05 2000L WATER TANK PUMP
2000L WATER TANK
L'DRY DP DP
PUMP 2000L WATER TANK
PUMP
CAR PARKING
SFL +2,850
BIN STORE
WC
2000L WATER TANK
+2,850
6,205
D07
2000L WATER TANK
D05
PA RL RAP 7.83 ET
TH26 A7150
STAIR
DB
BR-01
STAIR
D01
D05
D11
CINEMA / HOME OFFICE
D06
STAIR
D04 FOYER
FFL +3,000 SFL +2,970
BIN PICKUP
TH27 A7152
D06
BIN PICKUP
D01 DB NBN
2.41
BR-01
D06
2.37
4,207
ID VO E OV AB
FOYER
DRIVEWAY
D14 FFL +3,000 SFL +2,970
D11
D11
STAIR
D11
D01
DRIVEWAY W 25-G:02
PUMP
STAIR
FOYER DRIVEWAY W 26-G:02
D14 FFL +3,000 SFL +2,970
DB NBN
1:20~1:30
W 27-G:03
TH20 A7138
D09
D05
D12 FOYER DRIVEWAY
2.33
FFL +3,000 SFL +2,970
BR-01 +2,850
H-R DOO L 4. R 95
BIN PICKUP
W 24-G:01
CAR SPACE
#DrgID 2 #LayID A3100
D03
CINEMA / HOME OFFICE FFL +3,000 SFL +2,970
W H IND S-R -RL OW L 5. 6.45 10
BIN PICKUP
D09 BR-01
BIN PICKUP
BIN PICKUP
W 25-G:01
TH19 A7136
SKYLIGHT ABOVE
8,210 W 26-G:01
1,239
2.41 2.34
2000L WATER TANK D03
+2,850
CAR SPACE
+2,800 A3006 01
AVENUE
CAR WAIT ZONE
1 : 20 GRADE UP
D17
FOYER FFL +3,000 SFL +2,970
ME RKIN TE G R
WC
D05
6,739
2.28
2.22
D07
2000L WATER TANK 727x1117mm CAR SIZE
D17
9,640 01 A3007
5,091
SKYLIGHT SKYLIGHT ABOVE ABOVE
DB
STAIR
DB
D17
2.13 2.21
FFL+3,000 SFL+2,970
D06 FOYER
PUMP
D17
1 : 20 RAMP
SFL +2,360 SFL +2,802 GATE 617
PA
CINEMA / HOME OFFICE
TH18 A7134
D09 +2,850 D05
W 12-G:02
DB
D14 DP
D04 FOYER
D17
+2,975
2.12
CINEMA / HOME OFFICE
BR-01
BR-01
6,249
PERMEABLE PAVING
W 12-G:01
+2,720
3,074
2.38
FFL +3,000 SFL +2,970
TH17 A7132
D09
NBN
39.10 m2
1,039
FFL +3,000 SFL +2,970
BIN PICKUP
D17
1 : 10 RAMP
W 27-G:01
WC D07
D06
WC
LETTERBOXES TH08 - TH26
2 A3101
DB
863
CAR SPACE
WC
2000L WATER TANK
+2,850 CAR SPACE
D07
2000L WATER TANK
133 THISTLETHWAITE STREET SINGLE STOREY BRICK BUILDING
STAIR
STAIR
NBN
FOYER
CINEMA / HOME OFFICE
D06
1 A3100
NBN
FFL +3,000 SFL +2,970
TH16 A7130
D09
SKYLIGHT SKYLIGHT ABOVE ABOVE
+2,850
GLE
K
2.24
2.26
PUMP
FFL +3,000 SFL +2,970
D05
IAN
W 27-G:02
2.38
2.40
2.42
PUMP
CAR SPACE
D04
+2,830
TR
CINEMA / HOME OFFICE
BR-01
BIN PICKUP
MEWS
TH15 A7128
D09 BR-01
+2,770
FOYER / HOME OFFICE
D14
2.17
2.14
BIN PICKUP BIN PICKUP 81
+2,850
CAR SPACE
WC
D07
D06
BR-01
D01
W 11-G:01
ms
04 A5002
2.17
2.16 2.29
2.48
GLE IAN E TR IN HTL SIG
BIN PICKUP
D05
SKYLIGHT SKYLIGHT ABOVE ABOVE
D14
D07
WC
NBN
INE
2.28 2.22
2.10
STAIR
2000L WATER TANK
NBN
HTL
500
2.10
FOYER
SIG
EST. FFL 2,400
2.09
D04
2000L WATER TANK
SKYLIGHT SKYLIGHT ABOVE ABOVE
STAIR
2,419
4,300
STAIR
D04
90
DB
DB
DB
FFL +3,000 SFL +2,970
D14
4,300
2.16
05 A5003 STAIR
D01 FOYER / HOME OFFICE
FFL +3,000 SFL +2,970
D06 D05
D05
CAR SPACE
CINEMA / HOME OFFICE
TH14 A7126
D09 CAR G/F SPACE SFL +2,850
TOWER CRANE FOOTING
3000L UGRT
BR-01
W 10-G:01
RAMP 1 : 20~ 1:32
BIN PICKUP
D14
W 09-G:01
+2,850
CAR SPACE
D01 FOYER / HOME OFFICE
AC
FFL +3,000 SFL +2,970
BR-01
BIN PICKUP
D14
W 08-G:01
D06
FFL +3,000 SFL +2,970
SFL +2,830
SKYLIGHT ABOVE
SV
FFL+3,000 SFL+2,970
PUMP
PUMP
CINEMA / HOME OFFICE
TH13 A7124
D09 BR-01
D04 FOYER
STAIR
BR-01 D01
FOYER / HOME OFFICE
SFL +2,850
CAR SPACE
PARAPET RL 8.82
EXH T/A
D07
PUMP DB
GV
D14
W 07-G:01
STAIR
BR-01
FFL +3,000 SFL +2,970
TH12 A7122
D07
NBN
STAIR
D01 FOYER / HOME OFFICE
WC
WC
D07
3000L UGRT
PUMP
+2,850
CAR SPACE
LV BIN PICKUP 12-G:01 D11
DP
NBN
STAIR
CAR SPACE
3000L +2,850 UGRT
PUMP
RAMP 1 : 20~ 1:29
GV
WC
D06
FOYER
D06
NBN
NBN
CAR SPACE
3000L +2,850 UGRT
PUMP
TH11 A7120
WC
D07 D06
DB
DB
DB
2.45 2.38
+2,850
TH10 A7118
05
LV 11-G:01 D11
BIN PICKUP
2000L WATER TANK
D05
SFL +2,800
D16
D16
MAIN WATER
FOYER
PERMEABLE PAVING
01 A3009
2.22
3000L UGRT
D01
FFL +3,000 SFL +2,970
GATE
D17
2,000
4,300
PUMP
WC
D07
W 13-G:02
D17a
1,272
A3008 01 A3004 01
8.42 m2
LV 10-G:01 D11
BIN PICKUP
D06
BR-01 BR-01
VER
2.32
TH09 A7116
WC
D07 D06
FOYER / D14 HOME OFFICE
3,500
4,300
TH08 A7114
WC D07
LV 09-G:01 D11
BIN PICKUP
NBN
2.45 2.23 2.27
2.14 2.18
W 07-G:02
LV 08-G:01 D11
D06
4,300 4,300
2.37
2.35
BIN PICKUP
NBN
2.26
2.36
TH07 A7112
2.32
A3001 01 36
+3,404
BIN PICKUP
2.36
2.26
2.18
TP
2.34
LV 06-G:01
LV 05-G:01
BIN PICKUP
PERMEABLE PAVING
LANE
8.42 m2
LV 07-G:01 D11
500
PROPOSED CROSSO
STREET
01 A3005
PERMEABLE PAVING
+2,850 CAR SPACE
ER EXISTING CROSSOV REMOVED TO BE PARTIALLY
2.33
LV 04-G:01
BIN PICKUP
+2,777 D14
GATE
+2,800
2.15
4,300
2.42
CAR PARKING
BOUNDARY
LV 03-G:01
BIN PICKUP
GAS METER: 2000L x 600W x 2100H
BIN PICKUP
D17
L
D11
6,015
LV 01-G:01
BIN PICKUP
2000L UGRT
G
1 A3101
D07
46.35 m
F
J
WC
2
W 07-G:03
H
D07 WC
D11
PUMP WATER TANK
150H KERB TO DRIVEWAY END
E
#DrgID 2 #LayID A3100
D07 WC
D11
D16 W 13-G:01
EXISTING DRIVEWAY TO BE REINSTATED
TBM RL.2.365 RIVET IN CONCRETE
D17
SFL +2,970
D16
TOP OF KERB +2,950
D
2.37
2.50
2,000 MAIN ELEC.
PUMP
6,470
2.45
GAS METERS
2.35
2.17 2. 29
2.19
4,300
W 01-G:02
D07 WC
D11
2000L
D11
1:65 RAMP
D16
D02 W 01-G:03
C
2.23
2.24 NBN
NBN
PUMP
BR-01
CAR +2,850 SPACE
D06
D06
PUMP
+2,500
3000L UGRT
DB
+2,850 CAR SPACE
D06
PUMP
DB
3000L UGRT
TH06 A7110
1 : 10 RAMP
3,131
D01 STAIR
STAIR
GAS METERS
FFL +3,000 SFL +2,970
TH05 A7108
BR-01
W 06-G:02
8 VISITOR BIKE PARKS
2.49 NBN
NBN
+2,850 CAR SPACE
D06
FOYER / HOME OFFICE
D01 STAIR
DB
+2,850 CAR SPACE
L'DRY
+2,850
3000L UGRT
DB
2.45
2.42
2.40
2.38
2.42 2.41 2.49
2.51
2.49
W 01-G:04 2.35
4,300
2.33
2.23 2.20
INVERT OF KERB EDGE OF BITUMEN
BLUESTONE KERB
3000L UGRT
D07
TH04 A7106
BR-01
D14
FFL +3,000 SFL +2,970 D01
STAIR
+2,490
SFL +2,461
W 06-G:01
FOYER / D14 HOME OFFICE
FFL +3,000 SFL +2,970 D01
TH03 A7104
BR-01 LIFT
D17 SFL +2,787
EXISTING CROSSOVER TO BE REMOVED
PARKING METER
LOW HEIGHT SHRUBS TO LANDSCAPE ARCHITECT
PROPOSED CROSSOVER
D17
SFL +2,461 SFL +2,787 W 05-G:01
FOYER / D14 HOME OFFICE
FFL +3,000 SFL +2,970
STAIR
D01
CAR SPACE
INFILL LIGHTWEIGHT FLOOR FFL +3,000 SFL +2,850
SFL +2,461 SFL +2,787 W 04-G:01
FOYER / D14 HOME OFFICE
FFL +3,000 SFL +2,970
TH01 A7100
BR-01
DB NBN
FUTURE DUAL RETICULATION SYSTEM CONNECTION PROVISIONS, REFER HYDRAULIC SERVICES DRAWING
500
2.36
ES 2.41
2.42
2.41 2.45
1,212
W 01-G:01
D17
SFL +2,461 SFL +2,787 W 03-G:01
UP
FFL +3,000 SFL +2,970
B
4,300
D17
SFL +2,461
D12a
D07
2.36
2.45
D17 SFL +2,787
W 01-G:05
A5001 01
2.20
2.23
2.33
P EL
2.36
2.32
2.19
2.32 2.19
2.22
9.92
2.22
01 A5000
2.25 2.37 2.24
2.27
2.27
2.35 2.32
2.26
2.39
2.22 2.32
EP 2.26
2.32
2.22
NA TB IL M. IN RL BIT 2.4 UM 3 EN SV
A
TP
3,500
BITUMEN FOOTPATH
TP
1 A3100
9,850 PROPOSED SEMI-MATURE TREE - REFER LANDSCAPE ARCHITECTS PLANS
03 A5002
7,550
500
9
2 A3102
7
4,500
PUMP
A3000 01
6 4,500
PUMP
5
4,500
PUMP
4 4,500
PUMP
3 4,500
1 A3102
2 2,750
LINE MARKING
2.49
1
Images by Ridz
09
Images by Ridz
10
Image by DKO Architecture
4 F
E
+18,500 SFL Roof
+18,500 SFL Roof
FCL+17,920
W 07-4:01
FCL +17,800
LANDING
ROOF TERRACE 807
FFL+15,520 +15,370 SFL Level 4
TYP.
188
FCL +14,800
3,100
RISER: 178 GOING: 250 2R + G = 606
CORRIDOR
MIN.
1,000
MIN.
2,000
FCL+14,800
865
MASTER
FFL +15,400
+15,370 SFL Level 4
1,000
3,100
FCL+14,800
FFL +15,400
FFL+12,300
+12,270 SFL Level 3
CORRIDOR TYP.
182
2,000
MIN.
865
RISER: 182 GOING: 250 2R + G = 615
MIN.
FFL+9,200
+9,170 SFL Level 2
FCL +8,500
RISER: 182 GOING: 250 2R + G = 615
3,100
2,000
+9,170 SFL Level 2
FCL +8,700
DINING
MIN.
1,000
1,000
TYP.
182
MIN.
LIVING
FFL +9,200
FCL +8,500
865
3,100
FCL+8,700
03 A7860
1,000
1,000
3,100
BEDROOM 2
FCL +11,700
FCL +11,700
3,100
FCL+11,700
FCL+11,600
FFL +12,300
+12,270 SFL Level 3
FFL+6,100
+6,070 SFL Level 1
FFL +6,100
+6,070 SFL Level 1
FCL +5,600
+2,970 SFL Ground
Stair Section 01
10 A7860
TYP.
2,268
CAR SPACE
REFUSE ROOM
1,103
MIN.
2,000
1,316
182
RISER: 182 GOING: 250 2R + G = 615
3,100
FOYER 865
3,100
FCL+5,600
+3,000
+2,970 SFL Ground
FFL +3,000
FFL +2,880
Stair Section 02
11
C C
B B
A A
4,300 4,300
4,300 4,300
SOLAR PANELS SOLAR PANELS +18,500 +18,500
METAL ROOF METAL ROOF SARKING & INSULATION SARKING & INSULATION STRUCTURAL ROOF STRUCTURAL ROOFDETAILS FRAMING TO ENG'S FRAMING TO ENG'S DETAILS +17,490 +17,490
+17,250 +17,250 SERVICES SERVICES
+16,350 +16,350
STAIR STAIR
ROOF TERRACE ROOF TERRACE
1,000 1,000
PLANTER PLANTER
SSL+15,370 SSL+15,370 LEVEL 4 LEVEL 4
FFL+15,500 FFL+15,500
CONCRETE BEAM TO CONCRETE BEAM TO ENG'S DETAILS ENG'S DETAILS
4 4
1000MM DEEP PLANTER BOX 1000MM DEEP PLANTER BOX IN FOLDED METAL IN FOLDED METAL SUPPORTED ON STUD WALL SUPPORTED ON STUD WALL PROTECTION BOARD TO ALL PROTECTION BOARD TO ALL SIDES AND BASE OF PLANTER SIDES AND BASE OF PLANTER
PLASTERBOARD CEILING PLASTERBOARD CEILING
TANKING CONSISTING OF DRAINAGE TANKING CONSISTING DRAINAGE CELL & FILTER FABRIC OF & WATERPROOF CELL & FILTER FABRIC & WATERPROOF MEMBRANE. REFER LANDSCAPE MEMBRANE. REFER LANDSCAPE ARCHITECTS DRAWINGS ARCHITECTS DRAWINGS INSULATION INSULATION STRUCTURAL CONCRETE STRUCTURAL SLAB TO ENG'SCONCRETE DETAILS SLAB TO ENG'S DETAILS
Typical Part Roof Section TYP. PART ROOF SECTION TYP. PART ROOF SECTION 1:50 1:50
BRADFORD ANTICON 60 REFLECTIVE BLANKET TO BRADFORD ANTICON REFLECTIVE BLANKETR1.3 TO UNDERSIDE OF ROOF 60 SHEETING TO ACHIEVE UNDERSIDE OF ROOF SHEETING TO ACHIEVE R1.3 SARKING SARKING EF-20 LYSAGHT KLIPLOCK ROOFING@ 3° PITCH EF-20 LYSAGHT KLIPLOCK ROOFING@ 3° PITCH EF-04 COLORBOND PARAPET CAPPING EF-04 COLORBOND PARAPET CAPPING
EF-04 EF-04 300mm W x 100mm D BOX GUTTER ON GUTTER 300mm x 100mmWITH D BOX@GUTTER ON GUTTER BOARD W SUPPORT 1:100 FALL BOARD SUPPORT WITH @ 1:100 FALL
TOP OF PARAPET+18,500 TOP OF PARAPET+18,500
3º PITCH 3º PITCH
STRUCTURAL ROOF FRAMING. STRUCTURAL ROOFDRAWINGS FRAMING. REFER TO STRUCTURAL ENGINEERS REFER TO STRUCTURAL ENGINEERS DRAWINGS CROSS BRACING TO STRUCTURAL ENG. DRAWINGS CROSS BRACING TO STRUCTURAL ENG. DRAWINGS 13mm THK. MR PLASTERBOARD CEILING LINING 13mm THK. MROVER PLASTERBOARD CEILING LINING FIXED PROPRIETARY CSR RONDO OVER PROPRIETARY CSR RONDO SUSPENDEDFIXED SYSTEM. PAINT FINISH AS SCHEDULED SUSPENDED SYSTEM. PAINT FINISH AS SCHEDULED
FCL+17,900 FCL+17,900
CS:09 CS:09
CH PIT H 27º PITC 27º
BRADFORD ANTICON 60 REFLECTIVE BLANKET TO BRADFORD ANTICON REFLECTIVE BLANKETR1.3 TO UNDERSIDE OF ROOF 60 SHEETING TO ACHIEVE UNDERSIDE OF ROOF SHEETING TO ACHIEVE R1.3 TOP OF PARAPET+17,143 TOP OF PARAPET+17,143
WT:77 WT:77 NOTCH / CUT OUT RB1 TO NOTCH / CUT OUTBOX RB1GUTTER TO ACCOMMODATE AND ACCOMMODATE BOX GUTTER AND RAINWATER HEAD CONNECTION RAINWATER HEAD CONNECTION EF-21 EF-21
EF-21 EF-21
POWDERCOATED ALUMINIUM POWDERCOATED ALUMINIUM FRAMED GLAZED DOOR SYSTEM. FRAMEDDOOR/WINDOW GLAZED DOORSCHEDULE SYSTEM. REFER REFER DOOR/WINDOW SCHEDULE
FALL FALL
WT-54 WT-54
ROOF ROOF TERRACE TERRACE
FFL+15,500 FFL+15,500
2,721 2,721
2,553 2,553
865 MIN 865 MIN
EF-08 EF-08
2,400 2,400
TOWNHOUSE TOWNHOUSE TH27 TH27 NOTE: INTERNAL ARTIFICIAL NOTE: INTERNAL ARTIFICIAL LIGHTING TO BE CONFIRMED LIGHTING TO BE CONFIRMED
Lightweight RoofROOF Section Detail DE-04 TH27 SECTION DE-04 TH27 LIGHTWEIGHT LIGHTWEIGHT ROOF SECTION DETAIL DETAIL 1:20 1:20
12
FFL+15,500 FFL+15,500
1,030
545
404
TREAD
32
STRINGER
817
60 STRINGER
123TREAD
42
60
250
TREAD
32
250
182
182
123 250
28 0
MIN.
865 MIN.
865
28 0
28 0
Stair Detail 01 Elevation Stair Detail 01 Elevation 1:20 F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 1:20 TIMBER
60
320
TREAD
32 TREAD
13 13
09 F-12 75 x 45mm ALPINE OAK HANDRAIL. ALL EDGES TO BE SANDED AND SEALED
Stair Connection Detail
Stair Connection Detail 02 1:5
F-12
100 MIN.
32 817 42
STRINGER
250 33 13 TREAD 45
13
250
33
49
3
MIN.
32
STRINGER
70
VOID
36
880
12
45
13
3
3
12X 5 MM FLAT BAR PC FINISH
08 A7800
STEEL PLATE NOM 50X50MM 3mm THK WITH STEEL STANCHION CFW TO FIXING PLATES
F-12 @ NOM 900 CTS. WALL PLATE FIXED REAR STUD WALL PB OVER 70 x 70mm ALPINE OAK POST50WITH 2PACTOFINISH.
14
CONNECTION DETAIL TBC WITH BUILDER F-14 16mm DIA. METAL BALUSTADE WITH 280 x 42mm ALPINE OAK STRINGER MECH. FIX TO F-14 FINISH. ROUTER PC PANEL PLASTERBOARD OVER. CUT 16mm DIA. METAL POWDERCOAT BALUSTADE WITH PLASTERBOARD TO FULL SURROUND OF STAIR TIMBER TO TOP SIDE OF STAIR POWDERCOAT FINISH. ROUTER STRINGER. SPACED 120mm CENTER TREAD. CONNECTION DETAIL TBC WITH BUILDER 16 TIMBER TO TOP SIDE OF STAIR F-17 17 STRINGER. SPACED 120mm CENTER NOM. 50 x 20mm ALUMINIUM ANGLE 280 x 32mm TREAD. FINISH TO MATCH F-14 TIMBER 11 F-06HANDRAIL ELEVATION DETAIL MECH FIX TO SLAB, FLOORING OVER 16mm DIA. METAL BALUSTADE WITH NOM. 50 x 20mm ALUMINIUM ANGLE F-14 POWDERCOAT 1:5 FINISH. ROUTER TIMBER TO MECH FIX TO SLAB, FLOORING OVER 16mm DIA. METAL BALUSTADE TOP SIDE OF STAIR WITH STRINGER. SPACED 120mm F-06
05 TIMBERStair POWDERCOAT FINISH. ROUTER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER
TIMBER FLOOR FINISH AS SPECIFIED 75 100 F-06 MIN. 42 FLOOR 70 FINISH 13 50 13 TIMBER AS SPECIFIED
F-17
F-17
F-12
45
STINGER
CL ALPINEVOID OAK POST TO CONCRETE SLAB EDGE FIXING COUNTERSINK FIXINGS FIXING COLOUR ALPINE OAK POST TO CONCRETE SLAB EDGETO MATCH SURROUND 09 FIXING COUNTERSINK FIXINGS FIXING COLOUR F-12 TO MATCH SURROUND 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH
40
280
STRINGER
280 x 42mm STRINGER WITH 2PAC FINISH
100
G/F Wall Mount Handrail Detail 1:5
F-14 2 16mm DIA. STEEL BALUSTERS, 120mm SPACED POWDERCOAT FINISHED. SECURELY FIXED. FIXING TO FLOOR TBC BY BUILDER TIMBER HANDRAIL OVER
FCL +8,500
NOTCH TO STRINGER
POWDERCOAT FINISH
04
6
F-14
42
15
Detail 05CENTER Plan 1:20
280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER
280EDGES x 32mm TREAD. FINISH TO MATCH F-06 75 x 45mm ALPINE OAK HANDRAIL. ALL TIMBER TO BE SANDED AND SEALED
Stair Detail Plan
BALUSTER TO FLOOR FIXING TBC BY BUILDER BALUSTER TO FLOOR FIXING TBC BY BUILDER
70 x 70mm ALPINE OAK POST WITH 2PAC FINISH. SAND ALL SIDES TO ACHIEVE SMOOTH FINISH. MECH FIX TO STRINGER
32
280
STRINGER
F-12 F-12 75 x 45mm ALPINE OAK HAND 5 RAIL.ALPINE ALL EDGES BE SANDED 280 x 42mm OAKTOSTRINGER F-12 AND SEALED. 2PAC FINISH 2804x 42mm ALPINE OAK STRINGERWITH 2PAC FINISH 16mm DIA. METAL BALUSTADE WITH WITHF-14 2PAC FINISH
F-12
FIXING PLATES
VOID
805 30 FIXING TBC CLEAR SECURELYF-12 FIXED TO FLOOR. 70 x 70mm ALPINE70 OAK POST 42 WITH 2PAC 13mm PLASTERBOARD. PAINT STRINGER SMOOTH BYFINISH. BUILDER SAND ALL SIDESVOID TO ACHIEVE 838 402PAC x 40mm METAL SECURELY FINISH AS SCHEDULED 70 x 70mm ALPINE OAK POST WITH FINISH. FIX PLATE. TO STRINGER 75FIXEDMECH 961 TO PLASTERBOARD. PROVIDE FINISH. SAND ALL SIDES TO ACHIEVE SMOOTH STAIR WIDTH ADDITIONAL NOGGING FOR SECURE FINISH. MECH FIX TO STRINGER CL FIXING FOR HANDRAIL
10
33 13 45
6
F-14
30 x 30mm METAL PLATE. F-12 16mm DIA. STEEL 12 81120mm SECURELY FIXED TO BALUSTERS, POWDERCOAT FINISHED. UNDERSIDESPACED OF HANDRAIL
32
60 122 60
P50 SHADOW LINE F-02 CEILING F-14 16mm DIA. METAL BALUSTADE WITH ANGLE TO EDGE OF POWDERCOAT FINISH. ROUTE TIMBER TO TOP PLASTERSTOP PLASTERBOARD SIDE OF STAIR STRINGER. SPACED 120mm CENTER
32 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND STRINGER. CTS TO TREAD
5
75
F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER
7
4
13 5008 13 F-12 F-12 75 x 45mm ALPINE OAK TIMBER HANDRAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC NOM 12x 5 MM FLAT BAR METAL FINISH HANDRAIL BRACKET CFW TO
43
280 x 42mm STRINGER WITH 2PAC FINISH
8 F-14
3 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED
CL
13mm PLASTERBOARD DIRECT STICK TO SLAB EDGE
FINISH. ROUTER TIMBER TO 11 F-14TOPPOWDERCOAT SIDE OF STAIR STRINGER. SPACED 120mm F-14 CENTER 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY U/SALPINE OAK HAND RAIL. ALL EDGES TO 75 TO x 45mm 10 BE SANDED AND SEALED. 2PAC FINISH TREAD ANDEA STRINGER. CTSSECURELY TO TREAD 25mm x 3mmTHK. STEEL MECH. FIXED TO U/S F-17 AD AND STRINGER. CTS TO TREAD 9 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER
01 3
F-04
F-12
16mm DIA. METAL BALUSTADE WITH
11
40
13
NOTCH TO STRINGER NOTCH TO STRINGER F-17 280 x 32mm TREAD. FINISH TO MATCH 7 F-06 TIMBER 42 0 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER F-14
13
33
13
50
F-12 BALUSTER TO FLOOR FIXING TBC BY x 45mm ALPINE OAK HANDRAIL. NOMINAL F-12 BUILDER DEPTH75SHOWN TO BE SANDED AND 75 x 45mm ALPINEALL OAKEDGES HANDRAIL. CONCRETE ALL EDGES TO BESEALED SANDED AND SLAB SEALED
33
28 0
POWDERCOAT FINISH. ROUTE 30 250 TO TOP SIDE OF STAIR STRINGER. MAX 120mm CTS m DIA. METAL TIMBER BALUSTADE WITH POWDERCOAT FINISH. ROUTE BER TO TOP SIDE OF STAIR STRINGER. MAX 120mm CTS
13
13
50
MIN.A7861
TREAD
TIMBER FLOOR FINISH AS SPECIFIED
50
STRINGER
280
123
ALPINE OAK POST TO CONCRETE SLAB EDGE F-14FIXING COUNTERSINK FIXINGS FIXING COLOUR TO MATCH SURROUND 16mm DIA. METAL BALUSTADE WITH
75
F-06
MIN.
2
F-12 70 x 40mm ALPINE OAK POST WITH 2PAC FINISH BOLTED M16 (TBC) TO STEEL PLATE
NOM. 50 x 20mm ALUMINIUM ANGLE. MECH FIX TO SLAB, FLOORING OVER
100
13
280
STRINGER
42
EQ EQ
60
NOM. 4 x 10mm ALUMINIUM BLADES / REBATE TO STAIR TREAD. NOM. 2mm ABOVE FINISH TREAD
125 MAX. GAP
182
32
1
280 x 42mm ALPINE OAK STRINGER MECH. FIX TO PC PANEL PLASTERBOARD OVER. CUT PLASTERBOARD TO FULL SURROUND OF STAIR TREAD. CONNECTION TBC WITH BUILDER
F-14
16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTER TIMBER TO TIMBER FLOOR BOARDS. SPACED 120mm CENTER
F-14
25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND STRINGER. CTS 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED TO TREAD
F-14
F-14
150
32
CL
F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTER TIMBER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER
32
25
FINISH. MECH FIX TO STRINGER
SPACED AS SHOWN
13
20
280 x 42mm 2PAC FINISH 45 WITH x 75mm TIMBER HANDRAIL. ROUTER F-12 F-12STRINGER
TIMBER TO UNDERSIDE OF BALUSTER,50 280 x 32mm FINISH TO 45 x TREAD. 75mm70TIMBER HANDRAIL. ROUTER x 70mm ALPINE OAK POST WITH 2PAC FINISH. SAND ALL SIDES TO ACHIEVE SMOOTHSPACED AS SHOWN MATCH F-06 TIMBER TIMBER TO UNDERSIDE OF BALUSTER,
CL
75
F-12
EQ EQ
F-12 F-12 280 x 42mm STRINGER WITH 32 280 x 42mm STRINGER WITH 2PAC FINISH 2PAC FINISH F-12
75 50
13
20
70
33 13 45
42
42
F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTE TIMBER TO TOP SIDE OF STAIR 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTE TIMBER TO TOP SIDESTRINGER. OF STAIR MAX. 120mm CTS STRINGER. MAX. 120mm CTS
STRINGER
60
280
STRINGER
MAX.
MAX.
4 x10mm NOM. ALUMINIUM BLADES / REBATE TO STAIR TREAD. ALL/ ON 2mm NOM. ABOVE FINISH TREAD 10mm NOM. ALUMINIUM BLADES REBATE TO STAIR TREAD. ALL ON 2mm NOM. ABOVE FINISH TREAD
12
F-12
122
MAX.
08 A7800
60
120
120
122
F-12 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH
120 MAX. 120
13
12
F-12 280 x 42mm STRINGER WITH 2PAC FINISH 11 280 x 42mm STRINGER WITH 2PAC FINISH F-14 F-12 11 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO F-14 70 x 70mm ALPINE OAK POST WITH 2PAC FINISH. 10 14 SANDED AND SEALED. 2PAC 75 x 45mm ALPINEBE OAK HAND RAIL. ALL EDGES TOFINISH CONNECTION DETAIL TBC WITH BUILDER 10 BE SANDED AND SEALED. 2PAC FINISH 280 x 42mm ALPINE OAK STRINGER MECH. FIX TO 9 F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 PC PANEL PLASTERBOARD OVER. CUT PLASTERBOARD TO FULL SURROUND OF STAIR 9 TIMBER F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TREAD. CONNECTION DETAIL TBC WITH BUILDER 8 16 15 TIMBER F-17 17 F-14 8 280 x 32mm TREAD. FINISH TO MATCH 16mm DIA. METAL BALUSTADE WITH F-14 7 F-06 TIMBER FINISH. ROUTE TIMBER TO TOP 16mm DIA. METAL POWDERCOAT BALUSTADE WITH SIDE OF STAIR STRINGER. SPACED 120mm 7 POWDERCOAT FINISH. ROUTE TIMBER TO TOP CENTER SIDE OF STAIR STRINGER. SPACED 120mm 05 Stair Detail 056 Plan CENTER 6 1:20 F-12 75 x 45mm ALPINE 1,030OAK HAND 5 RAIL. ALL545 EDGES TO BE404 SANDED 49 32 OAK HAND F-12 75 x 45mm ALPINEAND 5 TREAD RAIL. ALL EDGES TO BESEALED. SANDED2PAC FINISH 4 F-12 AND SEALED.F-14 2PAC FINISH 16mm DIA. METAL BALUSTADE WITH 75 x 45mm ALPINE OAK HANDRAIL. ALL EDGES 4 TO BE SANDED AND SEALED POWDERCOAT FINISH TO MATCH F-17 280 x 32mm TREAD. FINISH DIA.F-06 METAL BALUSTADE WITH F-14 16mm TIMBER FLOOR FINISH FINISH POWDERCOAT 60
250
4 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER F-14 16mm DIA. METAL BALUSTADE WITH 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER POWDERCOAT FINISH
F-14 25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND STRINGER. CTS TO TREAD
42
09
F-12 75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH 12
250
45
STINGER
12
42
Stair Tread Detail
F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTE TIMBER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER
5
36
880
VOID
Stair Detail Plan
6
150
30 70 250
VOID
75
F-14 2 16mm DIA. STEEL BALUSTERS, 120mm SPACED POWDERCOAT FINISHED. SECURELY FIXED. FIXING TO FLOOR TBC BY BUILDER
75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED. 2PAC FINISH
NOM.
01
7
F-17
MIN.
280
8
32
STRINGER
STAIR WIDTH
100
STRINGER
9
NOM. 4 x 10mm ALUMINIUM BLA / REBATE BLADES TO STAIR TREAD. NO NOM. 4 x 10mm ALUMINIUM 2mm ABOVE FINISH TREAD / REBATE TO STAIR TREAD. NOM. 04 2mm ABOVE FINISH TREAD
280 x 42mm STRINGER WITH 2PAC FINISH
75
60 122 60
1
49
838 961
VOID STRINGER
CL
F-12 280 x 42mm STRINGER WITH 2PAC FINISH 11 F-14WITH 2PAC FINISH 280 x 42mm STRINGER 10
6
805
CL
30
32
5
CLEAR
42
75
F-12 F-12
25
4
70
02
50
25
32
SPACED POWDERCOAT FINISHED. SECURELY FIXED TO FLOOR. FIXING TBC BY BUILDER
42
12
3
50
F-12 F-14 75 x 45mm ALPINE OAK TIMBER HANDRAIL. ALL 25 x TO 25mm x 3mmTHK. STEEL 2PAC F-14 EDGES BE SANDED AND SEALED. EA MECH. FIXED SECURELYFINISH 25 x 25mm x 3mmTHK. TOSECURELY U/SSTEEL TREAD AND STRINGER. EA MECH. FIXED VOID F-14 TO U/S TREAD AND STRINGER. CTS TO TREAD 16mm DIA. STEEL BALUSTERS, 120mm CTS TO TREAD
02
25 x 25mm x 3mmTHK. STEEL EA MECH. FIXED SECURELY TO U/S TREAD AND 25 x 25mm x 3mmTHK. STEEL EA MECH. CTS TO TREAD FIXED SECURELY STRINGER. TO U/S TREAD AND STRINGER. CTS TO TREAD
F-14 16mm DIA. METAL BALUSTADE F-14 POWDERCOAT FINISH. 16mm DIA. METAL WITH BALUSTADE ROUTER TIMBER TO TOP SIDE O WITH POWDERCOAT FINISH. STAIR ROUTER TIMBER TO TOPSTRINGER. SIDE OF SPACED 120m STAIR STRINGER. CENTER SPACED 120mm CENTER
125 MAX. GAP
120
2
32
125 MAX. GAP
60
CL
120
123
125 MAX. GAP
CL
NOM. 4 x 10mm ALUMINIUM BLADES CL CL / REBATE TO STAIR TREAD. NOM. 2mm ABOVE FINISH TREAD
F-17
30
1
280 x 42mm ALPINE OAK STRINGER MECH. FIX TO PC PANEL PLASTERBOARD OVER. CUT
F-12 PLASTERBOARD TO FULL SURROUND OF STAIR TREAD. CONNECTION TBCWITH WITH BUILDER 280 x 42mm STRINGER F-12 2PAC FINISH 280 x 42mm STRINGER WITH 32 F-122PAC FINISH 70F-17 x 40mm ALPINE OAK POST WITH 2PAC FINISH BOLTED M16 (TBC) TO STEEL PLATE F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER 01 280 x 32mm TREAD. FINISH TO A7861 MATCH F-06 TIMBER 08
F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 280 x 32mm TREAD. FINISH TO250 MATCHTIMBER F-06 TIMBER
32
F-17 280 x 32mm TREAD. FINISH TO MATCH F-06 TIMBER FLOOR FINISH
F-14 16mm DIA. METAL BALUSTADE WITH POWDERCOAT FINISH. ROUTER TIMBER TO TOP SIDE OF STAIR STRINGER. SPACED 120mm CENTER
32
F-12 75 x 45mm ALPINE OAK F-12 2PAC 75 x 45mm ALPINE HAND OAK RAIL WITHFINISH 50 2PAC 25 HAND RAIL WITH FINISH F-14 16mm DIA. METAL BALUSTADE F-14 WITH POWDERCOAT FINISH. 16mm DIA. METAL ROUTER BALUSTADE TIMBER TO TOP SIDE WITH POWDERCOAT OF FINISH. 32 STAIR STRINGER AND ROUTER TIMBER TO TOP SIDE BOTTOM SIDE OF HAND RAIL. OF STAIR STRINGER AND SPACED BOTTOM SIDE OF HAND RAIL. 120mm CENTER SPACED 120mm CENTER
32
49
NOM. 50 x 20mm ALUMINIUM ANGLE. MECH FIX TO SLAB, FLOORING OVER TIMBER FLOOR FINISH AS SPECIFIED
13 50
MIN.
13
3
75 x 45mm ALPINE OAK HAND RAIL. ALL EDGES TO BE SANDED AND SEALED
F-12 NOM 12x 5 MM FLAT BAR METAL HANDRAIL BRACKET CFW TO FIXING PLATES
33
F-12
50
F-12 280 x 42mm STRINGER WITH 2PAC FINISH 280 x 42mm STRINGER WITH 2PAC FINISH 30 x 30mm METAL PLATE.
BALUSTER TO FLOOR FIXING TBC BY BUILDER DEPTH SHOWN NOMINAL
CONCRETE SLAB
13 13
11
3
MIN.
NOM.
F-01 ALPINE OAKPLASTERBOARD POST TO CONCRETE SLAB EDGE STICK TO 13mm DIRECT F-01 FIXING COUNTERSINK FIXINGS FIXING COLOUR TO MATCH SURROUNDSLAB EDGE 13mm PLASTERBOARD DIRECT STICK TO SLAB EDGE
75
F-06
100
F-14
40
CEILING SYSTEM SHOWN INDICATIVE ONLY ALLOW STRUCTURE FOR FACE CEILING SYSTEM SHOWN INDICATIVE FIXING ONLY ALLOW STRUCTURE FORPLASTEBOPARD FACE PLASTEBOPARD FIXING NOM.
280
STRINGER
32
TREAD
150
16mm DIA. METAL BALUSTADESECURELY WITH TO U/S TREAD AND STRINGER. CTS POWDERCOAT FINISH. ROUTER TIMBER TO TO TREAD TIMBER FLOOR BOARDS. SPACED 120mm CENTER
SECURELY FIXED TO
12
81
WOODS ROAD
Town Planning | 2IC Residential 190 Woods Road, Truganina
14
4,200 5,000
16,00 0
T08
Bed 2
2,300
3.6 x 3.0m
L'dry 1.1 x 2.0m
T01
DOWN
TH11 A: 126.20 m2
10 9
Garage 5.6 x 6.0m
4,500
17 16 15 14 13 12 11
T01
1
TH10 A: 130.00 m2
2 3 4 5
T01
Road
1 2 3 4 4 5
Bed 4 4.0 x 4.0m
4.1 x 1.8m
5
TH04 A: 149.82 m2
T01
3 4 5
T01
4
UP
1 2 3
5
5
4
Bath 2.8 x 1.9m
L'dry
4,700
DOWN
1.1 x 2.0m 17 16 15 14 13 12 11
Garage 6.3 x 7.0m
6,790
Road
DOWN
10 9
8 7 6 5 4 3 2 UP 1
5
Bath 4.1 x 1.8m
Garage 6.3 x 7.0m
STAGE 6C 5,500
Bed 2 3.6 x 3.0m
5
4
4,200
3.6 x 3.0m 4
3
Garage 6.3 x 7.0m
A: 5,142.56 m2
Garage 6.3 x 7.0m
4.1 x 1.8m
5,000
Bed 1
Bed 4 4.0 x 4.0m
4.1 x 1.8m
Garage 4.1 x 6.0m
3
2
Bath
4.0 x 4.0m
Bath
Garage 4.1 x 6.0m
Road Stage 6C
2
1
1,349 5,502
Bed 4
1
1,083
16,000
4.0 x 4.0m
4.1 x 1.8m
5
Garage 6.3 x 7.0m
Bed 4 4
Bath 4.1 x 1.8m
DOWN
4.0 x 4.0m
T01 TH17 A: 206.70 m2
4.0 x 4.0m
Bath
3
5 4
3
L'dry 2.1 x 1.9m
Bath
2.8 x 1.9m
2
4 3
2
Bath 2.8 x 1.9m
Garage 6.3 x 7.0m
Bed 4
Bed 4
2
1
2.1 x 1.9m
TH01 A: 163.96 m2
UP
L'dry
4.1 x 1.8m
Garage 6.3 x 7.0m
T08
3.0 x 3.0m
Bath 1
4.1 x 1.8m
T01
Garage 6.3 x 7.0m
Garage 6.3 x 7.0m
5
Bath
TH02 A: 130.00 m2
Bed 1
5
5
3.0 x 3.0m
4
4
4.0 x 4.0m
3
3
Bed 1
2
2
TH03 A: 130.00 m2
Bed 4
1
1
Bath 4.1 x 1.8m
Bed 4 4.0 x 4.0m
T01
4
4.0 x 4.0m
4.1 x 1.8m
Garage 6.3 x 7.0m
TH16 A: 130.00 m2
T04 TH05 A: 90.00 m2
Bed 4
Bath
Garage 6.3 x 7.0m
1
Bath
2
5
5
3
4
4.1 x 1.8m
Garage 6.3 x 7.0m
T04 TH06 A: 90.00 m2
2
3
Bath 4.1 x 1.8m
1
2
4.0 x 4.0m
T01
T01 TH07 A: 149.93 m2
Bed 4 4.0 x 4.0m
Bath
3
1
5,500 1,351
Bed 4
TH15 A: 130.00 m2
TH08 A: 129.91 m2
Bed 4 4.0 x 4.0m
1,351
2
TP30 0 02
T01
Garage 6.3 x 7.0m
4.1 x 1.8m
1
Bath
T01 TH14 A: 130.00 m2
TP30 0 01
TH09 A: 130.08 m2
Bed 4 4.0 x 4.0m
1
2.8 x 1.9m
3
Bath
T01 TH13 A: 130.00 m2
2
Bed 1 3.6 x 3.0m
1
TH12 A: 144.61 m2
4,500
8 7 6 5 4 3 2 UP 1
7,317
Garage 5.6 x 6.0m
2,300
847 1,425
DOWN
Bath 3.4 x 1.8m
3.0 x 3.1m
5
5
4
L'dry
2.1 x 2.1m
Bath
Bath
3.4 x 1.8m
3.4 x 1.8m
UP 5
4
1
3
2
Bed 2
UP
5
3
2
L'dry
8 7 6 5 4 3 2 1
UP
5
Bed 1
Bed 1
4.0 x 3.5m
4.0 x 3.5m
Garage 5.6 x 6.0m
UP
2
1
6,000
L'dry 2.1 x 2.1m
UP
L'dry 2.1 x 2.1m
Bath
3
Bath
3.4 x 1.8m
2
UP
1
3.4 x 1.8m
1
Bed 1
Bed 1
4.0 x 3.5m
4.0 x 3.5m
Bed 1
Bed 1
4.0 x 3.5m
4.0 x 3.5m
05 TP30 0
Garage 5.9 x 5.5m
Bath 3.4 x 1.8m 5
4
3
4
3
2
UP
Garage 5.6 x 6.0m
L'dry 2.1 x 2.1m
Bath 3.4 x 1.8m
5
4
1
1,000
5
5
4
4
3
2
UP
UP
Powder 1.9 x 1.0m
DOWN 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP
1.8 x 2.9m 1.9 x 1.8m
3
2
1
Ensuite Robe
1
Bed 1
Bed 1
4.0 x 3.5m
4.0 x 3.5m
Bed 1 4.4 x 3.6m
Kitchen 2.7 x 4.4m
Living / Dining 5.8 x 5.5m
1.1 x 2.0m
T12
T12
T12
T12
T12
T12
T12
T12
T09
TH21 A: 130.06 m2
TH22 A: 130.00 m2
TH23 A: 130.00 m2
TH24 A: 149.92 m2
TH25 A: 129.81 m
TH26 A: 130.00 m2
TH27 A: 126.50 m2
TH28 A: 120.35 m2
TH29 A: 296.63 m2
11,800
04 TP300
5,000
2,300
4,500
3.6 x 3.0m
Bath 2.8 x 1.9m
91110
Bed 1 3.6 x 3.0m
DOWN 17 16 15 14 13 12
T15
L'dry 2.1 x 2.1m
4
3
2
UP
1
TH20 A: 145.50 m2
L'dry
2.1 x 2.1m
4
3
2
1
Garage 5.6 x 6.0m
DOWN
TP300 03
L'dry 2.1 x 2.1m
Bath 3.4 x 1.8m
Bed 1
Bath 3.1 x 1.5m
Garage 5.6 x 6.0m
DOWN
L'dry 2.1 x 2.1m
DOWN
DOWN
DOWN
Bed 3 3.5 x 3.1m
T03 TH19 A: 130.00 m2
DOWN
3.5 x 3.1m
Garage 5.6 x 6.0m
Garage 5.6 x 6.0m
5,500
Garage 5.6 x 6.0m
7,194
Bed 3
1,003
Garage 5.6 x 6.0m
847
Garage 5.6 x 6.0m
DOWN
DOWN
3.0 x 3.1m
DOWN
5
4
3
1,000
Bed 1
3.1 x 1.5m
1,290
2
Bath
UP
1
T03 TH18 A: 130.00 m2
Stage 6c Ground Floor Plan
This is an visionary townhouse development, part of a local masterplan for central shopping centre development located in Truganina. The focal point is the town centre located in the centre of the masterplan. Stage 6c consists of 29 townhouses located south east of the local town centre and stage 7 consisting of 64 townhouses located to the north of the town centre. My role was to produce a town planning package under the direction of the project architect. This entailed model design, design and develop the floorplans, sections and elevations utilizing Archicad software. Coupled with skilled experience in documentation, my knowledge in materials, construction builds and building code requirements, it allowed me to produce effective and efficient designs, approved by the project architect.
15
UP 4
3
2
UP 4
3
2
1
T04
T07
TH15 A: 90.00 m2
TH23 A: 120.00 m2
Terrace
Bed 2
2.0 x 3.4m
3.4 x 3.4m
Terrace
Bed 2
2.0 x 3.4m
3.4 x 3.4m
DOWN
2.0 x 3.4m
T07 TH16 A: 120.00 m2
UP
1.0 x 1.5m
Terrace
Bed 2
2.0 x 3.4m
3.4 x 3.4m
500
Bed 1
Terrace
3.3 x 1.8m
3.3 x 1.8m
Terrace Garage 5.6 x 6.0m
Bath
Terrace
1.0 x 1.5m
L'dry
1.0 x 1.5m
Bath
DOWN
Bath
DOWN
Terrace
3.3 x 1.8m
3.3 x 1.8m
Bath 2.7 x 2.4m
DOWN
UP
T07
T07
TH38 A: 120.00 m2
Bed 1
3.3 x 1.8m
Terrace 3.3 x 1.8m
Bed 2
Terrace 2.0 x 3.4m
Bed 2
Terrace
3.4 x 3.4m
2.0 x 3.4m
Bed 2
Terrace
3.4 x 3.4m
2.0 x 3.4m
1.0 x 1.5m
Bath 2.7 x 2.4m
3.5 x 3.6m
Garage 5.6 x 6.0m
3.5 x 3.6m
2.7 x 2.4m
8,742
1,5
1,500
3.4 x 3.4m
L'dry
DOWN
L'dry
1.0 x 1.5m
98 7
11 10
DOWN 17 16 15 14 13 12
T14
T14
TH17 A: 149.48 m2
TH25 A: 180.01 m2
DOWN 17 16 15 14 13 12
8 7 6 5 4 3 2 1
6 5 4 3 2 1
UP
UP
8 7 6 5 4 3 2 1
DOWN 17 16 15 14 13 12
+9,000 3 Level 3
+6,000 2 Level 2
+3,000 1 Level 1
±0 0 Ground Floor
Townhouse Elevation 01
500
562
2,472
500
Stage 7 Ground Floor Plan
16
2.0 x 3.4m
1.0 x 1.5m
Terrace Garage 5.6 x 6.0m
Terrace
L'dry
3.5 x 3.6m
Garage 5.6 x 6.0m
Terrace
Bed 1
Bed 2 3.4 x 3.4m
UP
L'dry
1.0 x 1.5m
2.7 x 2.4m
Bed 1
Bed 1 Garage 5.6 x 6.0m
UP
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Bath 2.7 x 2.4m
3.3 x 1.8m
3.5 x 3.6m
DOWN
1.0 x 1.5m
3.5 x 3.6m
Garage 5.6 x 6.0m
3.5 x 3.6m
2.7 x 2.4m
L'dry
Bed 1
3.3 x 1.8m
2.7 x 2.4m
L'dry
Bath 2.7 x 2.4m
DOWN
3.5 x 3.6m
Garage 5.6 x 6.0m
Terrace
Bed 1
Bath
5,500
TH37 A: 120.00 m2
T07
T07
TH30 A: 120.07 m2
TH39 A: 120.00 m2
TP301 03
DOWN
L'dry 1.0 x 1.5m
T07 TH24 A: 120.00 m2
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace
500 Garage 5.6 x 6.0m
T07
T07
T07
T07
TH31 A: 140.00 m2
TH40 A: 140.11 m2
T07
T07
TH32 A: 120.00 m2
TH41 A: 120.07 m2
Bed 2
Terrace
3.4 x 3.4m
2.0 x 3.4m
T07
T07
TH33 A: 120.00 m2
TH42 A: 120.00 m2
11 109
5,500
L'dry
1.0 x 1.5m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
UP
3.4 x 3.2m
500
Bed 2 3.4 x 3.4m
UP
TH08 A: 147.23 m2
Bed1
L'dry
3.3 x 1.8m
Bed 1
2.0 x 3.4m
1.0 x 1.5m
TH29 A: 120.00 m2
Terrace
3.5 x 3.6m
Terrace
11 109
T13
Garage 5.6 x 6.0m
Bath 2.7 x 2.4m
DOWN
Bath 2.7 x 2.4m
TH22 A: 140.02 m2
1
5
DOWN
5
1,000
TP301 02
UP
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
T07
UP
Bed 1
3.3 x 1.8m
11 109
UP
3.0 x 3.0m
3.5 x 3.6m
Garage 5.6 x 6.0m
Terrace
2.0 x 2.5m
Bed 1
Bath L'dry
T06 TH07 A: 90.00 m2
Bath 1.8 x 2.1m
8 7 6 5 4 3 2 1
3.4 x 3.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
5
4
3
2
1
Bed 4 3.0 x 3.4m
Bed 2
2.0 x 3.4m
T07
TH14 A: 90.00 m2
3.0 x 3.0m
2.8 x 1.9m2.1 x 1.9m
Garage 5.5 x 6.0m
Bath
Bed 1
DOWN
UP
L'dry
Terrace
Bed 2 3.4 x 3.4m
L'dry
3.5 x 3.6m
Garage 5.6 x 6.0m
3.5 x 3.6m
1,500
TH21 A: 120.08 m2
T04
DOWN
Garage 4.1 x 6.0m
1.8 x 2.1m
1.0 x 1.2m
Bed 1
3.3 x 1.8m
2.7 x 2.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
5
4
3
2
1
Bath
3.0 x 3.4m
Terrace
DOWN
06 TP301
2.0 x 3.4m
1.0 x 1.5m
2.8 x 1.9m2.1 x 1.9m
3.3 x 1.8m
UP
Terrace
L'dry
Bath L'dry
TH06 A: 105.00 m2
Garage 5.5 x 6.0m
Bed 4
Garage 4.1 x 6.0m
T06
Terrace
3.3 x 1.8m
Garage 5.6 x 6.0m
TH36 A: 120.00 m2
TH28 A: 120.00 m2
Terrace
Bed 1
Bath
T07
T07
UP
Bed 2 3.4 x 3.4m
T07
UP
TP301 01
9,016
UP
UP
L'dry 1.0 x 1.2m
1.0 x 1.5m
2.0 x 3.4m
UP
2.0 x 3.4m
05 TP301
3.4 x 3.4m
TH12 A: 120.00 m2
3.4 x 3.4m
2.7 x 2.4m
3.5 x 3.6m
Garage 5.6 x 6.0m
Garage 5.6 x 6.0m
Terrace
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
UP
Terrace
Bed 2
2.0 x 3.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
DOWN
3.3 x 1.8m
L'dry
Bath
Bed 1
Bed 1 3.5 x 3.6m
DOWN
1.0 x 1.5m
Terrace
TH13 A: 120.00 m2
Terrace
Bath
Bed 2 3.4 x 3.4m
L'dry
1.0 x 1.5m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
DOWN
5
4
3
2
1
Bath 2.7 x 2.4m
3.5 x 3.6m
Garage 5.6 x 6.0m
3.3 x 1.8m
2.7 x 2.4m
TH35 A: 159.24 m2
DOWN 17 16 15 14 13 12
DOWN
UP
Bed 1
T06
DOWN
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
4
3
2
1
5
UP UP 4
3
2
5
1
Bed 2
1,500
TH05 A: 105.26 m2
2.7 x 2.4m
L'dry
T07
T07 TH26 A: 159.20 m2
TH27 A: 120.00 m2
Terrace
T07 TH20 A: 120.00 m2
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 DOWN
Bath 2.7 x 2.4m
1.8 x 2.1m
2.7 x 2.4m
3.5 x 3.6m
Garage 5.6 x 6.0m
Garage 5.6 x 6.0m
Bed 1 3.5 x 3.6m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
5
4
3
2
1
Bed 1 3.5 x 3.6m
Garage 5.5 x 6.0m
3.4 x 3.4m
UP
3.0 x 3.0m
1.0 x 1.5m
T07
Bath
Bath
Bed 2
2.0 x 3.4m
TH11 A: 90.00 m2
Bed 1
L'dry
Bed 4
Terrace
UP
UP
3.3 x 1.8m
1.8 x 2.1m
3.0 x 3.4m
T07 TH19 A: 120.00 m2
T04
L'dry
Terrace Garage 5.6 x 6.0m
Bath
Bed 1
3.3 x 1.8m
2.0 x 3.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
3.0 x 3.0m
Bath L'dry
T06 TH04 A: 104.98 m2
Terrace
Bath
Terrace
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Bed 1
2.8 x 1.9m2.1 x 1.9m
2.8 x 1.9m2.1 x 1.9m
1.0 x 1.2m
3.4 x 3.4m
Bed 2 3.4 x 3.4m
UP
UP
TH10 A: 90.00 m2
DOWN
L'dry
3.0 x 3.4m
Bed 2
2.0 x 3.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Garage 4.1 x 6.0m
Garage 5.5 x 6.0m
Terrace
L'dry
1.0 x 1.5m
T04
TH03 A: 105.00 m2
1.8 x 2.1m
1.0 x 1.2m
TH18 A: 127.71 m2
DOWN
DOWN
5
4
3
2
1
Garage 4.1 x 6.0m
L'dry 1.0 x 1.5m
T07
T07
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
L'dry
1.0 x 1.5m
Bath L'dry
T06
Garage 5.5 x 6.0m Bath
2.0 x 3.4m
DOWN
UP
L'dry 1.0 x 1.2m
Bed 4
Terrace
DOWN
3.3 x 1.8m
1.8 x 2.1m
3.0 x 3.4m
Bed 2 3.4 x 3.4m
TH09 A: 120.00 m2 DOWN
DOWN
DOWN
5
4
3
2
1
Terrace
TH02 A: 90.00 m2
Bath
3.0 x 3.4m
Bath 2.7 x 2.4m
3.5 x 3.6m
Garage 5.6 x 6.0m
T06
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Bed 1 Garage 5.5 x 6.0m
UP
UP
L'dry
933
1.8 x 2.1m
Bath 2.7 x 2.4m
DOWN
UP
Terrace 3.3 x 1.8m
1.0 x 1.2m
Bed 4
Bed 4
Bed 1 3.5 x 3.6m
Garage 5.6 x 6.0m
Bath
3.0 x 3.4m
2,750 488
STAGE 7
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
TH01 A: 118.51 m2
Garage 5.5 x 6.0m
DOWN
2
1
5
4
3
T06
DOWN
UP
L'dry 1.0 x 1.2m
Bed 4
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
5,500 1,071
TP302 09
T14
T14
TH34 A: 179.95 m2
TH43 A: 194.96 m2
TP302 09
11 10
UP
T14
DOWN 17 16 15 14 13 12
T11
Bed1
TH60 A: 150.00 m2
3.4 x 3.2m
8 7 6 5 4 3 2 1
T13 TH68 A: 160.09 m2
Garage 5.6 x 6.0m
8 7 6 5 4 3 2 1
1,530
UP 1
4
3
5
2 2
1
5
4
3
UP 3
UP 2
5
1
2
5
1
4
3
UP 4
3
UP 2
5
1
1
4
3
2
5
UP 4
3
L'dry 1.0 x 1.2m
Garage 5.6 x 6.0m
Bed 4 3.0 x 3.4m
DOWN
2
500
1
5,500
Bath 2.0 x 2.5m UP
Bed1 3.4 x 3.2m
862
260
500
TH52 A: 190.00 m2
500
1.8 x 2.1m
Garage 5.5 x 6.0m
1.8 x 2.1m
2.0 x 2.5m
DOWN 17 16 15 14 13 12
UP
Bath
Bath
TH67 A: 90.00 m2
109
T14 TH43 A: 194.96 m2
1.0 x 1.2m
T06 Garage 5.5 x 6.0m
5
2.0 x 3.4m
3.0 x 3.4m
L'dry
UP
3.4 x 3.4m
TH51 A: 120.00 m2
11 109
T14 TH34 A: 179.95 m2
8 7 6 5 4 3 2 1
3.0 x 3.4m
DOWN
91110
Terrace
Bed 4
Bath UP
4
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP
1
5
4
3
2
UP UP 5
4
3
2
1
UP
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 UP
TP301 03 06 TP301
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 5
4
3
2
1
UP UP 5
4
3
2
1
Bath 2.7 x 2.4m
5
3.5 x 3.6m
Bed 2
TH59 A: 90.00 m2
98 7
6 5 4 3 2 1
1.0 x 1.2m
T06 T07
Bed 1
Bath L'dry
3
L'dry 1.0 x 1.5m
2
3.3 x 1.8m
1
3.3 x 1.8m
3.0 x 3.0m
2.8 x 1.9m2.1 x 1.9m
Terrace
Garage 5.6 x 6.0m Garage 5.6 x 6.0m
Bed 4
1.8 x 2.1m
Garage 5.5 x 6.0m
1.8 x 2.1m
4
Garage 5.6 x 6.0m
Terrace
5,500
3.0 x 3.4m
Bath
T06 TH66 A: 90.00 m2
Garage 5.5 x 6.0m
Bed 4 3.0 x 3.4m
TH50 A: 90.00 m2
Bed 1
Bath L'dry
TH58 A: 90.03 m2
Bed 4
Bath 1.8 x 2.1m
DOWN
L'dry
1.0 x 1.2m
T06 T04
UP
Garage 5.6 x 6.0m
Garage 4.1 x 6.0m
L'dry 1.0 x 1.2m
5
UP
1.0 x 1.5m
TH49 A: 90.00
4
DOWN
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
L'dry
T04
3.0 x 3.0m
3
Bed 1 3.5 x 3.6m
Garage 4.1 x 6.0m
2
Bath 2.7 x 2.4m
2.8 x 1.9m2.1 x 1.9m DOWN
1
3.4 x 3.4m
5,500
UP
Bed 2
2.0 x 3.4m
5.6 x 6.0m
3.3 x 1.8m
1.0 x 1.5m
Terrace
Terrace
500
L'dry
1.0 x 1.2m
Garage 5.5 x 6.0m
Garage 5.5 x 6.0m
UP
T07 TH42 A: 120.00 m2
Garage 5.6 x 6.0m
3.0 x 3.4m
L'dry 1.0 x 1.2m
T06 TH65 A: 90.00 m2
Bath
TH57 A: 89.97 m2
Bed 1
3.0 x 3.4m
Bath
1.8 x 2.1m
5
T07 TH33 A: 120.00 m2
T06
L'dry
1.0 x 1.5m
Bath L'dry
Bed 4
1.8 x 2.1m
Garage 5.5 x 6.0m DOWN
1.8 x 2.1m
T07 TH48 A: 120.00
2
UP
2.0 x 3.4m
2.0 x 3.4m
1
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace
Garage 4.1 x 6.0m
Terrace
4
DOWN
DOWN
3.3 x 1.8m
Bed 1 3.5 x 3.6m
L'dry
Terrace Garage 4.1 x 6.0m
5.6 x 6.0m
Bed 4 3.0 x 3.4m
Bed 2 3.4 x 3.4m
T06 TH64 A: 90.00 m2
Garage 5.5 x 6.0m
Bed 4
Garage 5.6 x 6.0m
Terrace
Bath 2.7 x 2.4m
3
Bath 2.7 x 2.4m
Bed 1 3.5 x 3.6m
5
3.4 x 3.4m
Garage 5.6 x 6.0m
Bath
DOWN
L'dry
1.0 x 1.2m
T06 TH56 A: 90.00 m2
Garage 5.6 x 6.0m
L'dry 1.0 x 1.2m
2
Bed 2
2.0 x 3.4m
3.3 x 1.8m
3.3 x 1.8m
1.0 x 1.5m
Terrace
TH47 A: 120.00 m2
1
T07 TH41 A: 120.07 m2
2.0 x 3.4m
4
UP
T07 TH32 A: 120.00 m2
Terrace
3
DOWN
Bed 2 3.4 x 3.4m
Garage 5.6 x 6.0m
Terrace
3.5 x 3.6m
L'dry
Bath 2.7 x 2.4m
UP
3.4 x 3.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace 2.0 x 3.4m
2.0 x 3.4m
T07
Bed 1 3.5 x 3.6m
Bed 1
Garage 5.5 x 6.0m
UP
T07 TH40 A: 140.11 m2
Bath 2.7 x 2.4m
1.0 x 1.5m
Bed 4 3.0 x 3.4m
1.8 x 2.1m
1.8 x 2.1m
5
DOWN
L'dry
1.0 x 1.5m
3.3 x 1.8m
Garage 5.6 x 6.0m
Bath
Bed 4 3.0 x 3.4m
4
T07 TH31 A: 140.00 m2
Bed 2
Terrace
Garage 5.6 x 6.0m Garage 5.6 x 6.0m
Bed 1
1.0 x 1.2m
Garage 5.5 x 6.0m Bath
T06 TH55 A: 90.00 m2
3
UP
2.0 x 3.4m
Terrace
3.3 x 1.8m
3.5 x 3.6m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace
Terrace
TH63 A: 90.00 m2
T04 TH46 A: 90.00 m2
3.0 x 3.0m
L'dry
2
Bath 2.7 x 2.4m
L'dry
T06
Bath 1.8 x 2.1m
Bed 1
Bath L'dry
2.8 x 1.9m2.1 x 1.9m
L'dry 1.0 x 1.2m
Garage 5.5 x 6.0m
Bed 4 3.0 x 3.4m
UP
DOWN
L'dry
1.0 x 1.5m
Garage 4.1 x 6.0m
Garage 5.6 x 6.0m Garage 5.6 x 6.0m
Bed 4 3.0 x 3.4m
Garage 5.5 x 6.0m DOWN
TH54 A: 90.00 m2
1
3.4 x 3.4m
T06
T06 TH62 A: 90.00 m2
DOWN
L'dry
1.0 x 1.2m
5
TH39 A: 120.00 m2
Bed 2
2.0 x 3.4m
3.0 x 3.0m
DOWN
Bath 1.8 x 2.1m
L'dry
4
TH30 A: 120.07 m2
Terrace
Bed 1
2.8 x 1.9m2.1 x 1.9m
Garage 5.5 x 6.0m
1.0 x 1.2m
3
T07
TH45 A: 90.00 m2
2
UP
1,500
T07
Garage 4.1 x 6.0m
Bed 1 3.5 x 3.6m
T04
1
Bath 2.7 x 2.4m
Bed 4 3.0 x 3.4m
1.8 x 2.1m
1.8 x 2.1m
3.0 x 3.4m
UP
3.4 x 3.4m
TH53 A: 90.00 m2
UP
Bed 2
2.0 x 3.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
8,742 1,500
Terrace
2.0 x 3.4m
Terrace TH38 A: 120.00 m2
T06
TH44 A: 120.00 m2
4
UP
T07
T07 TH29 A: 120.00 m2
Garage 4.1 x 6.0m
L'dry
1.0 x 1.5m
Bath L'dry
Bath
Bed 4
T07
3
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace
2.0 x 3.4m
Garage 5.6 x 6.0m Garage 5.6 x 6.0m
Terrace 3.3 x 1.8m
1.0 x 1.5m
2.0 x 3.4m
1
3.5 x 3.6m
DOWN
L'dry
DOWN
Terrace
2
3.4 x 3.4m
Garage 4.1 x 6.0m
Bed 1
Bed 2 3.4 x 3.4m
5
2.0 x 3.4m
Terrace 3.3 x 1.8m
Bath 2.7 x 2.4m
TH37 A: 120.00 m2
TH28 A: 120.00 m2
Bath 2.7 x 2.4m
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
UP
T07
T07
2.0 x 3.4m
3.3 x 1.8m
1.0 x 1.5m
Bed 2
Bed 1 3.5 x 3.6m
Garage 5.6 x 6.0m
DOWN 17 16 15 14 13 12 11
L'dry
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace
Terrace
Garage 5.6 x 6.0m
Garage 5.6 x 6.0m Garage 5.6 x 6.0m
Terrace
DOWN 17 16 15 14 13 12
3.5 x 3.6m
DOWN
1.0 x 1.2m
Garage 5.5 x 6.0m Bath
Bed 1
2.7 x 2.4m
DOWN
3.4 x 3.4m
DOWN
Bed 2
2.0 x 3.4m
TH36 A: 120.00 m2
TH27 A: 120.00 m2
L'dry
T06 TH61 A: 90.00 m2
DOWN
Terrace
3.3 x 1.8m
DOWN
T07
T07
Bath
Garage 5.6 x 6.0m
Terrace
DOWN
UP
2.0 x 3.4m
1.0 x 1.5m
Garage 5.6 x 6.0m
DOWN
L'dry
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
Terrace
Bed 1 3.5 x 3.6m
DOWN
5,498 1,001
A: 13,001.56 m2
Bath 2.7 x 2.4m
DOWN
3.4 x 3.4m
DOWN
Bed 2
2.0 x 3.4m
DOWN
Terrace
DOWN
TH35 A: 159.24 m2
TH26 A: 159.20 m2
DOWN
T07
T07
2.0 x 3.4m
1,335
Stage 7
Terrace
+9,000 3 Level 3
+6,000 2 Level 2
+3,000 1 Level 1
±0 0 Ground Floor
Townhouse Elevation 02
17
WYNDHAM CHRISTIAN COLLAGE Design Documentation | 2IC Technology Block 418 Ballen Road, Wyndham Vale
18
As an extension to the existing school, this engagement consisted of designing and creating an allowance of a technology allotment for an approximate housing of 200 students for the school’s students. Appointed as the 2IC, I oversaw the production for design documentation and collaborated with multiple consultants. With on-site visitation, this allowed better understanding of project communication, specific requirements and ensuring my client’s needs were met. This project was indefinitely a pivotal engagement in terms of my learning expansion. Thus, it allowed me to understand users’ requirements such as student’s height which was reflected on the bench top heights and materials for durability. Neighbouring the technology block, there was a further requirement for a tensil roof to the sports court. This required me to approach various manufacturers, engage and collaborate together for design constructions and ensuring costs were within the allocated budget.
C
D
8,464
3,232
E
F
8,464
40
B
A3102 S-01
7 7,619
A3101 E-02
WATER TANK 10,000L
+37,748
1
+39,050
7,813
W W-01 7
8
+39,450
7,000
DP
WATER TANK 10,000L
D D-01
DP
MUSIC
W W-14
FOOD TECH
D D-02
D D-22
DP
DW
7,813
1
W W-02
D D-03
D D-21
2 DP
ART STORE
2
D D-04 FOOD TECH
MUSIC STORE
SCIENCE STORE
STORE
WM/DR
FR
10,515
W W-13
DP
FR
D D-05
D D-20
8
ARTS
W W-03
SCIENCE
D D-19
D D-06
DP
10,515
39,860
A
DP
1 m2
3
3
MULTI-PURPOSE COURTS
CLASS 3
W W-04 D D-07
D D-18
4
D D-16
D D-08
36,100 7,862
DP
4
D D-17
W W-11
7,864
E-03 A3100
CLASS 1
DP
CLASS 2
W W-05
CLASS 4
7,862
DP
37
+37,244
7,864
A3100 E-01
CORRIDOR
W W-12
A3102 S-02
DP
DP
D D-15
8,183
W W-10 DP
W W-07 D D-13
STAFF
W W-09
M JUNIOR TOILETS
F JUNIOR TOILETS A3102 S-03
DW
CLEANERS
DP
9
B
FR
6
BUILDING 1A
5
D D-14 COMMS
8,183
5
2,536
W W-08
D D-23
D D-09 E-04 A3101
D D-10
D D-11
DDA WC
D D-12
DP
6 +37,000 5,000
+37,850
A3102 S-01
+37,390
W W-06 D D-24
9
3,232
8,464
C A
D
BALUSTRADE
8,464
F
E +37,200
Ground Floor General Arrangement Plan
19
FLASHING TO BE INSTALLED AT BUILDING JUNCTION AS NECESSARY TO WEATHERPROOF AND SEAL. COLOUR TO MATCH METAL SHEET CLADDING. REFER TO FINISHES SCHEDULE
METAL SHEET ROOF AS SCHEDULED INSTALLED TO MANUFACTURER'S SPECIFICATIONS 20° PI TC
ROOF RAFTER AS PER STRUCTURE ENGINEER'S DWG
H
SARKING AS PER SPECIFICATIONS SAFETY MESH UNDERLAY AS PER SPECIFICATION
METAL SHEET CLADDING AS SCHEDULED INSTALLED TO MANUFACTURER'S SPECIFICATIONS
ROOF BEAM AS PER STRUCTURAL ENG'S DWGS 20° FA CEILIN LL G
SARKING AS PER SPECIFICATIONS
FLASHING TO BE INSTALLED AT BUILDING JUNCTION AS NECESSARY TO WEATHERPROOF AND SEAL. COLOUR TO MATCH METAL SHEET CLADDING. REFER TO FINISHES SCHEDULE
CL-02 REFER TO A2300 PSPs FOR EXTENT
OUTSIDE
CEILING VOID
METAL SHEET PANEL AS SCHEDULED INSTALLED TO MANUFACTURER'S SPECIFICATIONS. REFER TO EXTERNAL FINISHES SCHEDULE
W W-04
FLASHING TO BE INSTALLED AT BUILDING JUNCTION AS NECESSARY TO WEATHERPROOF AND SEAL. COLOUR TO MATCH METAL SHEET CLADDING. REFER TO FINISHES SCHEDULE STEEL ROOFING, REFER TO EXTERNAL FINISHES SCHEDULE SARKING
9° PITCH
SAFETY MESH AS PER SPECIFICATION
REFER TO A6300 FOR WALL EXTENT
TIMBER BEAM REFER TO STRUCTURAL ENGINEER'S DWG
CEILING SPACE
ROOF TRUSS, REFER TO STRUCTURAL ENGINEER'S DWG
Roof to Wall Detail
20
HALLWAY
4,429
4,429 7,509
7,509
9° PITCH
+40,930
400
+38,650
BRK001
800
+37,850
2,280
1,880
+40,930
800
+38,650
+37,850
D D-01 BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE
E
3,232
8,464
+45,360 PITC
H
5
6
9° PITCH
7,864
7,862
8,183
7,509
10,515
BOX GUTTER CLB003
4,429
4
42,270
CLB001
9° PITCH
4,429
3
+40,930
40,930
+40,930
+38,650
PDC001
+37,850
+37,850
2,280
+38,650
PDC001 +45,350
W W-12
C
4,270
+41,080
CLB001
D
W W-11
W W-10
E
W W-09
F
+40,930
PDC001
+38,850
+38,850
BRK001 CLB004
CLB004
+37,850
NGL+37,500
3,232
8,464
PDC001
PDC001
W W-19
CLB001
BOX GUTTER CLB003
2
1
40,930 7,813
2,278
10,515
W W-08
800
+38,850
3,078
PDC001 7,864
+37,850
PDC001
42,270
CLB001
9° PITCH
+41,080
2,670
7,862
3
CLB003
7,500
4
510
5
8,183
1,342
4,320
CLB001 METAL SHEET CLADDING
CLB001 6
+45,350
H
PITC
3,080
20°
7,500
8,464
West Elevation 1:50
E-01
150
CLB003
REFER TO DETAIL FOR WINDOW HOOD W W-13
W W-14
7,500
CLB001 PITCHED ROOF AT 20°
BOUNDARY LINE
+37,850
PDC001
South Elevation
+40,450
PDC001 BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE 1 BRK001
PDC001
BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE
+40,930
CLB001
PDC001
410
CLB003
WATER TANK
PDC001
D D-01
CLB001
North Elevation
PDC001 BRK001
800
PDC001
CLB004 DOWNPIPE
D D-24 W W-06
PDC001
+38,850
2,670
800
+45,350 +37,850
BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING 1A STAGE BRK001
1,880
PDC001
1,000
PDC001
400
W W-08 +38,850
800
2,278
PDC001
3,078
BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING 1A STAGE BRK001
ALU. PANEL. REFER D TO WINDOW DETAILS D-24FOR EXTENT PDC001 W W-06
PDC001 PDC001
W W-18
W W-17
W W-16
W W-05
W W-04
W W-03
+38,850
+37,850
CLB004 DOWNPIPE+45,350 +44,606
W W-15
CLB003 CLB001 PITCHED ROOF AT 20°
GUTTER CLB001
+40,930
PITCHED ROOF AT 5°
1,930
150
+40,780
W W-02
BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE 1 BRK001
+38,850
CLB001 1,000
BRK001 METAL CLADDING
CLB004
CLB004 +37,850
WATER TANK REFER TO SERVICES ENG'S DWG FOR EXTENT
West Elevation
East Elevation 1:50
1
2
3
7,813
4
10,515
PDC001
5
7,864
PDC001
PDC001
6
7,862
PDC001
PDC001
PDC001
8,183
PDC001
PDC001
PDC001
PDC001
4,270
+45,350
+45,350
CLB001 PITCHED ROOF AT 20°
CLB001
REFER TO DETAIL FOR WINDOW HOOD W W-09
+40,930
PDC001
+38,850
2,670
W W-10
W W-11
W W-12
+38,850
BRK001 CLB004
CLB004
+37,850
1,000
+37,850
W W-13
W W-14
PDC001
410
+40,450
BRICK VENEER WALL UP TO SILL HEIGHT. MIXED PATTERN TO MATCH EXISTING STAGE 1 BRK001
+41,080
CLB001
+40,930
CLB001
150
CLB003 CLB003
WATER TANK
7,500
E-03
NGL+37,500
East Elevation E-01
West Elevation 1:50
6
5
8,183
4
7,862
PDC001
PDC001
3
2
7,864
PDC001
1
10,515
7,813
ALU. PANEL. REFER TO WINDOW DETAILS FOR EXTENT PDC001
PDC001
21
+45,350 +44,606
CLB001
W W-19
W W-18
W W-17
W W-16
W W-05
W W-04
W W-03
W W-15
CLB003 CLB001 PITCHED ROOF AT 20°
GUTTER CLB001
+40,930
PITCHED ROOF AT 5° BRK001 METAL CLADDING BRICK VENEER WALL UP TO SILL
150
+40,780
1,930
7,500
20°
8,464
3,080
2
CLB003 510
3,232
+45,360
+45,350
C
7,509
7,813
D
8,464
H
+41,080
2,670
E
PITC
CLB001 METAL SHEET CLADDING
CLB001
F
7,500
4,320
20°
1
1,342
8,464
F
BOUNDARY LINE
D
BOUNDARY LINE
C
W W-02 +38,850
CLB001
+37,850
CHERRY ROAD
Design Documentation | Documentator Low-rise apartments 1616-1622 Burwood Highway, Belgrave, VIC. 1,465m2
22
Located at Belgrave amongst single dwelling townhouses, nestles a low-rise apartment block. The project contains 11 apartments with a precast concrete construction build. As part of the documentation team, my responsibility was to oversee the town planning endorsement set. This consisted of ensuring requirements such as set-backs were met, window glazing for over-looking and other design constraints. In addition, I had to build the file set-up for design documentation as well as wall types to be prepared for design documentation. Client consultations and discussions pertaining to construction, faรงade materiality and other various integral matters on fire and acoustic constraints in conjunction with the neighbouring buildings has allowed me to strengthen my skills in grasping the importance of continual client communication through the whole process from concept to design documentation.
Image by DKO Architecture
15
14 3,250
13 5,050
12 3,675
11 2,735
10 2,450
9 4,280
8 5,060
7 2,300
6 5,905
5 2,615
4 2,450
3 6,215
2 2,380
1 8,650
Roof
3,270
150
SSL+94,750
SSL+91,480
3,100
Level 2
SSL+88,380
3,100
Level 1
SSL+85,280
3,440
Ground
SSL+81,840 Basement
North Elevation
23
ImagesbyIrelandBrownConstructions
24
Image by DKO Architecture
89 .24R
87 .7T
86 .8B
85 .608
D 00-41
87 .55B
86 .200
4,400
FALL
D 00-34
86 .295
BED 01
FW
D 00-32 D 00-33
BED 03
BED 02
W 00-12
D 00-40
D 00-39
FW
W 00-10
A: 53.8 m2
86 .685 W 00-08
6,010
FALL
W
R 700
00-09 R 700 R 700
W 00-11
D 00-31
87 .529
D 00-42
86 .611
DP
NBN
LIVING/DINING
87 .438
W 00-13
C4
86 .564 86 .755
SCULLERY
C4
BATH
D 00-43
86 .616
86 .303
FW
2,540
E-02 A3001
86
FW
WIR
G03 G03 A: 140.7 m2
D 00-45
E-03 A3000
W 00-07
A: 185.7 m2
D 00-37
BED 02
E
+87,375
87 .428
D 00-44
BED 03
TRELLIS OVER
KITCHEN FW
87 .561
86 .073
FW
FALL
FW
D G04 G04 00-30 A: 163.9 m2
D 00-35
D 00-38 BATH
S
86 .483
FALL
85 .910 85 .903
86 .083
85 .609 ELEC 1,800 x 500
D 00-25
ENS
86 .734
87 .48F
89 .98T
86 .050
85 .410
3,816 1,250
85 .318
1,250 R 900
+85,780
W
KITCHEN
86 .829
700
W
D 00-46
P.O
+86,591
FW
FW
SCULLERY
+86,548
LDY
FW
D 00-24
D 00-36
FW
D 00-47
DP
D 00-26
FW
3,090
85 .230
4,200
W 00-24
W 00-06
D 00-28
86 .6 86 29 .629
D 00-52
BED 01
FW
ENS
FW
86 86.437 .441
85 .627 85 .118
4,700
R 900
W 00-15
ImagesbyIrelandBrownConstructions 84 .960
FALL
3,370 10
D 00-55
W 00-16
WIR
NBN
W 00-14
1,000
(0.4 7)
85 .096
A: 53.7 m2
(0.0 8)
85 .454
D 00-12
C4 LV 00-24
D 00-13
FW
LDY
9
R 700
W
D 00-11
FIP 1.2x.8x1
85 .550
7,765
84 .537
D 00-08
6
BED 02
D WIR 00-56
D 00-27
WIR
D 00-22 D 00-23
FW
FW
NBN
BED 01
ENS
FW
KITCHEN
REF. RISER 1,050x150
D 00-10
FW
C3
R 700
2,912
D 00-21
FW
NBN
H .52
FW
G05 G05 A: 143.6 m2
D 00-14
PUSH BUTTON TO EXIT
LOBBY
WM 1x.7
84 .920
FW
BATH
D 00-15
BED 03
FFL +85,300 SSL +85,280
8
D 00-54
84 .755
84 .653
86 .5B
87 .45T
86 .32B 87 .22T
D 00-59 D 00-47
D 00-49
FW
BATH
SD
7
C6
ENS
R 700 D 00-20
FW
W 00-01
RECESSED FLOOR MAT
D 00-60
FALL
FW
D 00-19
C4
CP G .7x.6 B
C5
D C5 00-48
FALL
FW
W 00-04
D 00-18
D 00-16
W 00-23
D 00-07
F.52
85 .161
84 .866
D 00-65
D 00-51
BED 03
W 00-03
BED 01
FW
5,207
FW
LDY
4,906
84 .317
BATH
FW
D 00-61
KITCHEN
C2
C4
R 700
87
84 .920
P.O.S.
5,975
+86,138
13
7,765
84 .840 84 .375
8383 .8.964 .925 44
1,500 1,850 2,300 3,105
FW
G02 G02 A: 148.7 m2
D 00-57
85
16
P.O.S.
+85,780
W 00-05
BED 02
ENTRY COURT
FW
AUTO SLIDING DOOR
G01 G01 A: 151.8 m2
LIVING/DINING
R 900 D 00-17
FFL+85,300
D 00-64
FALL
D 00-58
W 00-17
+84,904
3,250
86
+85,175
RAMP 1:10
KITCHEN
23.3 m2
931
1,940
D 00-63
NBN
FW
M PIT
Basement Ramp
15
5,050
FW
D 00-62
SCULLERY
W 00-18
+85,025 SD
R 900
RAMP 1:10
C7
DP
+84,719
14
W
3,675
A: 58.4 m2 W 00-02
+85,175
FW
DP
E-01 A3000
BED 03
FALL
84
1,490
C4
BED 02
W 00-19 D 00-66
A: 69.7 m2
J
W 00-22
C4
1 A3100
13
2,735
FW
+84,905
G
LANDING
+85,025
12
D 00-69 ENS
D 00-67
23.1 m2
3,280
TELECO
10,299
RAMP 1:20
11
BED 01
C2
+84,805
H
88 .94R
87 .2T
1:20 WALKWAY
+84,632
W 00-21
FW
SR Z
83 .999
+84,632
86 .030
84 .377
84 .430
83 .778 83 .772
4,080
ACCESS COVER OSD TANK
1,200 LANDING
12,000L OSD tank below ground (TBC)
LV 00-23
11,544
E-04 A3001
12
2,450
85 .346
1:20 WALKWAY
RAMP 1:20
WIR
A: 90.0 m2
K
+84,235
W 00-20
F
11
4,280
W
NBN 1,600 x 500
SD
84 .160
D 00-06
JUNCT
E
10 W
5,060
W
87 .04T
18,828 LANDING
+84,236
D 00-68
D
9
2,300
GAS 1.5x1.5x1.8
ION PIT
C
8
W
86 .3B
87 .18E
RAMP 1:20
7
84 .850
83 .701
8383.6 .67770
83 .816
83 83 .808 .823
83 .615
D 00-04
W
5,905
P.O.S.
R 700
83 .568
TP Z
+83,900
+83,900
D 00-05
2,615
Garage
1:20 WALKWAY
WATER METER 5,000 x 1,000 x 600H D 00-03
900
1:10
SURCHARGE PIT
4,235
LANDING
HYD 1.85x.8x1.5 83 .940
83 83.542 .428
D 00-01
D 00-02 1:10 1:10 +83,800
3,275
B
6
2,450 P.O.S.
87 .042
83 .592 83 .520
83 .308
83 8383.483 83.3 .366 00 83 .392 .255 89 .345 83 .229
TIMBER PALING FENCE TO MIN 1800mm 1,006 1:10
6,215 Brick
+83,713
83 .527
A
5
W
2,380
84
LIGHT
4
86 .99T
3
8,650
POLE AND
87 .95T
89 .02
2
86 .10B
83 .346
83 .117
10.69
1
85
82 .889
Image by DKO Architecture
W
Ground Floor General Arrangement Plan
25
NEWQUAY LOT 9
Contract Documentation | Documentator 17-Storey Mixed-Use Development 9 Newquay Promenade, Docklands 97m AUD - 2660m2
26
A new multi-residential located in Docklands, building A as apartments with lofts and building B as service apartments for Quest. My tasks were to update and coordinate construction drawings with information produced by consultants, updating drawings to follow shop drawings, facade details and to participate in documenting RFIs. By doing so, it allowed me to have a better knowledge of the project procurement procedure and methods. During contract administration, I was responsible for site building defects inspection, concentrating on internal rooms and corridors following documentation drawings and looking at the finishes for signs of defects logging each defect with the builder and client.
Images by KH Studio
Image by DKO Architecture
27
Image by DKO Architecture
28
AA
AB
S01
AC
3,820
AD
A3100
5,730
E01 A1100
AE
6,850
AF
7,380
S02 A3102
AG
7,000
AH
4,130
AJ
6,750
AK
3,120
7,170
51,950 (BUILDING A) 6,750
2,176
Planter -B
WA 509
WA 513
DP
WA 508
DDA REQ. 2070x1540
FW
FE
FW
3,000
DP
450 5,940
320 Planter -A
Planter -A
4,575 450 5,010
1,830 450 920 5,010
LEVEL NUMBER LEVEL NUMBER
1,830 920
AC
SITE BOUNDARY 50.00m 153°05'40"
2,340
DCB 507
SP
DB 507A
DP
WB 509
DP
WB 510
FW
D 01
506B Q22B
D 02
WB 511 AC
FW
9,450
8
D 02
F-02
DB 508
D 03
SP WM
D 03
D 01
506A Q22B
D 03
D 03 D 02
WB 508
AC
509A Q22H
D 01
WM
WM
WB 507
DP
FW
F-02
DB 509A
DDA REQ. 2070x1540
SP
DB 507B
DB 506B
WB 512
AC
WB 513
DP
FW
AC
FW
507A Q22C
DP
D 03
508 Q12D
D 03
507B Q22C
AC
D 03
DB 509B
FE
300X350
DCB 510
WB 519
WM
DB 506A
FE DCW DHW
SP
505A Q22L
DB 510
DP
SP
DCB 509
7
FW
DP WB 520
509B Q22H
FW
DP
D 03
D 03 F-02
WB 506
AC FW
DCB 505
WB 521 DP
WDB 506
510 Q11A
511B Q22K DB 511B
ELEC
WDB 505
REF
7,200 8,350
WB 505 WB 504
GAS
505B Q22L 504B Q22F
AC
DCB 504
DB 505A
D 03
9
DB 511A
DCB 506
F-02
D 02
DP
SFL +20,350 FFL +20,370
#LayID
DB 505B
COMMS
FACADE GLAZING WALL. REFER TO DRAWING AB6011
WB 522
ONLY
7,200
CORRIDOR
DB 504 DB 504B
FW
S05 A3108 FACADE GLAZING WALL. REFER TO DRAWING AB6011
LOCATION OF DESK AND TV TO
DP DPAPARTMENT 1307
14,410 (BUILDING B)
STAIR B1 CP EXHAUST
D 04
D 01
VENT
DB 504A
504A Q22F
AC
AB4001 LIFT
DDA REQ. 2070x1540
AC DP
WM
6
SP
D 02
9
DP
DP
WB 514
WB 517
WB 516
AC FW
FW
WB 515
AC
FW
DP
DP
FW
AC
DP
FW
WB 518
3,000
SP
1,609
FW
DCB 508
DP
SP
2,930 FW
WDB 504
BATHROOM
PRESS
DB 503B
503B Q22E
D 03
19,675
E08 A1106
WB 523
511A Q22K
PRESS
CORE B1
D 03
FW
2,450
5 E02 A1100
FACADE SETOUT
1,809
DB 503A
FW
DP
DCB 503
503A Q22E
WB 503
WDB 503
D 02
DCB 501
AC
8
DP
FW
1,550
450
9,450
DB 501
300X350
SP
9,925
25,305 (BUILDING B)
FW
4
FW
AC
WDA 501
19,675
DP DCB 502
DP
WB 502
3,450
AC
SP
DB 502
DP
FW
DB
AC 3,430
1,950
501 Q12B
FW
HOUSE KEEPING
FW
5:01 2A WDA 502
DP
S04 A3106
E05 A1104
F-02
WB 501
D WA 13 501
WB 524
1,770
5,480
6,130
502 Q12A
D 12 D 12
FW
DP
FW
SP
WDA 503
AC
WDB 501
AA7129
FW
WA 502
APARTMENT
D 12
FW FW
DP
WB 526
DP
D 13
DP
AC
FW
WB 527
6
450
DB
WDA 504
WDB 502
S05 A3108
5:09 1D
WA 532
3,774
6
DP
5:08 1C
D 12
DB
SITE BOUNDARY 49.99m 333°05'20"
9,926
FW
DP
7
AC
19,675 19,675
E08 A1106
FW
5 E02 A1100
450
2,450
WB 525
655
1,830
6,550
AC
DP
450
3,450
E06 A1104
E04 A1102
DP
FW
SITE BOUNDARY 50.00m 153°05'40"
1,950
AC
SP
4
FW
AC
WDA 501
WB 524
2,340
6,130
DP
D WA 13 501
5:01 2A WDA 502
DP
FW
A1106
5
WDA 503
S04 A3106
D 12 D 12
501 Q12B
FW
HOUSE KEEPING
4
AA7129
E05 A1104
F-02
550
APARTMENT
DB
AC
DB
FW
AC
FW
502 Q12A
6
D 13
D 12
DP
FW
DP
WB 526
DP
WDB 501
SP
S04 A3106
5:09 1D
FW
WA 502
DB
AC
WDA 504
WDB 502
5,480
D 12
3
WA 503 FW
D 13
DP
AC
FW
WB 527
DP
FW
DA 501
WA 532
3,774
WB 525 FW
AC
E04 A1102
DDA REQ. 2070x1540
DP
WA 504
5:08 1C
3,430
5
9,926
AC FW
D 12
AC
SITE BOUNDARY 49.99m 333°05'20"
6,550
655
1,830
4
DDA REQ. 2070x1540
DCA 501
DA 509
E06 A1104
550
D 13
DCA FE 502
DP
FW
WA 505 AC
SFL +20,050 FFL +20,080
AA4001
PRESS
12,900
13,891
S04 A3106
1,609
CORE A1
WDA 505 E07 A1106
2 5:02 1A
D 12
S299 #LayID
DA 502
1,999
STAIR A1
D 13
DP
WDA 506
WA 506
PF-21
DA 508
DB
5:07 1E
DP
LEVEL NUMBER
AA7138
WA 531
FACADE GLAZING WALL. REFER TO DRAWING AA6011
3
FW
DP
895
BIN CHUTE
S03 A3104
DA 503
DDA REQ. 2070x1540
DCA 504
1,610
DCW GAS FE
D 13
TOWNHOUSE
D 13 DA 504
LEVEL NUMBER
DHW
COMMS
ELEC
5:15M THB
D 12
5:03 L 2G
SSL +20,050
D 13
S299 #LayID
DCA 505
1
D 16
AC
DA 507
DB
D 12
WA 530
FACADE GLAZING WALL. REFER TO DRAWING AA6011
DA 515
D 13
D 13
5:14M THA
SSL +20,050
DA 505
DCA DCA DCA DCA 508 507 503 506
D 12
AC
DB
D 12
DB
24,745
DA 514
D 13
5:13M THA WA 529
FE
DCA 509
5:04 L 2F
D 13 DA 506
S299 DCA DCA #LayID 511 510
D 12
D 16
SSL +21,550
5:05 L 2F
SSL +20,050
D 13
SSL+20,050
SSL +21,550
D 16
AC
1,609
DA 513
DP
D 12
SSL +20,050
DA 510
DCA 513
2070x1540
WA 528
5:06 L 2F
FH
DCA 512
D 13 DA 511
DA 512
FW
5:10 L 2F
SSL+20,050
D 13
D 13
D 12
D 16
D 16
RELIEF
SSL+20,050
WA DDA REQ. 527
2
D 12
PRESS
5:11 L 2F
SSL+20,050
WA 526
S03 A3104
D 12
D 16
DB
7,590
5:12 L 2H
D 12
AC
8,590
STAIR A2
D 16
450
550
Planter -B
WA 510
895
DP
FW
2,650
DP
WA 512
FW
WA 511
1,975
FW
WA 514
FW
930
FW
450
WA 515
1,800
Planter -A Planter -A
7,590
DP
1,546 543
1,129
1,800
Planter -A
WA 517
500
4,685
DP
ID
3,545
24,905 (BUILDING A)
1,800
VO WA 518
100 20 20
2,176
Planter -A
FW
WA 516
450
450
1,129
FW FW
6,350
5,480
974
1,800
Planter -A
FW
450
12,900
450
10,335
3,175
5,480
2,176
3,175
10,335
DP
450
1,800
AC
3,150
Planter -A
WA 520
DP
450
SITE BOUNDARY 53.28mPlanter 63°05'20" -A
Planter -A
FW
FW
WA 521
WA 523
2,230
2,176
WA 519
FW
Planter -A
DP
AC
550
WA 524
450
1,800
Planter -A
FW FW
895
2,650
954
945
1,800
WA 522
Planter -B Planter -B
1
29
3,130
2,095
2,176
450
AC
1,936
1,800
6,350
AC
4,050
AC
1,548 188
2,950
AC
256
450
AC
3,495
FW
SITE BOUNDARY 53.28m 243°05'40"
450
1,250
BA
3,500
5,890
3,765
3,360
BB
450
12,729
6,850
AC
4,100
S01
A3100
450
3,356
6,640
450
10,025
BE
450
7,770
BF
10,790
6,750
E03 A1102
AD
AG
S02 A3102
3,120
AH
7,170
AJ
430
AK
Ground Floor General Arrangement Plan
29
GARFIELD
Design Documentation | 2IC Townhouses 37-38 Shelley Street, Richmond Victoria.
30
TITLE BOUNDARY
TITLE BOUNDARY
A set of opulent townhouses located in Richmond with red brick faรงade responding to the local context. I was responsible to review and revise the design documentation drawings based as per client requirements and adhere to budget restrictions and building requirements from the BCA. I researched on windows that not only required to maintain design aesthetics but also fit into the fire and ESD requirements. Notably, the details for the brick faรงade was challenging given that it provides zero structural support for the building. This therefore required consistent interaction with structural engineers to produce a viable solution yet maintain maximum yield to the townhouses.
RL+27,440
RL+25,720
MAX. 9m
RL+25,440
2,900
ROOF TERRACE FFL
3,180
ROOF
MAX. 10.5m
RL+22,540
2,800
9,000
2,800
10,500
SECOND FFL
RL+19,740
2,800
2,800
FIRST FFL
RL+16,940
GROUND FFL
+16,720
BASEMENT FFL
2,650
2,650
NGL
+14,290
BASEMENT FFL
North Elevation
31
Image by DKO Architecture
32
Image by DKO Architecture
33
+27,220
RL+25,940
T.O ROOF
3,440
2,963
3,400
T.O ROOF
DINING / KITCHEN RL+22,540
RL+22,540
KITCHEN / DINING
DINING / KITCHEN RL+22,370
KITCHEN / DINING RL+22,300
+22,300
SECOND FFL
GROUND FFL
NGL +17,080
BATH RL+16,950
ENS. RL+19,620
RL+19,550
BATH RL+16,870
BASEMENT FFL
Section 01
BATH RL+16,800
BASEMENT RL+13,950
ENS.
+19,550
FIRST FFL
2,750
BATH RL+17,040
ENS. RL+19,700
NGL +16,720
+16,800
GROUND FFL
2,850
2,400
2,750 RL+17,040
ENS. RL+19,790
FIRST FFL
2,750
10,500
RL+22,450
2,500
2,400
2,750
9,000
10,500
SECOND FFL
RL+19,790
34
MAX. 10.5m
+25,740
+13,950
BASEMENT FFL
BED 1
1,050
BED 1
1,050
BED 1
BATH
BATH
95°45'
1,095
1,242
1,690 185°49'
4,630 NBN.35x.1x.6
1,053
95°45' NBN.35x.1x.6
NBN.35x.1x.6
NBN.35x.1x.6
18,290
BED 1
BATH
BATH
TH01
TH02
+16,940
TH03
+16,940
43.49 m2
+16,940
45.03 m2
SB .3x.1x.6
SB .3x.1x.6
TH04
+16,940
45.03 m2
NBN.35x.1x.6
12,340 6°11'
HOME OFFICE / FLEXI
L
45.12 m2
SB .3x.1x.6
BATH
SB .3x.1x.6
R
HOME OFFICE / FLEXI
R
G
G
+16,940
1:20
G
+16,940
R
G
45.40 m2
+16,940
RAISED OUTDOOR AREA 12.27 m2
G
G
R
R
G
HOME OFFICE/ FLEXI
HOME OFFICE / FLEXI
R
6°11'
+17,480
GAS 1,600x600x2,000
1:20
47.56 m2
39.53 m2
1:20
SWITCH 1,800x450x2,100
SB .3x.1x.6
R G
FIP
+17,040
+16,800
HOME OFFICE/ FLEXI
17,480 186°07'
R G
HOME OFFICE/ FLEXI
SB .3x.1x.6
R
45.40 m2
SB .3x.1x.6
+16,940
HOME OFFICE/ FLEXI
+16,940
1:4 - 7,200mm
STACKED WATER & CHECK METER ASSEMBLY BELOW PLANTER 1,500 x 500 x 800
TH09 SB .3x.1x.6
HOME OFFICE / FLEXI
SB .3x.1x.6
47.24 m2
+16,940
TH06
TH07
BATH
BATH
BATH
NBN.35x.1x.6
NBN.35x.1x.6
NBN.35x.1x.6
BATH
TH08
186°11'
12,940
CAR PARK DOOR 2m2 OPENINGS
TH05
6,320
BED 1 BED 1
BED 1 1:8 - 3,000mm
BED 1
NBN.35x.1x.6
18,390 276°16'30"
4,560
276°16'30"
Ground Floor Plan
35
NORMANBY RD
Design Documentation | 2IC Mixed-use Residential Development 75m AUD - 1,210m2
36
Normanby road is a 40 story multi-residential building with hotel branded by Marriott from the ground floor to level 18 consisting of 193 hotel rooms, a common area including an outdoor pool and 111 apartments across level 19 to 39. The curtain wall façade is particularly unique given that it consisted of triangle planes at different angles to complete the building’s facade. I coordinated the hotel rooms and apartment rooms to identify and adopt a strategy, program, and process to enable project delivery. The timely completion and communication of accurate and comprehensible documents that includes the required drawings, wall type schedule, door type schedule and the works of a CAD manager. I was to coordinate all consultants and the required input to be placed into the drawings to provide the tender drawing set.
Images by Ridz
Image by DKO Architecture
37
Site Boundary
Site Boundary +131,780 Core Lid
3,400
+130,800
+128,380 Machine Room
3,550
+125,800
2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 3,250 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 2,940 3,250
+124,830 Roof +121,580 Level 39 +118,640 Level 38 +115,700 Level 37 +112,760 Level 36 +109,820 Level 35 +106,880 Level 34 +103,940 Level 33 +101,000 Level 32
+98,060 Level 31 +95,120 Level 30 +92,180 Level 29 +89,240 Level 28 +86,300 Level 27 +83,360 Level 26 +80,420 Level 25 +77,480 Level 24 +74,540 Level 23 +71,600 Level 22 +68,660 Level 21 +65,720 Level 20 +62,470 Level 19 +59,530 Level 18 +56,590 Level 17 +53,650 Level 16 +50,710 Level 15 +47,770 Level 14 +44,830 Level 13 +41,890 Level 12 +38,950 Level 11 +36,010 Level 10
+33,070 Level 9
4,000
+30,130 Level 8 +26,130 Level 7
3,650
+23,880
1,000
+19,380 Level 5
1,400
+22,480 Level 6
+7,380 Level 1
Woodgate Street +2,000 Ground
North Elevation
38
17,380
CANOPY
4,140 5,425
+10,380 Level 2
6,325 5,080
+13,380 Level 3
20,480
+16,380 Level 4
Normanby Road
Image by DKO Architecture
39
Site Boundary
Site Boundary
+130,800
Core Lid
+131,780 Core Lid
+128,380 +125,800 Machine Room +124,830 Roof
39
+121,580 Level 39
38
+118,640 Level 38
37
+115,700 Level 37
36
+112,760 Level 36
35
+109,820 Level 35
34
+106,880 Level 34
33
+103,940 Level 33
32
+101,000 Level 32
31
+98,060 Level 31
30
+95,120 Level 30
29
+92,180 Level 29
28
+89,240 Level 28
27
+86,300 Level 27
26
+83,360 Level 26
25
+80,420 Level 25
24
+77,480 Level 24
23
+74,540 Level 23
22
+71,600 Level 22
21
+68,660 Level 21
20
+65,720 Level 20
19
+62,470 Level 19
18
+59,530 Level 18
17
+56,590 Level 17
16
+53,650 Level 16
15
+50,710 Level 15
14
+47,770 Level 14
13
+44,830 Level 13
12
+41,890 Level 12
11
+38,950 Level 11
10
+36,010 Level 10 +33,070 Level 9 +30,130 Level 8 +26,130 Level 7
+19,380 Level 5
GLAZED AWNING FIRE HYDRANT BOOSTER ENCLOSURE FACADE GLAZING
SHOP
NORMANBY RD FOOTPATH
+16,380 Level 4 +13,380 Level 3 +10,380 Level 2
380
+7,380 Level 1
000
+2,000 Ground
West Elevation
40
17,380
20,480
1,000
1,400
+22,480 Level 6
LEVEL 1
FIRE HYDRANT BOOSTER CABINET
1,300
Roof
1,800
Machine Room
RL +500
EST NGL +2,000
Lobby Section Detail
HYDRANT BOOSTER INDICATIVELY SHOWN
1
2
3
14,965
448
2,252
3,605
4
6,100
5
14,700
6
6,450
12,500
7 3,250
250
SITE BOUNDARY
D
EF-21
EF-11
PLANTERS
PLANTERS
EF-21
PLANTER
EF-21
EF-21
PLANTER
PLANTER
DOOR CONTROL
CAR STACKER LOADING PENETRATION
DOOR CONTROL
CONC PUMP
D06 10B
D06 10D
D06 10C
D06 10E
POOL DECK 06:01
PRE-FUNCTION 06:03
FUNCTION 06:04
FFL +22,510 SFL +22,480
EF-24
FFL +22,510 SFL +22,480
+22,480 ACC. WC 06:14
FHR
FEMALE WC 06:12 EF-11
H
D06 22B
D06 22G LV066-22A
HYD 06:23
H GAS B E
R
D06 22D
W
FFL +22,510 SFL +22,480
HYD
L
HYD
D06 22E
D06 22F
HYD
D06 22G
D06 22J
SFL +20,840
Custom Text
1
2
3
4
5
6
7
8 9
HOTEL LIFTS
D06 22K
SERVICE
APT LIFTS
KE
FENCE
FHR
CORRIDOR 06:22
D06 22L D06 21A
17 16 15 14 13 12 11 10
PLANTER
D06 03C
D06 20A
SFL +22,480 EGRESS STAIR 01 06:20
FB
D06 03B
D06 03A
STAIR PRES.
5,250
D06 12A
H
D06 22C
D06 15A
DOOR CONTROL
STAIR PRES.
D06 22A
W066-W-07
DOOR CONTROL
MALE WC 06:15
D06 14A
D06 13A
B
LV066-20A
ACC. WC/SHR 06:13
STAIR RELIEF.
FFL +22,500 SFL +22,480
EF-22
FB
EGRESS STAIR 02 06:21
SFL+23,7609 10 8
7
11 12 13 14 15 16 17 6
5
4
3
2
1
D06 22I
LV066-22B
SFL+22,480
STAIR RELIEF.
POOL SFL +20,730
EF-09A
EF-09A
A
HOIST
POOL SIDE BAR 06:02 FFL +22,510 SFL +22,480
1,515 116 SITE BOUNDARY
7,040
NORMANBY ROAD
EF-39
C
OUTDOOR LOUNGE 06:10 FFL +22,500 SFL +22,380
D06 10A
D06 01B
3,033
260
CRANE
OUTDOOR LOUNGE 06:01
HOIST
SITE BOUNDARY
D06 01A
EF-09A
LV066-21A
6,840
EF-19
D06 22H
BER
EN
CH
ELEC 06:09 ER
KIT
OAR
S
ER
UT
BY
D06 10F
EF-13
KITCHEN 06:05
D06 05A
OTH
STORE 06:11
YO
LA
FW
LDER
EF-11
SITE BOUNDARY
5/F Common Area General Arrangement Plan
Image by DKO Architecture
41
BANKSIA
Design Documentation | 2IC Apartments 40.0m AUD - 4,040m2
42
Banksia is part of a master plan designed by DKO architecture located in Clayton South, Melbourne. It is a 9-storey building with 2 basement levels, both acting as the car park including bike parking, storage and services. The building is a concrete structure with a precast facade typical and window wall facade system to the north and west corner. My responsibility was to coordinate and the design development phase. The initial task was for me to reproduce the town planning documentation into a detailed design documentation coordination model. My responsibilities also extended to coordination of wall types considering fire ratings, acoustic values and waterproofing. From this, I learnt to adopt relevant consultants’ reports and requirements into elements of the building as well adoption based on construction method and buildability.
Image by DKO Architecture
43
1
2
3
8,940
4
5,530
5
3,500
6
8,670
7
5,010
8
6,650
9
4,200
10
7,500
11
5,870
5,605
1,450
4,400
+86,900 10 Story
2,550
3,100
+82,500 9 Roof
1,450 2,550
W A6-24
EF-14
EF-06 BT-01
EF-01
W A6-23
W A6-22
EF-06
EF-04 BT-05
EF-02
EF-04
BT-04
W A6-21
W A5-24
BT-01
W A5-22
W A5-21
2,550
W A5-23
BT-05
BT-04
BT-01
550
BT-01
W B4-31
W B4-29
BT-01
W A4-22
W A4-21
BT-04
W A3-24
W A3-26
W A3-23
BT-01
W A3-22
W A3-21
2,550
W B3-29
+65,000
BT-04
BT-05
W A4-23
BT-05
550
550 W B3-31
BT-04
19,769
BT-01
W B3-32
W A4-24
W A4-26
2,550
W B4-32
BT-01
EF-13
BT-05
BT-04
BT-01
550
BT-05
W B2-38
W B1-40
W B1-38
W B2-36
W B2-37
W B2-35
W B2-34
W B2-33
W B2-32
W B2-31
W B1-32
W B1-31
W B2-30
EF-12
EF-14
W BG-13
W B1-34
W B1-33
RL +56,540
945
+51,100
South Elevation
SCR-01
SCR-01
EF-05
REFE R TO
W BG-11
EF-04 EF-06
W BG-10
EF-14
W BG-30
W BG-09
W BG-08
W BG-29
RL+56,300
TOW RL +55,290
BT-03
EF-04
BT-06
EF-10
EF-04
W A2-23
W A2-22
BT-05
W A2-21
BT-04
W A1-24
W A1-23
BT-01
W A1-22
W A1-21
+58,800 BT-04
W BG-07
BT-01
EF-08
SCR-03 BT-03
RL +56,800
EF-17 +54,635
SCR-03 BT-03
EF-07
EF-14
TOW RL+55,290 +54,538
EF-05
BT-01
W A1-26
BT-05
EF-01
EF-13
PE LANDRGOL SCAPA E DR AW ING +58,800
EF-04
+54,439
RL +54,267
+54,083
W B1-30
EF-06 EF-15
W BG-12
EF-04
+54,100
EF-04
EF-06 BT-05
W BG-14
EF-04
550
EF-06
BT-05
W B1-35
281
BT-04
BT-04
SCR-05 EF-15
W B1-36
550
SCR-05
SCR-05 EF-04
W B1-37
2,550
EF-08 BT-01
BT-05
W A2-24
W A2-26
2,550
W B2-40
BT-04
TIMBER SEAT
44
EF-04
EF-04
BT-04
TOW RL +54,870 +54,500 0 Ground
EF-02
550
550 2,550 W B3-33
W A6-26
EF-14
W A5-26
3,100
W B4-33
W B3-35
EF-14
BT-04 EF-09
BT-01
7,650
3,100
1,450 1,450
3,100
W B4-35
EF-01
W B5-29
BT-05
1,650
19,600
EF-09
W B5-31
BT-05
EF-02
EF-06
EF-04
W B5-32
BT-04
1,450
3,100
EF-02
EF-04
BT-01
BT-04
1,450
3,100
W B6-29
BT-05
1,450
3,100
W B6-31
BT-04
2,350
3,200
W B6-32
EF-04
W B5-33
350
+57,700 1 Level 1
EF-14
BT-05
1,650
+60,800 2 Level 2
W B6-33
EF-06
W B5-35
1,650
+63,900 3 Level 3
EF-04
2,550
EF-14
EF-02
BT-04
1,450
3,100
W B6-35
EF-14
+77,400
EF-14 550
1,350
EF-02
1,650
+70,100 5 Level 5
+67,000 4 Level 4
EF-01
1,650
+73,200 6 Level 6
EF-10
BT-05
1,650
+76,300 7 Level 7
PERGOLA E DRAWING SCAP TO LAND REFER
EF-04
2,550
3,100
BT-01 +77,400
550
+79,400
+79,400 8 Level 8
EF-05
EF-01
+54,532
W AG-18
W AG-17
EF-04 EF-06
W AG-16
W AG-15
TOW RL +55,290
TOW RL+55,290
EF-05
EF-05
EF-11 TOW RL +55,290 RL +54,925
RL +54,850
+54,779
+54,715 +54,620
EF-14
BT-03
EF-04
EF-05
GS-02
RL +55,026
Image by DKO Architecture
45
4
5
6
8,670
7
5,010
8
6,650
W A1-42
AC STUDY
W A1-07 NBN
820
DT03
W A1-08 920 DT05
W A1-09 820
DT01
COMMS
W A1-11
ELEC
BATH BT-19A FW
FE GAS
PLANTER
W A1-12
W A1-13
WM
SR
DT27 DT01
W A1-14
DT03
820
820
W A1-15
DT01
2. 79
97°49'20"
W A1-16 W A1-17
DT01 DT01
W A1-18
NBN
DT03
DT03
820
FE
820
RT-01
STUDY
RT-01
3,0 00
W A1-20
DT04
DT01
920
DT04
NBN
920
DT05
W A1-19
BATH FW BT-17A 920
A1.09 3A
2,191
5.44
DT03 W A1-22
FW
BATH BT-18
FW
6. 4 0
AC
920
BALCONY FFL +57,800 W A1-43
DP/FW
820
DT03
LT-11 W A1-23
EF-23
BT-05
W A1-24
BT-01
64.28m
BED 01
DT27
DT03
820
KITCHEN TYPE 17
FW
DP/FW PLANTER
W A1-26
BT-01
SITE BOUNDARY
820
DT01
DT01 FE
A: 94.46 m2
CORRIDOR A
DT27 DT03
820
DT01 W A1-37
DT26
FW BEDROOM 01
A1.08 2.2B
BATH BT-18 FW 820
BALCONY FFL +57,800
SCR-05
Ground Floor General Arrangement Plan
FW BATH BT-20A
RT-01 RT-01
920
DP/FW W B1-30
DT03 820
FW
KITCHEN TYPE 05
920 W B1-31
LT-08
FW
BT-05
AC
W B1-32
DT03
820
LIVING
DT03
W B1-33
BT-01
W A1-44
FW
FFL +57,800
BALCONY FFL +57,800
W B1-34
FW BATH BT-01
FW BATH BT-01
DT01
DP/ FW
DT03
W A1-33
820 W A1-32
DP
BALCONY
BT-06 SCR-01
W B1-36
FW
DT03 820
FW
SCR-01 PLANTER ACCESS GATE TO MATCH BALUSTRADE SYSTEM NOM. 1.7m HIGH
BT-05
AC
LT-04
LT-04
RT-01 RT-01
920
KITCHEN TYPE 08
BG.09 L TH.1
LIVING
W B1-35
BT-05
46
DINING
J01
W A1-34
LIVING AC
BED 01
DT04
DT03
BG.08 L TH.1
FW
BED 02
ING ER DRAW A OV E OL AP RG SC PE LAND R TO FE RE
W B1-29
AC
DP/FW PLANTER
W B1-38
W A1-31
W A1-45
ER A OV OL RG PE
KITCHEN TYPE 08 NBN
DP
BALCONY FFL +57,800
A1.10 2.1A
DT03
BALCONY
AC
NBN
BED 02
820
820
A1.07 2.1A
DT04
W B1-27
BALCONY
DT03
ST
FW
KITCHEN TYPE 04
BT-01
BATH BT-03A
KITCHEN TYPE 04
W A1-25
DT04
LT-02
DT15
BALCONY
W B1-28
DT03 DT05
SCR-01
W A1-28
W B1-26 DT03
820
DT03
820
DT01
FW BATH BT-10 920
FW
820
BALCONY FFL +57,800
FW
FFL +57,800
DT15
EF-23
A1.11 2.1B
LT-01
DP
FFL +57,800
SCR-01
FW
FW
B1.10 2.2E
DT01
DT15
BT-03
PLANTER
BT-03
FFL +57,800 PE RG OL A OV ER
EF-23
W B1-40
920 DT04
FW
W A1-27
W B1-25 DT01 DT01 FE
920
DT04
SCR-01
W B1-37
DT04
920
BED 01
RT-01
DT06
W B1-39
AC 2,257
BALCONY FFL +57,800
BT-04
RT-01
BATH BT-15A
DT03
820 W B1-41
DP/FW
BT-01
PLANTER
920
DT03
W B1-44
W B1-43 W B1-42
8,218
H
820
KITCHEN TYPE 17
UP
KITCHEN TYPE 04
BATH BT-01 FW
KITCHEN TYPE 04
NBN
DT03
W B1-54
BT-05
SFL +57,720
LT-04
A1.06 2.1A
DT15
PLANTER
BUILDER TO ALLOW FOR PERFORATED MESH FENCE BACKING TO APARTMENTS A1.06 & A1.07 TO 1.5m ABOVE FFL
BED 02
DT03
B1.09 2.2B
FFL +57,800
FW
FW
KITCHEN TYPE 05
FW
BATH BT-18 FW 820
J
FW BATH BT-20A
DT27
7,205
NBN
LT-08
EXTERIOR GATES TO BE LOCKABLE. REFER DOOR TYPE SCHEDULE
SCR-01
NBN
KITCHEN TYPE 04
G
DP/FW
EF-23
EGRESS STAIRS 01
920
FFL +57,800
BT-03
AC
DT03
BALCONY
PLANTER
BT-03
DT03
AC
W A1-46
DT15
LT-13
FW BATH BT-01
BIN CHUTE A: 5.66 m2
FH
820
BED 02
SCR-01
REFER TO LANDSCAPE ARCH FOR INTENT. ALLOW FOR EXTERIOR LIGHTING.
BALCONY
B1.11 2.1E
RT-01 RT-01
W A1-30
W B1-23
W B1-24
SCR-01
BED 01
W A1-29
DT01
DP
820
DT03 820
W B1-45
NBN
BALCONY FFL +57,800
LT-01
DT20
DT21
PLANTER
BT-03
DT15
KITCHEN TYPE 04
B1.08 2.1A
BT-01
LIFT
FW
COURTYARD
W B1-53
FFL +57,800
FW
EF-23
920
EXH
DT25
DT05
KITCHEN TYPE 02
BT-04
DT04
FFL +57,720 SFL +57,700
LAUNDRY
W B1-22
PLANTER
DT15
A1.01 2.1B
KITCHEN TYPE 04
920 DT04
A1.05 1A
DP/FW
BALCONY FFL +57,800
DT21
CP EXH NBN
920 DT04
BT-03
BALCONY
BATH BT-01 FW
DP/FW
DP W A1-35
DT03
DT04 920 W A1-38 FFL +57,800
SCR-01
KITCHEN TYPE 04
LT-04 AC
W A1-36
BALCONY
PLANTER
AC
B1.12 2.1A
FW BATH BT-01
DT03
W A1-39
W B1-14
SCR-01 PLANTER
FFL +57,800 SFL +57,600
BED 02 FW
BED 02 W B1-55
DT04
NBN
920
AC SCR-01
920 DT05 DT03
LT-01
CR
1:40 WALKWAY
BT-03
AC
FW BATH BT-03A
FW
KITCHEN TYPE 04
AC
DT15
PLANTER
BT-03
BATH FW BT-17A
BATH BT-01 FW
W B1-16
W B1-17
FW BED 01
DT03 820
920
DT04
W A1-40
DT01
DT04
920
DT05
DT04
W B1-19
AC
COMMS
920
DT04
EGRESS STAIRS 02
NBN
DT03
DT03
DT27
820
DT03
BED 01
820
DT03
DT03
820
820
DP/FW
PREFAB PLANTER. REFER TO LANDSCAPE ARCH. DRAWINGS FOR INTENT
RT-01 RT-01
DT01
W B1-47
53.55
RT-01 RT-01
SCR-01
DT15
PLANTER
DT03
FW
FFL +57,800
FFL +57,800
820
A1.04 2.1A
BALCONY
FW
RT-01
920
LT-04
EXHAUST DISCHARGE
W B1-21 FE
W B1-48
BATH BT-01 FW
RT-01 RT-01
PENDING STRUCTURE REVIEW
FFL +57,800
SCR-01
FW
F
BALCONY
DP
PLANTER
LIVING
BALCONY
EXH W B1-20
820
AC
W A1-47
DT15
BED 01
W B1-15
W DP/FW B1-18
1:40 WALKWAY
BT-03
BATH BT-18
FW KITCHEN TYPE 17
BED 02
EXTERIOR GATES TO BE LOCKABLE. REFER DOOR TYPE SCHEDULE
FW
RT-01
DT04
FW
BATH BT-20A FW
DINING
EXHAUST DISCHARGE
LIVING FH
BED 01
FW
NBN
NBN
820
B1.02 1B
DINING
LT-04
DT03
RT-01 RT-01
BATH BT-23A
BEDROOM 01
B1.01 1A
SFL +57,720
CR
KITCHEN TYPE 02
A1.02 3B
920
W A1-41
LT-08 NBN
DP
RT-01
FW
920 DT03
W A1-10
AC
820
920
W B1-13
DT03
820 820
DT03
BALCONY FFL +57,800
FW
FW
BED 02
BED 01
FW BATH BT-19A
KITCHEN TYPE 02
DP
KITCHEN TYPE 04
DP/FW
LT-01 LAUNDRY
UP
BIN CHUTE
GAS
W B1-49
8,200
EF-23
J01
DT20
DT20
CORRIDOR B
A: 93.21 m2
PLANTER
DP/FW
SFL +57,720
DT27
FH
EXH
DT01
DT26
DT01
FW
820
820
DT03
ELEC
SERVICES
LT-04
W B1-46
DT03
DT01 820
W B1-52
DT04 DT03
LIFT
FFL +57,720 SFL +57,700
B1.07 2.1A
6,970
820
LT-05 820
DT03
2,360
NBN
W B1-51
FW
LT-09
AC
SCR-01
FW
DT01
W A1-05
W A1-04
KITCHEN TYPE 05
FE
SCA
UP
BATH BT-14
820
BALCONY FFL +57,800
W B1-56
PLANTER
FW
BATH FWBT-09A
NBN
7,050
DT20
SFL +57,720
LIFT
FW
BT-05
FW
DT01
BATH BT-07A FW
B1.06 2.2A
WW B1-06
920
BATH BT-25
FW
DP/FW
LT-11
FW
DT05
LT-05
ST
DT27
W B1-50
BT-01
820 DT03 820 DT03 DT06
BATH FW BT-08A
FW
FW
DT03
D
DT03
820
DT03
7,490
NBN
DT03
BALCONY FFL +57,800
WW B1-05
BATH FW BT-07A
BALCONY FFL +57,800
EF-23
A1.03 2.2B
820
FW BATH BT-18
ACCESS GATE TO MATCH BALUSTRADE SYSTEM
LT-12
PENDING STRUCTURAL ENG'S REVIEW
BO DP/ FW
FW
W A1-06
BT-01
BT-05 DP/FW PLANTER
DT03
NOM. 1.7m HIGH
ING OVER DRAW OLA APE PERG NDSC LA R TO REFE
NBN
AC
DT04 820
BATH BT-12 FW
W A1-03
W A1-01
DP /FW
W B1-12
B1.03 2.2C
NBN
DT04 820
FW
ST
BT-01
BALCONY FFL +57,800
DP/FW
NBN
WW B1-04
NBN
FW
BT-02
BALCONY FFL +57,800
BALCONY FFL +57,800
BT-06
W B1-09
BATH BT-18 FW 820
5,605
RT-01 BT-05
PLANTER TO BE DETAILED MATCH PRECAST & HOOD DETAIL
AC
DP/FW
PENDING STRUCTURE REVIEW
B1.04 2.2J
KITCHEN TYPE 07
B
E
DP/FW
W B1-06
PLANTER
W B1-10
BALCONY FFL +57,800 W B1-05
W B1-11
BT-04
W B1-07
WW B1-01 OF FW
AC
AC
W B1-01
W B1-04
DP/
W B1-03
W B1-02
W B1-08
BT-04
B1.05 2.2D
C
1.5m HIGH WIND SCREEN AS PER WIND ENG'R REPORT
BT-07 EF-23
BT-02
WW B1-02
BALCONY FFL +57,800
11
5,870
W A1-02
WINDOW HOOD WW B1-03
10
7,500
WINDOW HOOD
2. 87
A
9
4,200
97°44'20"
DT26
68.05
DT01
3,500
DT27 DT27
3 5,530
DT03
2 8,940
NBN
1
92
RT-01 W A1-21
6.40
FALL
ROPE ACCESS TO FACADE TO FUTURE DETAIL AND SHALL BE APPROVED BY ARCHITECT PRIOR TO FINALISATION OF TENDER
1,100
REINFORCED PRECAST CONCRETE PANEL BALUSTRADE WITH INTEGRAL COLOUR IN CLASS 2 FINISH AS SCHEDULED APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP INTO 20MM x 200MMH REBATE IN CONCRETE PANEL. REFER SPECIFICATION.
25MM X 75MM X 10MM THICK RECTANGULAR STEEL OVERFLOW POPS, PROTRUDING 10MM BEYOND PRECAST CONCRETE SPANDREL PANEL TO EACH WINDOW BALCONY DRAINAGE OUTLET, IN APPLIED FINISH AS SCHEDULED, ALIGNED VERTICALLY & HORIZONTALLY ACROSS FAÇADE, TO FUTURE ARCHITECT’S DETAIL
FALL MAX 1:100
ROOF SFL
350
RL 76,300
CONCRETE SOFFIT, WHITE RENDER FINISH AS SCHEDULED CH 2700 AFFL
LIVING
BALCONY
THERMAL INSULATION TO UNDERSIDE OF CONCRETE ROOF SLAB. REFER ESD REPORT.
LIVING
1,000
11
BALCONY
APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS. REINFORCED PRECAST CONCRETE PANEL BALUSTRADE WITH INTEGRAL COLOUR IN CLASS 2 FINISH AS SCHEDULED
200
LEVEL 2 SFL
150
200
125
25MM X 75MM X 10MM THICK RECTANGULAR STEEL OVERFLOW POPS, PROTRUDING 10MM BEYOND PRECAST CONCRETE SPANDREL PANEL TO EACH WINDOW BALCONY DRAINAGE OUTLET, IN APPLIED FINISH AS SCHEDULED, ALIGNED VERTICALLY & HORIZONTALLY ACROSS FAÇADE, TO FUTURE ARCHITECT’S DETAIL
CH 2700 AFFL 13MM PLASTERBOARD CEILING FLUSHSET, SQUARESET CORNICES, REFER FINISHES SCHEDULES.
CONCRETE SOFFIT RENDER FINISH AS SCHEDULED
RETURN PLASTEROARD TO FORM BLIND PELMET, FINISH AS SCHEDULED
PAVERS ON POD SUPPORTS, REFER FINISHES SCHEDULES. 10MM GAP TO WALLS, BALUSTRADES AND GLAZING FRAME. STEEL RHS FRAMING STRUCTURE, CONCEALED BEHIND & SUPPORTING WINDOW WALL PARAPET, ALIGNED TO WINDOW MULLIONS/TRANSOMS/ HEAD FRAMES ETC, IN APPLIED FINISH AS SCHEDULED, TO FUTURE ARCHITECT’S & STRUCTURAL ENGINEER’S DETAIL
100MM DEEP FRONT GLAZED BALCONY WINDOW SYSTEM AND GLAZING AS SCHEDULED
100
LEVEL 1 SFL
FALL
FALL
REINFORCED CONCRETE HOB 200Hx300W, REFER CSPS 50-60MM RIVER PEBBLE BALLAST OVER CONCRETE FLOOR SLAB FALLING INTO RAINWATER OUTLET TO ROOF SLAB, GREY COLOUR AS SCHEDULED
150MM DEEP FRONT GLAZED WINDOW WALL SYSTEM EXTENDING OVER BALCONY TO FORM BALUSTRADE AND CONCEAL STEEL FRAMING BEHIND
ROOF RAINWATER OUTLET AND O/F TO RETICUALTE INTO GYM CEILING 200
APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP ONTO HOBS. OVERFLOW AND PUDDLE FLANGE TO DP TO RUN VERTICALLY (NO BENDS) IN BALCONIES
ENGINEERED TIMBER FLOOR WITH UNDERLAY, REFER FINISHES SCHEDULES AND ACOUSTIC REPORT.
APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP ONTO HOBS. 1,050
MDF ON PACKER FIXED TO 100X100 HOB CONCEALING SUBSILL TO AW WINDOWS/DOORS TO PROVATE BALCONIES/TERRACES, REFER FINISHES SCHEDULES FOR SKIRTING.
RL 57,700
ALUMINIUM FRAMED FULLY GLAZED BALUSTRADE, REFER FINISHES AND BALUSTRADE SCHEDULES.
BALCONY
150
LIVING
1,000
RL 60,800
150MMH POWDERCOATED FLANGELESS AND SASHLESS LOUVRES TO GYM FACADE, INTEGRATED INTO WINDOW WALL SYSTEM
CH 2500 AFFL
REFER PLANS AND WALL SCHEDULE FOR WALL TYPES
CH 2600 AFFL THERMAL INSULATION BOARD PAINTED TO UNDERSIDE OF CONCRETE ROOF SLAB, REFER ESD REPORT
13MM PLASTERBORD CEILING FLUSHSET, SQUARESET CORNICES, REFER FINISHES SCHEDULES.
GROUND CARPARK
GYM
CORRIDOR
REFER FINISHES SCHEDULES FOR SKIRTING. LARGE FORMAT TILES TO CORRIDOR. TILING OVER LEVELLING SCREED WITHIN 30MM REBATE IN CONCRETE FLOOR SLAB AS SCHEDULED
RL 54,500
LARGE FORMAT TILES TO WALKWAY. TILING OVER LEVELLING SCREED REBATED INTO PAVING SLAB SCHEDULED .
ALUMINIUM FRAMED WINDOW, REFER ELEVATIONS, ACOUSTIC & ESD REPORTS, FINISHES SCHEDULE AND MANUFACTURER'S SPECS.
BLOCKWORK WALL. REFER TO PLANS AND WALL SCHEDULE FOR TYPES AND LININGS.
ACOUSTIC FLOOR WITH UNDERLAY, REFER FINISHES SCHEDULES AND ACOUSTIC REPORT.
GROUND FLOOR SFL
STAINLESS STEEL TRENCH GRATE DOUBLE BRICK, SOLDIER COURSE TO TOP IN FINISH AS SCHEDULED
APPLIED WATERPROOF MEMBRANE TO AS 4654 PARTS 1 AND 2 ON MONOLITHIC SLAB, FALLS TO RWO, FILLETS TO CORNERS, WRAPPING UP ONTO HOBS. UV RESISTANT. PAVING STONES ON SCREED LAID TO FALL ON SLAB, REFER FINISHES SCHEDULES. 10MM GAP WALLS, BALUSTRADES AND GLAZING FRAME. SETDOWN IN CONCRETE SLAB TO ALLOW FOR GYM FLOORING SYSTEM. REFER TO STRUCT. ENG. DWGS.
TOW RL +54,922 DRAINAGE CELL WATERPROOF MEMBRANE.
FALL
DPC
AG. DRAIN, REFER CIVIL, LANDSCAPE AND HYDRAULIC DESIGN.
BLOCKWORK WALL. REFER TO PLANS AND WALL SCHEDULE FOR TYPES AND LININGS.
BASEMENT 1 CARPARK
100MMH x 110MM DEEP CONCRETE HOB ALONG PERIMETER OF GROUND FLOOR WALKWAY AND PRIVATE TERRACES, UNDER BRICK PLANTER WALLS
THERMAL INSULATION BOARD PAINTED IN BLACK, REFER ESD REPORT CAPPING BEAM. REFER TO STRUCT. ENG. DWGS.
BASEMENT 1 FIRE PUMP ROOM
SHOTCRETE WALL WITH XYPEX ADMIX. REFER TO STRUCT. ENG. DWGS. STRIP DRAIN, PRODRAIN OR SIMILAR. WEEP HOLE.
SPOON DRAIN CONCRETE SLAB. REFER TO STRUCT. ENG. DWGS. RL 51,100
BASEMENT 1 SFL
300
SHOTCRETE WALL WITH XYPEX ADMIX. REFER TO STRUCT. ENG. DWGS. PROOFEX ENGAGE WATERPROOF MEMBRANE OR SIMILAR TO BASEMENT 2. REFER TO STRUCT. ENG. DWGS.
BASEMENT 2 CARPARK
CONCRETE WALL ON PROOFEX ENGAGE. REFER TO STRUCT. ENG. DWGS. WATERSTOP
TOPPING SLAB ON PROOFEX ENGAGE. REFER TO STRUCT. ENG. DWGS. CONCRETE SLAB. REFER TO STRUCT. ENG. DWGS. RL 48,250
BASEMENT 2 SFL
Facade Section
47