

PRIMARY
SECONDARY
PATTERNS + MATERIALS
TWO FRONT OF BUILDING MURALS. PAINTED ON MASONRY BRICK.
PAINTED PANELS
NEW UNIT NUMBERS. PROPOSED STANDARD WITH EXTERIOR CONTOUR CUT VINYL.
ALL DOOR CLEAN UP AND REPAINT IN BLACK
CLEAN UP AND REPAINT IN BLACK
MURALS
• ONE: FRONT MURALS (2) $4,600
• THREE: DONUT MURAL............... $3,000
• FOUR: CHURCH MURAL BACK $5,000
• FIVE: CHURCH MURAL FRONT..... $4,400
LIFT RENTAL
• WALL 4 + 5 .............................. $400
MULTI WALL DISCOUNT..................... -$1,000 TOTAL COST FOR MURALS + SALES TAX.................. $17,211 VINYL NUMBERS — DOORS • PRODUCT + INSTALLATION ............................... $1,673
MONUMENT SIGN GRAPHICS • PRODUCT + INSTALLATION ............................... $1,953 TOTAL GRAPHICS COST: $20,837
• STEEL CANOPY .............. $5,000
• I BEAM .......................... $2,800
• SQUARE STEEL PLANTER $1,500
• TRIANGLE PLANTERS...... $4,000
• A/C UNIT FENCE............. $2,000
• PAINT FOR CANOPIES...... $1,500
• STEEL PANELS FOR BACK.. $2,700
• POWER WASHING ................. $2,600
• PAINT PREP ......................... $1,800
• REPAIRING ROTTEN WOOD ..... $1,200
• PAINT WORK...... ... $4,500
• MATERIALS........................... $3,000
• RENTAL MACHINE.................. $1,850
• ELIJAH BLUE $2,000
• AMERICAN AGAVE $350
• GRASS. .......................... $300
• ADDITIONAL LANDSCAPING....... $8,000
• DELIVERY...................... $225
SIGNAGE LIGHTING (3 SIGNS) | PRICING BREAKDOWN
• THE SERENE SCENE ........ $6,000
• NEW TENANT SIGN ......... $6,000
• DONUT SHOP. ...................$6,000
• MONUMENT SIGN STEEL ...$5,000
LANDSCAPING | PRICING BREAKDOWN
• 6’ BENCHES (2 UNITS) * ..... $1,350
• 5’ BENCHES (2 UNITS) * ..... $1,250
• DELIVERY (BENCHES) $250
• COLORADO ROCK * .............. $810
• PEA GRAVEL * .................... $1,200
• METAL EDGE * .................... $1,440
• WEED BARRIER * ................ $450
• SOIL * ............................... $400
• DELIVERY + LABOR.......... $4,700
• PLANTER SCULPTURE * .......$3,000
• BIKE RACKS......................$4,000
• TAX ESTIMATE * .................$817
PLANTS COST: $10,875
SIGNAGE COST: $23,000
LANDSCAPING COST: $19,667
TOTAL PROJECT COST + CONTINGENCY $124,266
GRAPHICS / MURALS
CONSTRUCTION COST
PAINT / REPAIR COST