Roadform Ltd Contract Portfolio 2015

Page 1

www.roadform.ie



1

CONTENTS Company Profile

2

Health & Safety

2

Civils Portfolio

3

Bridge Replacement, Feakle, Co. Clare

4

Coláiste Mhuire, Buttevant, Co. Cork

4

Enabling Works Contract, Blanchardstown, Dublin

5

Bridge Rehabilitation, Crusheen, Co. Clare

5

Scoil Naisiúnta Mhuire, Saggart, Co.Dublin

6

L3058 Road Improvement Scheme, Mount Catherine, Co Clare

6

Harlem Court Development, Firhouse, Dublin 24

7

L3060 Road Realignment Project, Parteen, Co. Clare

7

Fullabrook Windfarm, Bittadon, Devon, EX31 4HL.

8

Freefoam Plastics Ltd. St James Mill Road, Northampton, NN5 5JP.

8

Rathcahill Windfarm, Tournafulla, Co Limerick

8

Greensbridge, New Road Surface Water Drainage Scheme, Kilkenny

9

Maudlins Industrial Estate Waste Water Treatment Plant, Naas, Co. Kildare

9

Ballinora to Lehenaghmore Gas Pipeline, Cork – Reinstatement

9

Ballinora to Lehenaghmore Gas Pipeline, Cork

10

Midleton to Whitegate Gas Pipeline, Co. Cork

10

Fairfield Meadows Housing Development, Cork – Phase 2

10

Cluid Housing Development, Newmarket, Co. Cork

11

Oakfield Housing Development, Co. Clare

11

Cluid Housing Development, Rathgoggin, Charleville, Co. Cork

11

Milestream Housing Development, Shanakiel, Blarney Rd, Cork – Phase 2

12

Infrastructure Enabling Works, Milestream, Shanakiel, Blarney Rd, Cork

12

Fairfield Meadows Housing Development, Fairhill, Cork

13

Orchard Heights Housing Development, Charleville, Co. Cork

13

Underground Car Park, Harty’s Quay Apartment Development, Mahon, Cork

14

Askeaton High Pressure Gas Pipeline to Wyeth Pharmaceutical Factory, Askeaton, Co. Limerick

15

Brideholm Apartment Development, Commons Road, Blackpool, Cork

16

Ballincollig By–Pass, Ballincollig, Cork

16

Firhouse Road, Realignment, Firhouse Road, Tallaght, Dublin

17

Curragh Sewerage Scheme, Curragh Camp, Co. Kildare

18

Gas Pipeline to the West, Bruff, Co. Limerick to Crusheen, Co. Galway

18

M1 Motorway, Drogheda By–Pass, Co. Louth

19

Cork Main Drainage, Mahon, Cork

19

Ballincollig to Ballineen Gas Pipeline, Cork

19


2

COMPANY PROFILE “At Roadform Ltd., our overriding mission is to establish lasting

relationships with our customers, by exceeding their expectations and gaining their trust through exceptional performance.”

Roadform Ltd are Building and Civil Engineering Contractors with offices in Cork and Dublin. We place a strong emphasis on performance, quality, safety, teamwork and a “hands-on” management approach to ensure customer satisfaction.

We recognise the importance of trust, certainty, conformance and value to our clients and can be relied upon to deliver projects safely, on time and on budget. Roadform Ltd have been developing medium to large scale infrastructure projects since 1998. Managing Director Martin Murphy started and developed the business from initially plant hire contracting to now developing construction projects for numerous clients and local authorities. We have now built a reputation as being a civil engineering contractor of choice for pipeline construction, wind farm development, bulk excavations, road & bridge building, groundworks, utilities installation and reinforced concrete contracts. Our workforce and modern fleet of plant and equipment are readily mobilised allowing us to undertake projects nationwide. Our priority is to establish and maintain strong relationships with our clients. We achieve this through our progressive attitude and innovative problem-solving approach to all projects. We believe this ensures satisfaction for our clients who return to Roadform Ltd for all their civil engineering needs. We believe a company is only as good as its employees and so we place great emphasis on employee development and training at all levels which creates a competent culture within our company. As part of our commitment to safety, health and environment all our operatives are Safe Pass trained, CSCS / CPCS qualified and undergo regular training. Our management team have extensive experience in construction projects demonstrated by our company’s wide range of successfully completed contracts. We are committed to high levels of quality, safety and environmental performance. Roadform Ltd's management systems are certified to ISO 9001, ISO 14001 and OHSAS 18001standards and we are also a Safe-T-Cert accredited company.


CIVILS PORTFOLIO


Civils Portfolio

4

Contract: Bridge Replacement, Feakle, Co. Clare Client:

Clare County Council

Duration:

January- February 2015

Contact:

Hugh McGrath Senior Executive Engineer

Contract Details: This project consisted of the Design & Build of a new bridge structure to replace a collapsed masonry stone arch bridge on the L40582 road. The construction element entailed the provision of a temporary access road during the construction period, excavation of the existing bridge and the installation of 10 ton precast concrete box culverts along with the construction of stone parapet walls to the new bridge replacement structure. Protection of the water course and the requirement to allow the stream to flow unobstructed was prioritised throughout the construction phase. Roadform Ltd carried out the role of PSCS for this project.

Contract: Colaiste Mhuire, Buttevant, Co.Cork Main Contractor:

K&J Townmore Construction Ltd, Tullamore, Co. Offaly

Duration:

July 2014 - October 2015

Contact:

Kevin Enright Managing Director

Contract Details: Roadform Ltd carried out the civils and groundworks contract on this green field site development for the construction of new 4,385sqm 2-storey postprimary school for 325 pupils. The project consisted of the construction of classrooms, laboratories, special needs unit, PE Hall, social areas, administration rooms, stores, toilets and other ancillary spaces, with outdoor play courts, car parking and associate site works.


Civils Portfolio

5

Contract: Enabling Works Contract, Blanchardstown, Dublin Client:

IPSEN Pharmaceuticals Ireland

Duration:

November - December 2014

Contact:

Colin McIlwaine Construction Manager

Contract Details: This project entailed the site clearance and development works for the expansion of the IPSEN manufacturing plant in Blanchardstown, Dublin. The works consisted of the bulk excavation of 25000m3 of subsoil and disposal off site as an enabling works contract to allow future development

Contract: Bridge Rehabilitation, Crusheen, Co. Clare. Client:

Clare County Council

Duration:

November - December 2014

Contact:

Hugh McGrath Senior Executive Engineer

Contract Details: The project consisted of the Design & Build of a reinforced concrete bridge structure to replace a collapsed masonry stone arch bridge on the L4074 road. The works included the preservation of an original stone parapet wall believed to be in the region of 150 years old. Our temporary works system allowed for the construction of reinforced concrete walls and a new bridge deck whilst maintaining the original stone parapet wall. Protection of the water course and the requirement to allow the stream to flow unobstructed was prioritised throughout the construction phase. Roadform Ltd carried out the role of PSCS for this project.


Civils Portfolio

6

Contract: Scoil NaisiĂşnta Mhuire, Saggart, Co.Dublin Main Contractor

ABM Design & Build Ltd, Swords, Co. Dublin

Duration:

January 2014 – September 2014

Contact:

Shane McEneaney Contracts Manager

Contract Details: This project consisted of the site development works for the construction of a new rapid build Primary School in Saggart, Co. Dublin. Roadform Ltd carried out the civils and groundworks for the construction of the 28 classroom two storey building. This included the development of the green field site up to ground floor level and the external works included for the construction of 3 ball courts, junior & special needs play areas along with car parks, roads, bus drop off & landscaped areas.

Contract: L3058 Road Improvement Scheme, Mount Catherine, Co Clare. Client

Clare County Council

Duration:

November 2013 to December 2013

Contact:

Hugh McGrath Senior Executive Engineer

Contract Details: The project consisted of new carriageway construction and realignment of a regional road while keeping public traffic flowing throughout the contract duration. The Civils works entailed traffic management, demolition, tree felling, bulk excavation and fill, drainage and culvert construction, liaising with landowners, construction of new boundary walls, perimeter fencing and landscaping of the project on completion.


Civils Portfolio

7

Contract: Harlem Court Development, Firhouse, Dublin 24 Main Contractor:

L&M Keating Ltd, Kilmihil, Co. Clare

Duration:

November 2013 – August 2014

Contact:

Patrick Queally Project Manager

Contract Details: This project consisted of the construction of 10 two bedroom apartments in a two storey block and a detached two storey ten bedroom children’s care home. Roadform Ltd completed the site clearance, pile mat construction, pile capping and ground beam and ring beam construction as part of the civils package. All formwork and groundworks on site were carried out by Roadform Ltd.

Contract: L3060 Road Realignment Project, Parteen, Co. Clare. Client:

Clare County Council

Duration:

August 2013 to October 2013

Contact:

Hugh McGrath Senior Executive Engineer

Contract Details: The contract involved the civil works associated with the junction upgrade and carriageway widening, realignment and upgrade of 600 metres of regional road. Works consisted of traffic management, bulk excavation & fill, drainage construction, management of live overhead and underground services and landscaping of the works on completion.


Civils Portfolio

8

Contract: Fullabrook Windfarm, Bittadon, Devon, EX31 4HL.. Client

John Sisk & Son Ltd

Duration:

October 2010 – November 2011

Contact:

Alan Donnelly PM

Contract Details: Main Civils Contract for the construction of a 22 turbine, 66 megawatt windfarm. This includes the upgrading of existing public roads and junctions, site enabling works, construction of 15km of access roads, base excavations, cable ducting, base and access road reinstatement.

Contract: Freefoam Plastics Ltd. St James Mill Road Northampton Northamptonshire NN5 5JP. Client

Freefoam Plastics Ltd.

Duration:

December 2010 to date

Contact:

Colin St. John

Contract Details: This contract involved the design and build of a nationwide distribution centre extension. This involved site clearance, fill importation, retaining structure and the supply of finishing of 6500m2 of reinforced concrete. Contract: Rathcahill Windfarm, 38KVA Cable Installation Toornafulla, Co. Limerick (IRE) Client: Duration Contact:

John Sisk & Son Ltd February – April 2011 John O’Connor, Contracts Manager

Contract Details: This contract involved the installation of 4.2 km of 38KVA underground ducting and cabling. It also consisted of the construction of insitu jointing chambers along the route. The route consisted of 2.9km in greenfield and 1.3 km on primary public road. This road had to remain live at all times through active traffic management. The purpose of this cabling was to connect Rathcahill Windfarm Tournafulla, Co Limerick (IRE) to the national grid.


Civils Portfolio

Contract: Greensbridge, New Road Surface Water Drainage Scheme, Kilkenny. Client:

Kilkenny County Council

Duration:

August – September 2009

Contact:

Michael Murphy

Contract Details: This involved the installation of a 450mm pipe for road surface water drainage over 200 linear metres in Kilkenny city. Works were carried out around live services and involved the supply of plant, labour and materials. Setting out, engineering services and traffic management were also provided by Roadform Ltd. Upon installation of the pipeline, permanent reinstatement works were carried out.

Contract: Maudlins Industrial Estate, Waste Water Treatment Plant, Co. Kildare. Client:

QK Coldstores Ltd

Duration:

May to July ‘09

Contact:

John Hennebury

Contract Details: This contract involved the construction of an over ground waste water treatment tank with a capacity of 3,600,000 litre. Our contract involved the supply of plant, labour and materials. Works involved the supply and fixing of 140 tonne of steel, the supply and placing of 1,500 m3 of concrete, 300 linear metres of contraction joints, 500 linear metres of water bar and 2,200 m2 of formwork.

Contract: Ballinora to Lehenaghmore Gas Pipeline Phase 2 Reinstatement Contract Client:

P.J. Hegarty Ltd

Duration:

May to June 2009

Contact:

Maurice Killeen, PM

Contract Details:

Land drainage, sub-soil ripping, topsoiling and

boundary reinstatement of 6km gas pipeline.

9


Civils Portfolio

Contract: Ballinora to Lehenaghmore Gas Pipeline

Main Contractor:

P.J. Hegarty Ltd.

Duration:

August 2008 to October 2008

Contact:

Maurice Killeen, PM

Contract Details: The details of our contract included the stripping and benching, pipe stringing, trench excavation, sanding and backfill for a 250mm gas pipeline. This includes rock excavation and road and stream crossings for the construction of 6.0km of the gas pipeline

Contract: Midleton to Whitegate Gas Pipeline, Cork Main Contractor:

Murphy International Ltd

Duration:

May 2008 to July 2008

Contact:

Danny Corr, CM

Contract Details: The details of our contract included the stripping and benching, trench excavation and backfill for a 600mm gas pipeline. This included rock excavation for the construction of 16.5km of the gas pipeline.

Contract: Fairfield Meadows – Phase 2 Main Contractor: Duration: Contact:

Coleman Brothers Developments March 2008 to March 2009 Michael Coleman, MD

Contract Details: The details of our contract included the supply of plant, labour and materials for the excavation and groundwork’s of 24 residential units from a green field site to floor level. The project consisted of site excavations, rock excavations, main drainage and services, house bases, paths, paving, roadways and landscaping etc.

10


Civils Portfolio

Contract: Cluid Housing Development, Newmarket, Co. Cork.

Client:

Atlantic Developments, Briarhill, Galway

Duration:

April 2007 to June 2008

Contact:

John Brady, PM

Contract Details: The details of our contract included the supply of plant and labour for 37 residential units from green field to floor level which includes site clearance and excavations, main drainage, house bases, landscaping, roads, paths and paving etc.

Contract: Oakfield Housing Development Client:

Burke Building and Civil Engineering, Atlantic Road, Lisdoonvarna, Co. Clare.

Duration:

October 2007 to March ‘09

Contact:

Kevin Enright, PM

Contract Details: The details of our contract included the supply of plant and labour for the groundworks contract of 164 residential units from green field to floor level. This includes earthworks, drainage, site services, house bases, roads, paths and paving, landscaping, boundary fencing etc. Contract: Cluid Housing Development, Rathgoggin, Charleville, Co. Cork Client: Duration: Contact:

Atlantic Developments, Briarhill, Galway January to December 2007 John Brady, PM

Contract Details: The details of our contract included groundworks for 48 residential units from green field to floor level. This included site excavations, main drainage, house bases, water mains, house services, landscaping, roads, paths and paving etc.

11


Civils Portfolio

Contract: Milestream Housing Development, Shanakiel, Blarney Road, Cork – Phase 2 Main Contractor:

Roadform Ltd.

Client:

Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.

Duration:

April 2007 to August 2008

Contact:

Michael Coleman, MD

Contract Details: The details of our contract included the supply of plant, labour and materials for Phase 2, a groundworks contract for 45 residential units. This includes house bases, boundary fencing, landscapes, services, footpaths, public footpaths, road paving and kerbing etc, from green field to floor level.

Contract: Infrastructure Enabling Works Milestream Housing Development, Shanakiel, Cork Main Contractor:

Roadform Ltd.

Client:

Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.

Duration:

August 2006 to May 2007

Contact:

Michael Coleman, MD

Contract Details: The details of our contract involved the supply of plant, labour, materials and setting out of levels for the construction of a new road junction on the Blarney Rd, and 350 metres of a single carriageway link road to service 104 residential units on a green field site. The project consisted of bulk excavation of 30,000m3 of rock, rock crushing and screening for reuse. Main drainage, water mains, ESB, telecom, gas for house services, public footpaths, boundary walls, slip form kerbing, road paving and the construction of storm water attenuation tank. The earthworks in this project were completed for a proposed site for 104 units which were linked to the Blarney Road with the new link road.

12


Civils Portfolio

Contract: Fairfield Meadows, Fairhill, Cork. Main Contractor:

Roadform Ltd.

Client:

Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.

Duration:

April 2006 to March 2007

Contact:

Michael Coleman, MD

Contract Details: The details of our contract included the supply of plant and labour for the excavation and groundwork’s of 44 residential units from a green field site to floor level. The project consisted of site excavations, rock excavations, main drainage and services, house bases, paths, paving, roadways and landscaping etc.

Contract: Orchard Heights Housing Development, Charleville, Co. Cork Main Contractor:

Burke Building & Civil Eng., Atlantic Road, Lisdoonvarna, Co. Clare.

Duration:

November 2005 to October 2007

Contact:

Kevin Enright

Contract Details: The details of this contract included the groundwork’s contract for 92 residential units. The work carried out was from a green field site to floor level. This project consisted of site excavation, main drainage, water mains, house services, house bases, public roads, paths, paving and landscaping etc.

13


Civils Portfolio

14

Contract: Underground Car Park at Jacob’s Island Development, Mahon, Cork

Main Contractor:

Ridge Developments Ltd. Dunderrow, Kinsale, Co. Cork

Duration:

June 2004 to February 2005

Contact:

Brian Keohane

Contract Details: Construction of an underground car park capable of accepting 70 parking spaces along with bin-stores/bike shed/service areas and two lifts the basement covers the whole footprint of the first 2 blocks. 9000 cubic metres of excavation took place before the piled foundations of up to 17m deep took place. An intricate system of ground beams/pile-caps and in-situ reinforced frame was constructed below high water level. A sophisticated dewatering system allowed construction to continue during heavy rains and high tides throughout the winter.


Civils Portfolio

Contract: Askeaton High Pressure Gas Pipeline to Wyeth Pharmaceutical Factory, Askeaton, Co. Limerick. Main Contractor:

Roadform Ltd & Murjoy Ltd - A joint venture.

Duration:

July 2004 to July 2005

Contact:

Michael Murphy, MD

Contract Details: The details of this contract included the construction of 2.6 km, 150mm high pressure gas pipeline which was a branch off of the main national gas pipeline to supply Wyeth Pharmaceutical Factory in Askeaton. For this project Roadform were the main civil contractors and Roadform's contract was the stripping and benching of an 18meter wide 2.6km way leave through fields, trench excavation, pipe ditching, back-filling and spread reinstatement. Murjoys contract was the connection to the existing main line by means of a hot-tap, 2.6km of pipe welding and construction of an AGI at Wyeth’s.

15


Civils Portfolio

Contract: Brideholm Apartment Developments, Commons Road, Blackpool, Cork. Main Contractor:

Coleman Brothers Developments Ltd, Tower, Blarney, Co. Cork.

Duration:

November 2003 to March 2004

Contact:

Michael Coleman, MD

Contract Details: The details of this contract included bulk excavation for two apartment blocks adjacent to the main CorkMallow Road, Blackpool. The project consisted of excavation of 17,500m3 of rock and 13,000m3 of subsoil. This also involved the disposal of materials off site.

Contract: Ballincollig By-Pass, Ballincollig, Cork Main Contractor:

Gama-Tubin Construction, Greenfields, Ballincollig, Cork

Duration:

August 2002 to March 2003

Contact:

Tansel Attagoue

Contract Details: The details of this contract included the excavation of 50,000m3 of bog land, which was three meters below the water table and filling the excavation with rock on the Poulavone interchange as part of the formation of the main carriageway.

16


Civils Portfolio

17

Contract: Firhouse Road Realignment, Firhouse Rd, Tallaght, Dublin Main Contractor:

Regan Civil Engineering, Halverstown, Killcullen, Co. Kildare.

Duration:

May 2003 to November 2003

Contact:

Eoin Costello, PM

Contract Details: The details of this contract included the supply of all management, plant and labour for this project. This project consisted of realigning of the existing road from the M50 link road to Firhouse School which was approximately 500meters long including the construction of new water mains, storm pipeline, gas and eircom services, a new bus corridor and cycle path, new kerb lines and the paving of the realigned road. This construction work was carried out while keeping the traffic free flowing to and from the M50 interchange.


BUILDING & CIVIL ENGINEERING Civils Portfolio

18

Contract: Curragh Sewerage Scheme, Curragh Camp, Co. Kildare Main Contractor:

Regan Civil Engineering, Halverstown, Killcullen, Co. Kildare.

Duration:

November 2002 to June 2003

Contact:

Eoin Costello, PM

Contract Details: The details of this contract included the supply of all site management, plant and labour for the main contractor. The project consisted of laying storm and foul lines from an existing treatment plant through the Curragh army barracks and the Curragh village. Approximately 1.2km of precast concrete storm pipes (225mm–600mm), 800 meters of precast foul (225mm–450mm), 74 precast manholes and also the replacement of old connections with 225mm concrete into new storm and foul lines. Road and field reinstatement etc.

Contract: Gas Pipeline to the West Bruff, Co. Limerick to Crusheen, Co. Galway.

Client:

P.J. Hegarty Ltd & O’Regan Civil Engineering

Duration:

March 2002 to September 2002

Contact:

John Brady, PM

Contract Details: The details of our contract included the stripping and benching of a 30 metre wide way leave through fields, 96 Km in length, to facilitate the construction of a 96 km 600mm diameter gas pipeline which was part of the national network.


Civils Portfolio

Contract: M1 Motorway, Drogheda By-Pass, Co. Louth Client:

SIAC O’Rourke & O’Regan Civil Engineering

Duration:

March 2001 to October 2001

Contract Details: The details of our contract included the bulk excavation, cut and fill and motorway drainage as part of the formation of the M1.

Contract: Cork Main Drainage, Mahon, Cork Main Contractors:

P.J. Hegarty Ltd & O’Regan Civil Engineering

Duration:

April 2001 to October 2002

Contact:

John Brady, PM

Contract Details: The details of our contract were the supply of site management, plant & labour for a section of drainage on the Cork Main drainage scheme. This consisted of the construction of 1.2kms of two 1200 diameter, ductile iron sewer lines which were in the one trench. The sewer lines were laid on 900m of a public road and 300m in green areas. The majority of the trench depth was from 8 – 10 meters deep. All excavated material was disposed of off site and the trench was backfilled with stone, the complete road was also reinstated, we also excavated for a pumping station which was 8 meters deep in rock. Contract: Ballincollig to Ballineen Gas Pipeline, Co. Cork Main Contractor:

P.J. Hegarty Ltd & O`Regan Civil Engineering

Duration:

June 2000 to October 2000

Contact:

Eoin Costello, PM

Contract Details: The details of our contract included the stripping of top-soil and benching of a 28km long, 18meters wide way leave through fields for the construction of a 300mm diameter high pressure gas pipeline. We were also involved in trench excavations, pipe bedding, and pipe ditching, backfilling and field reinstatement when our stripping contract was completed.

19




Head Office: Roadform Ltd., Bweeng, Mallow, Co. Cork. Tel: 021 7333140 • Fax: 021 7333140 Email: info@roadform.ie

Dublin Office: Roadform Ltd., 3013 Lake Drive, Citywest Campus, Dublin 24 Tel: 01 4693313 Email: info@roadform.ie