Branding Gudielines

Page 1

Version 1.0 18th August 2014

C O R P O R AT E I D E N T I T Y

Trueform Brand Guidelines


Trueform Brand Guidelines

Table of Contents

Table of Contents Why a strong brand is important 3 Our Path Forward - The Next Step

4

The Trueform Brand

5

Trueform Logo

Trueform Imagery Imagery

15

Business Card

25

Imagery Dont’s

16

Envelope

26

Letterhead

27

Compliment Slip

28

Van Livery

29

Website

30

Trueform Illustration Style Illustration Style

Preferred Logos

6

Alternative Logos

7

On Screen Logos

8

Clear Space

9

Applications

17

Typography The Trueform Primary Typeface

18

Email Signature

31

System Typeface

19

Staff Uniforms

32

Exhibition Graphics

33

Tender Proposals

34

Tender Return Document

35

Scaling the Trueform Logo

10

How to Build a Layout

On Backgrounds

11

Sample Brochures

20-21

Logo Dont’s

12

Sample Flyers

22-23

Trueform Colours

Powerpoint Templates

36-37

Factsheet 38

Primary Colour Palette

13

Product Catalogue

39-40

Secondary Colour Palette

14

HTML Newsletter

41

Opera Templates

42

External Policy Documents

43

Internal Policy Documents

44

Order Forms

45

Commercial Invoice

46

Sales Quotation

47

Delivery Notes

48

Signage 49-50

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

2


Trueform Brand Guidelines

Why a strong brand is important Trueform is driven by a clear purpose: Working together to transform public transportation through design, innovation & technology. Across the Trueform organization, we are unified in our approach and collaborative in our efforts to improve the journey experience for commuters, passengers and visitors. This effort applies to everything we do — from our methodology, to our manufacturing processes, to the tone, look, and feel of our communications. This document was developed to help us work together to build consistent, branded communications that collectively build Trueform’s reputation in the communities we serve. Using these guidelines will enable us to create materials that speak to specific audiences while maintaining one, unified voice. Together, we can contribute to Trueform’s reputation as a leader in public transport systems and specialist engineering solutions.

Version 1.0 18th August 2014

3


Trueform Brand Guidelines / Strategy and Messaging

Our Path Forward - The Next Step

Our Path Forward - The Next Step Our Purpose

The Promise We Make: Our Commitments

Our Strategies

What We Stand For: Our Values

The definitive statement about the difference we are

How can Trueform uniquely serve the world’s diverse

Generalized statements of the long-term tactics we

Our values represent our core beliefs. They inform

trying to make in the world:

transport needs like no other company? The answer

aim to achieve to advance the business

our decisions and guide our actions every day. This

Transforming public transportation through design, innovation and technology It is the reason we exist and why we come to work each day. We are in the business in bringing better transport solutions to more people around the world. Our Mission Trueform’s mission is to: Provide intelligent public transport systems and specialist engineering solutions for all modes of passenger transport

is in the commitments that show the world what we can contribute. We will: • Offer full ‘end-to-end’ service including all the key

• Optimize the patent-protected portfolio • Find and capitalize on new opportunities for established products

reflects our increased focus on serving the needs of our customers. We need to work more closely with partners inside and outside of Trueform, and the concept of collaboration expresses this orientation

• Grow in emerging markets

more precisely. These are Trueform’s enduring

Manufacture, Installation, Life Time Maintenance

• Grow our diversified businesses

values:

• Provide the crucial advice, guidance, practical

• Instill a culture of innovation and continuous

• Customer focus

improvement

• Community

stages: Audit, Analysis, Specification, Design,

assistance, components and management tools to enable transport departments in leading World cities to develop, implement and run 21st Century, well managed public transport systems • Continue to provide some of the largest and most

• Respect for people • Performance • Collaboration

successful public transport systems in the World

• Leadership

with their supporting infrastructure and systems

• Integrity

within the bus, over ground and underground rail

• Quality

and air passenger transport industry

• Innovation They describe the type of company we want to be, and we should demonstrate them in everything we do.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

4


Trueform Brand Guidelines / Visual Identity

The Trueform Brand Trueform logo Trueform colours Trueform imagery Trueform illustration style Typography How to build a layout

Version 1.0 18th August 2014

5


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo Colours: Preferred

Preferred Logos We have several logo versions, so be sure to use the proper logo for the right application. Use the 2-color positive logo whenever possible. Use the preferred CMYK positive logo when only CMYK printing is available. These versions of the logo are provided as scalable vector artwork (EPS). EPS format allows high-quality print reproduction. EPS files can be scaled to any

1 Colour (positive)

CMYK (positive)

Use this version for premium print applications

Use this version when only CMYK printing is

size without sacrificing image quality. You may use

Pantone

these files in page layout and graphics programs

Cool Gray 9

for print projects. Additionally, EPS format files may also be used to create files in any of the other image

available CMYK 55 / 47 / 44 / 10

formats at exactly the sizes required.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

6


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo Colours: Alternative

Alternative Logos Use these logos when the preferred logos cannot be used. They are designed to provide legibility for specific application types. These versions of the logo are provided as scalable vector artwork (EPS). EPS format allows high-quality print reproduction. EPS files can be scaled to any size without sacrificing image quality. You may use these files in page layout and graphics programs for print projects. Additionally, EPS format files may also be used to create files in any of the other image

Black

White

Use this version when the application requires a

Use this version when the application requires a

simplified mark in black (e.g., fax sheet, premium

simplified mark in white and the background is

items, small sizes, silkscreen, etc.).

too dark to allow use of the preferred mark or the

formats at exactly the sizes required.

1-colour alternate version (e.g. reverse applications, premium items, small sizes, silkscreen, etc.).

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

7


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo Formats: On Screen

On Screen Logos These versions are used for all desktop and on-screen applications. RGB logo files are provided in JPG and PNG file formats. These versions are also provided as scalable vector artwork (EPS). Additionally, EPS format files may also be used to create files in any of the other image formats at exactly the sizes required.

RGB (positive)

RGB (reverse)

Use JPG format logos for PowerPoint速

This is the preferred version for internet, video, TV,

Use this version when the application requires a

email signatures, Microsoft applications, etc

simplified mark in white and the background is too

presentations, Microsoft速 Word速 documents, and other office applications. You may use JPG files for

RGB

printing on low-resolution printers such as laser or

120 / 119 / 122

ink-jet printers. JPG format logos are never used for high resolution printing, and they are never scaled to

dark to allow use of the preferred mark RGB 255 / 255 / 255

larger sizes. Additionally, use PNG files when transparent backgrounds are required, such as websites and when placing the logo on a background that is not white.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

8


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo: Clear Space

Clear Space Always surround the Trueform logo with the amount of clear space shown to ensure that the logo is easily identifiable as well as visible and legible wherever it appears. Clear space is the minimum “breathing room” maintained around our logo. It also defines the minimum distance between the logo and the edge of a printed piece. The clear space around our logo is equal to the height of the ‘T’ of the Trueform logo. Do not position any text, graphic elements, or other visual marks inside the recommended clear space. Please note that this distance may sometimes be adjusted for select online or exterior signage applications where space is limited.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

9


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo: Scaling the Trueform Logo

Scaling the Trueform Logo EPS logo files may be scaled to any size necessary for the application, as long as the minimum size requirements are met. For most applications, the logo will be sized at heights of less than 15mm. Minimum size refers to the smallest allowable logo size. The logo is available in one size that can be scaled down to a minimum size of 5mm high for the preferred logo. Always maintain the logo’s aspect ratio when scaling. 5mm Preferred logo minimum size

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

10


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo: On Backgrounds

On Backgrounds Place the logo on backgrounds that provide good contrast and legibility to ensure that it is clearly recognizable.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

11


Trueform Brand Guidelines / Visual Identity / Trueform Logo

Logo: Dont’s

Logo Dont’s Ensure that our logo is clearly recognizable by using it properly, and do not alter it in any circumstances. Consider the logo version and the background it is placed on to provide the best legibility. The examples

DO NOT change the logo’s colour

DO NOT change the logo’s proportions

DO NOT add drop shadows or other effects to the logo

DO NOT outline the logo

DO NOT rotate the logo

DO NOT lock up product identifiers or product descriptions with the logo

DO NOT place the logo on a complicated background or a background that reduces its legibility

DO NOT use the logo in a holding box or other shape

DO NOT use the preferred logo on a tint of Pantone Cool Grey 9

DO NOT crop the logo

DO NOT alter the height of any of the letters used within the logo

show various uses to avoid.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

12


Trueform Brand Guidelines / Visual Identity / Colour Palette

Colour Palette

Primary Colour Palette The colour palette is made up of the Trueform grey

Corporate Grey

Corporate Black

Corporate Red

and supportive neutral colours (black, red, and white). The secondary colour palette consists of a complementary set of colours that tie in with the different product categories within the Trueform

40%

brand.

20%

10%

Whenever an application is referring to multiple

Pantone

Pantone

Pantone

product categories or Trueform in general as a brand

Cool Gray 9

Black C

485

the primary colour palette must be used.

CMYK

CMYK

CMYK

55 / 47 / 44 / 10

0 / 0 / 0 / 100

5 / 98 / 100 / 0

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

13


Trueform Brand Guidelines / Visual Identity / Colour Palette

Colour Palette

Secondary Colour Palette Counter Terrorism

Wayfinding

Bus & BRT

Signage

Whenever an application is referring to multiple

CMYK

CMYK

CMYK

CMYK

product categories or Trueform in general as a brand

0 / 39 / 70 / 10

10 / 20 / 60 / 0

0 / 60 / 60 / 30

10 / 60 / 30 / 40

Electronic Displays

Airports

Rail

Design & Build Metalwork

CMYK

CMYK

CMYK

CMYK

20 / 0 / 10 / 20

20 / 0 / 41 / 20

20 / 38 / 10 / 20

20 / 20 / 60 / 33

The colour palette is made up of the Trueform grey and supportive neutral colours (black, red, and white). The secondary colour palette consists of a complementary set of colours that tie in with the different product categories within the Trueform brand.

the primary colour palette must be used.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

14


Trueform Brand Guidelines / Visual Identity / Imagery

Imagery

Imagery Subject matter • Real life (not staged, posed, or fictional) • Optimistic and warm (or neutral) • Singular concept/subject per image • Advancing progress/positive change Style • Natural lighting (no extensive photo-retouching) • Bright tonal range • Clear/Sharp focus on subject matter • Clean, simple areas of “white space”

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

15


Trueform Brand Guidelines / Visual Identity / Imagery

Imagery Dont’s

Imagery Dont’s

DO NOT use dark imagery

DO NOT use stylised posed imagery

DO NOT distort imagery

DO NOT crop products poorly

DO NOT use low resolution imagery

DO NOT use imagery with a busy background

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

16


Trueform Brand Guidelines / Visual Identity / Illustration Style

Illustration Style

Illustration Style The Trueform illustrations will help to create a proprietary look across Trueform communications as well as convey the aspirational qualities within Trueform’s purpose and mission.

Positive

Reverse

When illustration is positive on a light background it can appear as a tint of Pantone

When illustration is reversed out on a dark background it can appear as a tint of

Cool Gray 9 or 100% Pantone Cool Gray 9

Pantone Cool Gray 9 or white

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

17


Trueform Brand Guidelines / Visual Identity / Typography

Typography

The Trueform primary typeface Trueform’s primary typeface is Helvetica Neue Modern, flexible, easy to read, open, and accessible, Helvetica Neue is uniquely suited for a wide range of visual communications. Multiple levels of typographic hierarchy are defined both for impact and clarity of our communications. When to use Use Helvetica Neue for all Trueform printed communications where possible. Use Helvetica Neue in rendered form for online and electronic applications. When use of Helvetica Neue is not possible, use the recommended system typeface. The weights shown for Helvetica Neue are approved for use.

Helvetica Neue 35 Thin Helvetica Neue 36 Thin Italic Helvetica Neue 45 Light Helvetica Neue 46 Light Italic Helvetica Neue 55 Roman Helvetica Neue 56 Italic Helvetica Neue 65 Medium Helvetica Neue 66 Medium Italic Helvetica Neue 75 Bold Helvetica Neue 75 Bold Italic

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

18


Trueform Brand Guidelines / Visual Identity / Typography

Typography

System typeface Trueform’s system typeface is Arial. Only use it when Helvetica Neue is not available. When to use Situations where Helvetica Neue cannot be used include but are not restricted to: Microsoft PowerPoint, Microsoft Word documents, or HTML content on web applications.

Arial Regular Arial Italic Arial Bold Arial Bold Italic

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

19


Trueform Brand Guidelines / Visual Identity / How to Build a Layout

Sample Brochures

cation

Sample Brochures

p system has been of installation and and installation options requirements.

Why choose Trueform?

ons rectly and securely over

Additional Options ts (patentedInstallation system), thus

A POWERFUL MARKETING & PR PLATFORM

Trueform have a proven track record in the provision of integrated and co-ordinated public transport infrastructure.

any excavation required he post can also be fitted directlyorand securely over

he top offloor existing 76mm posts (patented system), thus shed surfaces.

A powerful marketing tool

nsuring that there will not be any excavation required or

Various flag size options

Easy fitting of display material

Full colour flag graphics

isruption to pavement or finished floor surfaces.

Fully modular designs

Mobility is the central basis for economic growth and

Trueform have a proven track record in the provision of

prosperity in our globalized world, both in urban centres of

integrated and coordinated public transport solutions that

population and in less densely populated areas. Trueform

attract travellers by successfully transforming the waiting

ELITE BUS STOP SYSTEM These examples demonstrate how type, imagery, ©

Foundation Options

provide intelligent public transport solutions to meet this

experience. This is based on a sound understanding of the

basic requirement.

travellers requirements - both now and projected into the future.

Trueform blend specialist public transport design

5:00

5:13

5:59

5:30

6:12

6:59

5:40

6:29

7:12

7:58

5:49

6:39

7:28

8:09

6:48

7:38

8:23

7:47

8:33

8:42

NOTE: This route operates short turn trips.

6:30

6:43

7:24

8:06

El Camino Real & Avd Santa Margarita

El Camino Real & Avd Pico

7:17

8:02

8:53

9:48

9:23

10:10

10:27

10:59

11:12

11:29

11:33

11:52

12:01

12:15

12:32

12:12

12:35

12:55

1:04

1:18

1:13

2:10

2:20

2:31

1:44

1:57

2:46

1:46

2:14

2:59

2:47

3:15

3:11

3:48

3:21

4:13

1:36 2:53

3:36

4:23

3:54

4:37

4:55

3:30

3:46

3:59

4:15

4:48

5:13

5:22

5:34

5:50

4:30

4:46

4:59

5:15

5:43

6:04

6:13

6:25

6:40

5:34

5:48

6:00

6:15

6:40

6:59

7:07

7:19

and telecommunications cables for lighting and real-time information display systems.

8:18

9:06

9:57

10:50

11:11

11:58 12:58

10:46

10:31

7:04

7:49

8:44

9:29

10:57

11:47 12:46

1:30 2:29

10:09

6:51

7:40

8:27

9:07

9:55

Pacific Coast Hwy & Dana Point Harbor

Newport Transportation Center

Pacific Coast Hwy & Balboa

Laguna Beach Bus Station

6:11 7:05

7:51 8:53

9:44

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & 1st

Warner & Pacific Coast Hwy

7th & Channel

Pacific Coast Hwy & 10th

9:32 10:34

5:22

6:50

7:02

7:15

7:38

7:56

8:04

8:15

8:29

7:51

8:02

8:15

8:33

8:49

8:56

9:07

9:21

T: 020 8561 4959 F: 020 8848 1397 www.trueform.co.uk

AJO CITIE R S

R

M O C A D A/A

L

D

EA

D

R

Choice of finial options

Flag Signage Graphics Trueform’s in-house signage graphics department can produce tailor made full colour flag graphics to suit

AY S PL IS D

ER

IC

PO W

TR O N EC EL

SO

The world’s most intelligent, attractive & adaptable bus stop

Trueform Engineering Ltd ı 12 Pasadena Close ı Hayes ı Middlesex UB3 3NQ T. 020 8561 4959 ı F. 020 8848 1397 ı sales@trueform.co.uk ı www.trueform.co.uk

Route number tile fitting

Clear information graphics

LED solar powered options

Mounted in single, double or triple configurations the ‘Elite’

the stop. The curved upper surfaces also help prevent litter

Trueform have a comprehensive ‘off the shelf’ range of

Robust, vandal resistant and future proofed, the bus

innovative bus stop designs to suit virtually all customer

stops provide both riders and local councils the following benefits:

and drink cans from being placed in top of the structure.

Special Flag Options Trueform supply a range of attractive display sign

and solar powered illumination. Solar energy is a long term,

flags, each capable of fitting to the new ‘Elite’ post, to

cost effective method of illuminating bus stops. Trueform is

conventional square sign posts or to lighting columns. The sign plates are of a unique curved cross section construction for maximum strength and resistance to vandalism. The flags can be quickly and effortlessly

Fitting channel for DOT signs

promotion of public transport (branding or routes

• Robust, long lasting materials & finishes

and services)

• Easy to maintain for long lasting appearance

transport • A platform for the quality presentation of travel information – the shop window for your public

removed from the post to enable route number changes to be carried out safely at ground level.

Easy Fitting of Display Material

• Safe, eco friendly LED solar powered illumination courtesy lighting

There are various display mounting options available

• Full compliance with regulations and guidelines (ADA)

one specifically developed to give quick and easy

The choice of many major cities

to suit your present and future requirements, each operation with maximum long lasting clarity of display.

Route Tile system Route tiles can be readily interchanged using quick release

• Ability to accept RTI displays and touch Journey Planning modules

tamper proof fixings. This system enables quick effortless

• Future proofed and technology enabled

travel information

developed to be long lasting and are flush fitting at the rear

The Elite Bus Post System can be supplied in both mains

• Fully modular designs

• A powerful marketing & PR platform for the

display case fixing brackets are specially designed and

Solar Power Lighting

cleaner green energy on street furniture.

Benefits of the Elite Bus Stop System

• A platform for the delivery of advanced electronic

Quick release fittings

• Fully Integrated - Concealed Wiring

Single, Double and Triple Display Options

to prevent litter or incendiary devices being placed inside

bus service

WIDE RANGE OF ATTRACTIVE FINISHES

Quality route presentation

publicity material and available in an array of polyester

• A vehicle for improving the image of public

QUALITY PRESENTATION OF TIMETABLE INFORMATION

Elite pole cross section

static and electronic display platforms

customer requirements.

injection moulded polycarbonate. Display cases can

leading the way in the provision of sustainable design and

STRONG, LONG LASTING & LIGHTWEIGHT CONSTRUCTION

• Optional Solar Power, Touch Screen Display, RTI and Audio Information

www.trueform.co.uk sales@trueform.co.uk accounts@trueform.co.uk

Special flag options

be supplied in a wide range of sizes to suit most route

ELITE BUS STOP Innovative System for Bus, BRT & Tram

LA R

R AT IO N

TO TE M S

TE G

IO N

IN

R M AT

SY

IN

U

ID

TO

FO

S

FO RT

R EE N

O M

H

C

SC

TIV E

C

ER

ST EM

K IO SK S

R AIL

M AT

O

R FO

TI

IN TIM

&

E

AN

SE D AN

TY

TV

FE

C C

• Future Proofed - Can Incorporate the Latest ITS electronic Hardware

C

U

R

TE

R

IT

R

Y

• Modular system - Quick Release Fixings

SA

A Socket Option

The c h of ma oice ny M

IO N

IS

6:36 7:39

W AY S

Features

7:33

6:25 7:29

Safe & eco friendly

from highly durable aluminium alloy and exterior quality

ES

4:45 5:45 6:45 7:45 8:45

5:59 6:52

7:41 8:43

11:35 12:33

1:18 2:16 3:18 4:18

Tactile bumper foot

Trueform have provided over 45,000 bus stops globally and have unrivalled expertise in the quality presentation of on street bus information, providing both

VIC

4:19 5:19 6:19 7:23 8:24

5:49 6:42

7:30 8:32

9:23 10:25

5:12 6:15 7:19

G

3:52 4:54 5:55 6:59 8:02

SUNDAY AND HOLIDAY: Southbound TO: San Clemente

5:39 6:32

7:22 8:24

11:26 12:23

1:08 2:06 3:08 4:08

Elegant and Robust Route Display Cases

R

3:40 4:42 5:44 6:48 7:51

Long Beach to San Clemente via Pacific Coast Hwy

5:31 6:24

7:14 8:16 9:14 10:16

IN

3:24 4:28 5:30 6:34 7:36

5:23 6:16

11:17 12:13

• Lightweight, modular components for fast and safe erection on site

Robust, vandal resistant & future proofed

SE

3:10 4:13 5:15 6:19 7:21

Route 1

The post also has provision for the installation of electrical

E

3:53 4:53

C

2:52

3:41 4:42

AN

1:51

2:42

3:30 4:31

N

7:46 8:45 9:46 10:48 11:50 12:48

1:41

2:30

3:13 4:15

TE

7:36 8:35 9:36 10:39 11:40 12:37

1:29

2:13

2:59 4:01

AIN

7:26 8:26 9:27 10:28 11:29 12:27

1:12

1:59

2:43 3:44

M

7:12 8:12 9:13 10:13 11:13 12:11

12:59

1:43

2:17 3:18

Elegant & robust

ADVANCED BUS STOPS

requirements.

E M LEC AIN T TE RIC N AL AN CE

10:46

1:51 2:52

ST

7:02 8:02 9:03

12:44

1:16

1:40 2:41

PO

10:22

10:03 11:02 11:59

12:20

1:24 2:25

Y

6:50 7:50 8:50 9:50 11:45

11:59 12:53

10:52

1:10 2:11

Simplicity

IT

El Camino Real & Avd Pico

Pacific Coast Hwy & Superior

Newport Transportation Center

6:29 7:29 8:29 9:29 11:21

11:48 12:42

10:38

10:03

Pacific Coast Hwy & 1st

Laguna Beach Bus Station

6:11 7:11 8:11 9:10 11:02

11:32 12:26

10:25

9:53

Warner & Pacific Coast Hwy

Pacific Coast Hwy & Crown Valley

6:01 7:01 8:01 9:00

9:39

7th & Channel

Pacific Coast Hwy & Del Obispo

5:47 6:47 7:47 8:46

9:26

Pacific Coast Hwy & Bolsa

El Camino Real & Avd Santa Margarita 5:34 6:34 7:34 8:33

11:18 12:12

in a wide range of colours.

ES

8:35 9:32

VIC

1:49 2:49 3:49 4:53 5:53 6:49 7:42

8:19 9:16

R

8:34 9:34 10:38 11:41 12:47

1:32 2:32 3:32 4:36 5:36 6:32 7:25

8:05 9:03

SE

7:28

8:18 9:18 10:21 11:23 12:29

5:22 6:18 7:11

7:56 8:54

R

El Camino Real & Avd Santa Margarita

El Camino Real & Avd Pico 7:12

8:05 9:05

1:17 2:17 3:17 4:22

5:12 6:08 7:02

NOTE: This route operates short turn trips.

N

7:39 8:38

TIO

6:42

8:15

10:07 11:09 12:15

1:07 2:07 3:07 4:12

4:49

6:15 7:15

8:00

7:01

7:55 9:57 10:58

2:46 3:49 5:45

5:59 7:00

7:50

LLA

4:59

12:04

1:46

2:15 3:15 4:15 5:15

5:47 6:50

7:36

IC

12:46

1:15

1:59 2:59 3:59

5:32 6:36

7:26

4:47

8:55

9:39 10:40 11:43

12:15

1:47 2:47 3:47

4:32

6:52

7:38 8:38

9:15 10:15 11:15

11:59 12:59

4:21

Pacific Coast Hwy & Dana Point Harbor

Laguna Beach Bus Station

Newport Transportation Center

Pacific Coast Hwy & Balboa

10:48

6:36

7:15 8:15

9:00 10:00 11:00

11:47 12:47

1:31 2:32 3:32

5:20 6:24

7:17

BL

10:33

6:15

7:00 8:00

8:50 9:49

11:31 12:31

1:19 2:21 3:21

4:10

STA

10:23

6:02

6:50 7:50

8:37 9:36

11:19 12:19

1:09 2:10 3:10 5:09 6:15

PU

10:14

5:53

6:37 7:37

8:28 9:26

11:09 12:09

6:48

IN

5:42

6:28 7:28

8:19 9:17

1:49 2:49 3:52 4:52 5:48 7:47 8:42

EM S

5:33

6:20 7:20

10:45

6:37

ST

12:46

1:38 2:38 3:41 4:41 5:37 7:37 8:32

6:27

SY

10:34

8:23

6:12

IO

5:25

8:43 9:44 11:45

12:35

1:28 2:28 3:29 4:29 5:27 7:27

8:10

6:00

D

10:23

2:13 3:14 4:14 5:12 7:12

7:59

5:45

Long Beach to San Clemente via Pacific Coast Hwy

AY S

7:37

8:33 9:34 11:34

12:24

1:13

2:01 3:01 4:01 5:00 7:00

7:45 8:45

5:17 6:17

SUNDAY AND HOLIDAY: Northbound TO: Newport Transportation Center or Long Beach

PL

10:10

7th & Channel

7:27

8:22 9:23 11:23

12:10

1:01

1:45 2:45 3:45 4:45 6:45

7:22 8:23

4:48 5:49

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & Bolsa

7:20

8:09 9:10 11:10

11:59

1:18 2:17 3:17 4:17

Pacific Coast Hwy & 1st

Warner & Pacific Coast Hwy

7:08

7:58 8:59 9:59 10:59

11:45 12:45

10:23

1:48 2:48 3:48

6:57 7:59

4:36 5:38

IS

9:23

Pacific Coast Hwy & 1st

6:57

7:45 8:45 9:45 10:45

12:18

10:02

1:36 2:36 3:36

6:47 7:50

4:21 5:23

D

9:02

Pacific Coast Hwy & Superior

6:45

7:25 8:23

11:21

11:54 12:54

9:50 10:48

6:32 7:35

G

8:50

Newport Transportation Center

6:26

7:07 8:02

10:59

11:43 12:43

1:21 2:21 3:21

Warner & Pacific Coast Hwy

Laguna Beach Bus Station

6:09

6:56

8:35 9:35 10:32

7th & Channel

Pacific Coast Hwy & Crown Valley

5:58 7:51

11:28 12:28

6:18 7:22

Route 1

architectural grade anodising and polyester powder coating

s

5:44 6:42 7:37

8:21 9:21

1:06

Pacific Coast Hwy & 10th

Pacific Coast Hwy & Del Obispo

El Camino Real & Avd Pico

El Camino Real & Avd Santa Margarita 5:30 6:28 7:23

11:13 12:13

3:07

El Camino Real & Avd Santa Margarita

NOTE: This route operates short turn trips.

M

6:16 7:30 8:16 9:16

SATURDAY: Southbound TO: San Clemente

AU

6:06 7:20 8:07 9:07

Long Beach to San Clemente via Pacific Coast Hwy

SATURDAY: Northbound TO: Newport Transportation Center or Long Beach

AT

5:53 7:09 7:55 8:55

Effective September 9, 2007

Route 1

sign posts. Durable exterior quality finishes, including

IN

3:07 4:09 5:11

5:43 6:59 7:47 8:47

6:49 7:31 8:10 8:46

TIS

1:04 2:05

3:58 5:00

5:29 6:47 7:37 8:37

El Camino Real & Avd Pico

Pacific Coast Hwy & Bolsa

9:13 9:38 10:05 10:35 11:05 11:35 12:05 12:36 1:07 1:42 2:13 2:44 3:15 3:50 4:21 4:52 5:23 5:54 6:25 6:56 7:19 7:51 8:15 8:57 9:41 10:41

6:35 7:16 7:53 8:30

VE R

12:02

1:54 2:56

3:44

8:57 9:22 9:49 10:19 10:49 11:19 11:49 12:20 12:51 1:26 1:57 2:28 2:59 3:33 4:04 4:35 5:06 5:37 6:08 6:39 7:03 7:35 8:01 8:43 9:27 10:27

Route 1

Pacific Coast Hwy & Dana Point Harbor

Warner & Pacific Coast Hwy

7th & Channel

11:50 12:52

1:40 2:42

4:46

6:21 7:01 7:39 8:01 8:16 8:31 8:43 9:08 9:35 10:05 10:35 11:05 11:35 12:06 12:37 1:12 1:43 2:14 2:45 3:18 3:49 4:20 4:51 5:22 5:53 6:24 6:50 7:22 7:49 8:31 9:14 10:14

R AC

10:36

3:33

6:12 6:52 7:30 7:51 8:06 8:21 8:33 8:58 9:26 9:56 10:26 10:56 11:26 11:57 12:28 1:02 1:33 2:04 2:35 3:08 3:39 4:10 4:41 5:12 5:43 6:14 6:41 7:13 7:41 8:23 9:06 10:06

9:58 10:59

11:37 12:39

1:29 2:31

4:35

5:58 6:36 7:12 7:33 7:48 8:03 8:15 8:25 8:40 9:09 9:39 10:09 10:39 11:09 11:40 12:11 12:43 1:14 1:45 2:16 2:48 3:19 3:50 4:21 4:52 5:23 5:54 6:23 6:55 7:24 8:06 8:49 9:49

TE

10:26

9:48 10:49

11:26 12:28

1:18 2:20 3:22

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & Crown Valley

Pacific Coast Hwy & 1st

Laguna Beach Bus Station

9:35

11:15 12:17

4:24

Newport Transportation Center

9:25

10:17

Laguna Beach Bus Station

Newport Transportation Center

Pacific Coast Hwy & Balboa

Pacific Coast Hwy & 1st

Pacific Coast Hwy & Superior

8:05 9:01 9:54

Warner & Pacific Coast Hwy

El Camino Real & Avd Pico

7th & Channel

Pacific Coast Hwy & Del Obispo

6:22 7:15

7:56 8:53 9:46

5:41 6:17 6:48 7:08 7:23 7:38 7:50 8:00 8:14 8:44 9:14 9:44 10:14 10:44 11:15 11:46 12:17 12:48 1:19 1:50 2:21 2:52 3:23 3:54 4:25 4:56 5:27 5:59 6:31 7:03 7:45 8:30 9:30

6:03 6:34 6:53 7:08 7:23 7:54 8:58

9:16

2:00 3:06 4:09 5:14

6:10 7:04

7:48 8:45 9:38

Pacific Coast Hwy & 10th

El Camino Real & Avd Santa Margarita

1:50 2:55 3:58 5:03

5:59 6:55

7:35 8:34 9:27

5:53 6:24 6:57

7:44 8:48

IN

Rey

1:41 2:44 3:47 4:52

5:43 6:41

7:25 8:25 9:18

5:45 6:14 6:46

7:31 8:35

SK S

3

191A

1:28 2:29 3:32 4:37

5:28 6:28

5:37 6:05 6:36

7:20 8:25

IO

19

San Luis

191,

Presidio

Avd Santa Margarita 191 ; Christianitos NCTD 395

91,

1:16 2:16 3:18 4:23

5:29 5:57 6:28

7:11 8:16

K

Pico

191

Guadalajara

Avd

6:25 7:20 8:43 9:52 10:54 11:52 12:58

E

dV

Calafia

Av

1 r 19 Ma

6:16 7:11 8:33 9:42 10:44 11:42 12:48

Solar power lighting

Specialist Features

©

collaborative and rigorous, intelligent as well as inventive.

N

el

NOTE: This route operates short turn trips.

MONDAY - FRIDAY: Southbound TO: San Clemente or Dana Point

6:09 7:03 8:25 9:33 10:35 11:33 12:39

• Stainless steel & aluminium construction for long lasting performance and appearance

O

D

Avenida

3 Estrella 19 de s are sM Camino Lo 191 C a mino de

5:24 5:56 6:26 6:56 7:33 8:26 9:28 10:28

5:57 6:50 8:13 9:21 10:23 11:21 12:26

• Robust, vandal, graffiti and weather resistant materials and finishes

AD

91

Route 001/073107

5:48 6:40 8:02 9:11 10:13 11:11 12:14

Strength & Performance

ER S

Obispo

5:12 5:45 6:15 6:45 7:24 8:17 9:19 10:19

5:37 6:28 7:14 7:50 8:25 8:57 9:29 9:59 10:28 10:57 11:28 11:58 12:30 1:00 1:31 2:01 2:32 3:01 3:34 4:05 4:38 5:09 5:42 5:59 6:12 6:42 7:12 7:42 8:12 9:05 10:05 11:05

variety of configurations including over existing square

PH

Del

4:58 5:30 6:00 6:30 7:11 8:04 9:07 10:07

5:21 6:07 6:52 7:26 8:02 8:34 9:06 9:36 10:05 10:34 11:01 11:31 12:03 12:33 1:04 1:35 2:06 2:32 3:05 3:36 4:09 4:40 5:13 5:30 5:46 6:18 6:48 7:18 7:52 8:45 9:46 10:46

release tamper proof fixings, ability to be installed in a

LE

int

5:05 5:50 6:35 7:06 7:41 8:13 8:45 9:15 9:44 10:13 10:39 11:09 11:41 12:11 12:42 1:12 1:43 2:08 2:41 3:12 3:44 4:15 4:48

easy handling, special recessed channels for fitting quick

TE

Del

Prado

o Dan a P r Ha rb o

Center

Avocado 89 Coast MacArthur Newport Broadway 85; Valley Crown 581 85 LBMTL Selva 70, 85 Bay Lantern Golden

Newport

Pa i c f ic Co a st H wy C ap si tr a no

71

Monarch

Jamboree

47,

35

no

33

Newport 55 Dover

Superior

29

42/42A

Brookhurst

Magnolia

Beach

72 21, 70, 173 Warner 29, 172, 1st 25,

Seal Beach

Bolsa

4:56 5:40 6:25 6:56 7:30 8:02 8:34 9:04 9:33 10:02 10:29 10:59 11:31 12:01 12:32 1:02 1:33 1:58 2:31 3:02 3:32 4:03 4:36

2:06

7th

Westminster

Ma dri d

D

131, 171 10th

LBT A,

al

2nd

Main LBT

Numbers on streets indicate transfers. Números en la calle indican trasbordos.

Orange County Transportation Authority

Long Beach to San Clemente via Pacific Coast Hwy

MONDAY - FRIDAY: Northbound TO: Newport Transportation Center or Long Beach

4:43 5:26 6:11 6:43 7:15 7:47 8:19 8:49 9:18 9:47 10:14 10:44 11:16 11:46 12:17 12:46 1:17 1:43 2:16 2:47 3:17 3:48 4:21

Strong, lightweight construction for improved safety and

ELT

Rey

METRO

1, 55, 57, 75, 76, 79

Route 1

Route 1

5:09

L E Y E N D A

TR STA AN TIO SIT N AN S D

3

191A

VA HOSPITAL CSULB AREA 1, 50, 60; LBT: 81, 91, 92, 93, 94, 171, D, ZAP 96; METRO: 577x

/

Scheduled Departure Regular Routing Southbound Only No Service On Some Trips = Long Beach Transit = North County Transit District (San Diego) = Laguna Beach Municipal Transit Lines = Los Angeles MTA

C E

19

San Luis

191,

Presidio

Avd Santa Margarita 191 ; Christianitos NCTD 395

91,

1, 89; LB MTL: Canyon, North, South

N E

MAP NOT TO SCALE

LONG BEACH

Studebaker

SEAL BEACH

L E G E N D

LBT NCTD LB MTL

N

Pico

191

Guadalajara

Avd

S Bellflower Channel

PCH

PCH AND 1ST 1, 25, 29, 172, 173

IA

dV

Calafia

Av

1 r 19 Ma

st w y a H ic C o cif Pa

47

NEWPORT CENTER/ FASHION ISLAND

NEWPORT TRANSPORTATION CENTER/PARK-AND-RIDE

PL

el

oa

71

Nicolas

O PS

D

Avenida

3 Estrella 19 de s are sM Camino Lo 191 C a mino de

Re am i no

San

achieve all of these things our design approach has to be

SH

91

B alb

CORONA DEL MA R

LAGUNA BEACH BUS STATION

should be unambiguous and clearly presented. To

ST

Obispo

Pa i c f ic Co a st H wy C ap si tr a no

Del

E lC

SUNSET BEACH

WARNER LOOP 1, 21, 70, 72

HUNTINGTON BEACH

NEWPORT BEACH

LAGUNA BEACH 187

5

qu ero

SUPPORTIVE SALES & ADVISORY TEAM READY TO WORK WITH YOU

everyone. Graphic, service and operational information

SIT

int

191

5

a

should be highly visible, distinctive and easy to use, by

SIT

Del

Prado

o Dan a P r Ha rb o

Center

Avocado 89 Coast MacArthur Newport Broadway 85; Valley Crown 581 85 LBMTL Selva 70, 85 Bay Lantern Golden

Newport

no

71

Monarch

Jamboree

47,

35

Ma dri d

33

Newport 55 Dover

Superior

29

NOTE: This route operates short turn trips. W

i C am

ta is Ola V

4:32 5:13 5:58 6:28 6:59 7:31 8:03 8:33 9:02 9:31 9:59 10:29 11:01 11:31 12:02 12:31 1:02 1:28 2:01 2:32 3:01 3:32 4:05

4:07

L E Y E N D A

Numbers on streets indicate transfers. Números en la calle indican trasbordos.

A

DANA POINT

10:17

/

Scheduled Departure Regular Routing Southbound Only No Service On Some Trips = Long Beach Transit = North County Transit District (San Diego) = Laguna Beach Municipal Transit Lines = Los Angeles MTA

LB MTL METRO

1, 55, 57, 75, 76, 79

Route 001/073107

S E R V I C I O

Corona del Mar - Emerald Bay Laguna Beach - Laguna Beach Bus Station - Laguna Beach Civic Center - Monarch Bay - South Coast Medical Center Dana Point - Salt Creek Beach Capistrano Beach San Clemente - San Clemente (Metrolink Station)

CAPISTRANO BEACH

4:43 5:15 5:45 6:15 6:56 7:49 8:54 9:54

VA HOSPITAL CSULB AREA 1, 50, 60; LBT: 81, 91, 92, 93, 94, 171, D, ZAP 96; METRO: 577x

L E G E N D

LBT NCTD NEWPORT TRANSPORTATION CENTER/PARK-AND-RIDE

Orange County Transportation Authority

/

SAN CLEMENTE METROLINK STATION

15

N E

MAP NOT TO SCALE

LONG BEACH

Studebaker

SEAL BEACH

PCH AND 1ST 1, 25, 29, 172, 173

NEWPORT CENTER/ FASHION ISLAND

LAGUNA BEACH BUS STATION 1, 89; LB MTL: Canyon, North, South

Long Beach to San Clemente via Pacific Coast Hwy

T O

Avd Del Presidente

14

S Bellflower Channel

PCH

42/42A

Brookhurst

Magnolia

Beach

st w y a H ic C o cif Pa

47

72 21, 70, 173 Warner 29, 172, 1st 25,

oa

71

Nicolas

Seal Beach

San

Bolsa

B alb

CORONA DEL MA R

7th

al

SUNSET BEACH

WARNER LOOP 1, 21, 70, 72

HUNTINGTON BEACH

NEWPORT BEACH

LAGUNA BEACH 187

5

qu ero

Westminster

a

D

Re am i no

131, 171 10th

E lC

LBT A,

ta is Ola V

2nd

A

DANA POINT

i C am

191

Main LBT

S E R V I C I O

Corona del Mar - Emerald Bay Laguna Beach - Laguna Beach Bus Station - Laguna Beach Civic Center - Monarch Bay - South Coast Medical Center Dana Point - Salt Creek Beach Capistrano Beach San Clemente - San Clemente (Metrolink Station)

CAPISTRANO BEACH

S E R V I C E

Single, double & triple displays

powder coated colours.

welcoming, safe and easy to navigate. Transport systems

AN

NOTE: This route operates short turn trips. W

/

SAN CLEMENTE METROLINK STATION

Avd Del Presidente 5

Route 1

SAN CLEMENTE

• High profile tool for the promotion of bus routes and bus services

Easy to maintain

Trueform believes transport environments should be

AN

Long Beach to San Clemente via Pacific Coast Hwy

T O

SAN CLEMENTE

Long Beach - VA Hospital - Cal State Long Beach Seal Beach - Seal Beach City Hall Sunset Beach Huntington Beach - Huntington Beach Pier Newport Beach - Newport Center/ Fashion Island - Newport Transportation Center

• European designed

transport solutions are to be effective.

TR

Towards Seal Beach

Buses towards

City Centre S E R V I C E

Long Beach - VA Hospital - Cal State Long Beach Seal Beach - Seal Beach City Hall Sunset Beach Huntington Beach - Huntington Beach Pier Newport Beach - Newport Center/ Fashion Island - Newport Transportation Center

Route 2

incorporates the following specialist features:

Style & Branding

These are key components to improve, if area wide public

M

Duke Street Buses

Route 1

14

distinct Trueform look and feel. The ‘Elite’ post has been designed specifically for bus stop use and

PL AN VIS NIN G O R Y AN SE D R VIC E

R O U T E

network where passengers “join”, “transfer” and “leave”.

public transport operations.

High strength route cases

The attractive route display cases are manufactured

Trueform focus their attention on the points on the transport

technical specification, user analysis, installation and

TR

Removable Removeable route routetile tile options options

94

professional experience extending over 35 years.

systems, safety and statutory standards, system planning,

AD

58

(Post cast into concrete foundation)

56

C Standard Installation Option

38 43 44 45 54

This is achieved by an assembled team of expertise with

design, graphic design, signing, intelligent electronic transit

maintenance expertise, based on an in-depth knowledge of

existing square post option

B U S

B Patented mounted over

Buses towards

City Centre

engineering and manufacturing skills with accessibility

ABILITY TO ACCEPT SOLAR & RTI DISPLAY OPTIONS

colour, and illustration can be combined to create a

available

Duke Street

The world’s most intelligent, attractive & adaptable bus stop

Quick fitting of busQuick stop flags andof route fitting bus stop flags and route tile carriers, all sizestile andcarriers, layouts available all sizes and layouts

Q U A L I T Y

QUICK & EASY TO INSTALL & MAINTAIN

RTPI Display Systems

• Safe, welcoming places for customers to congregate RTPI display systems

updating of route information. The keyhole fitting system ensures that route numbers can always be positioned

The Elite Post can be adapted to incorporate real time

in the correct order and to high standards of precision

electronic display and/or journey planning systems via a

thereby maintaining high standards of display regardless of

discreet internal cable management system.

the operator skill level.

London buses bus stop

www.trueform.co.uk

cation

p system has been of installation and and installation options requirements.

m

Why choose m C Trueform? m

ons rectly and securely over ts (patented system), thus any excavation required or shed floor surfaces.

A

1 2 3 4 5

Trueform have a proven track record in the provision of

prosperity in our globalized world, both in urban centres of

integrated and coordinated public transport solutions that

population and in less densely populated areas. Trueform

attract travellers by successfully transforming the waiting

provide intelligent public transport solutions to meet this

experience. This is based on a sound understanding of the

basic requirement.

travellers requirements - both now and projected into the future.

Trueform blend specialist public transport design

T: 020 8561 4959 F: 020 8848 1397 www.trueform.co.uk

AJO CITIE R S

d

p

d

M

W

M

m

PL IS

ER

D

PO

W

N IC O

LA R

EC TR

SO

EL

VIC

IN G

SE R E AN C N

AIN TE M

E M LEC AIN T TE RIC N AL AN CE

ST PO IT

Y

TIO LLA

IC BL

STA

PU

IN

The UK s ead ng

The world’s most intelligent, attractive wayfind ov de & adaptableng busp stop

ES

IN ES VIC SE R N

M S ST E SY IO

M M

Innovative System for Bus, BRT & Tram

AY S

M S TE

EM

R FO

ST SY

AY S PL D IS G IN TIS VE R

TO

R

N

G

M

IN TE

FO

EE R

O

SC

C

C H U TO

M AT IO

N

RT

S

SK S IO K E TIV AC R TE IN SK S IO K E N O

AD

PH LE

AT IO N

W AY S AIL R TE

WAYF ND NG S GNAGE

ELITE BUS STOP ©

C E IA N PL M

• Future Proofed - Can Incorporate the Latest ITS electronic Hardware

C O

• Modular system - Quick Release Fixings

TR STA AN TIO SIT N AN S D

ER S

PS

Features

The c h of ma oice ny M

A

A Socket Option

information display systems.

D

• Lightweight, modular components for fast and safe erection on site

and telecommunications cables for lighting and real-time

M AT IO N

The post also has provision for the installation of electrical

SUPPORTIVE SALES & ADVISORY TEAM READY TO WORK WITH YOU

ER

(Post cast into concrete foundation)

C Standard Installation Option

Simplicity

A/A

7th &

Pacific Coast Hwy & Bolsa

Warner & Pacific Coast Hwy

Pacific Coast Hwy & 1st

Laguna Beach Bus Station

Pacific Coast Hwy & Crown Valley

Newport Transportation Center

Pacific Coast Hwy & Del Obispo

in a wide range of colours.

O

7th & Channel

architectural grade anodising and polyester powder coating

6:49 7:31 8:10 8:46

D D

9:13 9:38 10:05 10:35 11:05 11:35 12:05 12:36 1:07 1:42 2:13 2:44 3:15 3:50 4:21 4:52 5:23 5:54 6:25 6:56 7:19 7:51 8:15 8:57 9:41 10:41

8:30

SH ELT

8:57 9:22 9:49 10:19 10:49 11:19 11:49 12:20 12:51 1:26 1:57 2:28 2:59 3:33 4:04 4:35 5:06 5:37 6:08 6:39 7:03 7:35 8:01 8:43 9:27 10:27

ST

6:21 7:01 7:39 8:01 8:16 8:31 8:43 9:08 9:35 10:05 10:35 11:05 11:35 12:06 12:37 1:12 1:43 2:14 2:45 3:18 3:49 4:20 4:51 5:22 5:53 6:24 6:50 7:22 7:49 8:31 9:14 10:14

AN SIT

6:12 6:52 7:30 7:51 8:06 8:21 8:33 8:58 9:26 9:56 10:26 10:56 11:26 11:57 12:28 1:02 1:33 2:04 2:35 3:08 3:39 4:10 4:41 5:12 5:43 6:14 6:41 7:13 7:41 8:23 9:06 10:06

NOTE: This route operates short turn trips.

AN SIT

6:35 7:16 7:53

El Camino Real & Avd Santa Margarita

Pacific Coast Hwy & Bolsa

El Camino Real & Avd Pico

Warner & Pacific Coast Hwy

Pacific Coast Hwy & 1st

5:58 6:36 7:12 7:33 7:48 8:03 8:15 8:25 8:40 9:09 9:39 10:09 10:39 11:09 11:40 12:11 12:43 1:14 1:45 2:16 2:48 3:19 3:50 4:21 4:52 5:23 5:54 6:23 6:55 7:24 8:06 8:49 9:49

Pacific Coast Hwy & Dana Point Harbor

5:41 6:17 6:48 7:08 7:23 7:38 7:50 8:00 8:14 8:44 9:14 9:44 10:14 10:44 11:15 11:46 12:17 12:48 1:19 1:50 2:21 2:52 3:23 3:54 4:25 4:56 5:27 5:59 6:31 7:03 7:45 8:30 9:30

TR

3:07 4:09 5:11 6:16 7:30 8:16 9:16

IS M

1:04 2:05

3:58 5:00 6:06 7:20 8:07 9:07

R

12:02

1:54 2:56

3:44 4:46 5:53 7:09 7:55 8:55

O

11:50 12:52

1:40 2:42

3:33 4:35 5:43 6:59 7:47 8:47

Newport Transportation Center

10:59

11:37 12:39

1:29 2:31

3:22 4:24 5:29 6:47 7:37 8:37

Laguna Beach Bus Station

6:03 6:34 6:53 7:08 7:23 7:54 8:58 9:58

10:49

11:26 12:28

1:18 2:20

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & Superior

Laguna Beach Bus Station

5:53 6:24 6:57

7:44 8:48 9:48

Pacific Coast Hwy & Balboa

Newport Transportation Center

5:45 6:14 6:46

7:31 8:35 9:35 10:36

Pacific Coast Hwy & 1st

Pacific Coast Hwy & Crown Valley

5:37 6:05 6:36

7:20 8:25 9:25 10:26

Warner & Pacific Coast Hwy

Pacific Coast Hwy & Del Obispo

Pacific Coast Hwy & 10th

7th & Channel 10:17

Effective September 9, 2007

Pacific Coast Hwy & Superior

El Camino Real & Avd Santa Margarita

El Camino Real & Avd Pico

5:29 5:57 6:28

7:11 8:16 9:16

11:15 12:17

R

Rey

8:05 9:01 9:54

R

3

191A

2:00 3:06 4:09 5:14 6:22 7:15

7:56 8:53 9:46

R

19

San Luis

191,

Presidio

Avd Santa Margarita 191 ; Christianitos NCTD 395

91,

6:25 7:20 8:43 9:52 10:54 11:52 12:58

1:50 2:55 3:58 5:03 6:10 7:04

7:48 8:45 9:38

TE

Pico

191

Guadalajara

Avd

NOTE: This route operates short turn trips.

MONDAY - FRIDAY: Southbound TO: San Clemente or Dana Point

6:16 7:11 8:33 9:42 10:44 11:42 12:48

1:41 2:44 3:47 4:52 5:59 6:55

7:35 8:34 9:27

IN FO

dV

Calafia

Av

1 r 19 Ma

6:09 7:03 8:25 9:33 10:35 11:33 12:39

1:28 2:29 3:32 4:37 5:43 6:41

7:25 8:25 9:18

AN TI

el

5:57 6:50 8:13 9:21 10:23 11:21 12:26

1:16 2:16 3:18 4:23 5:28 6:28

E

D

Avenida

3 Estrella 19 de s are sM Camino Lo 191 C a mino de

Route 001/073107

5:48 6:40 8:02 9:11 10:13 11:11 12:14

&

no

91

5:37 6:28 7:14 7:50 8:25 8:57 9:29 9:59 10:28 10:57 11:28 11:58 12:30 1:00 1:31 2:01 2:32 3:01 3:34 4:05 4:38 5:09 5:42 5:59 6:12 6:42 7:12 7:42 8:12 9:05 10:05 11:05

Long Beach to San Clemente via Pacific Coast Hwy

Y

Obispo

Pa i c f ic Co a st H wy C ap si tr a no

Del

5:21 6:07 6:52 7:26 8:02 8:34 9:06 9:36 10:05 10:34 11:01 11:31 12:03 12:33 1:04 1:35 2:06 2:32 3:05 3:36 4:09 4:40 5:13 5:30 5:46 6:18 6:48 7:18 7:52 8:45 9:46 10:46

• Stainless steel & aluminium construction for long lasting performance and appearance

TIM

int

5:24 5:56 6:26 6:56 7:33 8:26 9:28 10:28

• Robust, vandal, graffiti and weather resistant materials and finishes

L

Prado

Del

o Dan a P r Ha rb o

Center

Avocado 89 Coast MacArthur Newport Broadway 85; Valley Crown 581 85 LBMTL Selva 70, 85 Bay Lantern Golden

Newport

Ma dri d

71

Monarch

Jamboree

47,

35

al

33

Newport 55 Dover

Superior

29

42/42A

Brookhurst

Magnolia

Beach

72 21, 70, 173 Warner 29, 172, 1st 25,

Seal Beach

Bolsa

7th

Westminster

El Camino Real & Avd Santa Margarita

D

131, 171 10th

LBT A,

5:05 5:50 6:35 7:06 7:41 8:13 8:45 9:15 9:44 10:13 10:39 11:09 11:41 12:11 12:42 1:12 1:43 2:08 2:41 3:12 3:44 4:15 4:48

5:12 5:45 6:15 6:45 7:24 8:17 9:19 10:19

variety of configurations including over existing square sign posts. Durable exterior quality finishes, including

Numbers on streets indicate transfers. Números en la calle indican trasbordos.

Orange County Transportation Authority

4:56 5:40 6:25 6:56 7:30 8:02 8:34 9:04 9:33 10:02 10:29 10:59 11:31 12:01 12:32 1:02 1:33 1:58 2:31 3:02 3:32 4:03 4:36

4:58 5:30 6:00 6:30 7:11 8:04 9:07 10:07

El Camino Real & Avd Pico

2nd

Main LBT

LB MTL METRO

1, 55, 57, 75, 76, 79

Long Beach to San Clemente via Pacific Coast Hwy

MONDAY - FRIDAY: Northbound TO: Newport Transportation Center or Long Beach

4:43 5:26 6:11 6:43 7:15 7:47 8:19 8:49 9:18 9:47 10:14 10:44 11:16 11:46 12:17 12:46 1:17 1:43 2:16 2:47 3:17 3:48 4:21

release tamper proof fixings, ability to be installed in a

EA

Rey

NEWPORT TRANSPORTATION CENTER/PARK-AND-RIDE

Route 1

Route 1

Route 1

easy handling, special recessed channels for fitting quick

R

3

191A

LAGUNA BEACH BUS STATION 1, 89; LB MTL: Canyon, North, South

L E Y E N D A

TR

19

San Luis

191,

Presidio

Avd Santa Margarita 191 ; Christianitos NCTD 395

91,

qu ero

VA HOSPITAL CSULB AREA 1, 50, 60; LBT: 81, 91, 92, 93, 94, 171, D, ZAP 96; METRO: 577x

/

Scheduled Departure Regular Routing Southbound Only No Service On Some Trips = Long Beach Transit = North County Transit District (San Diego) = Laguna Beach Municipal Transit Lines = Los Angeles MTA

PL AD AN VIS NIN G O R Y AN SE D R VIC E

Pico

191

Guadalajara

Avd

a

N E

MAP NOT TO SCALE

LONG BEACH

Studebaker

SEAL BEACH

L E G E N D

LBT NCTD

w

m

collaborative and rigorous, intelligent as well as inventive.

Y

dV

Calafia

Av

1 r 19 Ma

Re am i no

S Bellflower Channel

PCH

PCH AND 1ST 1, 25, 29, 172, 173

M

transport solutions are to be effective.

achieve all of these things our design approach has to be

IT

el

E lC

st w y a H ic C o cif Pa

47

NEWPORT CENTER/ FASHION ISLAND

These are key components to improve, if area wide public

should be unambiguous and clearly presented. To

R

D

Avenida

3 Estrella 19 de s are sM Camino Lo 191 C a mino de

ta is Ola V

oa

71

Nicolas

d

m

network where passengers “join”, “transfer” and “leave”.

everyone. Graphic, service and operational information

U

91

191

5

San

UK S

should be highly visible, distinctive and easy to use, by

C

Obispo

Pa i c f ic Co a st H wy C ap si tr a no

Del

W

B alb

CORONA DEL MA R

Strength & Performance

O

O m

welcoming, safe and easy to navigate. Transport systems

SE

int

Avd Del Presidente

NOTE: This route operates short turn trips.

SUNSET BEACH

WARNER LOOP 1, 21, 70, 72

HUNTINGTON BEACH

NEWPORT BEACH

LAGUNA BEACH 187

5

• High profile tool for the promotion of bus routes and bus services

W

WAYF ND NG S GNAGE ABILITY TO ACCEPT SOLAR & RTI DISPLAY OPTIONS

Trueform believes transport environments should be

D

Prado

Del

o Dan a P r Ha rb o

Center

Avocado 89 Coast MacArthur Newport Broadway 85; Valley Crown 581 85 LBMTL Selva 70, 85 Bay Lantern Golden

Newport

no

71

Monarch

Jamboree

47,

35

Ma dri d

33

Newport 55 Dover

Superior

29

L E Y E N D A

Numbers on streets indicate transfers. Números en la calle indican trasbordos. Route 001/073107

i C am

Route 1

4:43 5:15 5:45 6:15 6:56 7:49 8:54 9:54

VA HOSPITAL CSULB AREA 1, 50, 60; LBT: 81, 91, 92, 93, 94, 171, D, ZAP 96; METRO: 577x

/

Scheduled Departure Regular Routing Southbound Only No Service On Some Trips = Long Beach Transit = North County Transit District (San Diego) = Laguna Beach Municipal Transit Lines = Los Angeles MTA

LB MTL METRO

1, 55, 57, 75, 76, 79

A

DANA POINT

15

N E

MAP NOT TO SCALE

LONG BEACH

Studebaker

SEAL BEACH

L E G E N D

LBT NCTD NEWPORT TRANSPORTATION CENTER/PARK-AND-RIDE

Orange County Transportation Authority

S E R V I C I O

Corona del Mar - Emerald Bay Laguna Beach - Laguna Beach Bus Station - Laguna Beach Civic Center - Monarch Bay - South Coast Medical Center Dana Point - Salt Creek Beach Capistrano Beach San Clemente - San Clemente (Metrolink Station)

CAPISTRANO BEACH

14

S Bellflower Channel

PCH

PCH AND 1ST 1, 25, 29, 172, 173

NEWPORT CENTER/ FASHION ISLAND

LAGUNA BEACH BUS STATION 1, 89; LB MTL: Canyon, North, South

Long Beach to San Clemente via Pacific Coast Hwy /

SAN CLEMENTE METROLINK STATION

4:32 5:13 5:58 6:28 6:59 7:31 8:03 8:33 9:02 9:31 9:59 10:29 11:01 11:31 12:02 12:31 1:02 1:28 2:01 2:32 3:01 3:32 4:05

42/42A

Brookhurst

Magnolia

Beach

st w y a H ic C o cif Pa

47

72 21, 70, 173 Warner 29, 172, 1st 25,

Seal Beach

oa

71

Nicolas

Bolsa

San

7th

B alb

CORONA DEL MA R

Westminster

al

SUNSET BEACH

WARNER LOOP 1, 21, 70, 72

HUNTINGTON BEACH

NEWPORT BEACH

LAGUNA BEACH 187

5

qu ero

D

a

131, 171 10th

Re am i no

LBT A,

ta is Ola V

E lC

T O

technical specification, user analysis, installation and

AN

A

DANA POINT

i C am

191

2nd

S E R V I C I O

Corona del Mar - Emerald Bay Laguna Beach - Laguna Beach Bus Station - Laguna Beach Civic Center - Monarch Bay - South Coast Medical Center Dana Point - Salt Creek Beach Capistrano Beach San Clemente - San Clemente (Metrolink Station)

CAPISTRANO BEACH

S E R V I C E

SAN CLEMENTE

Strong, lightweight construction for improved safety and

• European designed

QUICK & EASY TO W INSTALL & MAINTAINM

Trueform focus their attention on the points on the transport

public transport operations.

Style & Branding

C TV

NOTE: This route operates short turn trips. W

/

SAN CLEMENTE METROLINK STATION

Avd Del Presidente 5

Route 1

Long Beach - VA Hospital - Cal State Long Beach Seal Beach - Seal Beach City Hall Sunset Beach Huntington Beach - Huntington Beach Pier Newport Beach - Newport Center/ Fashion Island - Newport Transportation Center

professional experience extending over 35 years.

systems, safety and statutory standards, system planning,

C

Long Beach to San Clemente via Pacific Coast Hwy

T O

SAN CLEMENTE

Main LBT

S E R V I C E

Long Beach - VA Hospital - Cal State Long Beach Seal Beach - Seal Beach City Hall Sunset Beach Huntington Beach - Huntington Beach Pier Newport Beach - Newport Center/ Fashion Island - Newport Transportation Center

Route 2

This is achieved by an assembled team of expertise with

design, graphic design, signing, intelligent electronic transit

SA FE T

Route 1

14

incorporates the following specialist features: existing square post option

M

R O U T E

engineering and manufacturing skills with accessibility

maintenance expertise, based on an in-depth knowledge of

m The ‘Elite’ post has been designed specifically for bus stop use and

B Patented mounted over

Removable route tile options

B U S

The world’s m most pp intelligent, d m attractive & adaptable d bus stop p d b d U Quick fitting of bus stop flags and route tile carriers, all sizes and layouts available

Buses towards

City Centre

Q U A L I T Y

ID

ELITE LEG BLEBUS LONDON STOP SYSTEM

Foundation Options

Mobility is the central basis for economic growth and

R

Full colour flag graphics

M s

Easy fitting of display material

AU D

Various flag size options

AT

A powerful marketing tool

©

Duke Street

A POWERFUL MARKETING & PR PLATFORM W M

Trueform have a proven track record in the provision of integrated and co-ordinated public transport infrastructure.

• Optional Solar Power, Touch Screen Display, RTI and Audio Information Quick release fittings

• Fully Integrated - Concealed Wiring

www.trueform.co.uk sales@trueform.co.uk accounts@trueform.co.uk

Trueform Engineering Ltd ı 12 Pasadena Close ı Hayes ı Middlesex UB3 3NQ T. 020 8561 4959 ı F. 020 8848 1397 ı sales@trueform.co.uk ı www.trueform.co.uk

Route number tile fitting

Clear information graphics

LED solar powered options

www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

20


Trueform Brand Guidelines / Visual Identity / How to Build a Layout

Sample Brochures

cation

Sample Brochures

p system has been of installation and and installation options requirements.

Why choose Trueform’s Comprehensive Trueform? Approach

Fingerposts Various flag size options

Wall EasyMounted fitting of display material

1 2 3 4 5

Full Digital colour Units flag graphics

Mobility is the central basis for economic growth and

population and in less densely populated areas. Trueform

5:22

5:34

5:48

6:00

6:15

6:40

6:59

7:07

7:19

7:33

6:25

6:36

6:50

7:02

7:15

7:38

7:56

8:04

8:15

8:29

7:29

7:39

7:51

8:02

8:15

8:33

8:49

8:56

9:07

9:21

T: 020 8561 4959 F: 020 8848 1397 www.trueform.co.uk

information display systems.

The c h of ma oice ny M

• Future Proofed - Can Incorporate the Latest ITS electronic Hardware

AJO CITIE R S

Testing was carried out in accordance with International

The tests on Trueform’s Bomb Blast structures successfully

Standards Organisation Bomb Blast Standard ISO EXV 25.

demonstrated that all glazing and metal panels tested

In simple terms the blast loading equated to a 100 kg TNT

resulted in very low hazard (or less) to personnel.

bomb to address the worst bomb blast scenario. Two bomb blast structures were tested. Both comprised

Trueform’s bomb blast protected shelters significantly reduced the hazard to occupants located behind the

foundations. Various roof and glazing types were tested.

structures compared to that provided by standard glazed

• Fully tested to withstand bomb blast of 100kgs of high explosive at 25mtr distance with no formation of hazardous glass shards

process that does not require adhesion between the glass sheet and the retaining members. It with no experience of silicone bonding. Unlike

• Compliant to ISO international standards - ISO EXV25

the conventional blast-resistant glazing system

• As used by British Airports Authorities - BAA

can be carried out readily on site by personnel

described previously, which requires formation of a silicone bond between the glass and the retaining members, there’s no risk of insufficient bonding due

sheet during curing. Trueform’s system provides instantaneous protection.

Furthermore, the tests demonstrated conclusively that

• Can be provided as part of a new build or retro fitted for protection to existing buildings / areas. • Instantaneous protection immediately after installation • Provides bomb blast protection to people and property

AY S

PL IS D

ER

IC

PO W

TR O N EC

SO

EL

IN

SY

LA R

R AT IO N

TO TE M S

TE G

IO N

IN

R M AT

ST EM

U

ID R

TO

FO

S

FO RT

R EE N

O M

SC

C

H C

ER

R AIL

K IO SK S TIV E R AC TE IN

ER S ELT

O PS

SH

ST

SIT

1

2

3

Fully Certified System

Range of Solutions

• Government, Public & Commercial

• Special bomb blast rated laminated

• Permanent & Temporary/Portable

Buildings • Public Transport Systems - Airports, Bus & Train Stations / Shelters • Sporting Events, Venues & Arenas • Shopping Centres & Communal Areas • Conferences, Exhibitions & Events

glass with specially ‘enhanced interlayers’ and Trueform’s ultra high strength dynamic ‘dry fit’ retention system. (PATENT PENDING) • Compliant to International, BS & ISO Standards • Tested to ISO EXV25 (100kgs High Explosive at 25mtrs)

©

• Specialist high strength shallow blast resistant foundation design

• Special bomb blast rated laminated annealed and toughened laminated blast resistant glass with specially enhanced interlayers

Attracting travellers by The world’s most intelligent, attractive transforming the waiting experience & adaptable bus stop

Easy Maintenance

In order to meet any possible location constraints,

The modular design of our wayfinding units allows

a range of wall mounted signs were incorporated to

many cities across the UK. Trueform hold several high

to incorporate many types of intelligent transport

the system, counting with the same approach that all

profile contracts for city wide wayfinding schemes

devices, such as interactive displays, data live feeds,

other products: high modularity, easy maintenance and

including London, New York and Portsmouth.

digital displays and touch screens, motion sensors,

interlocking systems to ensure updating or replacing

CCTVs, ticket machines and journey planners, wifi,

parts can be done in the most effective way.

The units are capable of incorporating digital displays

bluetooth and many more.

such as wireless information or touch screen panels,

Normally produced as a multi part vitreous enamel

back-lit maps powered by solar panels, and limitless

This options can be combined with standard media

slats, the parts can be also finished as brushed metal,

customisation to ensure each city will be able to

or considered as upgrades, with the chance of being

powdercoated paint, anodised aluminium and digitally

reflect its local distinctiveness.

retro-fitted into existing standard units.

printed toughened glass.

They are built with robust materials such as

to be the only way to address today’s requirements.

stainless steel and digitally printed toughened glass

Solar Powered

ABILITY TO INCORPORATE INTERACTIVE DIGITAL DISPLAYS

The solar powered units are a clear statement in

Legible Portsmouth Totem

durability.

sustainability.

material to find its way around a city, and first class systems

This green energy option is available to most of the units,

should tackle all these.

Fingerposts

powering back-lit displays, glowing beacons and even

to give a clear directions, guidance about how to connect

Developed as a directional aid, they merge visually into

points or in-depth information about certain area and its

a larger system proving a simple and cost effective

points of interest.

source of information.

digital panels, creating safer and more accessible streets without an environmental impact. Trueform takes sustainability seriously by exercising life cycle assessments and aiming for waste minimisation

A modular inter-lock system allow easy updating of

All this functions need to be addressed without clashing

practices, offering a range of green options for all its

its parts.

products.

The same approach to durability has been taken into

Trueform have produced city wide wayfinding schemes for:

DEVELOPED TO SUIT ANY CITY Clear information Digital Media graphics

High Profile Contracts

information required, these units are a landmark at

against each other in the simplest and most effective way.

Route number tile fitting Fingerposts

Digital & Conventional

Wall Mounted

Digital Media

Built in modular widths according to location and

Delivering information to suit every need means being able

LED solar Solar Powered powered options

all the wayfinding products, being built with durable

Legible London • Walk NYC • Legible Ipswich Centro

powder coated materials and digital screen printed

Birmingham • Legible Leeds • Legible Southampton

graphics. Options of laser engraving or brushed

Legible Peterborough • Legible Portsmouth • BAA

stainless steel options are also available. Walk NYC Totem

Legible Peterborough Fingerpost

BAA Flight Information Monolith

Installations • New Build & Retro-fitted Solutions

NEW BUILD AND RETRO FITTED SOLUTIONS

Bomb Blast Protection

PERMANENT AND TEMPORARY INSTALLATIONS

ULTRA HIGH STRENGTH STEEL STRUCTURES

• Anti-Terrorist Shelters

Bomb Blast Portals

Protection in Crowded Places

Anti-Terrorist Shelters

Maintain Safety & Security

Check-In Screens

BAA Approved

COUNTER TERRORISM

Trueform Bomb Blast Protected Structure

Protect your employees, customers and property from terrorist attack

Bomb Blast Protected Glazed Screens & Structures In response to this requirement, Trueform has developed and tested a range of security and anti terrorism products

• Bomb Blast Protected Screens

The worldwide political climate has made it more critical than ever for

& Enclosures

organisations to physically protect buildings, crowded places and the people who frequent them from terrorist bomb attack.

• Glazed Barriers • Blast Proof Portals

Terrorist targets include key government, public and

Bomb blast rated enhanced glass with a special retaining

commercial buildings as well as crowded places such as

system is required.

shopping centres, sport venues, airports, public transport

RAPID INSTALLATION AND COMMISSION

terminals, bus and railway stations.

Many companies and public organisations are now

In the event of an explosion in a built-up environment,

to government initiatives on protecting people in public

approximately 90% of fatalities and injuries are caused by

spaces.

The high strength steel framed structures are fitted with bomb blast rated enhanced glass uniquely secured using Trueform patented ultra-high strength ‘dry fit’ retention system.

Protecting Property

Special Rated Laminated Glass

“Retro-fitted” and “Temporary/ Portable” Trueform provide a range of both permanent and temporary / portable blast resistant screens that can

Protection in Built Up Areas

Enhanced Interlayered Glass

Providing physical protection to employees, delegates, customers and property in the event of terrorist attack, the special blast protected structures have been architecturally designed with contemporary clear glass appearance to complement any architectural

Trueform have recently installed its bomb blast resistant

be installed as part of a new build, or ‘retro fitted’ to

in order to help maintain safety and security, and

waiting shelters, check-in areas, door entrance portals

existing locations, providing instantaneous bomb blast

dramatically minimise disruption should a terrorist attack

and retail enclosures at the UK’s Heathrow, Gatwick and

protection.

occur.

Edinburgh airports.

Trueform’s high strength bomb blast resistant structures

The ultra high strength construction incorporates

shallow foundations, the blast protection screens can be

are designed to conform to and have been extensively

Trueform’s high strength bomb blast rated shallow

rapidly erected outside existing commercial or residential

Trueform have provided blast protection security screens

tested to recognised UK, US and international bomb

foundation and thus provides robust physical protection,

buildings, hotels, embassies, shops, taxi ranks etc. with

for many clients, including retail screening for Costa

blast standards, typically 100kgs of high explosive at 25

including protection against explosive attack by a vehicle

minimum disruption.

Coffee and check in screens for Emirates and Singapore

metres range.

borne explosive device (VBIED).

implementing bomb blast protection systems in response

projected glass shards.

Ultra High Strength Structures

and patented specialist bomb blast protection systems

The personal cost of the injuries is considerable, and

• Georgian Wired Glass • Float / Annealed Glass

surrounding. Each structure can be manufactured to meet individual

Utilising Trueform’s high strength bomb blast rated

customer requirements and colour schemes, including corporate identity and branding.

Airlines at Heathrow Airport.

Regular glazing provides very little protection against bomb blast. Death or serious injury from broken glass and shrapnel is highly probable.

• Heat Strengthened Glass • Toughened Glass • Acrylic

HAZARD LEVEL

During the explosion

During the explosion

During the explosion

During the explosion

During the explosion

During the explosion

During the explosion

During the explosion

During the explosion

is exacerbated by disruption to the efficient running of business and public services due to injured personal and

USED BY BRITISH AIRPORTS AUTHORITIES - BAA

damaged properties. Although conventional anti-fragmentation window films can

• Standard Laminated Annealed • Anti Shatter Films • Polycarbonate

often reduce the quantity of smaller shards, in many cases

• Comprehensive range of standard structures / designs available to suit a range of applications

• Rapid installation and commission

Bespoke Graphics

to ensure easy maintenance and optimum

Protecting people and property from terrorist attack

• Ultra high strength dynamic ‘Dry Fit’ glazing retention system

• Contemporary, architectural design appearance

Wall Mounted Signs

Totems

range that co-ordinates several information channels seems

People use a mixture of web, mobile, signs and printed

MODULAR & EASY MAINTENANCE

COUNTER TERRORISM

• Ultra high strength steel structure

• Flexible/custom design: our designers can design/modify the system to suit individual project requirements

High Resolution Maps

www.trueform.co.uk

Applications

• Temporary solutions for conferences and events

• Protection against ‘Vehicle Borne Improvised Explosive Devices’ (VBIEDs)

Elegant & Robust

Signage Options

Protecting People and Property from Terrorist Attack

Features of Trueform’s Patented System

Trueform’s ‘Dry Fit’ System is a simple mechanical

weakening of the bond by movement of the glass

use of any wet applied materials such as silicone.

Green Energy Options

A new breed of user-centred products, developed within a

screens and shelters.

Trueform’s ‘Dry Fit’ System

bonding caused by dirty surfaces and no risk of

Importantly, the protection could be achieved without the

identical robust steel frames and in-situ concrete

omb Blast Protected Shelter for T3 Heathrow Airport

and the rebate with silicone; no risk of inadequate

SIT

Trueform Engineering Ltd ı 12 Pasadena Close ı Hayes ı Middlesex UB3 3NQ T. 020 8561 4959 ı F. 020 8848 1397 ı sales@trueform.co.uk ı www.trueform.co.uk

Rigorous testing has been undertaken on full scale Trueform bomb blast structures in order to demonstrate their resilience and ability to offer protection in the event of a bomb blast.

The structures were orientated with the open end facing the

COMPLETE SIGNAGE ELITE BUS STOP PROVIDER Innovative System for Bus, BRT & Tram

Quick release fittings Totems

• Fully Integrated - Concealed Wiring

A FULLY TESTED SYSTEM

car bomb at 25 m standoff range.

of the wayfinding evolves, companies able to understand people’s needs are increasingly valuable.

• Optional Solar Power, Touch Screen Display, RTI and Audio Information

Protecting people and property from terrorist attack

to incomplete filling of the gaps between the glass

W AY S

• Modular system - Quick Release Fixings

www.trueform.co.uk sales@trueform.co.uk accounts@trueform.co.uk

d Structure

AN

Features

In the era of information, availability of concise, accurate and well organised data is a precious good. Meeting this level of demand is our goal. As the role

ES

5:12 6:15 7:19

This fills in the gaps. Most people are familiar with the convention of using alphabetically ordered street names and reference points to find individual streets on a map – it’s a means of quickly realising what’s just around the corner.

Fully Customisable

Attracting travellers by transforming the waiting experience

VIC

5:50 6:40

G

5:34 6:25

Long Lasting Finishes

COMPLETE SIGNAGE PROVIDER

R

5:22 6:13

IN

1:36 2:53 3:54 4:55

5:13 6:04

Back-Lit Graphic Panels

SE

3:36 4:37

4:48 5:43

E

11:29 12:32

1:18 2:31

3:21 4:23

4:15 5:15

C

7:17 8:18 9:23 10:27

11:12 12:15

1:04 2:20

3:11 4:13

3:59 4:59

AN

7:04 8:02 9:06 10:10

El Camino Real & Avd Santa Margarita

El Camino Real & Avd Pico

Pacific Coast Hwy & Dana Point Harbor 6:51 7:49 8:53 9:57 10:59 12:01

1:46 2:47 3:48

3:46 4:46

N

6:43 7:40 8:44

2:10

2:14 3:15

10:31

9:48 10:50 11:52 12:55

1:57 2:59

3:30 4:30

TE

6:30 7:24 8:27 9:29 11:33 12:35

1:13

1:44 2:46

10:09

Laguna Beach Bus Station

Newport Transportation Center 6:11 7:05 8:06 9:07 11:11

10:46

9:55

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & Balboa 5:59 6:52 7:51

12:12

1:30 2:29

9:44

8:53 10:57 11:58 12:58

10:34

3:18 4:18

AIN

5:49 6:42 7:41 8:43

11:47

1:18 2:16

9:32

Pacific Coast Hwy & 1st

Warner & Pacific Coast Hwy 5:39 6:32 7:30

12:46

10:25

M

9:23

8:32

11:35 12:33

1:08 2:06 3:08 4:08

Fully Modular Designs

EXTENSIVE ABILITY TO ACCEPT RANGE SOLAR OF & RTI DESIGNS DISPLAY OPTIONS

E M LEC AIN T TE RIC N AL AN CE

5:31 6:24 7:22 8:24

11:26 12:23

10:16

ST

7:14 8:16 9:14

Pacific Coast Hwy & 10th

7th & Channel 5:23 6:16

11:17 12:13

and telecommunications cables for lighting and real-time

PO

Street Finder

Y

5:49 6:48 7:47 8:42

IT

5:40 6:39 7:38 8:33

NOTE: This route operates short turn trips.

ES

5:30 6:29 7:28 8:23

VIC

5:13 6:12 7:12 8:09

R

5:00 5:59 6:59 7:58

SE

4:45 5:45 6:45 7:45 8:45

N

6:19

TIO

4:19 5:19 7:23 8:24

LLA

5:55

IC

3:52 4:54 6:59 8:02

SUNDAY AND HOLIDAY: Southbound TO: San Clemente

BL

5:44

STA

3:40 4:42 6:48 7:51

Long Beach to San Clemente via Pacific Coast Hwy

PU

3:24 4:28 5:30 6:34 7:36

• Lightweight, modular components for fast and safe erection on site

IN

3:10 4:13 5:15 6:19 7:21

Route 1

The post also has provision for the installation of electrical

EM S

1:51 2:52 3:53 4:53

ST

7:46 8:45 9:46 10:48 11:50 12:48

1:41 2:42 3:41 4:42

SY

7:36 8:35 9:36 10:39 11:40 12:37

1:29 2:30 3:30 4:31

IO

7:26 8:26 9:27 10:28 11:29 12:27

1:12 2:13 3:13 4:15

D

7:12 8:12 9:13 10:13 11:13 12:11

1:59 2:59 4:01

AY S

7:02 8:02 9:03 10:03 11:02 11:59 12:59

1:43 2:43 3:44

PL

10:46

2:17 3:18

IS

Newport Transportation Center 6:50 7:50 8:50 9:50 11:45 12:44

1:16

1:51 2:52

D

10:22

Pacific Coast Hwy & Superior

Laguna Beach Bus Station 6:29 7:29 8:29 9:29 11:21 12:20

1:40 2:41

G

10:03

Pacific Coast Hwy & 1st

Pacific Coast Hwy & Crown Valley 6:11 7:11 8:11 9:10 11:02 11:59 12:53

10:52

1:24 2:25

s

9:53

Warner & Pacific Coast Hwy

Pacific Coast Hwy & Del Obispo 6:01 7:01 8:01 9:00

11:48 12:42

10:38

1:10 2:11

M

9:39

7th & Channel

El Camino Real & Avd Pico 5:47 6:47 7:47 8:46

11:32 12:26

10:25

Simplicity

AU

9:26

Pacific Coast Hwy & Bolsa

El Camino Real & Avd Santa Margarita 5:34 6:34 7:34 8:33

11:18 12:12

in a wide range of colours.

AT

8:35 9:32

IN

1:49 2:49 3:49 4:53 5:53 6:49 7:42

8:19 9:16

TIS

7:28 8:34 9:34 10:38 11:41 12:47

1:32 2:32 3:32 4:36 5:36 6:32 7:25

8:05 9:03

TR STA AN TIO SIT N AN S D

El Camino Real & Avd Santa Margarita

El Camino Real & Avd Pico 7:12 8:18 9:18 10:21 11:23 12:29

1:17 2:17 3:17 4:22 5:22 6:18 7:11

7:56 8:54

VE R

7:01 8:05 9:05

5:12 6:08 7:02

NOTE: This route operates short turn trips.

SK S

7:39

10:07 11:09 12:15

1:07 2:07 3:07 4:12

4:49

8:38

Pacific Coast Hwy & Dana Point Harbor

6:52 7:55 8:55 9:57 10:58 12:04

1:46 2:46 3:49 5:45 6:42

8:15

IO

1:15 2:15 3:15 4:15 5:15 6:15 7:15

8:00

K

4:59

E

6:36 7:38 8:38 9:39 10:40 11:43

1:59 2:59 3:59 5:59 7:00

7:50

4:47

N

6:15 7:15 8:15 9:15

12:46

1:47 2:47 3:47 5:47 6:50

7:36

O

10:48

10:15 11:15 12:15

4:32

AD

6:02 7:00 8:00 9:00 10:00 11:00 11:59 12:59

1:31 2:32 3:32 5:32 6:36

7:26

PH

5:53 6:50 7:50 8:50

11:47 12:47

4:21

LE

10:33

9:49

11:31 12:31

1:19 2:21

5:20 6:24

7:17

TE

5:42 6:37 7:37 8:37 9:36

10:23

3:21

4:10

C E

5:33 6:28 7:28 8:28

11:19 12:19

1:09 2:10 3:10 5:09 6:15

N

10:14

9:26

11:09 12:09

6:48

IA

8:19 9:17

1:49 2:49 3:52 4:52 5:48 7:47 8:42

6:37

PL

5:25 6:20 7:20

10:45

7:37 8:32

6:27

M

11:45 12:46

1:38 2:38 3:41 4:41 5:37

Pacific Coast Hwy & Balboa

7th & Channel 7:37 8:43 9:44

10:34

Newport Transportation Center

Pacific Coast Hwy & Bolsa 7:27 8:33 9:34 11:34 12:35

1:28 2:28 3:29 4:29 5:27 7:27 8:23

6:12

O

10:23

7:12 8:10

6:00

Long Beach to San Clemente via Pacific Coast Hwy

C

7:20 8:22

12:24

1:13 2:13 3:14 4:14 5:12

Laguna Beach Bus Station

Warner & Pacific Coast Hwy

10:10

9:23 11:23

12:10

1:01 2:01 3:01 4:01 5:00 7:00 7:59

5:45

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & 1st 7:08 8:09 9:10 11:10

11:59

1:45 2:45 3:45 4:45 6:45 7:45 8:45

5:17 6:17

SUNDAY AND HOLIDAY: Northbound TO: Newport Transportation Center or Long Beach

A

6:57 7:58 8:59 9:59 10:59

11:45

Pacific Coast Hwy & 1st

Pacific Coast Hwy & Superior

Newport Transportation Center 6:45 7:45 8:45 9:45 10:45 12:45

1:18 2:17 3:17 4:17

7:22 8:23

4:48 5:49

D

9:23 10:23

Warner & Pacific Coast Hwy

Laguna Beach Bus Station 6:26 7:25 8:23

11:21 12:18

1:48 2:48 3:48

6:57 7:59

4:36 5:38

IO N

9:02 10:02

7th & Channel

Pacific Coast Hwy & Crown Valley 6:09 7:07 8:02

10:59 11:54 12:54

1:36 2:36 3:36

6:47 7:50

4:21 5:23

M AT

6:56 8:50 9:50 10:48

Pacific Coast Hwy & 10th

Pacific Coast Hwy & Del Obispo 5:58 7:51

11:43 12:43

1:21 2:21 3:21

6:32 7:35

A/A

8:35 9:35 10:32

D

5:44 6:42 7:37

11:28 12:28

6:18 7:22

Route 1

architectural grade anodising and polyester powder coating

D

8:21

El Camino Real & Avd Pico

El Camino Real & Avd Santa Margarita 5:30 6:28 7:23

11:13 12:13

9:21

El Camino Real & Avd Santa Margarita

NOTE: This route operates short turn trips.

SATURDAY: Southbound TO: San Clemente

AN

Long Beach to San Clemente via Pacific Coast Hwy

SATURDAY: Northbound TO: Newport Transportation Center or Long Beach

1:06

El Camino Real & Avd Pico

Pacific Coast Hwy & Bolsa

Effective September 9, 2007

Route 1

3:07

6:49 7:31 8:10 8:46

TR

3:07 4:09 5:11 6:16 7:30 8:16 9:16

6:35 7:16 7:53 8:30

TURNKEY QUICK & EASY SOLUTION TO TO WAYFINDING INSTALL & MAINTAIN SYSTEMS

M

1:04 2:05

3:58 5:00 6:06 7:20 8:07 9:07

9:13 9:38 10:05 10:35 11:05 11:35 12:05 12:36 1:07 1:42 2:13 2:44 3:15 3:50 4:21 4:52 5:23 5:54 6:25 6:56 7:19 7:51 8:15 8:57 9:41 10:41

Route 1

Pacific Coast Hwy & Dana Point Harbor

Warner & Pacific Coast Hwy

7th & Channel

12:02

1:54 2:56

3:44 4:46 5:53 7:09 7:55 8:55

8:57 9:22 9:49 10:19 10:49 11:19 11:49 12:20 12:51 1:26 1:57 2:28 2:59 3:33 4:04 4:35 5:06 5:37 6:08 6:39 7:03 7:35 8:01 8:43 9:27 10:27

IS

9:58 10:59

11:50 12:52

1:40 2:42

6:21 7:01 7:39 8:01 8:16 8:31 8:43 9:08 9:35 10:05 10:35 11:05 11:35 12:06 12:37 1:12 1:43 2:14 2:45 3:18 3:49 4:20 4:51 5:22 5:53 6:24 6:50 7:22 7:49 8:31 9:14 10:14

R

10:36

3:33 4:35 5:43 6:59 7:47 8:47

6:12 6:52 7:30 7:51 8:06 8:21 8:33 8:58 9:26 9:56 10:26 10:56 11:26 11:57 12:28 1:02 1:33 2:04 2:35 3:08 3:39 4:10 4:41 5:12 5:43 6:14 6:41 7:13 7:41 8:23 9:06 10:06

O

9:48 10:49

11:37 12:39

1:29 2:31

5:58 6:36 7:12 7:33 7:48 8:03 8:15 8:25 8:40 9:09 9:39 10:09 10:39 11:09 11:40 12:11 12:43 1:14 1:45 2:16 2:48 3:19 3:50 4:21 4:52 5:23 5:54 6:23 6:55 7:24 8:06 8:49 9:49

R

10:26

3:22 4:24 5:29 6:47 7:37 8:37

5:41 6:17 6:48 7:08 7:23 7:38 7:50 8:00 8:14 8:44 9:14 9:44 10:14 10:44 11:15 11:46 12:17 12:48 1:19 1:50 2:21 2:52 3:23 3:54 4:25 4:56 5:27 5:59 6:31 7:03 7:45 8:30 9:30

R

9:35

11:26 12:28

1:18 2:20

Pacific Coast Hwy & Monarch Bay

Pacific Coast Hwy & Crown Valley

Pacific Coast Hwy & 1st

Laguna Beach Bus Station

10:17

Newport Transportation Center

9:25

11:15 12:17

Laguna Beach Bus Station

Newport Transportation Center

Pacific Coast Hwy & Balboa

Pacific Coast Hwy & 1st

Pacific Coast Hwy & Superior

8:05 9:01 9:54

Warner & Pacific Coast Hwy

El Camino Real & Avd Pico

7th & Channel

Pacific Coast Hwy & Del Obispo

6:22 7:15

7:56 8:53 9:46

6:03 6:34 6:53 7:08 7:23 7:54 8:58

9:16

2:00 3:06 4:09 5:14

6:10 7:04

7:48 8:45 9:38

Pacific Coast Hwy & 10th

El Camino Real & Avd Santa Margarita

1:50 2:55 3:58 5:03

5:59 6:55

7:35 8:34 9:27

5:53 6:24 6:57

7:44 8:48

R

Rey

1:41 2:44 3:47 4:52

5:43 6:41

7:25 8:25 9:18

5:45 6:14 6:46

7:31 8:35

TE

3

191A

1:28 2:29 3:32 4:37

5:28 6:28

5:37 6:05 6:36

7:20 8:25

FO

19

San Luis

191,

Presidio

Avd Santa Margarita 191 ; Christianitos NCTD 395

91,

1:16 2:16 3:18 4:23

5:29 5:57 6:28

7:11 8:16

TI

Pico

191

Guadalajara

Avd

6:25 7:20 8:43 9:52 10:54 11:52 12:58

IN

dV

Calafia

Av

1 r 19 Ma

6:16 7:11 8:33 9:42 10:44 11:42 12:48

AN

el

NOTE: This route operates short turn trips.

MONDAY - FRIDAY: Southbound TO: San Clemente or Dana Point

6:09 7:03 8:25 9:33 10:35 11:33 12:39

E

D

Avenida

3 Estrella 19 de s are sM Camino Lo 191 C a mino de

5:24 5:56 6:26 6:56 7:33 8:26 9:28 10:28

5:57 6:50 8:13 9:21 10:23 11:21 12:26

&

91

Route 001/073107

5:48 6:40 8:02 9:11 10:13 11:11 12:14

TIM

Obispo

5:12 5:45 6:15 6:45 7:24 8:17 9:19 10:19

5:37 6:28 7:14 7:50 8:25 8:57 9:29 9:59 10:28 10:57 11:28 11:58 12:30 1:00 1:31 2:01 2:32 3:01 3:34 4:05 4:38 5:09 5:42 5:59 6:12 6:42 7:12 7:42 8:12 9:05 10:05 11:05

L

Del

4:58 5:30 6:00 6:30 7:11 8:04 9:07 10:07

5:21 6:07 6:52 7:26 8:02 8:34 9:06 9:36 10:05 10:34 11:01 11:31 12:03 12:33 1:04 1:35 2:06 2:32 3:05 3:36 4:09 4:40 5:13 5:30 5:46 6:18 6:48 7:18 7:52 8:45 9:46 10:46

EA

int

5:05 5:50 6:35 7:06 7:41 8:13 8:45 9:15 9:44 10:13 10:39 11:09 11:41 12:11 12:42 1:12 1:43 2:08 2:41 3:12 3:44 4:15 4:48

R

Del

Prado

o Dan a P r Ha rb o

Center

Avocado 89 Coast MacArthur Newport Broadway 85; Valley Crown 581 85 LBMTL Selva 70, 85 Bay Lantern Golden

Newport

Pa i c f ic Co a st H wy C ap si tr a no

71

Monarch

Jamboree

47,

35

no

33

Newport 55 Dover

Superior

29

42/42A

Brookhurst

Magnolia

Beach

72 21, 70, 173 Warner 29, 172, 1st 25,

Seal Beach

Bolsa

4:56 5:40 6:25 6:56 7:30 8:02 8:34 9:04 9:33 10:02 10:29 10:59 11:31 12:01 12:32 1:02 1:33 1:58 2:31 3:02 3:32 4:03 4:36

2:06

7th

Westminster

Ma dri d

D

131, 171 10th

LBT A,

al

2nd

Main LBT

Numbers on streets indicate transfers. Números en la calle indican trasbordos.

Orange County Transportation Authority

Long Beach to San Clemente via Pacific Coast Hwy

MONDAY - FRIDAY: Northbound TO: Newport Transportation Center or Long Beach

4:43 5:26 6:11 6:43 7:15 7:47 8:19 8:49 9:18 9:47 10:14 10:44 11:16 11:46 12:17 12:46 1:17 1:43 2:16 2:47 3:17 3:48 4:21

PL AN VIS NIN G O R Y AN SE D R VIC E

Rey

METRO

1, 55, 57, 75, 76, 79

Route 1

Route 1

5:09

L E Y E N D A

TR

3

191A

VA HOSPITAL CSULB AREA 1, 50, 60; LBT: 81, 91, 92, 93, 94, 171, D, ZAP 96; METRO: 577x

/

Scheduled Departure Regular Routing Southbound Only No Service On Some Trips = Long Beach Transit = North County Transit District (San Diego) = Laguna Beach Municipal Transit Lines = Los Angeles MTA

AD

19

San Luis

191,

Presidio

Avd Santa Margarita 191 ; Christianitos NCTD 395

91,

1, 89; LB MTL: Canyon, North, South

N E

MAP NOT TO SCALE

LONG BEACH

Studebaker

SEAL BEACH

L E G E N D

LBT NCTD LB MTL

Y

Pico

191

Guadalajara

Avd

S Bellflower Channel

PCH

PCH AND 1ST 1, 25, 29, 172, 173

IT

dV

Calafia

Av

1 r 19 Ma

st w y a H ic C o cif Pa

47

NEWPORT CENTER/ FASHION ISLAND

NEWPORT TRANSPORTATION CENTER/PARK-AND-RIDE

R

el

oa

71

Nicolas

U

D

Avenida

3 Estrella 19 de s are sM Camino Lo 191 C a mino de

Re am i no

San

C

91

B alb

CORONA DEL MA R

LAGUNA BEACH BUS STATION

SE

Obispo

Pa i c f ic Co a st H wy C ap si tr a no

Del

E lC

SUNSET BEACH

WARNER LOOP 1, 21, 70, 72

HUNTINGTON BEACH

NEWPORT BEACH

LAGUNA BEACH 187

5

qu ero

and compatability with potential new communications • Robust, vandal, graffiti and weather resistant technology. Each sign has a unique commentary of the materials and finishes surrounding area with useful travel information and a • Stainless steel & aluminium construction for description of the geography of nearby areas. long lasting performance and appearance

D

int

191

5

a

options, methods& ofPerformance displaying the mapping information Strength

SUPPORTIVE SALES & ADVISORY TEAM READY TO WORK WITH YOU

AN

Del

Prado

o Dan a P r Ha rb o

Center

Avocado 89 Coast MacArthur Newport Broadway 85; Valley Crown 581 85 LBMTL Selva 70, 85 Bay Lantern Golden

Newport

no

71

Monarch

Jamboree

47,

35

Ma dri d

33

Newport 55 Dover

Superior

29

NOTE: This route operates short turn trips. W

i C am

ta is Ola V

4:32 5:13 5:58 6:28 6:59 7:31 8:03 8:33 9:02 9:31 9:59 10:29 11:01 11:31 12:02 12:31 1:02 1:28 2:01 2:32 3:01 3:32 4:05

4:07

L E Y E N D A

Numbers on streets indicate transfers. Números en la calle indican trasbordos.

A

DANA POINT

10:17

/

Scheduled Departure Regular Routing Southbound Only No Service On Some Trips = Long Beach Transit = North County Transit District (San Diego) = Laguna Beach Municipal Transit Lines = Los Angeles MTA

LB MTL METRO

1, 55, 57, 75, 76, 79

Route 001/073107

S E R V I C I O

Corona del Mar - Emerald Bay Laguna Beach - Laguna Beach Bus Station - Laguna Beach Civic Center - Monarch Bay - South Coast Medical Center Dana Point - Salt Creek Beach Capistrano Beach San Clemente - San Clemente (Metrolink Station)

CAPISTRANO BEACH

4:43 5:15 5:45 6:15 6:56 7:49 8:54 9:54

VA HOSPITAL CSULB AREA 1, 50, 60; LBT: 81, 91, 92, 93, 94, 171, D, ZAP 96; METRO: 577x

L E G E N D

LBT NCTD NEWPORT TRANSPORTATION CENTER/PARK-AND-RIDE

Orange County Transportation Authority

/

SAN CLEMENTE METROLINK STATION

15

N E

MAP NOT TO SCALE

LONG BEACH

Studebaker

SEAL BEACH

PCH AND 1ST 1, 25, 29, 172, 173

NEWPORT CENTER/ FASHION ISLAND

LAGUNA BEACH BUS STATION 1, 89; LB MTL: Canyon, North, South

Long Beach to San Clemente via Pacific Coast Hwy

T O

Avd Del Presidente

14

S Bellflower Channel

PCH

42/42A

Brookhurst

Magnolia

Beach

st w y a H ic C o cif Pa

47

72 21, 70, 173 Warner 29, 172, 1st 25,

oa

71

Nicolas

Seal Beach

San

Bolsa

B alb

CORONA DEL MA R

7th

al

SUNSET BEACH

WARNER LOOP 1, 21, 70, 72

HUNTINGTON BEACH

NEWPORT BEACH

LAGUNA BEACH 187

5

qu ero

Westminster

a

D

Re am i no

131, 171 10th

E lC

LBT A,

ta is Ola V

2nd

A

DANA POINT

i C am

191

Main LBT

S E R V I C I O

Corona del Mar - Emerald Bay Laguna Beach - Laguna Beach Bus Station - Laguna Beach Civic Center - Monarch Bay - South Coast Medical Center Dana Point - Salt Creek Beach Capistrano Beach San Clemente - San Clemente (Metrolink Station)

CAPISTRANO BEACH

S E R V I C E

The Finder or 5-minute map is used to find a destination – the end point of the journey. It contains useful landmarks within the immediate vicinity– effectively a map of landmarks – so the user can be memorably guided towards specific streets and attractions.

for people who want to walk. A study conducted two years Strong, lightweight construction for improved safety and ago drew attention to the ineffectiveness of the present easy handling, special recessed channels for fitting quick multitude of pedestrian sign systems in Central London, release tamper proof fixings, ability to be installed in a and the consequent over-reliance on the tube map to help variety of configurations including over existing square navigate above ground. sign posts. Durable exterior quality finishes, including

• High profile tool for the promotion of bus Features of the new routes and buswayfinding services signage system includes modulisation, robustness, lighting and solar power

TY

NOTE: This route operates short turn trips. W

/

SAN CLEMENTE METROLINK STATION

Avd Del Presidente 5

Route 1

SAN CLEMENTE

aims to provide better information throughout the Capital

• European designed

TV

Long Beach to San Clemente via Pacific Coast Hwy

T O

SAN CLEMENTE

Long Beach - VA Hospital - Cal State Long Beach Seal Beach - Seal Beach City Hall Sunset Beach Huntington Beach - Huntington Beach Pier Newport Beach - Newport Center/ Fashion Island - Newport Transportation Center

incorporates the following specialist Transport for London’s ‘Legible London’ wayfinding project features:

FE

Towards Seal Beach

Buses towards

City Centre S E R V I C E

Long Beach - VA Hospital - Cal State Long Beach Seal Beach - Seal Beach City Hall Sunset Beach Huntington Beach - Huntington Beach Pier Newport Beach - Newport Center/ Fashion Island - Newport Transportation Center

Route 2

distinct Trueform look and feel. available

Duke Street Buses

Route 1

To date we have manufactured and installed over 1500 Legible London units The ‘Elite’ post has been designed throughout Greater London. Style & Branding specifically for bus stop use and

C

Finder Map

travellers requirements - both now and projected into the

C

Removable Removeable route routetile tile options options

R O U T E

experience. This is based on a sound understanding of the

basic requirement.

The first step to a successful Trueform’s large in house Our dedicated graphics We consider a project only We provide a range of future.has a ready once it is in the ground cleaning and maintenance wayfinding system is an production facility enables production department Trueform blendand specialistthe public design wealth of experience on high and the client is 100% accurate planning rapid transport and cost effective services to suit all thoughtful design. manufacture assembly profile projects for quality satisfied. requirement’s, including engineering and manufacturing skillsand with accessibility This is achieved by an assembled team of expertise with of all wayfnding signage demanding clients such as regular updates of mapping design, graphicthedesign, signing, intelligent electronic transit professionalTo experience 35 years. By understanding facilitate this,extending Trueform over requirements. Incorporating British Airports authority, panel information and environmentsafety in whichand our statutory provide a nationwide systems, standards, system planning, the very latest manufacturing Transport for London, and emergency response call out Trueform focus their attention on the points the transport products are to be installed, installation service, including technology, Trueform’s for Passenger Transport services on 24/7. technical specification, user analysis, installation and the whole programme full civils, foundation, resources are second to Executives, Councils, network where passengers “join”, “transfer” and “leave”. maintenance based on an in-depth knowledge of can be developedexpertise, in a product installation, none in this sector. This architects and designers These are key components to improve, if area wide public thoughtful way, fusing with traffic management and public transport operations. in house facility enables a globally. transport solutions are to be effective. the landscape without reinstatement services. seamless flow from concept losing prominency, as atransport Trueform are able to provide to prototyping and finished Trueform believes environments should be With many offices clear source of reliable full in-house printing of products at sensible costs, welcoming, safe and easy to navigate. Transport systems throughout the UK, with a information. mapping and directional whilst maintaining the modern fleet of vans, lorries should be highly visible, distinctive and easy to use, by information using the very highest standard of quality Trueform’s in house and highly trained workforce, latest print production andand detailing. everyone. Graphic, service operational information designers and engineer’s Trueform provides a second techniques, whether it be should be with unambiguous work closely wayfinding and clearly presented. To back printed glass, vitreous to none service. scheme designers, architects achieve all of these things our design approach has to beor screen printing. enamel and town planners, We have collaborative and rigorous, intelligent as well as inventive. many years of experience in the design of street furniture and wayfinding signage systems.

SA

94

(Post cast into concrete foundation)

58

C Standard Installation Option

56

provide intelligent public transport solutions to meet this

colour, and illustration can be combined to create a

existing square post option

38 43 44 45 54

The Trueform world’s aremost the approved intelligent, manufacturer attractive &and adaptable bus stopof Transport for London’s Legible London Units. installer

B Patented mounted over

B U S

©

A Socket Option

Buses towards

City Centre

Quick fitting of busQuick stop flags andof route fitting bus stop flags and route tile carriers, all sizestile andcarriers, layouts available all sizes and layouts

Duke Street

attract travellers by successfully transforming the waiting

ELITE LEGIBLEBUS LONDON STOP SYSTEM These examples demonstrate how type, imagery,

Foundation Options

CASE STUDY

All the signs are clearly identified by a yellow strip at the top and a ‘walker’ – the universal symbol for travelling by foot. They stand above head height so that they are clearly visible from a distance.

14

Trueform have a proven track record in the provision of

Design Manufacturing Graphics Printing Installation Maintenance prosperity in our globalized world, both in urban centres of integrated and coordinated public transport solutions that

Beacon

REGULAR GLAZING

A Totems powerful marketing tool

isruption to pavement or finished floor surfaces.

SAFETY GLAZING

he top offloor existing 76mm posts (patented system), thus shed surfaces.

Q U A L I T Y

HIGH A POWERFUL PROFILEMARKETING CONTRACTS FOR & PRCITY PLATFORM WIDE SCHEMES

Trueform have a proven track record in the provision of integrated and co-ordinated public transport infrastructure.

nsuring that there will not be any excavation required or

CASE STUDY

ons rectly and securely over

Although less likely to shatter and produce the same levels of shards as regular glazing systems, these glazing types offer limited protection as glazing retention is often inadequate to prevent the entire glazing panel being blown out of its frame - Carries significant risk of death or serious injury.

HAZARD LEVEL

the window frame will not be strong enough to retain the glass and prevent it from being projected ‘en masse’. The

CONTEMPORARY DESIGN APPEARANCE Anti-Terrorist Shelters

Anti-Terrorist Screens

Bomb Blast Proof Screens

Blast Proof Portals

projected glass and often the window frame itself pose a high risk of death and serious injury to persons nearby. Conventional sytems with thin PVB laminated glass are mis-sold as being ‘blast resistant’ when they are not.

Trueform Engineering Ltd ı 12 Pasadena Close ı Hayes ı Middlesex UB3 3NQ T. 020 8561 4959 ı F. 020 8848 1397 ı sales@trueform.co.uk ı www.trueform.co.uk

TRUEFORM SYSTEM

Totem

Additional Installation Options )tsare displayed on signs in a logical (patented system), thus any excavation required isclosure. he post can also be fitted directlyorand securely over

Bomb Blast Protected Screen for Costa Coffee - Heathrow Airport

Special bomb blast rated laminated glass with specially ‘enhanced

Unique dry system provides instantaneous protection unlike wet silicone systems that can take many days to cure.

interlayers’ and Trueform’s ultra high strength dynamic ‘dry fit’ retention system. (PATENT PENDING)

HAZARD LEVEL

Fully Certified System Compliant To International, BS & ISO Standards Tested To ISO EXV25 (100Kgs High Explosive At 25Mtrs)

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

21


Trueform Brand Guidelines / Visual Identity / How to Build a Layout

Sample Flyers

Sample Flyers Primary Colour Palette These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

Flyer Layout 1

Flyer Layout 2

Flyer Layout 3

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

22


Trueform Brand Guidelines / Visual Identity / How to Build a Layout

Sample Flyers

Sample Flyers Secondary Colour Palette These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

Flyer Layout 1

Flyer Layout 2

Flyer Layout 3

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

23


Trueform Brand Guidelines / Visual Identity

Applications Business Card

Internal Policy Documents

Envelope

Order Forms

Letterhead

Commercial Invoice

Compliment Slip

Sales Quotation

Van Livery

Delivery Notes

Website

Signage

Email Signature Staff Uniforms Exhibition Graphics Tender Proposals Tender Return Document Powerpoint Templates Factsheet Product Catalogue HTML Newsletter Opera Templates External Policy Documents

Version 1.0 18th August 2014

24


Trueform Brand Guidelines / Visual Identity / Business Card

Business Card

Business Card Typography Name: Helvetica Neue Light 10pt Title: Helvetica Neue Light 8pt Post-nominal letters: Helvetica Neue Light 5pt Address: Helvetica Neue Light 8pt Phone & Fax: Helvetica Neue Light 8pt Email: Helvetica Neue Light 8pt Website: Helvetica Neue Light 8pt Set all text uppercase & lowercase where appropriate, ranged left, normal tracking Colour Trueform Logo: White Text: Corporate Black/White

Jonathan Morley MBA MA MCSD Group Managing Director T. +44 (0) 208 561 4959 F. +44 (0) 208 848 1397 M. +44 (0) 771 009 9953 E. jmorley@trueform.co.uk W. www.trueform.co.uk Pasadena Trading Estate, Hayes, Middlesex, UB3 3NQ, UK

Complete solution providers for public transportation

Logo width: 22mm

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

25


Trueform Brand Guidelines / Visual Identity / Envelope

Envelope

Envelope Typography Address: Helvetica Neue Light 8pt Phone & Fax: Helvetica Neue Light 8pt Email: Helvetica Neue Light 8pt Website: Helvetica Neue Light 8pt Set all text uppercase & lowercase where appropriate, ranged left, normal tracking Colour Trueform Logo: Corporate Grey Text: Corporate Grey/Corporate Red Logo width: 33mm

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

26


Trueform Brand Guidelines / Visual Identity / Letterhead

Letterhead

Letterhead Typography Address: Helvetica Neue Light 8pt Phone & Fax: Helvetica Neue Light 8pt Email: Helvetica Neue Light 8pt Website: Helvetica Neue Light 8pt Set all text uppercase & lowercase where appropriate, ranged left, normal tracking Colour Trueform Logo: Corporate Grey Text: Corporate Grey/Corporate Red Logo width: 33mm

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk Registered Office. Registration No. 1324196

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

27


Trueform Brand Guidelines / Visual Identity / Comp Slip

Comp Slip

Comp Slip COMPLIMENTS

Typography Address: Helvetica Neue Light 8pt Phone & Fax: Helvetica Neue Light 8pt Email: Helvetica Neue Light 8pt Website: Helvetica Neue Light 8pt Set all text uppercase & lowercase where appropriate, ranged left, normal tracking

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

Colour Trueform Logo: Corporate Grey Text: Corporate Grey/Corporate Red Logo width: 33mm

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

28


Maintaining bus stops & shelters on behalf of London Buses

W. www.trueform.co.uk

0208 561 4959

Maintaining bus stops & shelters on behalf of London Buses

Trueform Brand Guidelines / Visual Identity / Van Livery

0208 561 4959

www.trueform.co.uk

www.trueform.co.uk

Van Livery

Van Livery

0208 561 4959

www.trueform.co.uk

Maintaining bus stops & shelters on behalf of London Buses

T. 0208 561 4959 W. www.trueform.co.uk

0208 561 4959

Maintaining bus stops & shelters on behalf of London Buses

T. 0208 561 4959 E. sales@trueform.co.uk W. www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

www.trueform.co.uk

T. 0208 561 4959 W. www.trueform.co.uk T. 0208 561 4959 Maintaining bus stops & shelters on behalf of London Buses

Maintaining bus stops & shelters on behalf of London Buses

E. sales@trueform.co.uk W. www.trueform.co.uk

29


Trueform Brand Guidelines / Visual Identity / Website

Website

Website UK & International Sales Office

0208 561 4959 sales@trueform.co.uk

HOME

COMPANY

PRODUCTS

SERVICES

NEWS

VACANCIES

CONTACT

LINKS

Trueform Awarded New York Wayfinding

Click to download our

2013 CATALOGUE

Trueform are pleased to have extended our wayfinding portfolio to New York City with the contract award for the Fabrication and Installation of Wayfinding Infrastructure in Lower Manhattan, Borough of Manhattan and New York City. With the first sign being installed in New York City a few weeks ago, there was a huge attendance from all involved in the contract and USA press. Leaders in the provision of wayfinding infrastructure systems, Trueform will be carrying out this work from our new service centre in Long Island, New York, to provide the required local presence and operating facilities. The depot is fully equipped for this contract on a 24/7 basis. Jonathan Morley, Managing Director, added “Trueform are delighted to have been awarded this major contract. We have been trying to secure this contract and establish an operating presence New York for

NEWS ARCHIVE / SEPTEMBER 2013

March New York 2014 Wayfinding

September 2013 Portsmouth Legible City

Copyright © 2013 Trueform. All Rights Reserved.

T: 0208 561 4959 ı sales@trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

30


Trueform Brand Guidelines / Visual Identity / Email Signature

Email Signature

Email Signature Typography Name: Helvetica Neue Bold 10pt Job Title: Helvetica Neue Roman 10pt Phone: Helvetica Neue Roman 9pt Email: Helvetica Neue Roman 9pt Website: Helvetica Neue Roman 9pt Email Body Copy: Helvetica Neue Roman 10pt Disclaimer: Helvetica Neue Roman 7.5pt Set all text uppercase & lowercase where appropriate, ranged left, normal tracking Colour Trueform Logo: Corporate Grey Text: Corporate Black/Corporate Red/Corporate Grey

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

31


Trueform Brand Guidelines / Visual Identity / Staff Uniform

Staff Uniform

Staff Uniform

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

32


Trueform Brand Guidelines / Visual Identity / Exhibition Graphics

Exhibition Graphics

Exhibition Graphics These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

33


Trueform Brand Guidelines / Visual Identity / Tender Proposals

Tender Proposals

Tender Proposals

01

These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

A Unique Company

Appendix 1

ES7451 – Provision for the Supply & Installation of Bus Shelters

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

Transport for London ES7451 – Provision for the Supply & Installation of Bus Shelters

Trueform is committed to ensuring that its activities make a positive contribution in safeguarding and improving the environment. Trueform’s activities however, inevitably have some environmental effects. We are committed to reducing or limiting any negative effects as far as is practicable within statutory, safety, financial and operational constraints. We also work with our suppliers to minimize any adverse environmental impact of the services they provide.

Trueform aims to manufacture for long-life and low maintenance by using materials which are resistant to the operating environment and the product use. Trueform keeps up-to-date with Environmental legislation and implements all recommendations as required. Trueform accepts its “duty of care” responsibilities as outlined in the Environmental Protection Act, and disposes of its waste in a responsible manner, and in accordance with the requirements of the Contractor.

Proposed Contract Personnel

Environmental Policy Statement

Conformance & Compliance Department

Conformance & Compliance Department

Proposed Contract Personnel

10

03

Conformance & Compliance Department

Derbyshire County Council ES7451 – Provision for the Supply & Installation of Bus Shelters

Proposed Contract Personnel

Jonathan Morley Contract Role: Project Director

Derek Veale Contract Role: Contract Manager

David Myles Contract Role: Project Manager

Cliff Mallaby Contract Role: Production Director

Nigel Levis Contract Role: Design Manager

Kevin Holland Contract Role: Installations Manager

Caroline Tompkins Contract Role: Graphics & Communications Manager

We will ensure our activities meet all statutory and regulatory requirements. Trueform acknowledges the contribution that design development can make in reducing the environmental impact through the choice of appropriate materials and processes. Trueform aims to reduce, or eliminate, the use of materials which are known to be toxic, or require toxic chemicals in their development, or create toxic waste on disposal.

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

Adam Moore Contract Role: Production Manager

Natasha Bryan Contract Role: Contract Administrator

John Clifford Contract Role: Health & Safety Manager

Maintenance Operatives

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex ı UB3 3NQ T. 0208 561 4959 ı F. 0208 848 1397 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

34


Trueform Brand Guidelines / Visual Identity / Tender Return Document

Tender Return Document

Tender Return Document Cheltenham Borough Council Cheltenham Pedestrian Wayfinding - Phase 1 Delta e-Sourcing access code TTDFS92264

These examples demonstrate how type, imagery, distinct Trueform look and feel.

Tender Return Approach to the delivery of this contract Trueform have the necessary resources ‘in house’ for the provision of all Cheltenham Pedestrian Wayfinding parts supplied for this contract and could therefore hit the ground running from day one.

Tender Return

colour, and illustration can be combined to create a

Trueform have130,000sqft design and manufacturing facility enables the provision of JIT manufacture and co-ordinated deliveries. Housing some of the most advanced computerised design and manufacturing equipment available in the industry, Trueform is able to offer Cheltenham Borough Council a uniquely responsive, JIT manufacture and installation service. Trueform’s One Stop Shop service enables the provision of value for money service (no subcontracting or multi-tier marking up) rapid lead times and total quality control under in house ISO9000 procedures that permeate every aspect of the service. Details of the various methods, systems and procedures that Trueform will employ to deliver this service and to make sure Trueform’s performance include the following (further details are provided on these areas):- Trueform’s Cheltenham Borough Council Infrastructure Computerised Works Order Management System - Fabritrack MRP2 Production Management System - Minor Planet - Installation Vehicle Tracking System - ‘Mayrise’ Computerised Road Opening Notice System - Project Sharepoint (Web Portal) - Liaison Procedure & ‘Project Tracking Spreadsheet’ (Already used and working well with existing street furniture Projects) - Sign Checklists (already up and running and working well with existing street furniture projects) - Quality Inspection ‘QA Checklists’ 1) Hold / On hold status - and full site specific report 2) Planned infrastructure installation date 3) Final status - completed / exception reporting

Quality control Systems and procedures for this contract: Quality Assurance Providing a Quality Product & Service Trueform are very able to manage and comply with the Quality Assurance aspects of the Contract as it has tried and tested quality assurance procedures processes and systems in place. These have been proven to work successfully throughout the term of existing contracts.

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex UB3 3NQ T. 0208 561 4959 ı F. 0208 589 0568 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

35


Trueform Brand Guidelines / Visual Identity / Powerpoint Templates

Powerpoint Template 1

Wayfinding Solutions

Wayfinding Solutions

Powerpoint Template 1 These examples demonstrate how type, imagery,

ABOUT US

colour, and illustration can be combined to create a distinct Trueform look and feel.

Trueform provide intelligent public transport hardware, wayfinding & signage solutions to the public transport sector

TRANSPORT SOLUTION PROVIDERS

Providing fully integrated public transport & wayfinding solutions through technology, design & innovations

Design - Manufacture - Installation - Maintenance

London, Birmingham, Manchester, Glasgow, Leeds, Liverpool, Sheffield, Las Vegas, New York, Seattle, Winnipeg, Abu Dhabi...

with their advanced public transport & wayfinding systems

Complete Service Providers for Public Transport

Complete Service Providers for Public Transport

Birmingham

Wayfinding Solutions

Complete Service Providers for Public Transport

Wayfinding Solutions

Legible London

We have provided some of the largest and most successful cities in the world

Complete Service Providers for Public Transport

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

36


Trueform Brand Guidelines / Visual Identity / Powerpoint Templates

Powerpoint Template 2

Powerpoint Template 2

Welcome to Trueform Health & Safety Induction for Visitors and Contractors

Welcome to Trueform Health & Safety Induction for Visitors and Contractors

New Visitors / Contractors

These examples demonstrate how type, imagery, colour, and illustration can be combined to create a

Welcome to Trueform

distinct Trueform look and feel.

Trueform takes its health and safety responsibilities very seriously and in order to ensure the health, safety and welfare of its visitors and contractors, you will be given a short induction covering our site rules and emergency procedures. Please pay attention as there is a short questionnaire at the end of the induction which requires a PASS in order to gain access onto our premises.

Health & Safety Induction for Visitors and Contractors

Press to

Press to

CONTINUE

CONTINUE

Welcome to Trueform Health & Safety Induction for Visitors and Contractors

Welcome to Trueform Health & Safety Induction for Visitors and Contractors

H&S Questionnaire - PPE Requirements

Thank you

When should Hi- Vis Vests be worn?

Reception/Security will now provide you with your visitor badge and further instructions.

When next to Machinery

At all times during the visit

They are not required at Trueform

When asked to be put on by your host

Please be aware that your visitor badge must be visible and on display at all times otherwise you may be asked to leave the site.

Click to

RETURN

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

37


Trueform Brand Guidelines / Visual Identity / Factsheet

Factsheet

Factsheet CASE STUDY

These examples demonstrate how type, imagery,

Bespoke Shelters & Canopies

CASE STUDY

Bespoke Shelters & Canopies

colour, and illustration can be combined to create a distinct Trueform look and feel.

Metrolink Integra Shelter In 2010 Greater Manchester Passenger Transport execute awarded Trueform a 12 year contract to design, manufacture and install up to 800 new platform shelters throughout Manchester’s tramway network.

CONTACT US Trueform UK & Other Countries Pasadena Trading Estate, Hayes, Middlesex UB3 3NQ, UK T:+44 (0)208 561 4959

Bond Street Canopy Trueform has designed, manufactured and installed bespoke entrance canopies for a wide range of applications including airport terminals, transport terminals and stations, and guided busways.

www.trueform.co.uk Trueform’s ‘Integra’ shelter provided Metrolink with the modular design, high quality

sales@trueform.co.uk

appearance and highly engineered construction they were looking for.

Pasadena Trading Estate, Hayes, Middlesex UB3 3NQ, UK T:+44 (0)208 561 4959 www.trueform.co.uk

Entrance canopies are designed to protect against the sun and the rain. Additional

sales@trueform.co.uk

and solar powered lighting can be incorporated into the design as required. Quirky and Trueform USA & Canada

management to facilitate rapid installation.

21-41 45th Road, Long Island

Displays, CCTV, induction loop and PA service announcement, and fare payment systems,

Trueform UK & Other Countries

accessories and details, such as covered walkways, rainwater management, lighting

The shelters were designed using modular construction techniques and intelligent cable

Incorporating a full range of advanced passenger amenities, including:- LED Lighting, RTI

CONTACT US

bespoke roof types can be designed to add a distinctive appearance to the structure.

Trueform USA & Canada 21-41 45th Road, Long Island

City Queens, New York, 11101

The canopies are designed, manufactured and assembled at the company’s London based

City Queens, New York, 11101

T:+001 (1)917 215 9453

manufacturing facilities.

T:+001 (1)917 215 9453

the shelters were well received by the travelling public of Manchester.

Trueform designed elegant station entrance canopies for TfL. They incorporate energy

The ‘Integra System’ is one of a range of modular shelter systems that Trueform has

Trueform Middle East

specifically developed to meet the demands of modern rail and light rail users.

Abu Dhabi Business Hub,

efficient LED downlighting and LED illumination of the blue perimeter band to ensure the station entrance and name is visible at all times.

Area icad-1, Mussafah UAE

Trueform Middle East Abu Dhabi Business Hub, Area icad-1, Mussafah UAE

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex UB3 3NQ

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex UB3 3NQ

T: 0208 561 4959 ı F: 0208 848 1397 ı sales@trueform.co.uk ı www.trueform.co.uk

T: 0208 561 4959 ı F: 0208 848 1397 ı sales@trueform.co.uk ı www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

38


Trueform Brand Guidelines / Visual Identity / Product Catalogue

Product Catalogue

Product Catalogue These examples demonstrate how type, imagery,

Products & Services

colour, and illustration can be combined to create a

Complete Solution Providers for Public Transportation

distinct Trueform look and feel.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

39


Trueform Brand Guidelines / Visual Identity / Product Catalogue

Product Catalogue

Product Catalogue These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

40


Trueform Brand Guidelines / Visual Identity / HTML Newsletter

HTML Newsletter

HTML Newsletter These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

41


Trueform Brand Guidelines / Visual Identity / Opera Templates

Opera Templates

Opera Templates These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

42


Trueform Brand Guidelines / Visual Identity / External Policy Documents

External Policy Documents

External Policy Documents 1.0

distinct Trueform look and feel.

Trueform Engineering Ltd is very aware of our responsibilities

C O R P O R AT E & S O C I A L R E S P O N S I B I L I T Y P O L I C Y

This policy rests on the subsequent fields, which reflect existing and emerging standards of Corporate Social Responsibility:

to ourselves, as well as our responsibilities to others,

Business Ethics and Transparency

Employee Relations

acknowledging how we may impact upon the communities

Trueform Engineering Ltd is dedicated to maintaining high standards of integrity and corporate governance practices to enable us to continue the excellence in our operations, and to advance confidence in our government systems.

Whilst respecting the Laws of the United Kingdom, Trueform Engineering Ltd will exercise fair working Practices.

and the environment in which we operate.

Our core values encapsulate our business

Trueform Engineering Ltd guarantees that

philosophy. We are an ethical business conducted

all issues concerning Corporate Social

with integrity, independent, with a true passion

Responsibility are supported in our day-to-day

for the business, our employees and wider

business activities and administrative matters.

community.

Furthermore it is ensured that all issues regarding Corporate Social Responsibility are in line

Our open, participative management style,

with the company’s stakeholders’ interests.

challenges convention and rewards innovation

Trueform Engineering Ltd commits itself to being

respecting all stakeholders. Trust, honesty and

recognised as an organisation understanding and

integrity are paramount to our organisation. In

protecting Corporate Social Responsibility, and

turn these core values are cascaded into our

believes that in doing so considerable value will

approach to Corporate & Social Responsibility,

be added for its shareholders.

reflecting a commitment to encourage people to combine local ambition with community objectives and environmental awareness. Trueform Engineering Ltd defines Corporate Social Responsibility as follows: • We always aim to conduct business in a socially responsible and ethical manner; • The environment as well as the safety of people enjoys our highest priority; • Our company fully supports the existing

This policy relates to all activities dealt with by or on behalf of the company. The company’s employees wholly embrace the considerations of Corporate Social Responsibility outlined in this policy. The company’s management team leads by example in this regard, as it continuously integrates those concerns into its daily business routine. The management team members make certain that proper organisational structures exist to identify, follow and manage Corporate Social Responsibility matters and performance pertinent to the business.

human rights; • We are keen to support and interact with the communities in which we work.

Trueform Engineering Ltd will carry out its business in an honest and ethical way. Trueform Engineering Ltd identifies the importance of protecting all of its assets, be it financial, physical, bodily, environmental or social.

Environmental Health & Safety Trueform Engineering Ltd is dedicated to protect the health and safety of all people who come into contact with our services; this includes employees, contractors and the general public. We will not compromise the health & safety of any person; we will ensure a safe and healthy workplace. Trueform Engineering Ltd will strive to advance responsible environmental practices and continue to improve. All the company’s’ employees are responsible for helping to work in a safe workplace and for operating in an environmentally accountable manner.

PO LIC IE S & PRO C E D U RE S

colour, and illustration can be combined to create a

Corporate & Social Responsibility Policy

PO LIC IE S & PRO C E D U RE S

These examples demonstrate how type, imagery,

1.0

C O R P O R AT E & S O C I A L R E S P O N S I B I L I T Y P O L I C Y

Trueform Engineering Ltd will make sure that all employees are treated equally and fairly and consideration will be taken for their aspirations and achievements in the workplace. All people coming into contact with Trueform Engineering Ltd will be treated equally irrespective of race, colour, religion, gender, sexual orientation, physical disability or any other grounds that might be construed as grounds for discrimination, including harassment and intimidation. We are an Equal Opportunities Company and abide by The Working Time Directive.

Community Investment Trueform Engineering Ltd will aim to develop beneficial relationships with communities and will combine Community Investment considerations onto decision-making and business practices. Where Trueform Engineering Ltd operates, we will endeavour to provide employment and economic opportunities in the community.

Human Rights Trueform Engineering Ltd will work with governments and agencies, as they have the primary responsibility to promote and protect human rights, to aid and respect human rights. Trueform Engineering Ltd will not tolerate abuse of human rights neither will Trueform Engineering Ltd engage in any activity that encourages the abuse of human rights.

We are an ethical business conducted with integrity, independent, with a true passion for the business, our employees and wider community.

Front

Trueform Engineering Ltd will always attempt to demonstrate respect for human rights in all associations it encounters, build trust, and have respect for cultures, customs, individuals and groups.

Jonathan Morley Group Managing Director Dated: February 2014. Next review due: February 2015.

Back

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

43


Trueform Brand Guidelines / Visual Identity / Internal Policy Documents

Internal Policy Documents

Internal Policy Documents C O R P O R AT E & S O C I A L R E S P O N S I B I L I T Y P O L I C Y

C O R P O R AT E & S O C I A L R E S P O N S I B I L I T Y P O L I C Y

distinct Trueform look and feel.

Trueform Engineering Ltd is very aware of our responsibilities to ourselves, as well as our responsibilities to others, acknowledging how we may impact upon the communities and the environment in which we operate.

Environmental Health & Safety

Community Investment

Trueform Engineering Ltd is dedicated to protect the health

Trueform Engineering Ltd will aim to develop beneficial

and safety of all people who come into contact with our

relationships with communities and will combine Community

services; this includes employees, contractors and the

Investment considerations onto decision-making and business

general public. We will not compromise the health & safety

practices.

of any person; we will ensure a safe and healthy workplace. Trueform Engineering Ltd will strive to advance responsible environmental practices and continue to improve. All the company’s’ employees are responsible for helping to work

Our core values encapsulate our business philosophy. We are

This policy relates to all activities dealt with by or on behalf

in a safe workplace and for operating in an environmentally

an ethical business conducted with integrity, independent,

of the company. The company’s employees wholly embrace

accountable manner.

with a true passion for the business, our employees and wider

the considerations of Corporate Social Responsibility outlined

community.

in this policy. The company’s management team leads by

Human Rights

example in this regard, as it continuously integrates those

Trueform Engineering Ltd will work with governments and

Our open, participative management style, challenges

concerns into its daily business routine. The management

agencies, as they have the primary responsibility to promote

convention and rewards innovation respecting all

team members make certain that proper organisational

and protect human rights, to aid and respect human rights.

stakeholders. Trust, honesty and integrity are paramount to

structures exist to identify, follow and manage Corporate

our organisation. In turn these core values are cascaded into

Social Responsibility matters and performance pertinent to the

our approach to Corporate & Social Responsibility, reflecting a

business.

commitment to encourage people to combine local ambition with community objectives and environmental awareness.

Trueform Engineering Ltd defines Corporate Social Responsibility as follows: • We always aim to conduct business in a socially responsible and ethical manner; • The environment as well as the safety of people enjoys our highest priority; • Our company fully supports the existing human rights; • We are keen to support and interact with the communities in which we work.

rights neither will Trueform Engineering Ltd engage in any activity that encourages the abuse of human rights. Trueform Engineering Ltd will always attempt to demonstrate

Trueform Engineering Ltd is dedicated to maintaining high

respect for human rights in all associations it encounters, build

standards of integrity and corporate governance practices to

trust, and have respect for cultures, customs, individuals and

enable us to continue the excellence in our operations, and to

groups.

Trueform Engineering Ltd will carry out its business in an honest and ethical way. Trueform Engineering Ltd identifies the importance of protecting all of its assets, be it financial, physical, bodily, environmental or social.

Where Trueform Engineering Ltd operates, we will endeavour to provide employment and economic opportunities in the community.

Trueform Engineering Ltd will not tolerate abuse of human

Business Ethics and Transparency

advance confidence in our government systems.

P OLIC I ES & P R OCED U R ES

colour, and illustration can be combined to create a

Corporate & Social Responsibility Policy

PO LIC IE S & PRO C E D U RE S

These examples demonstrate how type, imagery,

Jonathan Morley Group Managing Director Dated: 19th February 2015

Employee Relations Whilst respecting the Laws of the United Kingdom, Trueform Engineering Ltd will exercise fair working Practices. Trueform Engineering Ltd will make sure that all employees are treated equally and fairly and consideration will be taken for their aspirations and achievements in the workplace. All people coming into contact with Trueform Engineering

Trueform Engineering Ltd guarantees that all issues

Ltd will be treated equally irrespective of race, colour,

concerning Corporate Social Responsibility are supported

religion, gender, sexual orientation, physical disability or

in our day-to-day business activities and administrative

any other grounds that might be construed as grounds for

matters. Furthermore it is ensured that all issues regarding

discrimination, including harassment and intimidation. We are

Corporate Social Responsibility are in line with the company’s

an Equal Opportunities Company and abide by The Working

stakeholders’ interests. Trueform Engineering Ltd commits

Time Directive.

itself to being recognised as an organisation understanding and protecting Corporate Social Responsibility, and believes that in doing so considerable value will be added for its shareholders.

Front

Back

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

44


Trueform Brand Guidelines / Visual Identity / Order Forms

Order Forms

Order Forms These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

Purchase Order Form

TT Order Form

Works Order Form

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

45


Trueform Brand Guidelines / Visual Identity / Commercial Invoice

Commercial Invoice

Commercial Invoice These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

COMMERCIAL INVOICE

Date: 19th December 2014

Invoice No: CT001

Shipper Name: Trueform Engineering

Consignee Name: Trueform UAE

Contact Person: Caroline Tompkins

Contact Person: Dave Hogg

Street Address:

Street Address:

Unit 12 Pasadena Trading Estate

Honda Showroom Building

Pasadena Close

Electra Street

Hayes, Middlesex

Apt 1901

UB3 3NQ

Abu Dhabi

Country: United Kingdom

Country: United Arab Emirates

Telephone No: 0208 561 4959

Telephone No: 0561211093 or 07919493548

Total No. of Pieces: 1 Item No

Qty

1

1

Total Gross Weight in Kilos: 2

Description

Country of Origin

Weight (kgs)

Dims (cm’s) LxWxH

Value per Item (£)

Total Value (£)

Flag Graphics - Vinyl

UK

2

71 x 9 x 9

10.00

10.00

TOTAL VALUE

10.00

I/We hereby certify that the information on this invoice is true and correct and that the contents of this shipment are as stated above.

Authorised Signature: ....................................................................................................

Date: 19th December 2014

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

46


Trueform Brand Guidelines / Visual Identity / Sales Quotation

Sales Quotation

Sales Quotation Q U O TAT I O N

Q U O TAT I O N

These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

FAO John Cummings

High Street, Christchurch

Dorset County Council

Removal and dispose of Seat & Bin @ £360.00

Date: 21st May 2014

To Supply 1 off 3 bay Evo shelter @ £6,335.00

Quotation Number: 4305

• Single roof wing / Flight curved roof • Shelter painted in the colour of black

Dear John,

• Half end panels • A seat with arm rests that is one bay shorter than the shelter. Seats and Arm rests in Dorset Dark Green

RE: Trueform Evo Shelter

RAL 6018 or Pantone 361 • No flag

Further to your recent enquiry we have pleasure in submitting our quotation to undertake the work as follows:Barrack Road, Christchurch To Supply 1 off 3 bay Evo shelter @ £6,335.00 • Single roof wi¬ng / Flight curved roof • Shelter painted in the colour of black • Half end panels • A seat with arm rests that is one bay shorter than the shelter. Seats and Arm rests in Dorset Dark Green RAL 6018 or Pantone 361 • No flag • Vinyl location name ‘Avenue Road’ in white Helvetica bold. • Vinyl identification number sticker x 2 with DCC 92 stuck to the front and back of the roof • DRU Installation with foundations @ £2,400.00 Electrical connection cost £800.00. Tail up @ £610.00

• Vinyl location name ‘High Street’ in white Helvetica bold? • Vinyl identification number sticker x 2 with DCC ?? stuck to the front and back of the roof? • DRU Installation with foundations @ £2,400.00 Electrical connection cost TBC with local UKPN Tail up @ £610.00 All prices exclusive of VAT Please note: Price includes all project management costs including overseeing installation, H&S Requirements, Labor & Plants etc This quotation and any subsequent orders will be subject to our standard terms and conditions, a copy of which is available on request. I hope this quotation meets with your approval and we look forward to receiving your order in due course. Yours sincerely

Amanda O’Connor Sales & Marketing

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex UB3 3NQ

Trueform ı Pasadena Trading Estate ı Hayes ı Middlesex UB3 3NQ

T. 0208 561 4959 ı F. 0208 589 0568 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

T. 0208 561 4959 ı F. 0208 589 0568 ı E. sales@trueform.co.uk ı W. www.trueform.co.uk

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

47


Trueform Brand Guidelines / Visual Identity / Delivery Notes

Delivery Notes

Delivery Notes These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

Sub Contract Note

Customer Delivery Note

Depot Delivery Note

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

48


Trueform Brand Guidelines / Visual Identity / Signage

Signage

Signage These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

Unit Signage - Vinyl

Unit Signage - Vinyl

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

49


Trueform Brand Guidelines / Visual Identity / Signage

Signage

Signage These examples demonstrate how type, imagery, colour, and illustration can be combined to create a distinct Trueform look and feel.

Please knock before entering

Door with Window - Frosted Diecut Vinyl

Door without Window - Diecut Vinyl

All logo formats, fonts and design templates can be found in X:\Cad Drawings\Trueform Sales & Marketing Graphics

Version 1.0 18th August 2014

50


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.