3 minute read
MILLER ACTIVITY COMPLEX (MAC
1375 West Plum Creek Parkway Castle Rock, CO 80109 Main Line: 720-733-2222 CRgov.com/MAC
Advertisement
HOURS OF OPERATION
Monday–Saturday 8 a.m.–9 p.m. Sunday 8 a.m.–8 p.m.
LIMITED HOLIDAY HOURS
Dec. 31
April 9 May 29 8 a.m.–2 p.m. Closed
Closed
8 a.m.–2 p.m.
• Adult and youth athletics • Batting cages (no pitching machine provided) • Beam interactive floor games • Birthday party rooms • Children’s play area with climbing structure and slides • Family locker room • Functional Fitness Area • Full-sized and half-sized synthetic-turf fields • Leisure pool with zero-depth area, vortex whirlpool, slide and four lap lanes • Trampolines
FUNCTIONAL FITNESS AREA
Need to kill some time while the kids have sports practice? Stop by the Functional Fitness Area inside the MAC! The space has everything you need to get a great workout and is included with your daily admission.
Equipment provided:
• Balance trainers • Chin-up/dipbars • Dumbbells, kettlebells and exercise balls • Plyometric boxes • Ropes • Rowing machine • Sleds (available upon request) • Stationary fan bikes • Tires
Possibilities Playground Possibilities Playground
at Butterfield Crossing Park at Butterfield Crossing Park
Project Scope
Imagine a universally designed, sensory-rich environment that enables children of all abilities to develop physically, socially and emotionally. With your help, this vision may soon become a reality at Butterfield Crossing Park in Castle Rock.
The Castle Rock Parks and Trails Foundation joined forces with the Parks and Recreation Department to maximize already planned renovation work. The department’s Capital Improvement Plan identified the need for upgrades, and 2022 priorities focused on addressing safety and life-cycle replacement at Butterfield Crossing Park. The Foundation is using this timing as an opportunity to enhance the park beyond renovation work with the Possibilities Playground.
The goal of this inclusive playground is for visitors of all ages and abilities to be able to play, be challenged and have fun together. Visit PossibilitiesPlayground.org to learn how you can help children of all abilities interact with one another and do what every child wants to do: play!
The Butterfield Crossing Park Renovation project is a priority for the Castle Rock Parks and Trails Foundation, an independent 501c3 that works to enhance Castle Rock’s parks and trails and maximize the community’s recreational experiences. Established in 2012, the Foundation is a resident-led advocacy group, brought together by their collective desire to create educational and enjoyable recreational experiences.
The Foundation would like to thank supporters of the project to date. With generous contributions from local businesses paving the way, the Foundation has reached nearly 70% of its fundraising goal. Community giving has played an important role in bringing inclusive play to Castle Rock too, with over $9,000 coming from individuals opting to trade their regular coffee shop visits or coins in their piggy banks for something bigger.
$1,300,000 $1,200,000 $1,100,000 $1,000,000 $900,000 $800,000 $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $100,000