ConnectMcKinleyville.com public engagement summary

Page 1

Design Workshop Summary 233 ideas + proposed design solutions summarized in six priority investment strategies:

4 2

5 6

1 3

1 2

Slowing traffic

3

Reducing conflicts

4

Beautifying the corridor & place making

5 6

Access to business

Improving bike/ped. safety

Other ideas

*A combination of strategies is needed to improve Central Ave.


Connect McKinleyville.com

Enhanced pedestrian

crossings & bike lanes

Create a central place/destination

Paint speed limit on roadway

Enhanced striping or intermittent medians with turn pockets

Colorized crosswalks & bike lanes

Created on Streetmix.net a project of Code for America

*A combination of strategies is needed to improve Central Ave.


Workshop Summary


Crowdbrite Design Workshop Summary 1. Slow Traffic A) Flashing light with speed indicators B) Paint speed limit on roadway? C) Public education for safe bike, pedestrian and vehicles D) Regulatory Traffic Control - Police 2. Improved Bicycle/Pedestrian Safety A). Enhanced pedestrian crossings and bike lanes (10) colorized crosswalks and bike lanes (5) with improved lighting /flashing lights B) Use bulb outs and shorten the distance across the street. C) Signal improvements – tied together, bike actuated (2), longer pedestrian walk signals. D) Complete sidewalk connections 3. Reduce Conflicts Reduce turn conflicts with enhanced striping or intermittent medians with turn pockets A) mountable and vegetated intermittent medians B) dedicated right turn lanes C) pullouts for buses

2

Investment Strategies

4. Beautify the Corridor A) Create a central place/destination B) Preserve trees, landscaping and Create a gateway to the South 5. *Access to Local Business


Connect McKinleyville.com


Top Priorities

www.connectmckinleyville.com


Implementation Strategies

www.connectmckinleyville.com


Alt 1 Comments

www.connectmckinleyville.com


Preferred Alternative

www.connectmckinleyville.com


Alt. 2 Feedback

www.connectmckinleyville.com


Treatment Options

www.connectmckinleyville.com


7600 Views (1600+) per Plan

www.connectmckinleyville.com


500+ responses 100+ respondents

www.connectmckinleyville.com


Sept – Oct 15


Overall Stats


STATION #A -– Your Priorities ! How#might#we#IMPROVE## Central#Avenue?#

At#the#Spring#Workshop# 233#ideas#were#iden5fied# along#with#five#priori5es# for#the#corridor.#A# combina5on#of#strategies# is#needed.# #

Workshop#Summary:############# 2!

Poll##2#

Iden5fy#your#top#3# implementa5on#strategies# What#is#missing?##

## # # #

SM

Crowdsourcing for Better Communities

A"combina*on"of" treatment"op*ons"is" needed."" "

1.!

Treatment"Op*ons"

Poll"#3"

Poll##1##

Iden5fy#&#confirm#the#top# themes#from#the#Design# Workshop.#Iden5fy#your# top#2#priori5es#from#the# following#list:# •  Slow#traffic# •  Improve#bicycle/ pedestrian#safety# •  Reduce#conflicts# •  Beau5fy#the#corridor#&# place#making# •  Preserve#Access#to# business# Add#addi5onal#comments.# #

STATION #B -– Improvements!

McKinleyville Central Ave. Improvement Project

www.connectmckinleyville.com!

Iden*fy"which"treatment" op*ons"are"most" appropriate"for"Central" Avenue." You"may"also"provide" addi*onal"comments." " 1."Intersec*on"Pedestrian" Refuge"Islands" 2."Colored"Bike"Lanes" 3."Mid"Block"Pedestrian" Crossings" 4."Buffer"Strip"for"Bike" Lanes" 5."Emergency"Vehicle"PreM emp*on"Equipment" 6."Double"Red"Traffic"Light" Signals" "

" 5.! "" " " "

Crowdsourcing for Better Communities

SM

2!

3!

4.!

McKinleyville Central Ave. Improvement Project

www.connectmckinleyville.com!



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.