MBTA: Red & Orange Line Improvements

Page 1

MBTA Red Line/Orange Line Improvement Programs MassDOT Board Review


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Improvement Programs

Red Line New Vehicle Procurement Program (2014)

Orange Line

NEW VEHICLE PROCUREMENT PROGRAM INFRASTRUCTURE IMPROVEMENTS PROGRAM

Vehicle Delivery Programs

SIGNALS UPGRADE PROJECTS STATE OF GOOD REPAIR PROJECTS 2


MBTA

Red Line/Orange Line Improvement Programs

New Vehicle Procurement Program 284 New Heavy Rail Vehicles for Red and Orange Lines

Red Line

• Replacement of 132 Cars • (218 Exist. Fleet)

Vehicles

Orange Line Vehicles

• Replacement of All Existing 120 Cars & Addition of 32 Cars (152 total)


MBTA

Red Line/Orange Line Improvement Programs

New Vehicle Procurement Program- Features Focus: Improving/Enhancing of MBTA Passenger Experience Capacity and Accessibility

• • • • • • •

Increased car capacity Wider doors More accessible areas Advanced passenger information and announcement systems such as LCD displays Automated passenger counting system Horizontal gap mitigation devices Energy efficient features such as LED lighting and modern HVAC systems

Communication and Safety Features • On-board CCTV cameras • Automated Train Protection/Automatic Speed Regulation (ATP/ASR) signal system compatible with the existing Red and Orange Line infrastructure and foreseeable future wayside upgrades.

Advanced Maintenance features • Such as a vehicle monitoring system (VMS) and the incorporation of common design elements to both the Orange and Red Line fleets.

Improved reliability • Improved reliability through fewer breakdowns as typically experienced with the current old equipment.


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Schedule Development New Vehicle Procurement Program Notice to Proceed December 18, 2014

RED LINE

ORANGE LINE

Pilot Car

Pilot Car

March 18, 2019

Dec 18, 2017

First Production Vehicle

First Production Vehicle

Nov 18, 2019

Dec 18, 2018

Last Production Vehicle Jun 18, 2022

Last Production Vehicle Dec 18, 2022

5


MBTA

Red Line/Orange Line Improvement Programs

New Vehicle Procurement Program

Project Status – On-Schedule • Total project budget of $801.2M • The final assembly of the new vehicles will be in CNR MA’s North American headquarters located in Springfield, Massachusetts. • Preliminary Design Review Completed • Mock-up Nearing Completion – Anticipated Delivery – January 2017 • Mock-up Review performed Changchun, China – July 2016 • Final Design Review Underway - Anticipated Completion – March 2017 • First Article Inspection - Anticipated Completion – March 2017 • Springfield Facility will have the “Topping Out” Ceremony – August 25, 2016

6


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Improvement Programs Red Line/Orange Line Vehicle and Infrastructure Improvement Programs Definition Timeline

New Vehicle Procurement Program (2014)

Coordination

Infrastructure Improvement Program (2014)

PM/CM (2015)

Testing and Commissioning

Maintenance and Service

New Vehicle Delivery Infrastructure Support Storage

Infrastructure Improvements Identified (2016)

Reliability and Safety 7


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program

Orange Line Test Track at Wellington Yard/Track 5 Wellington Yard Expansion-Tracks 33 to 38 Wellington Yard-Zones A-B Wellington Maintenance Facility Red Line Test Track at Cabot Yard Cabot Yard Rebuild-Zones A-C

Red/Orange Line Infrastructure Improvements Program

Cabot Maintenance Facility Signal Systems RL & OL Enhancements

8


– ORANGE LINE TEST TRACK AT WELLINGTON YARD & TRACK 5 – WELLINGTON YARD EXPANSION TRACKS 33-38 – WELLINGTON MAINTENANCE FACILITY – WELLINGTON YARD REBUILD ZONES A-B

MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Orange Line Contracts

WELLINGTON YARD REBUILD

ORANGE LINE TEST TRACK

WELLINGTON EXPANSION TRACKS 33-38 WELLINGTON MAINTENANCE FACILITY

FACILITY EXPANSION ZONE A

ZONE B

TRACK 5


– RED LINE TEST TRACK AT CABOT YARD – CABOT MAINTENANCE FACILITY – CABOT YARD REBUILD – ZONES A-C

MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Red Line Contracts

CABOT MAINTENANCE FACILITY– Phases 1 & 2

Zone B

Zone A

RED LINE TEST TRACK

CABOT YARD REBUILD

Zone C


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Project Status & Cost Red Line Orange Line Infrastructure Improvement Projects Orange Line Test Track at Wellington Yard Wellington Yard Expansion-Tracks 33 to 38 Wellington Maintenance Facility Wellington Yard-Zones A-B Red Line Test Track at Cabot Yard Cabot Maintenance Facility Cabot Yard Rebuild-Zones A-C Signal Systems RL & OL Enhancements RL/OL Program Level (PM/CM, OR & Project Admin.) Unallocated Contingency

Current Status Design: 15% Design: PSE Design: 90% Design: NTP 10/2016 Design: 15% Design: NTP 12/2016 Design: NTP 12/2016 Design: 15% Ongoing Total:

Cost (Millions) $6.4 $26.0 $104.1 $50.2 $21.1 $90.0 $55.3 $3.7 $70.9 $70.9 $498.6

11


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Cost

MassDOT ISA 84195 RL/OL PM/CM & DESIGN & CONST Grant #S15007

Current Funding: $53.4M

MassDOT ISA 82471 WELLINGTON CARHOUSE IMPROVEMENT Grant #S15008

MassDOT ISA 82737 RL/OL INFRAS-OWNER’S REPRESENTATIVE Grant #S15009

Current Funding:

Current Funding:

$4.0M

$5.0M

Additional Funding Requested: FY2017 Obligation $148.3M

Total Program Cost: $498.6M •Full program cost included in the current CIP.

12


Red Line Orange Line Infrastructure Improvement Projects (Cost in Millions) Orange Line Test Track at Wellington Yard Wellington Yard Expansion-Tracks 33 to 38 Wellington Maintenance Facility Wellington Yard-Zones A-B Red Line Test Track at Cabot Yard Cabot Maintenance Facility Cabot Yard Rebuild-Zones A-C Signal Systems RL & OL Enhancements

FY2017 FY2018 FY2019 FY2020 TOTAL Obligation Obligation Obligation Obligation Obligation $6.38 $6.38 $26.00 $26.00 $104.09 $104.09 $11.84 $38.32 $50.16 $5.06 $16.01 $21.07 $5.78 $84.19 $89.97 $9.24 $46.09 $55.33 $3.65 $3.65 RL/OL Program Level (PM/CM, OR & Project Admin.) $38.68 $17.35 $14.96 $70.99 Unallocated Contingency $3.0 $37.10 $30.88 $70.98 Total: $210.72 Current Funding: ($62.44) TOTAL ADDITIONAL FUNDING REQUIRED: $148.28M $204.96M $52.06M $30.88M $498.62M

MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Annual Funding Needs ISAs

13


Project

2015

2016

2017

2018

2019

2020

2021

2022

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q

PHM (PM/CM) & Owners Representative Vehicle Delivery Projects Orange Line Projects Orange Line Test Track at Wellington Yard Wellington Yard Expansion - Tracks 33 to 38 Wellington Maintenance Facility Wellington Yard Rebuild - Zones A - B Red Line Projects Red Line Test Track at Cabot Yard Cabot Maintenance Facility Cabot Yard Rebuild - Zones A - C Signal Systems R.L. & O.L. Enhancements

MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program

Legend Design Activities Construction Activities PHM (PM/CM) & OR PHM Type Studies Procurement (Design/Const.) Interim Milestone to Support Vehicle Delivery

MassDOT/FMCB Funding Approval for ISA required by November 2016.

August 2016

Final Production Vehicles

14


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Program Funding Total Program Funding Required

For this action, MBTA is requesting $148.28M for all Fiscal Year 2017 (FY17) obligations.

Current Funding:

Current Funding:

$62.4M

$62.4M

Total Additional Funding Required (FY17 – FY21):

Additional Obligated Funding Required (FY17):

$436.2M

$148.3M

Total Funding and Program Cost: $498.6M •Future ISAs will be necessary for FY18 and beyond. •Full program costs are incorporated in the current CIP.

Total Obligated Funding (Through FY17): $210.7M 15


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvements

Questions?

Red/Orange Line Infrastructure Improvements Program

16


Orange Line Test Wellington Track At Yard Expansion Wellington Yard Trks 33-38

MAC Item Construction Materials Procurement Force Account Field Inspection Project Administration Professional Services Escalation Project Totals Unallocated Contingency Program Total

MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvements

$ $ $ $ $ $ $ $ $ $

WYTC 4,884,786 474,880 247,724 533,691 239,668 6,380,749 6,380,749

$ $ $

WYTC 3,816,239 1,068,547 4,884,786

Wellington Yard Rebuild

Wellington Maintenance Facility

Red Line Test Track at Cabot Yard

Cabot Yard Rebuild

WYEC WYRC WMFC CYTC CYRC $ 20,176,539 $ 33,392,247 $ 75,829,341 $ 15,884,201 $ 37,241,041 $ 1,501,500 $ 3,376,800 $ 5,253,723 $ 252,000 $ 2,109,450 $ 693,306 $ 1,642,271 $ 4,763,206 $ 601,484 $ 1,867,879 $ 536,957 $ 344,135 $ 1,391,032 $ 715,107 $ 545,340 $ $ $ $ $ $ 1,994,688 $ 8,465,183 $ 7,524,084 $ 2,260,717 $ 9,236,838 $ 1,100,415 $ 2,938,330 $ 9,329,620 $ 1,354,671 $ 4,330,261 $ 26,003,405 $ 50,158,965 $ 104,091,005 $ 21,068,181 $ 55,330,809 $ $ $ $ $ $ 26,003,405 $ 50,158,965 $ 104,091,005 $ 21,068,181 $ 55,330,809

Orange Line Test Wellington Track At Yard Expansion Wellington Yard Trks 33-38

MAC Item Construction Estimate Risk Allocation - P74 Total Construction

PROGRAM COST ESTIMATE SUMMARY

WYEC $ 15,762,921 $ 4,413,618 $ 20,176,539

Cabot Maintenance Facility

$ $ $ $ $ $ $ $ $ $

CMFC 66,726,027 469,705 4,070,768 1,445,525 5,778,935 11,475,589 89,966,549 89,966,549

Signal System Enhancements

SSEC $ $ 539,175 $ 1,883,408 $ 739,210 $ $ 256,514 $ 235,115 $ 3,653,422 $ $ 3,653,422

PROGRAM UNALLOCATED LEVEL CONTINGENCY $ $ $ $ $ $ $ $ $ $ $ $ $ 16,132,093 $ $ $ 54,862,833 $ $ $ $ $ $ 70,994,926 $ $ $ $ 70,980,316 $ $ 70,994,926 $ 70,980,316 $

Total 254,134,182 13,502,353 15,997,201 5,965,030 16,132,093 90,913,483 31,003,669 427,648,012 70,980,316 498,628,328

PROGRAM LEVEL $ $ $ -

Total 189,080,115 65,054,067 254,134,182

PROGRAM COST ESTIMATE SUMMARY Wellington Yard Rebuild

Wellington Maintenance Facility

WYRC WMFC $ 25,686,344 $ 56,169,882 $ 7,705,903 $ 19,659,459 $ 33,392,247 $ 75,829,341

Red Line Test Track at Cabot Yard

Cabot Yard Rebuild

Cabot Maintenance Facility

CYTC $ 11,427,483 $ 4,456,718 $ 15,884,201

CYRC $ 28,212,910 $ 9,028,131 $ 37,241,041

CMFC $ 48,004,336 $ 18,721,691 $ 66,726,027

Signal System Enhancements

SSEC $ $ $

-

UNALLOCATED CONTINGENCY $ $ $ -

$ $ $


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvements Orange Line Test Track at Wellington Yard

$6.4

Wellington Yard Expansion-Tracks 33 to 38

$26.0

Wellington Maintenance Facility

$104.1

Wellington Yard-Zones A-B

$50.2

Red Line Test Track at Cabot Yard

$21.1

Cabot Maintenance Facility

$90.0

Cabot Yard Rebuild-Zones A-C

$55.3

Signal Systems RL & OL Enhancements

$3.7

Program Level Costs

Red/Orange Line Infrastructure Improvements Program

$70.9

Unallocated Contingency Total

$70.9 $498.6

Orange Line Signal Upgrade-Mainline

$140.0

Red Line Signal Upgrade-Mainline

$235.0 Total

Wellington Yard Rebuild C-G

Signals Upgrade

$375.0 $213.9

Orange Line Traction Power Upgrades

$77.4

Cabot Yard Rebuild Zones D-F

$229.7

Red Line Traction Power Upgrades

$197.9 Total

State Of Good Repair

$718.9

Total Cost $1,592.5M

18


MBTA

Red Line/Orange Line Improvement Programs

Level of Service (LOS): The measurement of the quality of service that passengers experience Level of Service

Reliability and Safety (Operating Ability)

Loss of Reliability and Safety • System Obsolesce  Safety: Wear failure protection features  Maintenance related delays  Maintenance & repair Cost

System Capacity (Operating Potential)

Loss of System Capacity • Operating Ability  Need for reliable underlying system • Geometric Constrains  Spacing between stations.  Grade changes. • MBTA Procedural Constrains • Dwell Times


MBTA

Red Line/Orange Line Improvement Programs

Level of Service Improve System Reliability

Increase System Capacity New Vehicle Procurement

Winter Resiliency Effort

Vehicle Critical Projects

Signal Upgrade Projects

Other State of Good Repair (SOGR) Projects Bridge Strengthening Program

Orange Line= 152 “No. 14” Red Line = 132 “No. 4” Upgrade of existing “No. 3” cars on the Red Line


MBTA

Red Line/Orange Line Improvement Programs

Red Line/Orange Line Infrastructure Improvement Programs

Orange Line Test Track at Wellington Yard/Track 5 Wellington Yard Expansion-Tracks 33 to 38 Wellington Yard-Zones A-B Wellington Maintenance Facility Red Line Test Track at Cabot Yard Cabot Yard Rebuild-Zones A-C

Red/Orange Line Infrastructure Improvements Program

Cabot Maintenance Facility Signal Systems RL & OL Enhancements Orange Line Signal Upgrade-Mainline Red Line Signal Upgrade-Mainline

Signals Upgrade

Wellington Yard Rebuild C-G Orange Line Traction Power Upgrades Cabot Yard Rebuild Zones D-F Red Line Traction Power Upgrades

State Of Good Repair

21


MBTA

Red Line/Orange Line Improvement Programs

Red Line Orange Line Infrastructure Improvements Program Timeline MBTA Review Period

MBTA Review Period Strategic Program PlanDraft Submission 2/3/2016 SPP Presentation 2/16/2016

MBTA Approval of Draft SPP Approach

Risk Workshop 3/15-18/2016

Value Engineering 6/28-30/2016

MassDOT Board Approval 2017-2021 CIP 06/20/16

MassDOT/ MBTA ISA for remainder of Program Funding Submit Strategic Program Plan Final Baseline Cost & Schedule 7/21/16 Procurement Of Design and Construction Contracts 22