Portfolio_Wenqin.S

Page 1

20-

PORTFOLIO W EN Q IN

S H EN G

-22


Wenqin Sheng +61 0450083997 crystalsheng0109@gmail.com

Education

Participated Projects

Aug 2015 - Jun 2016 Trinity College (Foundation study of Melbourne)

Shanghai East Railway Station, Hines Heritage Renovation, Zhangjiang Medical Park Commercial Building, Zhanjiang Highrise, Tianchang National Sports & Fitness Center

2016 - 2019 University of Melbourne Bachlor of Environments (Major in Architecture) Jul 2020 - Dec 2022 University of Melbourne Master of Architecture

Work Aug 2019 - Oct 2019 Architectural Intern Tongji Architectural Design (Group) Co., Ltd Sep 2021 - Jan 2022 Architectural Intern Hassell Studio Shanghai

Skill AutoCAD Revit Rhinoceros+Grasshopper Sketch Up+3DS Max VRay+Enscape Photoshop CC+Illustrator CC+InDesign CC Makerbot 3D Printing+Model Making Film Photography Oil Painting Screenplay Adaption 2

Volunteer Feb 2022 - May 2022 Peer Mentor (University of Melbourne) July 2023 Open House Aug 2023 - Nov 2023 Robin Boyd Foundation Collection Team

Language Chinese(Mandarin)& English

Referee Mr. Klevis Koco Principal of Hassell Prof Paul Walker Professor of University of Melbourne


01

02

03

04

Radical Shed

Watchdog

Waterfront Tower

Museum of Open Secret

05

06

07

08

A Slow Friday

Landscape Buffer Zone

Grid Synthesis

Tianchang National Stadium

09

10

Zhangjiang Medical Park 06-01 Plot

Shanghai East Station 3


RE FER ENC E LET T E R 12F BASE 45 CAOXI NORTH ROAD XUHUI DISTRICT SHANGHAI 200030 CHINA 中国上海徐汇区漕溪北路 45 号 BASE 航空大厦 12 楼 邮编 200030 +8621 5456 3666 AUSTRALIA / ASIA / UNITED KINGDOM / UNITED STATES 澳大利亚 / 亚洲 / 英国 / 美国 HASSELL DESIGN CONSULTING (SHANGHAI) LIMITED 铿晓设计咨询(上海)有限公司

8 November 2022

To Whom It May Concern, RE: WENQIN SHENG I have had the pleasure of working with Wenqin on a number of competitions and projects during her intership in Shanghai. I have found Wenqin to be a great collaborator and curious. Always very responsive with an outstanding team work spirit. Wenqin was actively engaged in the team and was well liked by her colleagues. I wish Wenqin a great start to the proffesional career. I am confident that Wenqin would be an asset to any organisation bringing diverse skills and experience. Should you have any questions, please do not hesitate to contact me.

Yours sincerely

Klevis Koco Principal Email

4

hassellstudio.com

01/01

kkoco@hassellstudio.com

Letter_FORM_191206.dotx Recommendation Letter_Xu Zhang.docx


RE FE RE NCE L E T T E R

Professor Paul Walker BArch (Auckland) PhD (Auckland)

6 December 2022

To Whom It May Concern

Re: Wenqin Sheng

I am very pleased to write a letter of recommendation for Wenqin Sheng. Wenqin has been enrolled in the Master of Architecture Design Thesis studio which I have run during semester 2, 2022. This subject culminates the University of Melbourne Master of Architecture degree and requires students to undertake a research-led design in response to a broad theme set by the studio teacher. The studio I offered this semester was called ‘Radical Suburbs’ and required students to rethink typical suburban building programs, within a typical Melbourne middle-suburban setting – Cheltenham/Southland in our case. Wenqin’s project involved the rehabilitation of two large industrial sheds in a zone of industrial buildings in the west of Cheltenham. While she envisaged her project as maintaining building fabric associated with the suburb’s history of light industrial manufacturing, she introduced a range of community activities to replace the original uses, to reactivate the buildings, and to introduce them to new groups of users. These new uses were organised in plan in discrete zones of each shed, but with lateral connections devised to allow communication between. While conserving the repetitive frame structures of the two buildings, and their overall extruded form, she planned to partly de-clad or re-clad them. Some building materials and interior fittings and furniture were envisaged to be derived from recycled resources. The project was elegant both in conception and presentation. Before her studies for the Master of Architecture, Wenqin undertook a Bachelor of Environments at the University of Melbourne, with a major in architecture. She has undertaken internships in Shanghai with the Tongji Architectural Design Group and with Hassell’s Shanghai studio. Wenqin undertook a range of electives in her masters study, particularly focussing on contemporary architectural practice. These included an elective studio in Venice, working with members of the eminent international practice Snøhetta. She has achieved mostly honours grades (H2A) in both her core and elective subjects, completing her Design Thesis with this grade as well.

Faculty of Architecture, Building and Planning The University of Melbourne Victoria 3010 Australia 5


Site Map

01 Radical Shed

Thesis project Cheltenham, Vic | Heritage | Factory Renovation | Community Centre

The configuration of sheds can be found everywhere in Western industrial Cheltenham. With a lack of cultural interest, they expose their intrinsic to functionalism. The industrial iteration of [ Shed ] is abused in this bleak place. The absence of landscape on the site leads to an unsuccessful shed. [ Shed ] has lost its charm as a primitive hut interface with nature. The intrinsic connection between industrial and domestic sheds is the expression of extreme functionality. This scheme aims to examine the success of domestic sheds and provide a solution for the superseded industrial shed on 233 Bay Road. Through a process of recycling the abandoned domestic furniture, the hard rubbish carrying the untold story of previous owners will be renovated and become part of the civic space. 6

Radical Shed


7


1 CIVIC LIFE WITH PERFORMANCE OPEN STAGE

Short Section 1:600@ A3

2 CIVIC LIFE WITH TECTONIC

1

LANDSCAPE

section bb’ 1:600

CONNECTION BRIDGE

3 CIVIC LIFE WITH

6

FOOD

COMMUNITY

1

a’

2

KITCHEN

3 4 CIVIC LIFE WITH

4

GARDENING

COMMUNITY GARDEN

5

5 CIVIC LIFE WITH BOOKS

COMMUNITY LIBRARY EMBEDED WITH BOTANIC

Plan 1:500 @A3

GARDEN

b

6 CIVIC LIFE WITH HANDCRAFT

b’ RENOVATION WORKSHOP

8

New Elevation 1:500 @A3


section cc’ 1:600

2

3

section dd’ 1:600

4

section ee’ 1:600

a’

c

d

e

c’

d’

e’

9


1

Open Stage

The stage provides a civic event space for the local community, people are encouraged to bring and leave their unwanted chairs, sofas or even mattress to create seating for themselves.

Trial Section 1:50@ A3 10

2

Trial

The grand gesture of landscape renovation connects the two existing buildings and boosts circulation. The soil replaces the cold concrete walkway. This lifted trail retains planting between the platforms and is at the same time a shortcut with various hotspots attached.

3

Community Kitchen

A community kitchen builds against the leftover brick walls. A relaxing space for people to share and enjoy food. It is lifted to reduce the significant floor-to-ceiling height within the structure of the industrial shed.

Long Section aa’ 1:600@ A3


4

Community Garden

An edible public garden for everyone that encourages the local community to grow and cultivate their ingredient.

5

Botanic Garden & Library

The community library builds closely with the botanic garden and provides people with a calm reading experience. People can grab a book and a chair stored in the community library and share their reading experience in the botanic garden.

6

Workshop

The workshop located in the preserved building at the back allows people to bring their old furniture or home appliances there; people can build, repair and create upon the superseded.

11


Botanic Garden Section 1:100 @ A3

12


Renovated Workshop

Community Kitchen`

13


02 Watchdog

Master project Melbourne | Conceptual Design | Workplace& Data Center | Mixed-use Office Tower

The designed environment generates social spaces concretely. It influences the way you act; stimulates the reflection you see. The cyber environment generates social spaces virtually. It changes the way you think, shapes the value you believe in. The principle of the algorithm should be revealed to awaken people’s awareness of the big data crisis. This design attempts to bring reflection and insights to the public regarding the emerging ethical issues of technological innovation. It should provoke self-consciousness and offer a bird’s eye view inspection of a common domain. Waterfront Tower 14


15


12 10

11

1. SUNKEN PLAZA

Auditorium

Watch

Big Data Office

Libr

Watchdog Office

Consultat

2. WATCHTOWER GATEWAY 3. PUBLIC ENTRANCE

8

6

4. DATA STORAGE

9

7

5. STAFF ENTRANCE 6. RECPTION 3

7. CORE 8. TOILETS

5

9. DINING AREA

2

4 1

10. CONSULTATION ROOM FOR CLIENTS 11. MEETING ROOM FOR CLIENTS 12. LOUNGE 01 23 4 5

Axonometric Ground Floor Plan

10

SCALE 1:200

OFFICE

PUBLIC

BIG DATA SPACE

BIG DATA WATCHDOG

The building is made up of three forms. The watchtower, a circulation space also for reflection, the public frontage to educate and the office area for working. The mass building is divided into two parts by the watchtower. The public space facing the street and office space that is only accessible for authorised staff. For the front part, a cylinder data storage running through the block emphasise the connection between these two different spaces. At the back of the building, it shows a more clear relation that the big data space is surrounded and being supervised by the watchdog. 16

A new grid is introduced to the site by following th sunken plaza leading to the watchtower is the sta is a metaphor for people are monitored all the time watchtower is the main circulation in this design. It is of the watchtower continues and become the core of


htower

Data Storage

Detailed Section

rary

Hotdesk

tion Room

Food Court

SCALE 1:20

he angel between the site and parliament. A arting point of the journey. The watchtower e. It is also a gateway into the building. The s the transition between each floor. The form f this building. Precedent Study - Jewish Museum 17


Library

18


ROOF +44,000

LVL 9 FFL +38,000

LVL 8 FFL +34,000

LVL 7 FFL +30,000

LVL 6 FFL +26,000

LVL 5 FFL +22,000

LVL 4 FFL +18,000

LVL 3 FFL +14,000

LVL 2 FFL +10,000

LVL 1 FFL +6,000

Section

0123 4 5

10

SCALE 1:200

19


Watchdog Overview

20

Office Entrance


Public Data Centre

21


03 Waterfront Tower

Master project Melbourne | Construction Details | Highrise | Mix-used Tower

Waterfront Tower is located at the corner of Spencer and Lonsdale street in the Central Business District (CBD), adjacent to the Docklands. The tower features a mixedused programme of retail, premium rentable commercial space, luxury hotel floors, a sky lobby and sky deck that offer scenic views of the city. To speak to the urban context and waterfront landscape near the site, the selected facade and form cooperate to create a flowing structure with a streamline. The form of the tower is magnified with the design of the facad.

Waterfront Tower 22


23


LA TROBE STREET

TYPICAL LOW RISE FLOOR PLAN 1:500 GFA | 1,671m² NLA | 1,387m² Efficiency | 83%

TYPICAL MID RISE FLOOR PLAN 1:500 GFA | 1,671m² NLA | 1,387m² Efficiency | 83%

LITTLE LONSDALE

SPENCER STREET

GROUND FLOOR PLAN 1:500 GFA | 3,517m² NLA | 3,197m² Efficiency | 90% FFL + 224,600

CROWN

FFL FFL FFL FFL FFL FFL

+ 211,500 + 208,000 + 204,500 + 201,000 + 197,500 + 194,000

L49 L48 L47 L46 L45 L44

FFL FFL FFL FFL FFL FFL FFL

+ 187,000 + 183,500 + 180,000 + 176,500 + 173,000 + 169,500 + 166,000

L43 L42 L41 L40 L39 L38 L37

FFL FFL FFL FFL

+ 162,500 + 159,000 + 155,500 + 152,000

L36 L35 L34 L33

FFL + 144,000

L32

FFL + 120,000

L26

FFL + 116,000

L25

FFL + 108,000

L24

FFL + 104,000

L23

FFL + 100,000

L22

FFL + 96,000

L21

FFL + 92,000

L20

FFL + 88,000

L19

FFL + 84,000

L18

FFL + 80,000

L17

FFL + 76,000

L16

FFL + 72,000

L15

FFL + 68,000

L14

FFL + 64,000

L13

FFL + 60,000

L12

FFL + 56,000

L11

FFL + 52,000

L10

FFL + 48,000

L9

FFL + 44,000

L8

FFL + 40,000

L7

FFL + 36,000

L6

FFL + 32,000

L5

FFL + 28,000

L4

FFL + 20,000

L3

FFL + 12,000

L2

FFL + 8,000

L1

FFL + 0

LG

FFL - 4,000

LB1

FFL - 8,000

LB2

HIGH RISE CORE (HOTEL LIFTS)

MEDIUM RISE (LEVEL 18 - LEVEL 31)

PLANT LVL 02

MID RISE CORE (OFFICE LIFTS)

L27

CONNECTIVITY & ACCESSIBILITY The building’s form emphasises circulation through the site and provides various points of 20,088m² | 18,992m² access.

HIGH RISE PLANT LEVEL 03

1,443m²

SKY LOBBY LEVEL

1,443m² | 1,277m²

MID RISE OFFICE LEVELS 13 LEVELS

21,723m² | 18,031m²

LOW RISE OFFICE LEVELS 14 LEVELS

LOW RISE (G FLOOR - LEVEL 17)

MID RISE PLANT LEVEL 01 PODIUM LEVELS 2 RETAIL FLOORS G FLOOR ATRIUM

PLANT LVL 01

SCALE 1:500

TOTAL: GFA | NLA

1,671m²

MID RISE PLANT LEVEL 02

CURVED FORM

23,394m² | 19,418m² 1,671m²

SOUTHERN CROSS STATION

CURVING FORM Curved form creates a welcoming street frontage and responds to wind loads.

5,922m² | 5,296m² 3,517m² | 3,197m²

80,872m² | 66,211m² CURVED FORM

OVERALL TOTAL LOADING BAY

OVERALL TOWER SECTION

24

CURVED FORM

FLOORS HIGH RISE HOTEL LEVELS 15 LEVELS

EXPRESS SKY LOBBY CORE

FFL + 124,000

MID RISE CORE (OFFICE LIFTS)

L28

HIGH RISE (LEVEL 31 - LEVEL 48)

LOW RISE CORE (OFFICE LIFTS)

L29

FFL + 128,000

PLANT LVL 03

LOW RISE CORE (OFFICE LIFTS)

L31 L30

FFL + 132,000

LONSDALE STREET

TYPICAL HIGH RISE FLOOR PLAN 1:500 GFA | 1,343m² NLA | 1,181m² Efficiency | 82%

OVERALL SITE PLAN 1:1000

SERVICE CORE (GOODS LIFT)

FFL + 140,000 FFL + 136,000

HOTEL SKY LOBBY FLOOR PLAN 1:500 GFA | 1,443m² NLA | 1,277m² Efficiency | 89%

VISUAL PRESENCE The tower’s prominent form serves as an iconic landmark and allows for surrounding views of the city skyline at different levels.

AXONOMETRIC FORM & CORE STRUCTURE


LIT

ALE NSD

Y ENTR

AM

WIND PATH

RE R ST NCE

BICYCLE

ET

Y ENTR

ICLE

ICE

SERV

ET

E STR

PM

ALE NSD

ET

E STR

LO

Y ENTR

E DAL

ONS LE L

WIND PATH

RE R ST NCE

SPE

AM

LIT

GE

ALE NSD

LO TLE

ED ED

CURV

VEH

A2.2 STRUCTURAL PLAN 1:200

ET

E STR

LO TLE

TRAM LINE

ET

E STR

LITT GE

ED ED

CURV VEH

ET

ALE NSD

TRY

EN ICLE

ICE

SERV

PM ET

E STR

LO

Y ENTR

RE R ST NCE

SPE

ACCESS & CIRCULATION PM AM Facilitates pedestrian movement from Spencer, T REE STinto Lonsdale Street and Little Lonsdale Street E L A NSD podium and vehicle and serviceLOentry.

E STREET

GE

ED ED

CURV

ET

KINGS STREET

T

ICLE

VEH

TRAIN LINE SPE

T

WIND PATH

ICE

SERV

Y ENTR

G

DIN OUN SURR VIEWS

L RVE

MA

M

DIU STA

TYPICAL MID-RISE OFFICE FLOOR PLAN 1:200

G

DIN OUN SURR VIEWS

VEHICLE ACCESS

DS AN NT O CKL DO TERFR WA L RVE

MA

M

DIU STA

G

CLE LINE N LINE BICY TRAI TRAM

DS AN NT O CKL DO TERFR A W

E ROB

LA T

DIN OUN SURR VIEWS

EET

STR

M ADIU L ST

RVE

TRE GS S

KIN

MA

EET

TYPICAL LOW-RISE OFFICE FLOOR PLAN 1:200

ET

STR RELATIONSHIP TO THE WATERFRONT ALE NSD LE LO LITT TheNbuilding form establishes its relationship DS T LA ONT REE CKto the city as a link between the CBD and E ST ROB DO TERFR LA T WA waterfront. CLE LINE N LINE BICY TRAI TRAM

T

REE

R ST

NCE

SPE

EET

STR

TR

TR

BE TRO

EET

T

ET

TRE GS S

R LE ST SDA LON EET STR ALE NSD

LE LO

LITT

KIN

REE

R ST

NCE

SPE

LA

ET

LEE ST LINE ACL LINE SD BICY AIN AM

N LE LO LITT EET STR

TRE GS S

T REE

KIN

LE SDA

LON

T

REE

R ST

NCE

SPE

LE SDA

LON

EET

STR

TYPICAL SKY LOBBY FLOOR PLAN 1:200

TRAFFIC FLOW Located at the corner of Spencer Street and Lonsdale Street, the site experiences high traffic flow coming from La Trobe Street towards Spencer Street.

The building utilises a central lift core to maximise Gross Floor Area (GFA) and overall efficiency while providing convenience and accessibility to the occupants.The floor plate is designed to optimise efficiency, with the office and hotel floor plate efficiency achieved at 83% and 82% respectively. The central core is also used to maximise Net Lettable Area (NLA) and allows for the effective distribution of interior spaces as well as reception of natural lighting.

12

GROUND FLOOR PLAN 1:200

TYPICAL HIGH-RISE HOTEL ROOM FLOOR PLAN 1:200

25


A3.2 DETAILED ELEVATION & SECTION 18,000

FFL + 20,000

Crown FFL +224,600

Pilkington Planar L Safety Glass P Curved Facade Level 49 - Hotel FFL +211,500

Spider Fi�ngs

Level 48 - Hotel FFL +208,000 Level 47 - Hotel FFL +204,500 Level 46 - Hotel FFL +201,000 Level 45 - Hotel FFL +197,500 Level 44 - Hotel FFL +194,000

FRL + 8,74

FRL + 8,740

NORTHERN FACADE

Level 42 - Hotel FFL +183,500

VLAM Toughe Glass

1,500

Level 43 - Mech. Level FFL +187,000

Steel Tubul

1,500

VERTICAL & HORIZONTAL SHADING

Level 40 - Hotel FFL +176,500

FCL + 4,500

Level 39 - Hotel FFL +173,000

Top Hung Steel Mullion

1,500

Level 41 - Hotel FFL +180,000

FCL + 4,50

Reinfor Col

Level 38 - Hotel FFL +169,500

Level 36 - Hotel FFL +162,500

FFL + 0

1,500

Level 37 - Hotel FFL +166,000

FFL + 0

1,500

Level 35 - Hotel FFL +159,000 Level 34 - Hotel FFL +155,500 Level 33 - Hotel FFL +152,000

1 A3.2

OUTER PODIUM FACADE - TYPICAL PARTIAL ELEVATION SCALE 1:100

2 A3.2

OUTER PODIU SCALE 1:100

Level 32 - Sky Lobby FFL +144,000 Level 31 - Office FFL +140,000

4,000

Spendre System Perforat Office L Tinted V

8,000

Level 30 - Office FFL +136,000

Perforat maximis lation o level

Level 29 - Office FFL +132,000 Level 28 - Office FFL +128,000 Level 27 - Office FFL +124,000 Level 26 - Office FFL +120,000

WESTERN FACADE

UNITISED CURTAIN WALL SYSTEM

Level 25 - Office FFL +116,000 Level 24 - Office FFL +112,000

Level 23 - Mech. Level FFL +104,000 Level 22 - Office FFL +100,000 Level 21 - Office FFL +96,000

4,000

Level 20 - Office FFL +92,000 Level 19 - Office FFL +88,000

Vertical

Level 18 - Office FFL +84,000

4,000

Level 17 - Office FFL +80,000 Level 16 - Office FFL +76,000 Level 15 - Office FFL +72,000 Level 14 - Office FFL +68,000 Level 13 - Office FFL +64,000

MATERIAL

Level 12 - Office FFL +60,000

4 A3.2

POWDER COATED ALUMINIUM PANEL & FROSTED GLASS PANEL

Level 11 - Office FFL +56,000

WESTERN FACADE (OFFICE & MECHANICAL LEVEL) - TYPICAL PARTIAL ELEVATION SCALE 1:100

Level 10 - Office FFL +52,000 Level 9 - Office FFL +48,000 Level 8 - Office FFL +44,000

1,780

Level 7 - Office FFL +40,000 Level 6 - Office FFL +36,000 4

4,000

A3.2

13,780

Level 4 - Office FFL +28,000

Level 3 - Office FFL +20,000

4,000

Level 5 - Office FFL +32,000

Level 2 - Podium FFL +12,000

4,000

Level 1 - Podium FFL +8,000

Level Ground - Podium FFL + 0

1

A3.1

WEST ELEVATION SCALE 1:300

STRUCTURAL SECTION SCALE 1:250

26

2

EXPLODED CURTAIN WALL

A3.2

ENLARGED WEST ELEVATION - CROWN SCALE 1:100

UNITISED CURTAIN WALL SYSTEM

15

6 A3.2

CROWN FACADE - WEST ELEVATION SCALE 1:100


Laminated Panels

1,500

40

1,500

ened Laminated s Panels Cable Truss System

Space Frame

lar Strut Tubular

Pilkington Planar Laminated Safety Glass Panels

00

rced Concrete lumn (CHS)

Spider Fi�ngs

FACADE SYSTEM

UM FACADE - TYPICAL PARTIAL SECTION

3 A3.2

UNITISED CURTAIN WALL SYSTEM

INNER PODIUM FACADE - TYPICAL PARTIAL SECTION SCALE 1:100

el Panel with PV

ted Panel for Typical Level Vision Glass Level 30 - Office FFL +136,000

4,000

Mechanical System Duct

ted Panel to se the ventiof mechanical

l Fin

Level 29 - Office FFL +132,000

4,000

Mechanical System Duct

Level 28 - Office FFL +128,000

Lift Core

Slab, Wall, Core

V1

4,000

Lift Core Level 27 - Office FFL +124,000

Mechanical System Duct

Laminated Safety Glass, Frosted Barton Glass, Melbourne C1

5 A3.2

Exposed Concrete, In Situ, Smooth Melbourne Concrete Company Steel Members

OFFICE LEVEL FACADE - TYPICAL PARTIAL SECTION (LVL 27-30) SCALE 1:100

Zincalume Sheet Steel Melsteel, Melbourne External Paving

Australian Bluestone Pavers Australian European Bluestone Suppliers

UNITISED CURTAIN WALL SYSTEM

Internal Lining, Flooring

Imported Marine Plywood BS1088 Bord Products, Melbourne

ALUMINIUM CLADDING

STRUCTURAL MODEL

UNITISED CURTAIN WALL SYSTEM

Steel, Galvanised Melsteel, Melbourne Mechanical Floor

Round Hole Perforated Sheet Steel Damodar Perforators Internal Wall, Ceiling

Wash&Wear Matt, Highgate Dulux

MATERIAL

UNITISED CURTAIN WALL SYSTEM

27


STRUCTURAL SECTION SCALE 1:250

28

1500mm modular grids and belt and outrigger system are chosen for the overall structural system. The belt and outrigger system includes three layers of outriggers connected by belt trusses on mechanical floors, as well as a series of perimeter columns and beams to distribute the loads evenly.


Waterfront Tower uses Unitised Curtain Wall System. Only about 30% of work needs to be done onsite. It improves the quality control while 70% is carried out in the factory. Besides, it can be installed from the interior of the building, which is ideal for high tower construction where the footprint is tight.

29


ENTRY TICKET

Saturday, 11th June 2022 MSD, B115

(Basement foyer)

04 Museum of Open Secret Master project Barbican, London | Conceptual Design | Museum

Barbican was established during the time that the political consensus was very different from now. It was a council housing, not for the vulnerable group but for the middle-class commuters who work in London city. Barbican, as an articulation of economic wealth. It is also a stage set that always caters to its excellence. The flower here is perfectly in bloom on a particular date. And the day they appear to be dying, they must be taken away. This museum aims to display the fragments of these enjoyable London apartments and the servants behind these well-served spaces. Cross Section 1:75 @A1

30

0

1

3

6


Level 1 1:100 @A1

Ground Floor Plan 1: 75 @A1

1

Asending Staircase

2

Dressing Room

3

Fly Floors

4

Nested Drum

5

Grand Curtain

Basement 1:100 @A1

1

Scaffolding Staircase

1

2

2

Hanging Exhibition Space

3

Amphitheatre

4

Barbican Theatre/ Immversive Exhibition Public Rotating Door/ Domestic Swinging Door Transitional Hall

4

Transitional Space Mirrored Amphitheatre

5

Staircase

5

6

Amphitheatre

7

Exhibition of Servant

3

Entrance

Behind the massive, fortified facade, the form of the drum begins to emerge. It allows a clockwise circulation that motivates people to walk around the building. A scaffolding-like staircase will lead to a scene that people don’t usually see. It goes directly to the stage, not to the auditorium. The metal mesh curtain covers the domestic setting on the stage, layering a blurry boundary between the actual world and the theatric reality.

31


"Exhibition Hall"

"Barbican Theatre"

"Drum

32


m Kit"

"Scaffolding Staircase"

Immersive Stage

Exhibition

Reflect

The stage also works as an immersive exhibition. The show is on when the exhibition is closed. The exhibition is on when the show is closed. Whenever people come, they either participate on the stage as a host or watch the show from the amphitheatre as a guest. The stage intrudes into the drum. The cladding of the stage started to be peeled away along the outline of the drum. The tension between the void and occupancy is emphasised here. It will be a different story if we access the building from the other entrance hidden behind the facade. A narrow descending staircase takes people to the museum directly. The exhibition of “servant” is waiting ahead for people to explore. furniture pieces from different apartment types and levels are hanging in the air while the belongings of the servants are displayed on the ground. When the walls and floors are removed, people see through the vanishing structures to spy on others’ life. The invisible economic ladder is building here. The amphitheatre located underneath the nested drum leaves space for people to think and reflect. The noise of the stage can be heard from the sunken space. It’s a parallel story that belongs to someone else. The unfinished, raw timber stud behind the stage reminds people of the truth that it’s just a stage setting. Life has to be continued and the show goes on... 33


05 A Slow Friday

Master project Sant’ Elena, Venice | Conceptual Design | Pavilion

A Slow Friday

It is not intended as an introduction to a new formulation, but rather a growth from Sant’Elena, a physical and ideoloigcal manifestation of its’ heritage and people. A place that interacts with the edge of the water, an ambiguity of space offering the local residents a choice of usability, of creative freedom, and the potential for performance. It is a space to be given and to strengthen identity. This project celebrates the interplay between the heritage of Sant’Elena and Venice, the interplay between the Venetian people and the intangible production of performance, the interplay between land and water, and the interplay between past + present + future. It offers a place of being in Nature to rest and to contemplate. It is a relation to and connection to the people of Sant’Elena and to the island itself.

A Slow Friday 34


35


Method 1. Enhance the Merri Creek Corridor by building a 3D landscape system 2. Minimise the artificial interruption by merging the design into the soil, the whole site will be covered - (decomposed material) 3. Maintain the same level of security Brunswick “Walkbility“

Small Cell

Orbstruction

Medium Cell

06 Landscape Buffer zone Bachelor project Merri Creek | Parametric Design | Pavilion

Landscape buffer zone provides an interface between the Brunswick Terminal Station and Merri Creek by neutralizing the articial and nature. It works both visually and physically as a barrier, which keeps the Merri Creek visitors away from the urban disturbance. Besides, it enhances and responds to the upgrade operation of Brunswick Terminal Station, which aims to reduce the urban footprint and improve the overall aesthetics of Merri Creek Corridor. To overcome the conflict between artificial industry and the nature in our site. We are trying to resolve the sense of presence of BTS so people can purely experience the freshness in Merri Creek instead of getting interrupted by the existing double – layered wire fences. The exsisting fence will be replaced by a wavy grid structure merging into the site.

36

BEFORE

Human Interaction

Large Cell


Fabrication

Grasshopper Iteration

Form Generation

The components made of plywood are patterned with 2mm linear strips by laser cutting. They are connected with each other by friction.

Exsisting Fence AFTER

CHOSEN ITERATION Merri Creek Brunswick Terminal Station

Site Users

37


07 Grid Synthesis

Competition project Virtual Site | Conceptual Design | Pavilion

During this special period when people are united worldwide, we started to consider how metabolism architecture can be adapted instantly to response the outbreak of pandemic diseases, with improving medical, working and living environment of staffs and patients in temporary mobile cabin hospital as an aim bear in mind.

A Slow Friday

Under the consideration of building up a safety guaranteed and comfortable healthcare environment, this project selects four most critical programs as prototypes to represent utopian speculation of the adaptive hospital, which structurally dependent on 6*6 technique. The using of different materiality and greenery in prototypes also aims to achieve a balance between functionality and spatial experience, meanwhile takes minimal amount of resources to create a psychologically supportive environment for both patients and staffs.

A Slow Friday 38


ISOMETRIC

m 00 36

62

00 m

m

m 0m 20

62

00 m

6

mm

60

90

3700mm

m

m

3700mm

00 m

3700mm

3700mm

36

90

60

m

mm

60

45

mm

Staff

Consultation Room

Single Ward

Double Ward

for medical staffs

for medical treatment

for patient with servere symptoms

for patients with mild symptoms

PLAN

B

B’

A C’

C

D

D’

A’

ELEVATION

North

B-B’

South

East

A-A’

North

South

East

West

North

SECTION

D-D’

C-C’

39


08 Tianchang National Sports & Fitness Centre Internship project Tianchang, China | Schematic Design | Stadium

The major responsibilities include: Design, Presentation Prep, Prelimnary Render, Grasshopper Debug, Concept Modelling, Diagramming

Tianchang National Sports & Fitness Center

1. Work primarily with Rhino & SketchUp to produce protypes of design schemes. 2. In charge of presentation slides with Indesign. 3. Assist the project manager to develop the overall architecture form and the façade. 4. Use Grasshopper for the design of façade The major accomplishments include: - Participate in multiple projects to adjust and optimize the initial design schemes. - Cooperate with colleagues and leaders to contribute to the final presentation. - Help to win one of the competitions for the firm.

Tianchang National Sports & Fitness Center 40


41


09 Zhangjiang Medical Park 06-01 Plot Internship project Shanghai, China | Schematic Design | Mixed-Use Commercial Tower

The major responsibilities include: 1. Site analysis & research, diagramming & illustration with Illustrator & Indesign 2. Recording and taking notes for the meetings 3. Bringing insightful observations to the team during the concept design stage 4. Worked primarily with Rhino & Revit to produce protypes of design schemes 5. Using Enscape to render for perspective drafts and videos The major accomplishment includes: - Design for the landscape architecture of the project. - Helped to win the competitions for the firm.

Zhangjiang Medical Park 06-01 Plot 42


43


10 Shanghai East Station

Internship project Shanghai, China | Schematic Design | Railway Station

The major responsibilities include: 1. Diagramming & illustration with Illustrator & Indesign 2. Refine Rhino model for 3D Printing 3. Work primarily with Rhino & Revit to produce protypes of design schemes 4. Use Enscape to render for perspective drafts and videos The major accomplishment includes: - Close contact with different departments of the firm and gained the communication skills.

Shanghai East Station 44


45


Work Example

Internship project, Hassell Shanghai Schematic Design, Diagramming, Master Planning, Draft Rendering

塔楼功能方案二 建筑设计 Architecture design

立面图

张江医学园06-01B及06-07地块项目

Tower Program Stacking Option 2 - 200m

Elevation

ELEVATION - Photoshop + Enscape

FUNCTION ARRANGEMENT DIAGRAM -Enscap

67.10

RF

63.80

18F

60.60

17F

57.30

16F

54.00

15F

50.70

14F

47.40

13F

44.10

12F

40.80

11F

37.50

10F

34.20

9F

30.90

8F

27.60

7F

24.30

6F

21.00

5F

塔冠 Crown

豪华公寓 Luxury Apartments 空中大堂 Sky Lobby

服务式公寓 Service Apartments 酒店 Hotel

办公室 Office

19.00 4MF 15.00

4F

10.50

3F

6.00

2F

±0.00

GF

首层平面图 技术设计 Technical design

54

Hassell ©

Prepared for 张江集团

December, 2021

Function arrangement 1 塔冠 Crown

Ground Floor Plan

SITE LOCATION - Photoshop + Indesign

功能排列1

Service Apartments SITE PLAN - Illustrator + Photoshop 核心议题 Sky Lobby 豪华公寓 Luxury Apartments 服务式公寓 空中大堂

PROJECT ASPIRATIONS 办公室 Office 酒店 Hotel

3 G150

裙房 Podium

现在 Present

湛江华侨城欢乐海湾超高商业地标项目

上海东站 Zhanjiang OCT super high rise tower competition

SHANGHAI EAST STATION

华星路

IN RD.

HUAX

路 PLA

2ND NNING

规划二

CO²

RD.

潘家泓

PANJIA

祝川路

CANAL

1 落客区 2 餐厅

3 北侧裙房

.

ZH

AN RD UCHU

4 中心广场景观 5 海边剧场 6 文化中心 1 Drop-off area

- 规整的 Formal - 强界面Hard Edged - 固定的 Fixed - 购物街 Shopping

2 Restaurant EN RD

.

3 North podium

上海东站高台公园

SHANGHAI EAST STATION UPPER LAND PARK

46

金闻路

JINW

4 Central plaza Hassell ©

5 Amphitheater 32 6 Culture centre

N

上海东站高台公园

SHANGHAI EAST STATION UPPER LAND PARK

湛江华侨城欢乐海湾超高商业地标项目

Zhanjiang OCT super high rise tower competition


二 200米

AXON DIAGRAM - Illustrator + Indesign

pe + Indesign

+217.8m

空中大堂 Sky Lobby

空中大堂 Sky Lobby

Function arrangement 2

Design Bridge Design

ge

+147m B2 地铁站厅层

L3 运动品牌旗舰店 Sports Flagship Store 1500㎡

设备用房 Back of house / MEP

办公室 Office

地铁站台 Metro Platform 停车 Parking

酒店 Hotel

+23.5m B3设备层

g Medical Zhangjiang Park 06-01B Medical & 06-07 Park 06-01B Plot & 06-07 Plot

功能安排2

设备用房 Back of house / MEP

服务式公寓 Service Apartments

办公室 Office

连桥设计 连桥设计

下沉广场 Sunken Plaza

豪华公寓 Luxury Apartments

服务式公寓 Service Apartments

e

精品生活零售 Boutique Retail 2800㎡

塔冠 Crown

豪华公寓 Luxury Apartments

屋顶

精品超市 Boutique Supermarket 1500㎡

塔冠 Crown 酒店 Hotel

B1 地下商业街

L2 运动体验店 Sports Experience Store 1200㎡

设备用房 Back House

运动品牌旗舰店 Sports Flagship Store 1700㎡ 健康简餐 Healthy Dining 400㎡

滨水健身馆 Riverside Gym 400㎡

功能排列3

B4 地铁站台层

L1 运动体验店 Sports Experience Store 2000㎡

设备用房 Back of house / MEP

Function arrangement 3

运动品牌旗舰店 Sports Flagship Store 2200㎡

地铁站台 Metro Platform

健康简餐 Healthy Dining 1900㎡

滨水健身馆 Riverside Gym 500㎡

Hassell ©

上海东站高台公园

200

Hassell ©

201

SHANGHAI EAST STATION UPPER LAND PARK

Draft Rendering - Enscape + Photoshop

Hassell ©

3

155

1

2

1

1

4

直道

直道

交叉步道

交叉步道

分岔步道

分岔步道

环抱型步道

环抱型步道

Straight Bridge Straight Bridge

Crossing BridgeCrossing Bridge

5 6

圆环步道

Circle Bridge Hassell ©

160

Y Bridge

Y Bridge

Hugging Bridge Hugging Bridge

47


20-

W EN Q IN S H EN G c r ys talshe n g 010 9 @ g mail.com + 61 4 5 0 0 8 3 997

-22


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.