20-
PORTFOLIO W EN Q IN
S H EN G
-22
Wenqin Sheng +61 0450083997 crystalsheng0109@gmail.com
Education
Participated Projects
Aug 2015 - Jun 2016 Trinity College (Foundation study of Melbourne)
Shanghai East Railway Station, Hines Heritage Renovation, Zhangjiang Medical Park Commercial Building, Zhanjiang Highrise, Tianchang National Sports & Fitness Center
2016 - 2019 University of Melbourne Bachlor of Environments (Major in Architecture) Jul 2020 - Dec 2022 University of Melbourne Master of Architecture
Work Aug 2019 - Oct 2019 Architectural Intern Tongji Architectural Design (Group) Co., Ltd Sep 2021 - Jan 2022 Architectural Intern Hassell Studio Shanghai
Skill AutoCAD Revit Rhinoceros+Grasshopper Sketch Up+3DS Max VRay+Enscape Photoshop CC+Illustrator CC+InDesign CC Makerbot 3D Printing+Model Making Film Photography Oil Painting Screenplay Adaption 2
Volunteer Feb 2022 - May 2022 Peer Mentor (University of Melbourne) July 2023 Open House Aug 2023 - Nov 2023 Robin Boyd Foundation Collection Team
Language Chinese(Mandarin)& English
Referee Mr. Klevis Koco Principal of Hassell Prof Paul Walker Professor of University of Melbourne
01
02
03
04
Radical Shed
Watchdog
Waterfront Tower
Museum of Open Secret
05
06
07
08
A Slow Friday
Landscape Buffer Zone
Grid Synthesis
Tianchang National Stadium
09
10
Zhangjiang Medical Park 06-01 Plot
Shanghai East Station 3
RE FER ENC E LET T E R 12F BASE 45 CAOXI NORTH ROAD XUHUI DISTRICT SHANGHAI 200030 CHINA 中国上海徐汇区漕溪北路 45 号 BASE 航空大厦 12 楼 邮编 200030 +8621 5456 3666 AUSTRALIA / ASIA / UNITED KINGDOM / UNITED STATES 澳大利亚 / 亚洲 / 英国 / 美国 HASSELL DESIGN CONSULTING (SHANGHAI) LIMITED 铿晓设计咨询(上海)有限公司
8 November 2022
To Whom It May Concern, RE: WENQIN SHENG I have had the pleasure of working with Wenqin on a number of competitions and projects during her intership in Shanghai. I have found Wenqin to be a great collaborator and curious. Always very responsive with an outstanding team work spirit. Wenqin was actively engaged in the team and was well liked by her colleagues. I wish Wenqin a great start to the proffesional career. I am confident that Wenqin would be an asset to any organisation bringing diverse skills and experience. Should you have any questions, please do not hesitate to contact me.
Yours sincerely
Klevis Koco Principal Email
4
hassellstudio.com
01/01
kkoco@hassellstudio.com
Letter_FORM_191206.dotx Recommendation Letter_Xu Zhang.docx
RE FE RE NCE L E T T E R
Professor Paul Walker BArch (Auckland) PhD (Auckland)
6 December 2022
To Whom It May Concern
Re: Wenqin Sheng
I am very pleased to write a letter of recommendation for Wenqin Sheng. Wenqin has been enrolled in the Master of Architecture Design Thesis studio which I have run during semester 2, 2022. This subject culminates the University of Melbourne Master of Architecture degree and requires students to undertake a research-led design in response to a broad theme set by the studio teacher. The studio I offered this semester was called ‘Radical Suburbs’ and required students to rethink typical suburban building programs, within a typical Melbourne middle-suburban setting – Cheltenham/Southland in our case. Wenqin’s project involved the rehabilitation of two large industrial sheds in a zone of industrial buildings in the west of Cheltenham. While she envisaged her project as maintaining building fabric associated with the suburb’s history of light industrial manufacturing, she introduced a range of community activities to replace the original uses, to reactivate the buildings, and to introduce them to new groups of users. These new uses were organised in plan in discrete zones of each shed, but with lateral connections devised to allow communication between. While conserving the repetitive frame structures of the two buildings, and their overall extruded form, she planned to partly de-clad or re-clad them. Some building materials and interior fittings and furniture were envisaged to be derived from recycled resources. The project was elegant both in conception and presentation. Before her studies for the Master of Architecture, Wenqin undertook a Bachelor of Environments at the University of Melbourne, with a major in architecture. She has undertaken internships in Shanghai with the Tongji Architectural Design Group and with Hassell’s Shanghai studio. Wenqin undertook a range of electives in her masters study, particularly focussing on contemporary architectural practice. These included an elective studio in Venice, working with members of the eminent international practice Snøhetta. She has achieved mostly honours grades (H2A) in both her core and elective subjects, completing her Design Thesis with this grade as well.
Faculty of Architecture, Building and Planning The University of Melbourne Victoria 3010 Australia 5
Site Map
01 Radical Shed
Thesis project Cheltenham, Vic | Heritage | Factory Renovation | Community Centre
The configuration of sheds can be found everywhere in Western industrial Cheltenham. With a lack of cultural interest, they expose their intrinsic to functionalism. The industrial iteration of [ Shed ] is abused in this bleak place. The absence of landscape on the site leads to an unsuccessful shed. [ Shed ] has lost its charm as a primitive hut interface with nature. The intrinsic connection between industrial and domestic sheds is the expression of extreme functionality. This scheme aims to examine the success of domestic sheds and provide a solution for the superseded industrial shed on 233 Bay Road. Through a process of recycling the abandoned domestic furniture, the hard rubbish carrying the untold story of previous owners will be renovated and become part of the civic space. 6
Radical Shed
7
1 CIVIC LIFE WITH PERFORMANCE OPEN STAGE
Short Section 1:600@ A3
2 CIVIC LIFE WITH TECTONIC
1
LANDSCAPE
section bb’ 1:600
CONNECTION BRIDGE
3 CIVIC LIFE WITH
6
FOOD
COMMUNITY
1
a’
2
KITCHEN
3 4 CIVIC LIFE WITH
4
GARDENING
COMMUNITY GARDEN
5
5 CIVIC LIFE WITH BOOKS
COMMUNITY LIBRARY EMBEDED WITH BOTANIC
Plan 1:500 @A3
GARDEN
b
6 CIVIC LIFE WITH HANDCRAFT
b’ RENOVATION WORKSHOP
8
New Elevation 1:500 @A3
section cc’ 1:600
2
3
section dd’ 1:600
4
section ee’ 1:600
a’
c
d
e
c’
d’
e’
9
1
Open Stage
The stage provides a civic event space for the local community, people are encouraged to bring and leave their unwanted chairs, sofas or even mattress to create seating for themselves.
Trial Section 1:50@ A3 10
2
Trial
The grand gesture of landscape renovation connects the two existing buildings and boosts circulation. The soil replaces the cold concrete walkway. This lifted trail retains planting between the platforms and is at the same time a shortcut with various hotspots attached.
3
Community Kitchen
A community kitchen builds against the leftover brick walls. A relaxing space for people to share and enjoy food. It is lifted to reduce the significant floor-to-ceiling height within the structure of the industrial shed.
Long Section aa’ 1:600@ A3
4
Community Garden
An edible public garden for everyone that encourages the local community to grow and cultivate their ingredient.
5
Botanic Garden & Library
The community library builds closely with the botanic garden and provides people with a calm reading experience. People can grab a book and a chair stored in the community library and share their reading experience in the botanic garden.
6
Workshop
The workshop located in the preserved building at the back allows people to bring their old furniture or home appliances there; people can build, repair and create upon the superseded.
11
Botanic Garden Section 1:100 @ A3
12
Renovated Workshop
Community Kitchen`
13
02 Watchdog
Master project Melbourne | Conceptual Design | Workplace& Data Center | Mixed-use Office Tower
The designed environment generates social spaces concretely. It influences the way you act; stimulates the reflection you see. The cyber environment generates social spaces virtually. It changes the way you think, shapes the value you believe in. The principle of the algorithm should be revealed to awaken people’s awareness of the big data crisis. This design attempts to bring reflection and insights to the public regarding the emerging ethical issues of technological innovation. It should provoke self-consciousness and offer a bird’s eye view inspection of a common domain. Waterfront Tower 14
15
12 10
11
1. SUNKEN PLAZA
Auditorium
Watch
Big Data Office
Libr
Watchdog Office
Consultat
2. WATCHTOWER GATEWAY 3. PUBLIC ENTRANCE
8
6
4. DATA STORAGE
9
7
5. STAFF ENTRANCE 6. RECPTION 3
7. CORE 8. TOILETS
5
9. DINING AREA
2
4 1
10. CONSULTATION ROOM FOR CLIENTS 11. MEETING ROOM FOR CLIENTS 12. LOUNGE 01 23 4 5
Axonometric Ground Floor Plan
10
SCALE 1:200
OFFICE
PUBLIC
BIG DATA SPACE
BIG DATA WATCHDOG
The building is made up of three forms. The watchtower, a circulation space also for reflection, the public frontage to educate and the office area for working. The mass building is divided into two parts by the watchtower. The public space facing the street and office space that is only accessible for authorised staff. For the front part, a cylinder data storage running through the block emphasise the connection between these two different spaces. At the back of the building, it shows a more clear relation that the big data space is surrounded and being supervised by the watchdog. 16
A new grid is introduced to the site by following th sunken plaza leading to the watchtower is the sta is a metaphor for people are monitored all the time watchtower is the main circulation in this design. It is of the watchtower continues and become the core of
htower
Data Storage
Detailed Section
rary
Hotdesk
tion Room
Food Court
SCALE 1:20
he angel between the site and parliament. A arting point of the journey. The watchtower e. It is also a gateway into the building. The s the transition between each floor. The form f this building. Precedent Study - Jewish Museum 17
Library
18
ROOF +44,000
LVL 9 FFL +38,000
LVL 8 FFL +34,000
LVL 7 FFL +30,000
LVL 6 FFL +26,000
LVL 5 FFL +22,000
LVL 4 FFL +18,000
LVL 3 FFL +14,000
LVL 2 FFL +10,000
LVL 1 FFL +6,000
Section
0123 4 5
10
SCALE 1:200
19
Watchdog Overview
20
Office Entrance
Public Data Centre
21
03 Waterfront Tower
Master project Melbourne | Construction Details | Highrise | Mix-used Tower
Waterfront Tower is located at the corner of Spencer and Lonsdale street in the Central Business District (CBD), adjacent to the Docklands. The tower features a mixedused programme of retail, premium rentable commercial space, luxury hotel floors, a sky lobby and sky deck that offer scenic views of the city. To speak to the urban context and waterfront landscape near the site, the selected facade and form cooperate to create a flowing structure with a streamline. The form of the tower is magnified with the design of the facad.
Waterfront Tower 22
23
LA TROBE STREET
TYPICAL LOW RISE FLOOR PLAN 1:500 GFA | 1,671m² NLA | 1,387m² Efficiency | 83%
TYPICAL MID RISE FLOOR PLAN 1:500 GFA | 1,671m² NLA | 1,387m² Efficiency | 83%
LITTLE LONSDALE
SPENCER STREET
GROUND FLOOR PLAN 1:500 GFA | 3,517m² NLA | 3,197m² Efficiency | 90% FFL + 224,600
CROWN
FFL FFL FFL FFL FFL FFL
+ 211,500 + 208,000 + 204,500 + 201,000 + 197,500 + 194,000
L49 L48 L47 L46 L45 L44
FFL FFL FFL FFL FFL FFL FFL
+ 187,000 + 183,500 + 180,000 + 176,500 + 173,000 + 169,500 + 166,000
L43 L42 L41 L40 L39 L38 L37
FFL FFL FFL FFL
+ 162,500 + 159,000 + 155,500 + 152,000
L36 L35 L34 L33
FFL + 144,000
L32
FFL + 120,000
L26
FFL + 116,000
L25
FFL + 108,000
L24
FFL + 104,000
L23
FFL + 100,000
L22
FFL + 96,000
L21
FFL + 92,000
L20
FFL + 88,000
L19
FFL + 84,000
L18
FFL + 80,000
L17
FFL + 76,000
L16
FFL + 72,000
L15
FFL + 68,000
L14
FFL + 64,000
L13
FFL + 60,000
L12
FFL + 56,000
L11
FFL + 52,000
L10
FFL + 48,000
L9
FFL + 44,000
L8
FFL + 40,000
L7
FFL + 36,000
L6
FFL + 32,000
L5
FFL + 28,000
L4
FFL + 20,000
L3
FFL + 12,000
L2
FFL + 8,000
L1
FFL + 0
LG
FFL - 4,000
LB1
FFL - 8,000
LB2
HIGH RISE CORE (HOTEL LIFTS)
MEDIUM RISE (LEVEL 18 - LEVEL 31)
PLANT LVL 02
MID RISE CORE (OFFICE LIFTS)
L27
CONNECTIVITY & ACCESSIBILITY The building’s form emphasises circulation through the site and provides various points of 20,088m² | 18,992m² access.
HIGH RISE PLANT LEVEL 03
1,443m²
SKY LOBBY LEVEL
1,443m² | 1,277m²
MID RISE OFFICE LEVELS 13 LEVELS
21,723m² | 18,031m²
LOW RISE OFFICE LEVELS 14 LEVELS
LOW RISE (G FLOOR - LEVEL 17)
MID RISE PLANT LEVEL 01 PODIUM LEVELS 2 RETAIL FLOORS G FLOOR ATRIUM
PLANT LVL 01
SCALE 1:500
TOTAL: GFA | NLA
1,671m²
MID RISE PLANT LEVEL 02
CURVED FORM
23,394m² | 19,418m² 1,671m²
SOUTHERN CROSS STATION
CURVING FORM Curved form creates a welcoming street frontage and responds to wind loads.
5,922m² | 5,296m² 3,517m² | 3,197m²
80,872m² | 66,211m² CURVED FORM
OVERALL TOTAL LOADING BAY
OVERALL TOWER SECTION
24
CURVED FORM
FLOORS HIGH RISE HOTEL LEVELS 15 LEVELS
EXPRESS SKY LOBBY CORE
FFL + 124,000
MID RISE CORE (OFFICE LIFTS)
L28
HIGH RISE (LEVEL 31 - LEVEL 48)
LOW RISE CORE (OFFICE LIFTS)
L29
FFL + 128,000
PLANT LVL 03
LOW RISE CORE (OFFICE LIFTS)
L31 L30
FFL + 132,000
LONSDALE STREET
TYPICAL HIGH RISE FLOOR PLAN 1:500 GFA | 1,343m² NLA | 1,181m² Efficiency | 82%
OVERALL SITE PLAN 1:1000
SERVICE CORE (GOODS LIFT)
FFL + 140,000 FFL + 136,000
HOTEL SKY LOBBY FLOOR PLAN 1:500 GFA | 1,443m² NLA | 1,277m² Efficiency | 89%
VISUAL PRESENCE The tower’s prominent form serves as an iconic landmark and allows for surrounding views of the city skyline at different levels.
AXONOMETRIC FORM & CORE STRUCTURE
LIT
ALE NSD
Y ENTR
AM
WIND PATH
RE R ST NCE
BICYCLE
ET
Y ENTR
ICLE
ICE
SERV
ET
E STR
PM
ALE NSD
ET
E STR
LO
Y ENTR
E DAL
ONS LE L
WIND PATH
RE R ST NCE
SPE
AM
LIT
GE
ALE NSD
LO TLE
ED ED
CURV
VEH
A2.2 STRUCTURAL PLAN 1:200
ET
E STR
LO TLE
TRAM LINE
ET
E STR
LITT GE
ED ED
CURV VEH
ET
ALE NSD
TRY
EN ICLE
ICE
SERV
PM ET
E STR
LO
Y ENTR
RE R ST NCE
SPE
ACCESS & CIRCULATION PM AM Facilitates pedestrian movement from Spencer, T REE STinto Lonsdale Street and Little Lonsdale Street E L A NSD podium and vehicle and serviceLOentry.
E STREET
GE
ED ED
CURV
ET
KINGS STREET
T
ICLE
VEH
TRAIN LINE SPE
T
WIND PATH
ICE
SERV
Y ENTR
G
DIN OUN SURR VIEWS
L RVE
MA
M
DIU STA
TYPICAL MID-RISE OFFICE FLOOR PLAN 1:200
G
DIN OUN SURR VIEWS
VEHICLE ACCESS
DS AN NT O CKL DO TERFR WA L RVE
MA
M
DIU STA
G
CLE LINE N LINE BICY TRAI TRAM
DS AN NT O CKL DO TERFR A W
E ROB
LA T
DIN OUN SURR VIEWS
EET
STR
M ADIU L ST
RVE
TRE GS S
KIN
MA
EET
TYPICAL LOW-RISE OFFICE FLOOR PLAN 1:200
ET
STR RELATIONSHIP TO THE WATERFRONT ALE NSD LE LO LITT TheNbuilding form establishes its relationship DS T LA ONT REE CKto the city as a link between the CBD and E ST ROB DO TERFR LA T WA waterfront. CLE LINE N LINE BICY TRAI TRAM
T
REE
R ST
NCE
SPE
EET
STR
TR
TR
BE TRO
EET
T
ET
TRE GS S
R LE ST SDA LON EET STR ALE NSD
LE LO
LITT
KIN
REE
R ST
NCE
SPE
LA
ET
LEE ST LINE ACL LINE SD BICY AIN AM
N LE LO LITT EET STR
TRE GS S
T REE
KIN
LE SDA
LON
T
REE
R ST
NCE
SPE
LE SDA
LON
EET
STR
TYPICAL SKY LOBBY FLOOR PLAN 1:200
TRAFFIC FLOW Located at the corner of Spencer Street and Lonsdale Street, the site experiences high traffic flow coming from La Trobe Street towards Spencer Street.
The building utilises a central lift core to maximise Gross Floor Area (GFA) and overall efficiency while providing convenience and accessibility to the occupants.The floor plate is designed to optimise efficiency, with the office and hotel floor plate efficiency achieved at 83% and 82% respectively. The central core is also used to maximise Net Lettable Area (NLA) and allows for the effective distribution of interior spaces as well as reception of natural lighting.
12
GROUND FLOOR PLAN 1:200
TYPICAL HIGH-RISE HOTEL ROOM FLOOR PLAN 1:200
25
A3.2 DETAILED ELEVATION & SECTION 18,000
FFL + 20,000
Crown FFL +224,600
Pilkington Planar L Safety Glass P Curved Facade Level 49 - Hotel FFL +211,500
Spider Fi�ngs
Level 48 - Hotel FFL +208,000 Level 47 - Hotel FFL +204,500 Level 46 - Hotel FFL +201,000 Level 45 - Hotel FFL +197,500 Level 44 - Hotel FFL +194,000
FRL + 8,74
FRL + 8,740
NORTHERN FACADE
Level 42 - Hotel FFL +183,500
VLAM Toughe Glass
1,500
Level 43 - Mech. Level FFL +187,000
Steel Tubul
1,500
VERTICAL & HORIZONTAL SHADING
Level 40 - Hotel FFL +176,500
FCL + 4,500
Level 39 - Hotel FFL +173,000
Top Hung Steel Mullion
1,500
Level 41 - Hotel FFL +180,000
FCL + 4,50
Reinfor Col
Level 38 - Hotel FFL +169,500
Level 36 - Hotel FFL +162,500
FFL + 0
1,500
Level 37 - Hotel FFL +166,000
FFL + 0
1,500
Level 35 - Hotel FFL +159,000 Level 34 - Hotel FFL +155,500 Level 33 - Hotel FFL +152,000
1 A3.2
OUTER PODIUM FACADE - TYPICAL PARTIAL ELEVATION SCALE 1:100
2 A3.2
OUTER PODIU SCALE 1:100
Level 32 - Sky Lobby FFL +144,000 Level 31 - Office FFL +140,000
4,000
Spendre System Perforat Office L Tinted V
8,000
Level 30 - Office FFL +136,000
Perforat maximis lation o level
Level 29 - Office FFL +132,000 Level 28 - Office FFL +128,000 Level 27 - Office FFL +124,000 Level 26 - Office FFL +120,000
WESTERN FACADE
UNITISED CURTAIN WALL SYSTEM
Level 25 - Office FFL +116,000 Level 24 - Office FFL +112,000
Level 23 - Mech. Level FFL +104,000 Level 22 - Office FFL +100,000 Level 21 - Office FFL +96,000
4,000
Level 20 - Office FFL +92,000 Level 19 - Office FFL +88,000
Vertical
Level 18 - Office FFL +84,000
4,000
Level 17 - Office FFL +80,000 Level 16 - Office FFL +76,000 Level 15 - Office FFL +72,000 Level 14 - Office FFL +68,000 Level 13 - Office FFL +64,000
MATERIAL
Level 12 - Office FFL +60,000
4 A3.2
POWDER COATED ALUMINIUM PANEL & FROSTED GLASS PANEL
Level 11 - Office FFL +56,000
WESTERN FACADE (OFFICE & MECHANICAL LEVEL) - TYPICAL PARTIAL ELEVATION SCALE 1:100
Level 10 - Office FFL +52,000 Level 9 - Office FFL +48,000 Level 8 - Office FFL +44,000
1,780
Level 7 - Office FFL +40,000 Level 6 - Office FFL +36,000 4
4,000
A3.2
13,780
Level 4 - Office FFL +28,000
Level 3 - Office FFL +20,000
4,000
Level 5 - Office FFL +32,000
Level 2 - Podium FFL +12,000
4,000
Level 1 - Podium FFL +8,000
Level Ground - Podium FFL + 0
1
A3.1
WEST ELEVATION SCALE 1:300
STRUCTURAL SECTION SCALE 1:250
26
2
EXPLODED CURTAIN WALL
A3.2
ENLARGED WEST ELEVATION - CROWN SCALE 1:100
UNITISED CURTAIN WALL SYSTEM
15
6 A3.2
CROWN FACADE - WEST ELEVATION SCALE 1:100
Laminated Panels
1,500
40
1,500
ened Laminated s Panels Cable Truss System
Space Frame
lar Strut Tubular
Pilkington Planar Laminated Safety Glass Panels
00
rced Concrete lumn (CHS)
Spider Fi�ngs
FACADE SYSTEM
UM FACADE - TYPICAL PARTIAL SECTION
3 A3.2
UNITISED CURTAIN WALL SYSTEM
INNER PODIUM FACADE - TYPICAL PARTIAL SECTION SCALE 1:100
el Panel with PV
ted Panel for Typical Level Vision Glass Level 30 - Office FFL +136,000
4,000
Mechanical System Duct
ted Panel to se the ventiof mechanical
l Fin
Level 29 - Office FFL +132,000
4,000
Mechanical System Duct
Level 28 - Office FFL +128,000
Lift Core
Slab, Wall, Core
V1
4,000
Lift Core Level 27 - Office FFL +124,000
Mechanical System Duct
Laminated Safety Glass, Frosted Barton Glass, Melbourne C1
5 A3.2
Exposed Concrete, In Situ, Smooth Melbourne Concrete Company Steel Members
OFFICE LEVEL FACADE - TYPICAL PARTIAL SECTION (LVL 27-30) SCALE 1:100
Zincalume Sheet Steel Melsteel, Melbourne External Paving
Australian Bluestone Pavers Australian European Bluestone Suppliers
UNITISED CURTAIN WALL SYSTEM
Internal Lining, Flooring
Imported Marine Plywood BS1088 Bord Products, Melbourne
ALUMINIUM CLADDING
STRUCTURAL MODEL
UNITISED CURTAIN WALL SYSTEM
Steel, Galvanised Melsteel, Melbourne Mechanical Floor
Round Hole Perforated Sheet Steel Damodar Perforators Internal Wall, Ceiling
Wash&Wear Matt, Highgate Dulux
MATERIAL
UNITISED CURTAIN WALL SYSTEM
27
STRUCTURAL SECTION SCALE 1:250
28
1500mm modular grids and belt and outrigger system are chosen for the overall structural system. The belt and outrigger system includes three layers of outriggers connected by belt trusses on mechanical floors, as well as a series of perimeter columns and beams to distribute the loads evenly.
Waterfront Tower uses Unitised Curtain Wall System. Only about 30% of work needs to be done onsite. It improves the quality control while 70% is carried out in the factory. Besides, it can be installed from the interior of the building, which is ideal for high tower construction where the footprint is tight.
29
“
”
ENTRY TICKET
Saturday, 11th June 2022 MSD, B115
(Basement foyer)
04 Museum of Open Secret Master project Barbican, London | Conceptual Design | Museum
Barbican was established during the time that the political consensus was very different from now. It was a council housing, not for the vulnerable group but for the middle-class commuters who work in London city. Barbican, as an articulation of economic wealth. It is also a stage set that always caters to its excellence. The flower here is perfectly in bloom on a particular date. And the day they appear to be dying, they must be taken away. This museum aims to display the fragments of these enjoyable London apartments and the servants behind these well-served spaces. Cross Section 1:75 @A1
30
0
1
3
6
Level 1 1:100 @A1
Ground Floor Plan 1: 75 @A1
1
Asending Staircase
2
Dressing Room
3
Fly Floors
4
Nested Drum
5
Grand Curtain
Basement 1:100 @A1
1
Scaffolding Staircase
1
2
2
Hanging Exhibition Space
3
Amphitheatre
4
Barbican Theatre/ Immversive Exhibition Public Rotating Door/ Domestic Swinging Door Transitional Hall
4
Transitional Space Mirrored Amphitheatre
5
Staircase
5
6
Amphitheatre
7
Exhibition of Servant
3
Entrance
Behind the massive, fortified facade, the form of the drum begins to emerge. It allows a clockwise circulation that motivates people to walk around the building. A scaffolding-like staircase will lead to a scene that people don’t usually see. It goes directly to the stage, not to the auditorium. The metal mesh curtain covers the domestic setting on the stage, layering a blurry boundary between the actual world and the theatric reality.
31
"Exhibition Hall"
"Barbican Theatre"
"Drum
32
m Kit"
"Scaffolding Staircase"
Immersive Stage
Exhibition
Reflect
The stage also works as an immersive exhibition. The show is on when the exhibition is closed. The exhibition is on when the show is closed. Whenever people come, they either participate on the stage as a host or watch the show from the amphitheatre as a guest. The stage intrudes into the drum. The cladding of the stage started to be peeled away along the outline of the drum. The tension between the void and occupancy is emphasised here. It will be a different story if we access the building from the other entrance hidden behind the facade. A narrow descending staircase takes people to the museum directly. The exhibition of “servant” is waiting ahead for people to explore. furniture pieces from different apartment types and levels are hanging in the air while the belongings of the servants are displayed on the ground. When the walls and floors are removed, people see through the vanishing structures to spy on others’ life. The invisible economic ladder is building here. The amphitheatre located underneath the nested drum leaves space for people to think and reflect. The noise of the stage can be heard from the sunken space. It’s a parallel story that belongs to someone else. The unfinished, raw timber stud behind the stage reminds people of the truth that it’s just a stage setting. Life has to be continued and the show goes on... 33
05 A Slow Friday
Master project Sant’ Elena, Venice | Conceptual Design | Pavilion
A Slow Friday
It is not intended as an introduction to a new formulation, but rather a growth from Sant’Elena, a physical and ideoloigcal manifestation of its’ heritage and people. A place that interacts with the edge of the water, an ambiguity of space offering the local residents a choice of usability, of creative freedom, and the potential for performance. It is a space to be given and to strengthen identity. This project celebrates the interplay between the heritage of Sant’Elena and Venice, the interplay between the Venetian people and the intangible production of performance, the interplay between land and water, and the interplay between past + present + future. It offers a place of being in Nature to rest and to contemplate. It is a relation to and connection to the people of Sant’Elena and to the island itself.
A Slow Friday 34
35
Method 1. Enhance the Merri Creek Corridor by building a 3D landscape system 2. Minimise the artificial interruption by merging the design into the soil, the whole site will be covered - (decomposed material) 3. Maintain the same level of security Brunswick “Walkbility“
Small Cell
Orbstruction
Medium Cell
06 Landscape Buffer zone Bachelor project Merri Creek | Parametric Design | Pavilion
Landscape buffer zone provides an interface between the Brunswick Terminal Station and Merri Creek by neutralizing the articial and nature. It works both visually and physically as a barrier, which keeps the Merri Creek visitors away from the urban disturbance. Besides, it enhances and responds to the upgrade operation of Brunswick Terminal Station, which aims to reduce the urban footprint and improve the overall aesthetics of Merri Creek Corridor. To overcome the conflict between artificial industry and the nature in our site. We are trying to resolve the sense of presence of BTS so people can purely experience the freshness in Merri Creek instead of getting interrupted by the existing double – layered wire fences. The exsisting fence will be replaced by a wavy grid structure merging into the site.
36
BEFORE
Human Interaction
Large Cell
Fabrication
Grasshopper Iteration
Form Generation
The components made of plywood are patterned with 2mm linear strips by laser cutting. They are connected with each other by friction.
Exsisting Fence AFTER
CHOSEN ITERATION Merri Creek Brunswick Terminal Station
Site Users
37
07 Grid Synthesis
Competition project Virtual Site | Conceptual Design | Pavilion
During this special period when people are united worldwide, we started to consider how metabolism architecture can be adapted instantly to response the outbreak of pandemic diseases, with improving medical, working and living environment of staffs and patients in temporary mobile cabin hospital as an aim bear in mind.
A Slow Friday
Under the consideration of building up a safety guaranteed and comfortable healthcare environment, this project selects four most critical programs as prototypes to represent utopian speculation of the adaptive hospital, which structurally dependent on 6*6 technique. The using of different materiality and greenery in prototypes also aims to achieve a balance between functionality and spatial experience, meanwhile takes minimal amount of resources to create a psychologically supportive environment for both patients and staffs.
A Slow Friday 38
ISOMETRIC
m 00 36
62
00 m
m
m 0m 20
62
00 m
6
mm
60
90
3700mm
m
m
3700mm
00 m
3700mm
3700mm
36
90
60
m
mm
60
45
mm
Staff
Consultation Room
Single Ward
Double Ward
for medical staffs
for medical treatment
for patient with servere symptoms
for patients with mild symptoms
PLAN
B
B’
A C’
C
D
D’
A’
ELEVATION
North
B-B’
South
East
A-A’
North
South
East
West
North
SECTION
D-D’
C-C’
39
08 Tianchang National Sports & Fitness Centre Internship project Tianchang, China | Schematic Design | Stadium
The major responsibilities include: Design, Presentation Prep, Prelimnary Render, Grasshopper Debug, Concept Modelling, Diagramming
Tianchang National Sports & Fitness Center
1. Work primarily with Rhino & SketchUp to produce protypes of design schemes. 2. In charge of presentation slides with Indesign. 3. Assist the project manager to develop the overall architecture form and the façade. 4. Use Grasshopper for the design of façade The major accomplishments include: - Participate in multiple projects to adjust and optimize the initial design schemes. - Cooperate with colleagues and leaders to contribute to the final presentation. - Help to win one of the competitions for the firm.
Tianchang National Sports & Fitness Center 40
41
09 Zhangjiang Medical Park 06-01 Plot Internship project Shanghai, China | Schematic Design | Mixed-Use Commercial Tower
The major responsibilities include: 1. Site analysis & research, diagramming & illustration with Illustrator & Indesign 2. Recording and taking notes for the meetings 3. Bringing insightful observations to the team during the concept design stage 4. Worked primarily with Rhino & Revit to produce protypes of design schemes 5. Using Enscape to render for perspective drafts and videos The major accomplishment includes: - Design for the landscape architecture of the project. - Helped to win the competitions for the firm.
Zhangjiang Medical Park 06-01 Plot 42
43
10 Shanghai East Station
Internship project Shanghai, China | Schematic Design | Railway Station
The major responsibilities include: 1. Diagramming & illustration with Illustrator & Indesign 2. Refine Rhino model for 3D Printing 3. Work primarily with Rhino & Revit to produce protypes of design schemes 4. Use Enscape to render for perspective drafts and videos The major accomplishment includes: - Close contact with different departments of the firm and gained the communication skills.
Shanghai East Station 44
45
Work Example
Internship project, Hassell Shanghai Schematic Design, Diagramming, Master Planning, Draft Rendering
塔楼功能方案二 建筑设计 Architecture design
立面图
张江医学园06-01B及06-07地块项目
Tower Program Stacking Option 2 - 200m
Elevation
ELEVATION - Photoshop + Enscape
FUNCTION ARRANGEMENT DIAGRAM -Enscap
67.10
RF
63.80
18F
60.60
17F
57.30
16F
54.00
15F
50.70
14F
47.40
13F
44.10
12F
40.80
11F
37.50
10F
34.20
9F
30.90
8F
27.60
7F
24.30
6F
21.00
5F
塔冠 Crown
豪华公寓 Luxury Apartments 空中大堂 Sky Lobby
服务式公寓 Service Apartments 酒店 Hotel
办公室 Office
19.00 4MF 15.00
4F
10.50
3F
6.00
2F
±0.00
GF
首层平面图 技术设计 Technical design
54
Hassell ©
Prepared for 张江集团
December, 2021
Function arrangement 1 塔冠 Crown
Ground Floor Plan
SITE LOCATION - Photoshop + Indesign
功能排列1
Service Apartments SITE PLAN - Illustrator + Photoshop 核心议题 Sky Lobby 豪华公寓 Luxury Apartments 服务式公寓 空中大堂
PROJECT ASPIRATIONS 办公室 Office 酒店 Hotel
3 G150
裙房 Podium
现在 Present
湛江华侨城欢乐海湾超高商业地标项目
上海东站 Zhanjiang OCT super high rise tower competition
SHANGHAI EAST STATION
华星路
IN RD.
HUAX
路 PLA
2ND NNING
规划二
CO²
RD.
潘家泓
PANJIA
祝川路
CANAL
1 落客区 2 餐厅
3 北侧裙房
.
ZH
AN RD UCHU
4 中心广场景观 5 海边剧场 6 文化中心 1 Drop-off area
- 规整的 Formal - 强界面Hard Edged - 固定的 Fixed - 购物街 Shopping
2 Restaurant EN RD
.
3 North podium
上海东站高台公园
SHANGHAI EAST STATION UPPER LAND PARK
46
金闻路
JINW
4 Central plaza Hassell ©
5 Amphitheater 32 6 Culture centre
N
上海东站高台公园
SHANGHAI EAST STATION UPPER LAND PARK
湛江华侨城欢乐海湾超高商业地标项目
Zhanjiang OCT super high rise tower competition
二 200米
AXON DIAGRAM - Illustrator + Indesign
pe + Indesign
+217.8m
空中大堂 Sky Lobby
空中大堂 Sky Lobby
Function arrangement 2
Design Bridge Design
ge
+147m B2 地铁站厅层
L3 运动品牌旗舰店 Sports Flagship Store 1500㎡
设备用房 Back of house / MEP
办公室 Office
地铁站台 Metro Platform 停车 Parking
酒店 Hotel
+23.5m B3设备层
g Medical Zhangjiang Park 06-01B Medical & 06-07 Park 06-01B Plot & 06-07 Plot
功能安排2
设备用房 Back of house / MEP
服务式公寓 Service Apartments
办公室 Office
连桥设计 连桥设计
下沉广场 Sunken Plaza
豪华公寓 Luxury Apartments
服务式公寓 Service Apartments
e
精品生活零售 Boutique Retail 2800㎡
塔冠 Crown
豪华公寓 Luxury Apartments
屋顶
精品超市 Boutique Supermarket 1500㎡
塔冠 Crown 酒店 Hotel
B1 地下商业街
L2 运动体验店 Sports Experience Store 1200㎡
设备用房 Back House
运动品牌旗舰店 Sports Flagship Store 1700㎡ 健康简餐 Healthy Dining 400㎡
滨水健身馆 Riverside Gym 400㎡
功能排列3
B4 地铁站台层
L1 运动体验店 Sports Experience Store 2000㎡
设备用房 Back of house / MEP
Function arrangement 3
运动品牌旗舰店 Sports Flagship Store 2200㎡
地铁站台 Metro Platform
健康简餐 Healthy Dining 1900㎡
滨水健身馆 Riverside Gym 500㎡
Hassell ©
上海东站高台公园
200
Hassell ©
201
SHANGHAI EAST STATION UPPER LAND PARK
Draft Rendering - Enscape + Photoshop
Hassell ©
3
155
1
2
1
1
4
直道
直道
交叉步道
交叉步道
分岔步道
分岔步道
环抱型步道
环抱型步道
Straight Bridge Straight Bridge
Crossing BridgeCrossing Bridge
5 6
圆环步道
Circle Bridge Hassell ©
160
Y Bridge
Y Bridge
Hugging Bridge Hugging Bridge
47
20-
W EN Q IN S H EN G c r ys talshe n g 010 9 @ g mail.com + 61 4 5 0 0 8 3 997
-22