JAVIERPÉREZTORREJÓN · CV+PORTFOLIO
02345X
We lack of errors. Many other errors are needed.
INDEX pg 3 pg. 4 pg. 5 pg. 6 pg. 7 pg. 8 pg. 10 pg. 11 pg. 12 pg. 13 pg. 14 pg. 15
cv Norvento Headquarters Crematorium Thun-Schoren E-Tower Dubai Housing Lormont Buttiniere The utility of the futile - Master Thesis The finger rubs, with certain faith, the immobile (De)growing platform - 14. Biennale Venezia Par dÊlicatesse j´ai perdu ma vie White hair Laughter and forgetting A way of forgetting javier.pereztorrejon@gmail.com Tlf. +34 606 30 82 50
02345X
JAVIER PÉREZ TORREJÓN [09/09/1990 - Cadiz, Spain] Nationality: Spanish Marital status: single javier.pereztorrejon@gmail.com Tel. (+34) 606 30 82 50
EDUCATION 2008/ /2015
2012/ /2013
Architecture School of Seville (ETSAS) Architecture Master Thesis: 10/10 Master Thesis tutor: Marta Pelegrín University ORT Uruguay Architecture Grade point average: 92/100
2014/ /present
UNED Social and cultural anthropology
2006/ /present
I.E.S. Andrés Benítez Graduated with honors
LANGUAGUES Spanish: native English: proficient First Certificate in English 175/190 German: proficient Goethe B2 Zertifikat 89/100 Awarded a scholarship of the DAAD (German Service of Academic Exchange) in 2012
03
French: conversational Primary and secondary education courses with French as the first language
PROFESSIONAL EXPERIENCE Jan 2016/ present
Mangado y Asociados S.L. Pamplona - Project Architect COMPETITIONS Art Mill Museum, Doha - Finalist Coordinator of the Thrid Stage of the competition, leading a team of 7 architects and coordinating the cost control, museography and engineering design process. Museum of the 20th Century, Berlin Coordinator, leading a team of 4 architects and landscape architects. Metro Station Pont de Bondy, Paris Coordinator, leading a team of 5 architects and landscape architects. Kampus Albertov, Prague - 2nd Place Coordinator, leading a team of 5 architects and coordinating the engeneering design process. Krematorium Thun-Schoren Coordinator, leading a team of 2 architects and coordinating the engeneering design process. Office Building for Metro Madrid, Madrid - 2nd Place Coordinator, leading a team of 3 architects and coordinating the cost control and engeneering design process. Lycée Jean Moulin, Paris Coordinator, leading a team of 3 architects and coordinating the cost control and engeneering design process. Justice Palace, Mont de Marsan (France) - 3rd Place Coordinator, leading a team of 4 architects and coordinating the engeneering design process. PROJECTS Norvento Headquarters, Spain Developing the execution project, control and works supervision of the new Headquarters for Nrovento Enerxia at Lugo. 4.020 sqm - 7.900.000 € Termo-SPA Center at Amelie Les Bains, France Coordinator, leading the Building license Process (PC). 2.500 sqm - 6.650.000 €
July 2015/ Dec 2016
Mangado y Asociados S.L. Pamplona - Junior Architect
Urban Park at Espinho, Portugal (Project under construction) Krematorium Thun-Schoren, Thun (Competition Nou Palau Blaugrana, Barcelona (Competition, finalist) Campus da Agua, Ourense (Competition)
Aug 2013/ May 2014
RCR arquitectes Olot - Architectural Assistant
Musée Soulages, Rodez (Construction completed) E-Tower, Dubai (Second Place) Collective Housing Dubai (Construction completed) Housing Jean Moulin, Burdeux (First Place) Ilot Buttiniere, Bordeaux (First Place)
HONORS AND AWARDS 2015
1st Price Nationally “You create sustainability“ Best architeconic solution Organized: Yesos Ibéricos S.A.
2015
Took part in the XIV Venice Biennale of Architecture Guest in the exhibirion of the Italian pavilion in coolaboration with Studioerrante architetture.
2014
National Prize of Young Architects Arquia scholarship - Caja de Arquitectos
2014
1st Place Ideas competition Housing in Prado del Rey.
2014
2nd Place Ideas competition Housing in Jimena de la Frontera.
2014
1st Accesit Ideas competition Housing in Vejer de la Frontera.
WORKSHOPS July 2015 August 2013 June 2013
Fronteiras: Actions in the hereditary space Belmonte, Portugal. International architecture and scenery workshop Espai Barberi. Olot, Spain. Writing architecture: rules and criterion. Architecture School of Málaga, Spain.
March 2013
Urban nature: housing needs generated by the afection of Hurricane Sandy. Santiago de Cuba, Cuba.
February 2013
The costs of growth: a critical enviromental review. Montevideo, Uruguay.
December 2012
Science, technique and architecture: four historical episodes and its changable relation. Montevideo, Uruguay. Public route: Design, communication and production. Mar del Plata, Argentina. Summer courses in the bay of Cádiz: the rebelion of the public space. Cádiz, Spain.
October 2012 August 2011
COMPUTER SKILLS BIM: Basic knowledge in Autodesk Revit. CAD: Advanced level in AutoCAD. Graphics: Advanced level in Photoshop, InDesign and Illustrator. 3D and render: Intermediate level in 3D studio Max, Rhinoceros 3D and AutoCAD 3D Calculation: Intermeadiate level in CYPECAD.
02345X
NORVENTO HEADQUARTERS 2016 - Lugo, Spain GFA: 4.020 sqm Budget: â‚Ź 7.9 M In collaboration with Mangado and Associates Project under construction Coordinator of the Thrid Stage of the competition, leading a team of 7 architects and coordinating the cost control, museography and engineering design process.
The question was how might a place to work be. The answer was found working like a gardener, sweeping the things a little. It costs nothing to dream. Something like forgetting what scares you but still being afraid.
04
0
2m
Detail of the skylight
N
0
10 m
Ground floor
Photographs of the construction
• • ••• • • • • • • •
b
56
3.4
•••••••••• ••••
CREMATORIUM THUN-SCHOREN 2015 - Thun, Switzerland GFA: 1.600 sqm Budget: € 2.8 M In collaboration with Mangado and Associates
a
56
8.6
56
Coordinator, leading a team of 2 architects and coordinating the engeneering design process.
2.8
56
56
2.9
2.8
N
56
2.6
0
10 m
a
b
Ground Floor
The question was how might a place for the body´s final moments in this world be. The answer was found in a space of the conscience, where the scale of nature dominates the human being. Somthing like not trying to be the white line in the middle of the road.
05
Site plan
0
1m
Strip section and elevation
Section a
Site plan
0
10 m
Section b
E-TOWER DUBAI 2013 - Dubai, UAE GFA: 160.000 sqm Budget: $ 530 M In collaboration with RCR arquitectes Competition - 2nd Place Participation in the design, drawings, models and graphics. These images are the final result of this work.
The question was who (from a closed group of offices) would be capable of imagining the most beautiful tower in the world. The answer was not ours, although for me, it was. Something like being indecisive, but not being so sure now.
06
Model
Model
Outside view
0
10 m
Cross section
ILOT LORMONT BUTTINIERE 2014 - Bordeaux, France GFA: 36.000 sqm Budget: â‚Ź 57 M In collaboration with RCR arquitectes Competition - 1st Place Participation in the design, drawings, models and graphics. These images are the final result of this work.
The question was how to solve, across the levels, the limits of a ctiy. The answer was found in the respect and coexistence of architecture and nature, trying to inscribe living inside the scenery. Something like pretending to be Fernando Pessoa like Pessoa was Ă lvaro de Campos. Participation in the design, drawings and graphics. These images are the final result of this work.
07
0
5m
Section a
a
b
b
N
0
50 m
a
Masterplan
Section b
02345X
THE UTILITY OF THE FUTILE Master Thesis
departments
DISCUSS! SILENCE!
computers
The question was how should a university affect society.
Something like understanding that glory, as anyone knows, is bitter stuff.
08
?
The answer was that, although the architecture is not capable of such a thing, it can generate and provide propitious work ambiences to individuals that will do it.
meetings
NOISE classrooms
exhibitions
auditorium library workshops
NOISE labs
NOISE individual work
?
SILENCE! secretary
books
Site plan
DISCUSS!
meetings
SILENCE! departments computers
SILENCE! research
NOISE ateliers
hall workshops
labs NOISE groups NOISE research
NOISE secretary
SILENCE! working rooms
exhibitions reading books
Schemes
c
b
b
a
a
d
d
N
Schemes
0
20 m
c
Ground floor
02345X
THE UTILITY OF THE FUTILE Master Thesis
For whom is the architecture done? For what kind of people?, if this is not difficult to define already. For whom is a university done? Now I am sure of it, it is done for us: for us reading, studying, learning, discussing and growing. Because to grow, sometimes, it is not necessary that time passes, it is necessary that life happens.
09
Interior view
Faรงade
B C
C
A sección C D
Section a A
D A
B
B C
B sección D Section b
UNIVERSIDAD URBANA: ARQUITECTURA, FORMACIÓN Y URBANIDAD NiP 2345X
sección SectionC sección Ac
0 50 cm
Detail
0
sección sección D B
20 m
Section d
UNIVERSIDAD UNIVERSIDAD URBANA: URBANA: ARQUITECTURA, ARQUITECTURA, FORMACIÓN FORMACIÓN Y Y URBANIDAD URBANIDAD NiP NiP 2345X 2345X
02345X
THE FINGER RUBS, WITH FAITH, THE IMMOBILE Competition 1st Place
Section a
Section b
0
20 m
Section c
The question was how to rehabilitate a farmhouse for a new use, how to provide it again with life. The answer was found in the ruins. The defeat (or the ruin) can be the most shining victory. I understood that the wall, on having been constructed, is in itself the ruins. Something like to be destroyed to know that one is one himself and not all the rest.
10
Outside view
c
b
Laboratories
a
a
0
20 m
N
c
b
Masterplan
0
20 m
Ground floor
02345X
(DE)GROWING PLATFORM Exhibition 14. Biennale Venezia In collaboration with Studioerrante architetture
The question was how to re-use the space that would occupy the 2015 Universal Exhibition. The answer was blowing in the wind. Something like understanding that the evil is not as black as his painters. Participation in the design, drawings and final model. These images are the final result of this work.
11
Model
Schemes
02345X
PAR DÉLICATESSE J´AI PERDU MA VIE Living at any place Basic project - Hotel 2015 - Almeria, Spain GFA: 610 sqm Budget: € 300 K Work in progress
a
b
c
c
The question was how the home of an anchorite might be. The answer was found in a space for the calmness and the reflection, which appears and disappears in a variable scenery. Something like understanding that everything finishes and no one knows which past is waiting for him.
N
View
12
a
b
0
3m
Plans
Section a
0
3m
Section b
Section c
02345X
WHITE HAIR Architecture workshop Espai Barberi
The question was how is a city with its edge. The answer was found in an affirmation: sometimes, the borders are difficult to find. Something like understanding that the best building is the one that does not exist (or at the worst, which does not seem like one).
13
View
A A
A A
B
B
B
B
A
C C C
A
C B
B
C
C
ESQUEMA CIRCULACION ESQUEMA CIRCULACION
a
a
b
b
ESQUEMA CIRCULACION
ESQUEMA VERDE Y FACHADA
ESQUEMA VERDE Y FACHADA
ESQUEMA VERDE Y FACHADA
ESQUEMA USOS ESQUEMA USOS
ESQUEMA USOS
Schemes
SECCI,ON A A
Section a SECCI,ON A A SECCI,ON A A
ESQUEMA USOS SECCION BB
SECCION B-Bv
SECCION CC
VHFF×RQ F F ESQUEMA USOS SECCION BB ESQUEMA USOS
SECCION BB
0
A. LEYENDAS PROGRAMA EN MAIUSCULAS MorganSnLining REGULAR TAMAÑO 7pt B. ...
PLANTA GENERAL DE LA PROPUESTA
0
SECCION B-Bv
N
0
TEXTOS CONCEPTUALES CENTRADOS RESPECTO A LA LAMINA O RESPECTO A LA IMAGEN CORRESPONDIENTE, EN MAIUSCULAS, Swis721 Lt BT LIGHT, TAMAÑO 9pt, ALARGADO A 135%
20 m
Masterplan
EL BOSC DE TOSCA : LIMITE DE LA CIUDAD A1 ESCALA 1/500
EL BOSC DE TOSCA : LIMITE DE LA CIUDAD
02
30 M
100 M
A1 ESCALA 1/1500 LABORATORIO DE ARQUITECTURA Y PAISAJE - RCR ARQUITECTES
LABORATORIO DE ARQUITECTURA Y PAISAJE - RCR ARQUITECTES
SECCION B-Bv
Section b 02345X
LAUGHTER AND FORGETTING In collaboration with Zuloark
The question was how to turn a bench into a superbench. The question was that, as Peter Parker, all we need is a spider sting to turn into a superman. Something like to remind to oneself every morning that sharing is free.
14
AxonometrĂical view
Plans
Photos of the process
02345X
best regards,
Javier
javier.pereztorrejon@gmail.com Tlf. +34 606 30 82 50
02345X