1 minute read

Combat rising costs

require more than 50,000 chargers suitable for heavy-duty vehicles, including some 35,000 megawatt chargers, as well as at least 700 hydrogen refuelling stations. With the state of charging and refuelling infrastructure today, even the current CO2 targets (-30% by 2030) are out of reach.

The AFIR agreement falls short of the required ambition level, both with respect to the necessary power outputs and deployment timelines. The short-term review for heavy-duty vehicles, will have to ensure that further adjustments will be made to address the specific requirements of trucks.

In addition to AFIR, member states must urgently ensure that planning and permitting processes are accelerated, power grids are upgraded and suitable sites are made available for truck-charging, ACEA concludes.

This article is from: