EDUCATION 2010 - 2015
BACHELOR IN STRUCTURAL ARCHITECTURE Santa Maria La Antigua Catholic University
1997 - 2009
HIGH SCHOOL DIPLOMA IN SCIENCES AND HUMANITIES R.R. Esclavas del Sagrado Corazón de Jesús High School
EXPERIENCE 2016 - 11 Present
CONSTRUCTION MANAGER - Grupo de Ingenieros Contratistas, S.A. , UDG Group.
2015 - 09 2016 - 10
CONSTRUCTION MANAGER - Constructora DFR, S.A. , UDG Group.
2013 - 09 2015 - 09
ARCHITECTURE ASISTANT - Urbanistmo, S.A.
2012 - 10 2013 - 05
INTERN - T.C. Panamá. Drawing of plans for residential buildings, gallerys and comercial buildings.
cwongg25@gmail.com +507 6672-4456 25/01/1992 Panama
Spanish Native
Advance
Develpment of the construction of the family entertainment park, Crazy Park. Construction managment, control of changes, quality control, contractor manager.
Development of plans and design for residential, commercial and mixed buildings. 3D modeling, furniture design, material calculatios and field surveys.
CAYUCO DRAGON BOAT PADDLE
LANGUAGES
English
Develpment of the construction of the mall, Caminos de Centennial. Responsable of construction site, construction managment, quality control, contractor manager.
MOUNTAIN
HIKING
PROFESSIONAL SKILLS
SEMINARS AND WORKSHOPS
SWIMMING
INTERESTS
2013 - 10
Workshop “No shape, Only concept” - Arch. Haiko Cornelissen Santa Maria la Antigua Catholic University - Panama City, Panama
2013 - 10
Masterful talk - Arch. Haiko Conerlissen Santa Maria la Antigua Catholic University - Panama City, Panama
2010 - 06
Seminar/ Workshop “The city theater, a circle of interventions in the Casco Antiguo of Panama City” - Arch. Miguel Cifuentes-Arango Santa María la Antigua Catholic University - Panama City, Panama
PAINTING
THEATER
POLICLINICA PEDIATRICA
PALACIO LEGISLATIVO
McDonald's
DEL RE MUSEO HOMB EÑO AM PAN
ME
RC
AD Y BUO DE HO ARTE NE RIA SANIA S S
EDIFICIO
PLAZA 5
DE MAYO
POLICLINICA PEDIATRICA
PALACIO LEGISLATIVO
POLICLINICA PEDIATRICA
PALACIO LEGISLATIVO
MUSICOS
GIMNASIO FITNESS
BIBLIOTECA
SALA DE RECREACION Y PROYECCION
SALON AEROBICS ASEO
ASEO
BANOS
S
S B S
B
B
B
S
DEPOSITO
BAR COCINA
SALON PRIVADO
SPA
BOUTIQUE
SUITES
VESTÍBULO
AGENCIA DE TURISMO RECEPCIÓN
ASEO ENTRADA DE SERVICIO CAFETERÍA
S
S BOUTIQUE
B S COCINA
BAÑOS
B
B
University project: Design X 2013 Instructor: Juan Roquette
The design of the museum is through a star with elongated points and a central core. Each point of the star fulfills an independent function of the museum, alternating the buildings of exhibition halls with those of research and conferences. The interaction of all visitors takes place in the core that also serves as a central atrium, with bleachers in the spaces between buildings.
Sala de introducciรณn Sala de Etnias
Sala de Etnias
/ /
//
Sala de Comercio
Sala de Personajes de la Ciudad
/
Sala de Comercio Sala de Transporte
Sala de Personajes de la Ciudad
Sala de Exhibiciones Temporales
Sala de Biodiversidad y Pasaje
/
Sala de Transporte
Sala de Exhibiciones Temporales
Sala de Biodiversidad y Pasaje
Almacenaje #3
Almacenaje #1
Almacenaje #4
Almacenaje #2
/
/
Biodiversity Golden Frog
No. 1 Geisha coffee in the world
City Icons Bridge of the Americas
Athletes Roberto Durรกn
Ethnicities The Gunas
Transport Panama Canal
Economy
EXHIBITION
HALLS
CONFERENCE
ROOMS
CENTRAL
YARD
STUDY AND
RESEARCH LABS
ADMINISTRATION
AND STORAGE
CAFETERIA
Family Entertainment Center Altaplaza Mall Constructor: DFR, S.A. Sept 2015 – Oct 2016 Development area: 3,177.00 m2 Design: Forrec
Prizes: Silver medal. 2017 Best new retail concept in Latin America by International Council of Shopping Centers. Construction project of a theme park set as a jungle. Were the users discover the attractions following the course of a river set in the design of the floors, walking through full scale trees and under colorful clouds.
S
S
S
S
FLOOR 200
FLOOR 300
CL
PANEL D 0+7.00
PANEL C 0+5.80
PANEL B 0+4.80
TUBO PVC 200 mm Ø, ACABADO IMPRESO DIGITAL DE CORTEZA DE ARBOL. PANEL A 0+3.80 COLUMNA SUPERIOR ACABADO IMPRESO DIGITAL DE CORTEZA DE ARBOL.
CLG +3.20
RODAPIE REVESTIMIENTO SOBRE ESTRUCTURA INTERNA,VER DETALLE.
CLG +4.80
CLG +4.20
CLG +3.20
COLUMNA INFERIOR ACABADO REVESTIMIENTO DE CORTEZA FALSA
N.C.T.= +2,90
N.C.T.= +3,20
N.P.T= 0+0.00 NIVEL 600
N.C.T.= +3,10
N.C.T.= +3,40
CAPA SUPERIOR CONTINUA A PARED VER SECCIÓN. DOBLAJE
N.C.T.= +3,60 CLG +3.60
CLG +2.80
CAPA SUPERIOR MDF
N.C.T.= +2,80
PIEZA SEPARACIÓN
F - 2.02 02
SEGUNDA CAPA MDF
N.C.T.= +2,90
CLG +3.60
N.C.T.= +3,10
TERCERA CAPA MDF
N.C.T.= +3,40
N.C.T.= +2,60
PATRÓN DE HOJA GRABADO
L. PROPIEDAD
N:80.65
L. PROPIEDAD
N:81.70
N:82.20
N:79.45 6.20
PARED CIEGA
Techo Liviano
Techo Liviano
T. Gas
N:72.00
N:71.80
N:70.56 ACCESO PLANTA BAJA
PROY. FOSO DE ASCENSOR
TINAQUERA
ESTACIONAMIENTOS
2.95
LOUVERS
ACCESO PLANTA BAJA
PL. ALTA N. 100
4.00
N:72.50 N. 0.00
13.15
PARED CIEGA
PL. BAJA N. 0.00 N:69.20 N:69.05 SEMISOTANO N. -100