Curriculum Vitae & Architecture Portfolio | Cynthia Sugiono

Page 1

ARCHITECTURE

PORTFOLIO selected works / 2013 - 2017

C Y N T H I A SUGIONO fresh graduated architect


/GREETINGS/ My name is Cynthia Sugiono and people usually call me CS. I was graduated as Bachelor of Architecture from Architecture Department of Soegijapranata Catholic University on September 2017. I can work under the pressure and I have the ability to work both together in the team and individual. I also have the ability of public speaking and good communication skill that required to communicate with clients. I have intersted to learn everything especially in architecture and I hope I can give a positive contribution to your company’s growth.


CYNTHIA SUGIONO fresh graduated architect Semarang, October 18th, 1995 Jl. Karang Wulan Barat I/23 A Brumbungan, Semarang Tengah, Semarang Bachelor of Architecture Architecture Department Soegijapranata Catholic University Graduated with 3.49/4.00 GPA from 144 Credit Hours

+62 81 901 393 805 cynthiaasugiono@gmail.com cynthiasugiono_


/CURRICULUM VITAE/ /EDUCATIONAL BACKGROUND/ 2001 - 2007 2007 - 2010 2010 - 2013 2013 - 2017

Cor Jesu Elementary School | Semarang, Central Java Domenico Savio Junior High School | Semarang, Central Java Van Lith Boarding Senior High School | Muntilan, Central Java Soegijapranata Catholic University | Semarang, Central Java Architecture Department Graduated with 3.49/4.00 GPA from 144 Credit Hours

/SKILLS/ SOFTWARE SKILLS Auto CAD Sketch Up 3Ds Max Corel Draw Lumion Microsoft Office

SOFT SKILLS Organization Public Speaking Time Management Responsibility Communication Team Work

/HOBBIES & INTERESTS/ Architecture

Secretariat

Photography

Movies

Culinary

Traveling

/EXPERIENCES (2007-2017)/ 2007 - 2010 2010 2010 - 2013 2013 August 2013 April 2014 August 2014 September 2014 March 2015 March 2015 March 2015 April 2015 April 2015 Agusut 2015 September 2015 September 2015 August - December 2015 March 2016 August - December 2016 September 2017 August - December 2017

Joined School’s Flag Raisers Team Graduated from Domenico Savio JHS Joined School’s Orchestra and Choir Graduated from Van Lith SHS UNIKA New Student Orientation | Participants FAD Leadership Training | Participants UNIKA New Student Orientation | Committee / Secretary Joined Student Board of Faculty of Architecture and Design | as Secretary Live In FAD | Committee / Secretary Best of Studio Architecture | Nominee Dies Natalis 47 Architecture | Commitee / Business Funds FAD Leadership Training | Commitee / Secretary FAD Graduation | Committee / Chairwoman UNIKA New Student Orientation | Commitee / Student Guide FAD Graduation | Committee / Event Coordinator FAD Festival | Committee / Competition Coordinator Research : PT Rajawali Nusindo Heritage Building | Research Assistant & Surveyor Best of Studio Architecture | Nominee Lecturer Assistant of Technical Drawing Graduated from Architecture Department Soegijapranata Catholic University Lecturer of Technical Drawing Freelancer Architect and Drafter Junior High School Tutor


/PROJECT CONTENTS/

Architecture Studio 2 : The Flamingo Boutique

Architecture Studio 4 : UNIKA Bureau Center

Architecture Studio 5 : The Patio Mall

Architecture Studio 6 : International Indoor Swimming Pool

Architecture Studio 7 : Herbal Botanic Park

Architecture Final Project : Pangudi Luhur Boarding Senior High School


/THE FLAMINGO BOUTIQUE/

Architecture Studio 2 Academic Work 2015 Best of Studio Architecture 2015| Nominee

Mentor : Albertus Sidharta, Ir., MSA Case : Simple Function Building This project’s function is as a boutique named The Flamingo Boutique. The concept of this project is to make a “combine with nature” building. Its name, is taken from the amingo bird which is has a feminime, soft, and elegant. So this building will be dominated with the color of violet and cream as the amingo has.



/THE FLAMINGO BOUTIQUE/

Hard-material area, used for parking area

Site Data

Soft-material area, used for green area Security pos Building area Pond area

Existing Contour

Contour After Cut and Fill

Site Zoning The given site is a land of 300 sqm which has a slope. Site processing is done by cut and ď€ ll system and also spit level on the sloping parts of the site, and also some columns are used for the stage structure.

Needed Rooms Cashier and Accessories Display Fitting Rooms

Site Entrance

Public Zone Clothes Display

Toilet

Private Zone Service Zone

Shoes and Bags Display

Stockroom Main Entrance


The rooms needed in this boutique are display room, cashier area, tting rooms, stockroom, and bathroom. The oor plan of this building uses the analogy form of boots, where shoe is one of the fashion products are also sold in a boutique.

Wall area using stage structure

Massive walls

Spit level Stage structure

Spit level with cut and ll

Building Entrance

Cashier Area

Fitting Rooms

Display Room

Bathroom

Stockroom


/UNIKA BUREAU CENTER/ Architecture Studio 4 Academic Work 2015 A Group of 4 - Project Best of Studio Architecture 2016| Nominee

Mentor : FX. Bambang S., Ir., MT Case : Low-Rise Public Building Imam Bonjol Street, Semarang, Indonesia This project is a building that accomodate business units of Soegijapranata Catholic University which is open to public. This project is consist of: - Language Training Center (CLT) - Legal Aid - IDX Corner - Consultant Bureau - Psychology Therapy Institute - Design Consultant Association, and - Meeting Hall with capacity of 200 people



/UNIKA BUREAU CENTER/ Site Data Sate House

street

- site -

empty land

Imam Bonjol Street, Semarang, Indonesia Site area: 1.252 sqm Building coverage area: 60% Green area: 40%

Dafam Hotel

Basement Floor Used for parking for motor cycle, pump machine room, MDF room, etc

Ground Floor Used for Lobby, Ofď€ ce Boy room, reading room, and CLT for kids area

Eco-Indonesian Culture A concept that retains ecological value and implements the study of local wisdom that still relevant nowadays. Some forms of the building parts imitate the typical Indonesian culture such as gunungan in Javanese puppet, roof of Traditional House of Minangkabau, Paduraksa Gate, roof of Joglo Traditional House and the shape of the Bentar Temple in Bali.

Gunungan

House of Minangkabau

Paduraksa

Bentar Temple

2nd Floor Used for psychology therapy institute that consist of test room, ofď€ ce, kids room, etc

3rd Floor Used for Legal Aid, IDX Corner, Consultant Bureau, and Design Consultant Association


1st Floor Used for CLT, consist of classrooms, wi area, CLT Laboratory, and ofce

Perspective Building Interior

4th Floor Used for meeting hall

The material in the building interior is selected using granite ooring, white walls and ceiling, and some wood accents on columns or other elements. The reason for this election is to create a formal impression remembering the building’s background is on educational, but still give warm impression.


/THE PATIO MALL/ Architecture Studio 5 Academic Work 2015 Mentor : BPR. Gandhi, Ir., MSA Case : High-Rise Public Building S. Parman Street, Semarang, Indonesia The Patio Mall is a shopping center located in Semarang. As the name implies, this mall will be designed by giving a similar image to the name of the mall itself. The image will be developed into the addition of indoor garden design on the building and also the design of this building that is semi outdoor and friendly to the surrounding environment.



a) OPEN AIR PLAZA

This section is an open plaza area used for the visitors to walk casually and enjoy the outdoor environment of the building. Open air plaza is designed at the front of the building and behind the building.

/THE PATIO MALL/

b) 5 FLOORS MASS In this area the number of floors of buildings is as much as 5 floors with different functions each floor. On the top floor is designed outdoor foodcourt and outdoor gym center so that visitors can access the outside of the building.

Site Data street

c)

street

- site Richeese Factory

-

LetJen S Parman Street, Semarang, Indonesia Site area: 13.380 sqm Building coverage area: 60% Green area: 40%

street

CORE Core area consist of emergency stairs, and visitor elevators are continuous from the ground floor to the 5th floor where the functions and properties of the 5 floors are still very public compared to the more private floor functionality such as office and ballroom.

d) CORE

This area is the core area of the building which consists of emergency stairs, visitor lift, and also the freight elevator. Core buildings enclosed in massive concrete walls to reinforce that building continuously from ground floor to rooftop.

e) ATRIUM AREA

Plan Concept

This area is used as an atrium on the ground floor and providing voids on the floors above it to maximize the function of the mall building and as the building's vertical respiration.

d) The concept of building plan is simply by combine 3 basic forms; square, triangle, and circle.

a)

f) h)

e)

OPEN AIR PLAZA It is an open air plaza zone at the front of the building that becomes the main entrance to the building and as the drop off area.

g) 2 FLOORS MASS b) f) c)

g)

In this area, there are two floors of building floor. This area functioned as semi-open public areas of buildings that will be shown with opened design such as the use of wall materials and giving roof garden on the upper floors.

h) CIRCULAR RAMP

A circular ramp is used to reach the car park area inside the rear building.


FUNCTION NEEDS SUPERMARKET 2

AREA +/- 1500m - 2 FLOORS

DEPARTMENT STORE 2

AREA +/- 1500m - 2 FLOORS

CINEMA 2

AREA +/- 1500m - 2 FLOORS

HOME FURNISHING 2

AREA +/- 2000m - 2 FLOORS

FOODCOURT 2

AREA +/- 900m - 1 FLOOR

FITNESS/BOOK/GAME CENTER

SUPERMARKET Supermarket is located on the 1st and 2nd floor to prioritize the effectiveness of activities and prioritized on locations that facilitate the process of loading goods in large quantities and routine.

CINEMA Placed on the 3rd and 4th floor. The floor above the cinema room is left empty (plate no) so the studio space avoid the existence of the column. Interior studio space uses soundproof panel to avoid noise.

DEPARTMENT STORE Located on the 3rd and 4th floor of the back so as not crowded with supermarket visitors. Its placement is pay attention to the ease of loading a lot of goods and routine but not as routine as supermarket.

HOME FURNISHING & ELECTRONIC CENTER The home-furnishing and electronic center area is located on the ground floor up to the 3rd floor. The placement takes into account the flexibility and ease of loading large-size items.

2

AREA +/- 2600m - 3 FLOORS

“YOUTH MALL” Mall as a gathering place should be a Place Making for the environment, especially among young people, where one of the target visitors mall is a young man who likes to spend time in the mall to perform various activities such as holding events and shopping or just eating, fitness, or watching the cinema.

Open Space to Hangout

Hall for Events

Playfull Landscape

“FAMILY LEISURE” As a means of entertainment and family recreation, the functions contained in the mall should be able to provide family needs and are recreational. Family needs will be much greater than the needs of youth so it needs to be placed functions such as supermarkets and department stores, as well as home furnishing center.

Open Air Plaza

Green Market

Leisure Park

FOOD COURT Located on the 5th floor. Divided into 2; indoor and outdoor. The outdoor one is located above the cinema area with an opened atmosphere.

FOOD COURT Located between the 4th, 6th and 7th floor. Book Center is on the 4th floor, the Fitness Center is on the 6th floor, while Game Center is on the 7th floor.


CHANGING PEOPLE’S PERSPECTIVE OF NOWADAYS MALL

FIXING TODAY ISSUE

MALL FOR VEHICLE

???

The problem of setting the location of the vehicle becomes a problem in the design of public buildings such as a Mall.

A mall for vehicles?

???

???

???

???

Design mall that’s too crowded by the vehicle gives visitors the impression that the mall is intended for the wheeled machine to stop over.

An isolated box? BECOME . . . o2

o2 o2 o2 o2

FIXING TODAY ISSUE

o2

o2

o2

o2

As a result the design of the building to fall because the land is too exploited for the vehicle.

AN ISOLATED BOX The impression of ‘mall is a closed box’ that is isolated from the outside environment to be avoided by applying the concept of urban living concept or living concept that embraces the progress of modern civilization in urban areas, but still remember the importance of health factors and the sustainability of the surrounding natural environment.

A Livable Community CREATING FUTURE ISSUE ON SEMARANG CITY

RIVER

PARK

+ MALL

THE PATIO. what is that?

PATIO (n) 1) Open porch at the back of the house 2) Open park inside the house From the above understanding, PATIO name is chosen to give a similar image to the building of the mall later, the image owned by 'patio' itself.

THE PATIO.

The image will be developed into the addition of indoor garden design on the building and also the design of this building itself that is semi outdoor and friendly to the surrounding environment


Exterior-Interior

Building Elevation


/INTERNATIONAL INDOOR SWIMMING POOL/ Architecture Studio 6 Academic Work 2016 Mentor : Antonius Ardiyanto, Ir., MT Case : Wide-Span Building Marina Raya Street, Semarang, Indonesia This project is an international level swimming facility that used for inter-state races that also features a recreational pool. On this project, students are taught to combine 3 structures on a wide-span system. The structure used is space frame, shell structure, and membran-cable structure.



/INTERNATIONAL INDOOR SWIMMING POOL/

Form Study The concept for this project is the “ocean waves”. The reason for the selection of waves as the main concept of the project is still related to the project title, "Swimming Pool", where the swimming pool is identical with water.

Site Data Java Sea

The waves have a philosophy of "never-ending spirit" because the waves are constantly rolling to shore, just like a swimmer competing toward the nish line to become a winner.

+ ++ empty land

- site -

empty land

street

Marina Raya Street, Semarang, Indonesia Site area: 30.000 sqm Building coverage area: 40% Green area: 60%

Building Section

A swimmer's butterystyle analogy is also applied to the design that appears on the front side of the building. The analogy is indicated by the indentation on the shape of the building that mimics the style of a swimmer.

Building element that apply the basic shape of the waves as the basic concept The function as a recreational pool cover with tensile cable structure and mast pole with EFTE membrane roof covering


Interior Competition Swimming Pool

Interior Audience Stands

Building Axonometry


/HERBAL BOTANIC PARK/

Architecture Studio 7 Academic Work 2016 Mentor : Krisprantono, Dr., Ir. Case : Thematic Design Ambarawa-Magelang Street, Jambu, Indonesia This project is one of the new innovations for the recreation visit as well as education for all circles, especially for children, students, learners as an addition to knowledge about cultivation and processing medicinal plant into traditional medicines.



Mass Compotition

/HERBAL BOTANIC PARK/ Site Data

Receiver

Educational

Research

Museum Managerial

settlement

settlement

Research

- site street

settlement

Receiver

Managerial

Museum

Educational

Ambarawa-Magelang Street, Jambu, Indonesia Site area: 30.000 sqm Building area: 10.635,3 sqm Building coverage area: 40% Green area: 60%

Canonical Design Method

Site Zoning

Is an design approach that is based on various speciď€ c aspects such as geometric aspects of the object, the proportion of systems, modules, order the mass of all of which lead to

the regularity as the basis for designing

Building’s axis is following the line of GSB. This is the basic thinking to make a circle-based-shape building. The following zone within site is adjust the extant open space such as parking zone, herbal plant garden zone, and service zone.

Center point Service Zone

Herbal Plant Garden

Building 1

Building 3 Building 4

Building 2

Building 5

The basic shape of the building is some overlapping circles combined as well. If the lines from each building is conected, they will meet at 1 point as a center point of the circle. Each building has its own size but still make a proportion overall

Building Zone

GSB

Parking Zone Access Zone

Managerial Parking Zone


Section 01 The Dome

Section 02 Building Entrance

Site Elevation 01

Herbal Plant Garden

Site Elevation 02


/PANGUDI LUHUR BOARDING SENIOR HIGH SCHOOL/ Architecture Final Project Academic Work 2017 Mentor : Antonius Ardiyanto, Dr., Ir., MT Soegijapranata Street, Ambarawa, Indonesia A project of a middle-level education facility (Senior High School) which is equipped with dormitory system that’s a mandatory for all students. This project is owned and managed by the Pangudi Luhur foundation and located in Ambarawa. The goal of this project is to make the next generation of the nation with good quality, both in terms of intellectuality or softskill.



/PANGUDI LUHUR BOARDING SENIOR HIGH SCHOOL/

Contextual-Contrast Architecture Contextual

Contrast

St Joseph Church (Jago) Ambarawa Landscape

To the settlement around site

Steep roof Adding some courtyards and communal rooms both in school and dormitory

Non-characteristic architecture Contrast on the scale of the building Creating the “Old and New Image”

Site Data chruch

-

settlement

- site -

settlement

+ + +

elds mountain

Mgr. Sugiyapranata Street, Panjang, Ambarawa Site area: 35.050 sqm Building area: 17.669 sqm Building coverage area: 40% Green area: 60%

Site Zoning

Concept “Applying The Foundation’s Vision and Mission into Design” vehicle zone

girls dormitory

school building

boys dormitory

Faith community centered on Jesus Christ

The spirit of brotherhood, partnership, and developing communication

Chapel as religion facility

Communal room for the students’s interaction

Quality education and learning, premeditated, orderly, disciplined, and consistent

service zone

Base of site’s division is to separate the boys dorm from the girls dorm. The school building is placed in the middle as a meeting point and remember its main function. The site’s front side is used as vehicle zone, used as parking space, while the site’s back site is as service zone.

Building’s shape full with rm elements and less curved elements


School Building

Dormitory Unit

Dormitory Receiver Building

Dormitory Refter and Chapel


1

4


2

3

Sequences:

5

6

1) Dormitory Prayer Park 2) Dormitory Communal Room 3) Dormitory Basketball Court 4) Main Entrance, Parking Area, School Chapel 5) School Sports Field 6) Field Ceremony


/MODELING/ The Flamingo Boutique

The Patio Mall


UNIKA Student Activitiy Center Site Analysis Course

UNIKA Bureau Center

Pangudi Luhur Boarding Senior High School


thank you for reading


/SINCERELY/

Cynthia Sugiono



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.