DANA BAR’ELY KATZ KEY PROJECTS 2010-15
DANA BAR’ELY KATZ GRADUATE ARCHITECT
ACADEMIC BACKGROUND
SOFTWARE SKILLS
BACHELOR OF ARCHITECTURE* / 2012 with honours (Magna Cum Laude) ASOA- Azrieli School of Architecture, Tel Aviv, Israel *Five-year degree
*** Autocad / Revit / Sketchup / Adobe CS / Artlantis Render ** Rhino / Grasshopper / Vray
AWARDS AND DISTINCTIONS DAVID AZRIELI PRIZE - Isreal’s best final projects / 2012 Shortlist XNET ONLINE MAGAZINE Publication / 08.2012 Distinctive final projects in Tel Aviv university
A LITTLE ABOUT ME I am a Graduate architect with 5 years of experience (2.5 years post-grad). I Moved to Australia as a permanent resident after graduating with honours from Tel Aviv University and working in two renown architecture firms in Israel. I have been working in ARM Architecture for the past year and enjoying Melbourne.
ARCHITECTURAL SKILLSET *** 2D Drafting, 3D Modelling, Modelmaking, Sketch Drawing ** Rendering
CAREER SNAPSHOTS
PERSONAL INFORMATION
GRADUATE ARCHITECT / 02.2014- present Ashton Raggatt McDougal Architects, Melbourne
Place of birth: Tel Aviv, Israel Languages: English, Hebrew, Spanish Visa status: Permanent Resident in Australia
GRADUATE ARCHITECT / 11.2013- 02.2014 Martin Friedrich Architects, Melbourne GRADUATE ARCHITECT / 08.2012- 08.2013 Mann-Shinar Architects & Planners, Tel Aviv, Israel INTERN ARCHITECT / 10.2009- 07.2012 BLK Architects & Town Planners, Tel Aviv disctrict, Israel
VOLUNTEERING [Co]Design Studio, Melbourne, Australia / 10-12.2013
CONTACT Adress: 7/ 14-18 Howitt Street, South Yarra, VIC 3141 Phone: 0497871840 Email: danabarely@gmail.com
PROFESSIONAL EXPERIENCE
GOLD COAST 2018 Commonwealth Games Village | ARM Architecture Project: CG Athletes village / residential neighborhood as a legacy development Client: The City of Gold Coast / Grocon Program: 29 hectares of housing (1,200 units), retail, community and public space Location: Gold Coast, QLD, Australia Phase: Design Development Year: 2014-2015 Role: Schematic Design > Documentation
The project provides the essential infrastructure for the Gold Coast 2018 Commonwealth Games athletes’ village that will accommodate 6500 athletes and officials. On completion of the games, permanent works will provide over 1250 residential units (with supporting retail amenity). As part of a joint Venture, ARM are designing two mixed-use lots and the ‘Village Heart’.
C1
F
C3
A
ENTRY
ENTRY
C1
Hosp it
al Bo uleva
rd
FACILITIES MANAGEMENT OFFICE
C
1
STREET GRID
A
E
B1
E
C2
B B1 VILLAGE HEART
C2
ENTRY
C2
B2
nD
n ve hA
8
ven u
e LOT B
ue
ENTRY
T
hir The proposed building fabric for the apartment buildings is comprised of 2 distinct elements: dA
en Av
A
LOT F
LOT E
▪ Base façade – consisting of glazed windows & balcony doors set in a wall which takes the orthogonal form of the individual apartments He 10 alth ▪ Shaped ribbon façade – consisting of powdercoated aluminium panels that give a shaped Str eet profile to the buildings
GYM
t Fif
LOT A
CYCLE ROUTES 2.7.3.1.2 BUILDING FABRIC
9
A A
7
th ur Fo
B1 B2 STORE
ue
6
ENTRY
ENTRY
E
LOT E
5
C2 ENTRY
C2
v
southport sharks fields
MAIN CONNECTIONS
4
PARK
FIRST STREET
B2
F
2 3
COMMUNITY FACILITIES
A
ENTRY
gold coast university hospital
Inn ova tio
C3
musgrave park
C1
rive
ENTRY
E
southport sharks fields
VILLAGE HEART
ENTRY
E
ENTRY
E
ENTRY
HOSPITAL BOULEVARD
Shark Lan e
Further studies towards the end of Schematic Design have focussed on a new approach whereby the shaped ribbon façade could comprise precast panels with cast in coloured tiles. This work will be ongoing into Design Development and as yet the construction method for the building fabric has not been finalised.
LOT D
11
ENTRY GYM
CARPARK ENTRY
C
nd S
tre
et
ENTRY
This colour and texture creates variation throughout the precinct whilst still providing a C1 OPEN SPACE NETWORK 12coherent neighbourhood character. SOLARAdditionally, ACCESS these façade types have been developed and B1 distributed to provide buildings with no ’back’. The colour of the buildings respond to their 13 private proximity to the arbour ‘string’ that radiates out from the Village Heart and both the colour hospital and textures used emulate those found on the Gold Coast. Reappearing throughout the E F development the arbour string will become the neighbourhoods signature. Sec o
LOT C
SCHEMATIC DESIGN REPORT/ PARKLANDS 31-JUL-2014 / PAGE 8
Pa rk
lan ds
Dr
st Fir
ive
university gold coast
TYPE B2
STREET GRID
MAIN CONNECTIONS
VILLAGE HEART
CYCLE ROUTES
OPEN SPACE NETWORK
SOLAR ACCESS
COMPACT URBAN FORM
OUTLOOK TO PARKLANDS
TYPE B2
D01-2-204
D01-2-202
TYPE E D01-2-203
TYPE A D01-2-205
TYPE F
C O A R B G Y IR P H T
C OG R B A Y IR P T H
D01-2-202
TYPE F D01-1-204
TYPE B D01-2-201
TYPE B D01-1-201
MAIN STREET LOOKING WEST SCHEMATIC DESIGN REPORT/ PARKLANDS 31-JUL-2014 / PAGE 8
Typical Floor Plan
Typical Units
t
st Fir
Typical Facade
D01-2-203
ue
ee Str
en Av
t
in Ma
TYPE E
t
COMPACT URBAN FORM
ee Str
MAIN STREET LOOKING WEST
h alt He
FOURTH AVENUE
Lot D - Residential - Ground Floor Plan
Further studies towards the end of Schematic Design have focussed on a new approach whereby the shaped ribbon façade could comprise precast panels with cast in coloured tiles. This work will be ongoing into Design Development and as yet the construction method for the building fabric has not been finalised. OUTLOOK TO PARKLANDS
ee Str
ith
t
e re
St
Sm
Site Plan
SWANSTON SQUARE Wintergarden | ARM Architecture
Project: Public wintergarden and pathway between two residential towers in Swanston Sqaure Client: Grocon Program: 850 m2 urban space and retail Location: Melbourne, Australia Phase: under construction Year: 2014 Role: Design Development
-
SCALE 1:5
ALUMINIUM GLAZING ADAPTER WITH INTERNAL COLUMNS. DRAINAGE CHANNEL TO DISCHARGE INTO GUTTER. CONTINUOUS SEAL WHERE GUTTER STEELWORK
STEEL SILL PLATE TO ENCLOSE "SHADOWBOX"
INTERSECTS PORTAL COLUMN CLADDING
LOCALLY NOTCH OUT OF UB MEMBER AND ADD STIFFENING PLATES AS NECESSARY. REFER STRUCTURAL ENGINEER'S DRAWINGS. 368
CONTINUOUS SEAL AT CLADDING JUNCTIONS. STEELWORK CONNECTIONS TO STRUCTURAL ENGINEER'S DESIGN. 368
PORTAL Q SPRAY APPLIED HP1200 POLYURETHANE
SECTION THROUGH BOX GUTTER AT 3 PORTALS N & Q
1 -
PATTERNED ROOF GLAZING TO ARCHITECT'S DESIGN
PORTAL N
COATING WITH BOND BREAKER AND TAPE AT JUNCTIONS BETWEEN GUTTER MEMBERS OR SIMILAR APPROVED SOLUTION
NOTES
AMENDMENT NOTES FOR THIS ISSUE
05 REV No.
TENDER ISSUE REASON FOR THIS ISSUE:
DOWNPIPES CONCEALED WITHIN PORTAL CLADDING. HYDRAULIC ENGINEER TO ADVISE REQUIREDFOR DOCUMENT ISSUE DP DIMENSIONS. SEAL AROUND PENETRATION WHERE DPs EXIT AVAILABLE FROM: STEEL PORTAL STRUCTURE.
20/10/14 DATE
ALUMINIUM GLAZING ADAPTER WITH INTERNAL DRAINAGE CHANNEL TO DISCHARGE INTO GUTTER.
HISTORY REFER TO DOCUMENT REGISTER
Project Architect at ARM tel. 03 8613 1888
LOCALLY NOTCH OUT OF UB MEMBER AND ADD STIFFENING PLATES AS NECESSARY. REFER STRUCTURAL ENGINEER'S DRAWINGS.
200
PORTAL STRUCTURE TO ENGINEER'S DESIGN 8MM STEEL PLATE CLADDING. HIGH PERFORMANCE COATING SYSTEM AS SPECIFIED.
FALL
The ‘Wintergarden’ is a 850sqm public space and pathway between two buildings in the new Swanston Square development, comprising six steel portal structures covered by a glazed roof and sitting and planting areas. The next phase of the project will connect between Swanston street and Bouverie Street.
-
AMENDMEN
ONLY AMENDMEN
05 REV No.
a-r-m.com.au
SPRAY APPLIED HP 1200 POLYURETHANE MEMBRANE TO ALL BURIED STEEL SURFACES PROJECT
30
40
50
60
70
80
90
MILLIMETRES ON ORIGINAL Uses files: 100mm
10
SECTION THROUGH BOX GUTTER AT TYP. PORTAL 20
NTS 1:10 SCALE
30
40
50
60
70
80
SCALE 1:5
90
MILLIMETRES ON ORIGINAL Uses files: 100mm
GZ.1
6details_1to5
2000 NOM
GZ.2
VISION GLAZING (FRITTED)
PF.1
3 COAT PAINT SYSTEM
AL.1
ALUMINIUM ANGLE
A1
0
20/10/14 BT JS
2
3 -4
SECTION THROUGH BOXCONNECTION GUTTER AT TYP. PORTAL PORTAL SLAB AT HARDSCAPE 2 6
8
SCALE 10m
CONCEALED SIPHONIC DOWNPIPE AND OVERFLOW DOWNPIPE TO HYDRAULIC ENGINEER'S DESIGN.
368
FALL
HIGH PERFORMANCE COATING SYSTEM AS SPECIFIED.
T. LEADER
AMENDMENT NOTES F
FALL
GZ.2
ONLY AMENDMENTS SINCE LAS
05 REV No.
Project Architect at ARM tel. 0
PRE DRILLED HOLES IN END PLATE AND PRE WELDED BOLT HEADS TO ALLOW FOR BOLT FIXING THROUGH ADJACENT PORTAL SEGMENT
LEVEL 07 RESDENTIAL R.L. 40.000
ARM
ARCHITECTURE URBAN DESIGN MASTERP LEVEL 11/ 522 FLINDERS LANE MELBOURN T/ 03 8613 1888 F/ 03 8613 1889 ABN/ 2 E/ arm@a-r-m.com.au
FALL
FALL
P3 CARPARK 38.400
a-r-m.com.au PROJECT
WINTERGARDEN CARLTON BREWE CARLTON, VICTORIA 3053
BRACING SECTION
SCALE 1:5 LEVEL 05 RESDENTIAL R.L. 32.900
PF.1 0
10
20
30
40
SCALE 1:50
50
60
70
80
90
MILLIMETRES ON ORIGINAL Uses files: 100mm
CLIENT
SE GM EN T1
GROCON
PO
RT
AL
PF.1
LEVEL P2 CARPARK R.L. 36.650
TYPICAL PORTAL CROSS SECTION
3 LEVEL P1 CARPARK R.L. 32.900
TYPICAL BASE PLATE PLAN DETAIL
4 -
SCALE 1:5
TITLE
DETAILS GROUND LE CONNECTIO
DATE DRAWN
SCALE 1:5
T. LEADER SCALE on
LEVEL 05 RESDENTIAL R.L. 32.900
90
A1
0
20/10/14 BT JS
2
4
JOB NUMB DRAWING
1:10, 1:5 WG 60
v Printed by: L:\0855 CUB Wintergarden\0855 CAD\AutoCAD\Sheets\WG01-A6001-A1~D WG01-A6001[05]-A1~D
LEVEL 04 PODIUM R.L. 29.900
BOUVERIE ST
LEVEL 03 WINTERGARDEN R.L. 26.800
LANDSCAPE IS INDICATIVE ONLY REFER TO LANDSCAPE DOCUMENTATION FOR FURTHER INFORMATION WINTERGARDEN
BUILDING 5
3 ALBERT COATES LANE, MELBOU
LEVEL 06 RESDENTIAL R.L. 35.900
TYP PORTAL SEGMENT CONNECTION DETAIL
5 -
LEVEL P1 CARPARK R.L. 32.900
6details_ground level connection details
LEVEL 04 PODIUM R.L. 29.900
LEVEL 03 WINTERGARDEN R.L. 26.800
TENDER ISSUE REASON FOR T
FOR DOCUMENT ISSUE HISTOR AVAILABLE FROM:
200x200MM NOM REMOVEABLE ACCESS PANEL TO ALLOW BOLTED CONNECTIONS ON INTERIOR OF PORTAL MEMBERS
ANCHORS AND STRUCTURAL COMPONENTS TO ENGINEER'S DESIGN. ALL HOLD DOWN BOLTS TO BE SEALED AND CONCEALED BENEATH WATERPROOF MEMBRANE.
STEEL BASE PLATE BOLT FIXED TO SLAB TO ENGINEER'S DESIGN WITH SITE APPLIED DURABILITY COATING TO MAINTAIN INTEGRITY OF BASE MATERIAL SIMILAR TO REMAINDER OF COLUMN.
PF.1
LEVEL 06 RESDENTIAL R.L. 35.900
1:5 / 1
A1
16:22:17 (CAD file) 8MMname) STEEL PLATE CLADDING TO PORTAL. HIGH (file PERFORMANCE COATING SYSTEM AS SPECIFIED
FULL PENETRATION WELDS BETWEEN 8MM STEEL PLATES. GRIND EDGES FLUSH.
LEVEL P2 CARPARK R.L. 36.650
20/10/14 BT JS
SCALE on 90
L:\0855 CUB Wintergarden\0855 CAD\AutoCAD\Sheets W
0
350UB INTERNAL PORTAL STRUCTURE
1500 NOM
R.L.
N
10
DRAWN
Details
SCALE 1:10
A6102 05
DATE
ACCESS PLATES FIXED WITH COUNTERSUNK SCREWS AND SILICON SEALANT. SCREWS AND SEALANT TO BE COLOUR MATCHED TO PORTAL FINISH.
WINTERGARDEN ROOF R.L. 38.800
CONTINUOUS SEAL AROUND PENETRATION. LEVEL
1:5 -
TENDER 0855
DRAWING No.
60
vbredin Printed by: on: 20/10/14 at: L:\0855 CUB Wintergarden\0855 CAD\AutoCAD\Sheets\WG01-A6102-A1~Details - Roof Level Connections 2.dwg WG01-A6102[05]-A1~Details - Roof Level Connections 2.PDF
LEVEL P4 CARPARK R.L. 41.150
LEVEL P3 CARPARK R.L. 38.400
3 ALBERT COATES
TYP PORTAL
JOB NUMBER
1:5 / 1:20 WG01
2000 NOM
STRUCTURAL STEEL BEAM TO ENGINEER'S DESIGN.
GZ.2
FALL
SCALE on 90
8MM STEEL PLATE CFW TO STRUCTURAL COLUMN.
LEVEL 07 RESDENTIAL R.L. 40.000
WINTERGARDEN ROOF R.L. 38.800
T. LEADER
LEVEL P5 CARPARK R.L. 43.900
350
1500 NOM
DRAWN
VISION GLAZING
FALL
LEVEL P4 CARPARK R.L. 41.150
DATE
6details_1to5
MATERIALS LEGEND
GROCON
DETAI ROOF CONNE
368
SE GM EN T2
20
PORTAL N FROM NORTH EAST
TITLE
AL
10
0
CARLTON, VICTOR
CONTINUOUS SEAL AT CLADDING JUNCTIONS. STEELWORK CONNECTIONS TO STRUCTURAL ENGINEER'S DESIGN.
DETAILS ROOF LEVEL CONNECTIONS 2
PORTALSLAB N CONNECTIONS PORTAL CONNECTIONPERSPECTIVE AT RAISED PLANTER
12 --
3 -
NTS LEVEL P5 CARPARK R.L. 43.900
BOLTED CONNECTION BETWEEN GUTTER END PLATE AND TITLEUB WEB TO ENGINEER'S DESIGN
CLIENT
CONTINUOUS SEAL WHERE GUTTER STEELWORK INTERSECTS PORTAL COLUMN CLADDING
COATES LANE, MELBOURNE, VIC 3000
200
PORTAL N CONNECTIONS PERSPECTIVE
2 0
PORTAL N FROM SOUTH EAST
TYP PORTAL
PORTAL N FROM NORTH EAST
WINTERG CARLTON
GROCON
SCREED AND TANKING WITH FALLS TO DRAIN.
ALBERT DRAINAGE DESIGN BY HYDRAULIC3ENGINEER.
CONTINUOUS SEAL AT CLADDING JUNCTIONS. STEELWORK CONNECTIONS TO STRUCTURAL ENGINEER'S DESIGN.
PO
PORTAL N FROM SOUTH EAST
a-r-m.com.au PROJECT
CLIENT
CONTINUOUS SEAL WHERE GUTTER STEELWORK INTERSECTS PORTAL COLUMN CLADDING
368
ARM
ARCHITECTURE URBAN LEVEL 11/ 522 FLINDER T/ 03 8613 1888 F/ 03 E/ arm@a-r-m.com.au
100MM MIN LOCAL SCREED COVER AT PORTAL SLAB CONNECTIONS. FEATHER FALLS AWAY FROM COLUMNS
STEEL BASE PLATE TO HAVE SITE APPLIED DURABILITY COATING TO MAINTAIN INTEGRITY OF BASE MATERIAL SIMILAR TO REMAINDER OF 3053 COLUMN. ALL HOLD DOWN BOLTS CARLTON, TO BE SEALED VICTORIA AND CONCEALED BENEATH WATERPROOF MEMBRANE.
PORTAL CLADDING HIDDEN FOR CLARITY
STIFFENING PLATES AS REQUIRED. REFER STRUCTURAL ENGINEER'S DRAWINGS.
SEAL BETWEEN TILE AND METAL PORTAL SLOTTED HOLESCONTINUOUS IN STIFFENER PLATE TO CLADDING. SIKAFLEX OR SIMILAR ALTERNATIVE. ACCOMMODATE LATERAL MOVEMENT AT ONE END OF GUTTER MEMBER.
WINTERGARDEN STAGE 01 CARLTON BREWERY
SLOTTED CONNECTION TO ALLOW LATERAL MOVEMENT
BOX GUTTER
BOLTED CONNECTION BETWEEN GUTTER END PLATE AND UB WEB TO ENGINEER'S DESIGN
Project Architect
STEEL BASE PLATE TO HAVE SITE APPLIED DURABILITY COATING TO MAINTAIN INTEGRITY OF BASE MATERIAL SIMILAR TO REMAINDER OF COLUMN. ALL HOLD DOWN BOLTS TO BE SEALED AND CONCEALED BENEATH WATERPROOF MEMBRANE.
100
PORTAL CLADDING HIDDEN FOR CLARITY
STIFFENING PLATES AS REQUIRED. REFER STRUCTURAL ENGINEER'S DRAWINGS.
FALL
RT
SLOTTED CONNECTION TO ALLOW LATERAL MOVEMENT
BOX GUTTER
8MM STEEL PLATE CLADDING. HIGH PERFORMANCE COATING SYSTEM AS SPECIFIED.
ARM
ARCHITECTURE URBAN DESIGN MASTERPLANNING
LEVEL 11/ 522 FLINDERS LANE MELBOURNE 3000 AUS PLANTER EDGE INDICATIVE ONLY. REFER LANDSCAPE ARCHITECT'ST/ 03 8613 1888 F/ 03 8613 1889 ABN/ 22 476 949 399 DRAWINGS. E/ arm@a-r-m.com.au
SUMP
TE RE
FOR DOCUMENT AVAILABLE FROM
PORTAL STRUCTURE TO ENGINEER'S DESIGN
SLOTTED HOLES IN STIFFENER PLATE TO ACCOMMODATE LATERAL MOVEMENT AT ONE END OF GUTTER MEMBER.
PORTAL P REFER WG01 - A4003
LEVEL 03 WINTERGARDEN R.L. 26.800
BUILDING 10
LEVEL 03 WINTERGARDEN R.L. 26.800
LANDSCAPE IS INDICATIVE ONLY REFER TO LANDSCAPE DOCUMENTATION FOR FURTHER INFORMATION WINTERGARDEN
BUILDING 5
Cross Sections BUILDING 10
AMENDMENT NOTES FOR THIS ISSUE
ONLY AMENDMENTS SINCE LAST ISSUE ARE SHOWN.
05 REV No.
0
10
20
30
40
50
60
70
80
90
TENDER ISSUE REASON FOR THIS ISSUE:
20/10/14 DATE
TOWN PLANNING PORTAl P ElEVATiON PORTAl P ElEVATiON SWANSTON SQUARE WINTERGARDEN swANsTON squARE wiNTERgARDEN swANsTON sTEET cARlTON/gROcON /0855
K FOR DOCUMENT ISSUE HISTORY REFER TO DOCUMENT REGISTER AVAILABLE FROM:
MilliMETREs ON ORigiNAl 100mm
Project Architect at ARM tel. 03 8613 1888
SWANSTON
swANsTON sTREET/ cARlTON gROcON / 0855 1:50@A1 20.10.2014Vic/ / ARM-TP-A4404[01] 1:50@A1 / 11-Nov-2014 / ARM-TP-A4404[01] 0
10
MilliMETREs ON ORigiNAl VicTOR bREDiN / Monday, 20 October 2014 6:05:31 PM (PRiNT)
100mm 20 30 40 50 60 80 90 ####[####]-####~####.pdf (FilE) PLANNING APPLICATION / REV 03 70/ issuED NOVEMbER 2014 / PAGE 11
swANsTON
l:\0855 cub wiNTERgARDEN\0855 cAD\AuTOcAD\sHEETs\TP-A4404-A1~PORTAl FRAMEs 05.Dwg (cAD)
200
swAN
L
APARTMENT LOBBY MAIL ROOM
ARM
MALTSTORE W.C.
ARCHITECTURE URBAN DESIGN MASTERPLANNING LEVEL 11/ 522 FLINDERS LANE MELBOURNE 3000 AUS T/ 03 8613 1888 F/ 03 8613 1889 ABN/ 22 476 949 399 E/ arm@a-r-m.com.au a-r-m.com.au
M
BUILDING 10
PROJECT
WINTERGARDEN STAGE 01 CARLTON BREWERY
DP
H
N
CARLTON, VICTORIA 3053
B5 EXHAUST RISER
BUILDING 5
CLIENT
GROCON
SPILL AIR 1.35m2
N-1
3 ALBERT COATES LANE, MELBOURNE, VIC 3000
FIRE
P
TITLE
SETOUT ELEVATIONS PORTAL BRACING
SERVICES
DP LIFT 10
LIFT 9
Q
1200
2 1101
SPRAY APPLIED HP1200 POLYURETHANE COATING WITH BOND BREAKER AND TAPE AT JUNCTIONS BETWEEN GUTTER MEMBERS OR SIMILAR APPROVED SOLUTION
4
PLANTING BY LANDSCAPE ARCHITECTS
PATTERNED ROOF GLAZING TO ARCHITECT'S DESIGN
SUMP
ALL DIMENSIONS ARE IN MILLIMETER DRAWING HAS BEEN PRINTED TO SC LEFT CORNER. VERIFY ALL DIMENSIO WORK OR SHOP DRAWINGS OR ORD
PATTERNED GLASS TO ARCHITECT'S DESIGN
ONLY AMENDMENTS SINCE LAST ISSUE ARE SHOWN.
-
SCALE 1:5
DATE DRAWN
Bracing Structure
T. LEADER SCALE on 90
5part_Portals
xGrid_140818
A1
0
20/10/14 VB JS
2
4
6
10m
TENDER 0646
DRAWING No.
A4004 05
1:50 WG01 60
8
JOB NUMBER
Printed by: on: 20/10/14 at: vbredin L:\0855 CUB Wintergarden\0855 CAD\AutoCAD\Sheets\WG01-A4004-A1~Portal Setout Elevations - Bracing.dwg WG01-A4004[05]-A1~Portal Setout Elevations -Bracing.PDF
10
N
0
16:21:52 (CAD file) (file name)
Site Plan
TIMNA International Airport | Mann-Shinar Architects
Project: New international resort airport in the south of Israel Client: The Israeli Airports Authority Program: 5.5 km2 including a 30,000 m2 passangers terminal and 50,000 m2 support areas Location: Timna, Israel Phase: under construction Year: 2012-2013 Role: Concept design > Documentation
The new airport is located in the middle of nowhere. The aim was to create a simple, inviting airport that is meant more for tourists than business travelers. The airport will serve domestic and international flights. It’s projected to open in 2016, and to be capable of handling between 1.8 million and 2.25 million passengers a year. Estimated project cost: $300m. The design is inspired by the shape of the desert
The open-plan design is inspired by the shape of the desert rocks, with an abstract interpretation that is reminiscent of origami paper folds and which blurs the distinction between the ceiling and the walls. Two giant roof structures (alluding an airplane’s wings) from both sides of the passengers terminal are covering the support area, which consist of several designated buildings.
Unusual stone formations at Timna National Park
700 m2 maintenance building
800 m2 General Aviation Terminal
EXPO 2015 Israel pavilion Mann-Shinar Architects
Project: Israeli pavilion pro the Expo 2015 ex Program: 800 m2 exhebitio retail, 1,300 m2 g open theater Location: Milan, Italy Year: 2013 Role: Concept design
We proposed a unique and e structure which leverages th geometric constraints. This i longitudinal structure alludes “Noah’s arch” and manifests Israeli exhibition theme: “Ma from less”. This pavilion show the unique spirit of Israel in t innovation, as well as its cult ancient tradition.
oposal for xhibition on space & garden &
eminent he site’s iconic, s a huge s the aking more wcases terms of ture and
The pavilion consists of two opposite spaces, negative and positive which acts as a whole; a terraced garden with an open theater and a closed exhibition space beneaththe theater, taking advantage of its sloping face for a huge projections screen.
Project: Mixed-use 52 level tower Program: 50,000 m2 offices, retail outlets, public facilities and 140 residential units Location: Givataim, Israel Phase: Under construction Year: 2012 Role: Schematic design > Contract Documentation
HASHAHAR tower BLK Architects
The mixed-use tower is creating an urban sequence of high-rise office buildings and adding a variety of housing posibilitiesfrom 1-2 bedroom apartments to penthouses and at the top floors.
The site is located on the bank of Ayalon highway, a major traffic artery in Tel-Aviv. We proposed a unique concept for this tower, making it a new landmark alongside the highway; it was designed as a dynamic sculpture that changes its visual perception from every direction and reflects the highway’s sense of speed.
‘NEW‘ Tower Competition BLK Architects
Tower typical level plans
Project: Mixed-use 45 level tower Program: 39,000 m2 offices, 13,000 m2 hotel, 1,250 m2 retail Location: Tel Aviv, Israel Year: 2011 Role: Concept design > Schematic design
ACADEMIC WORK
TRANSFORMER Diploma Project | Tel Aviv University
Project: Multi - purpose public space, as part of the urban renewal of a neglected neighborhood in Tel Aviv Program: 27,000 - 36,000 m2 mixed use functions (education, housing, offices, community & recreation) Location: Tel Aviv, Israel Year: 2011-2012
Vibrant ethnic communities
Building additions reflecting human needs
Controversial politic situation
The old central bus station as a “black hole”
Housing shortage
“Pixels”- Architecture of improvisations
THE AESTHETICS OF A MESS
The project proposes to extend the main pedestrian mall, the neighborhood’s vigorous heart, by some 600 meters, until it intersects with the up-market Rothschild Boulevard. The pedestrian route will encompass the development of three focal points: • Adding to the residential fabric along the route • Reviving use of the new central bus station • Developing the old bus station compound as a gateway to the neighborhood
Design principles: The area of South Tel Aviv, particularly the neighborhood of Neve Shaanan, is considered one of the lowest socio-economic and dangerous parts of Israel. Today it is inhabited by thousands of migrants from Southeast Asia and refugees seeking asylum from Sudan, Eritrea and the Ivory Coast.
The project deals with the urban renewal of Neve Shaanan by embracing the neighborhood’s social and multicultural features, transforming it into a unique and essential landmark in the city.
1. Diversity 2. Flexibility 3. Connectivity
The TRANSFORMER The Transformer, a new type of multi-purpose urban public space, derives its inspiration from the old central bus station, now empty and neglected. It is composed of permanent “piers” that channels the moving circulation and the various systems, interspersed with light, mobile structures that can change positions between the piers as desired.
Usage schemes
Open Spaces schemes
The forlorn situation of the old central bus station compound
+7.0- Upper layer: a “mosaic” of light and mobile structures of mixed use that can change possitions across the piers
The vibrant old central bus station back in its glory days
Permanent “Tel Avivian” structures facing a wide road and serving as a basis for the dynamic structures
Permanent piers: connecting the two main levels of the complex, comprised of two leveled tracks
0.0- Lower layer: consisting of light and mobile structures of school classrooms, restaurants, bars and shops
Inspiration from the old central bus station: mobile structures between permanent piers
“Minshar” School of Art + art galleries
WEEK Elementary school
WEEK Elementary school during recess
WEEKEND +7.0 Level plan, weekends: interspersion of the light structures creates a sense of wandering through a fair
Weekend Market
WEEK: Elementry school and Art school
WEEKEND: Art galleries and a market
Longitudinal sections through “The Transformer”
Detail of ‘Pier’ and light structures in level 0.0 and +7.0
Friday 23:00 - Bustling nightlife. The casino, hidden throughout the week, reveal itself only on weekends.
INTER*A*CTIONS | Tel Aviv University Housing Complex Project: Housing complex: defining a new housing typology Program: 3,000 m2 apartments & public facilities Florentine neighborhood, Location: Tel Aviv, Israel Year: 2010
The goal of this project is to enhance relationships between dwellers at different scales (unit, housing complex and street). The proposed design redefines common spatial hierarchies through the implementation of a formal scheme whose primary concern is the encouragement of human interaction.
North Facade
Typical floor plan
Typical two opened units cluster
HULA VALLEY Visitor Centre | Tel Aviv University
Project: 1,300 m2 Ecological visitors centre at a famous bird-watching site Program: Auditorium, information, exhibitions, space, souvenir shop, offices and observatory Location: Hula valley, North of Israel Year: 2010
Interspersed with islands that serve as protected bird nesting sites, Hula Lake Park has become a major birdwatching site. As a gate to the reserve, the Hula Valley visitor centre frames its surroundings without detracting from views of the landscape. The design blurs the line between open and closed, interior and exterior. This results in an open envelope which permits the free-flow of wind throughout the building, whilst allowing birds to occupy the space. Ecological principles Scheme
Ground floor plan
Sections
THANK YOU