suitability: EXISTING
0-15% slopes grassland mattoral/scrubland roads
suitability: PROPOSED
relocated lots reservoir flood zone 0-15% slopes 15-30% slopes disturbed land mattoral/scrubland mountain paths
river: EXISTING FLOW
flux: GLACIAL LAKE OUTWASH FLOOD
reservoir: PROPOSED BODY
interface: SHORELINE AS INTERMEDIARY
resource phasing: SOIL
resource phasing: TIMBER
FEBRUARY NOVEMBER
OCTOBER
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
DECEMBER
JANUARY
temporal cycles: HERD MOVEMENT & CLIMATE
2009 GLOF
2008 GLOF
2008 GLOF 2008 GLOF
RIVER FLOW VOLUME 93
RESERVOIR LEVELS
92 91
90
veranadas: POTENTIAL ROUTES
jun
jul
un
ul
aug
p
oct
nov
dec
an
eb
mar
apr
may
un
jun
jul
aug
sep
oct
nov
dec
jan
feb
mar
apr
may
jun
un
ul
aug
p
oct
nov
dec
an
eb
mar
ul
aug
sep
oct
nov
dec
an
feb
mar
may
may
un
apr
apr
feb
an
jan
eb
dec
dec
mar
nov
nov
feb
oct
oct
mar
jan
p
sep
mar
feb
an
dec
nov
oct
sep
aug
ul
un
may
apr
mar
dec
nov
oct
sep
aug
ul
aug
jul
aug
may
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
may
may
apr
apr
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
apr
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
apr
mar
feb
jan
dec
nov
oct
sep
aug
jul
jun
may
27,000 SQ M
100m
200m
1PADDOCK = WINTER GRAZING for 50 sheep 20 PADDOCKS = 1,000 SHEEP
spring/fall movement
winter grazing paddock
low reservoir level
hay shed & junction
hayfields
shearing shed
claiming the bathtub ring
outward expansion
creation of dry hayfields
creation of seasonally wet hayfields
300m
400m
kit of parts: WALL TYPOLOGIES
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
forage slash site prep slope soil st terrain visiblity access water
introduced topography: PADDOCK BOUNDARY
introduced topography: FLOWLINE MOVEMENT CORRIDOR
introduced topography: SHORELINE TOPOGRAPHIC DEPTH