DANIEL RUIZ LOLO ---------------------------------------PORTFOLIO 2018
PROFESSIONAL EXPERIENCE ---------------------------------------PROJECTS
Parkmerced. -------------------------------------------------------Fougeron Architecture - ESTUDIO ESE YEAR LOCATION PROGRAME SIZE DESCRIPTION
2016 San Francisco, USA. Residential building 7215 m² Residential building located in the city of San Francisco. It has four levels of height where 64 units of 1, 2 and 3 bedrooms are installed. On the ground floor are developed community use programs such as; Gym, communal lounge, central courtyard and others.
Italian Pizza Kitchen. -------------------------------------------------------Kurzman Architecture - ESTUDIO ESE
ROOF ASSEMBLIES: SINGLE PLY MEMBRANE ROOF SYSTEM, EPDM, OVER 6" MIN. POLYISO, TAPERED RIGID INSULATION, STEEL DECKING, K-JOISTS, AS PER STRUCTURAL
ITALIAN PIZZA KITCHEN ROSELLE
ITALIAN PIZZA KITCHEN ROSELLE
.
.
A5.01
A6.12b
2016 Illinois, USA. Residential building 690 m² New restaurant building with partial basement.The work done Includes sitework, parking, utilities and landscaping.
2 A6.20
8'' X 800 X 16'' CMU- 2 CORE, SSD
STAINLESS STEEL FLASHING TO RECEIVE SHEET METAL ROOF
B.O. ROOF DECK
ROOF ASSEMBLIES: SINGLE PLY MEMBRANE ROOF SYSTEM, EPDM, OVER 6" MIN. POLYISO, TAPERED RIGID INSULATION, STEEL DECKING, K-JOISTS, AS PER STRUCTURAL
B.O. ROOF DECK
3 A6.11
3"x3" Box above Left blank for City Eplan Review
ROOF ASSEMBLIES: SINGLE PLY MEMBRANE ROOF SYSTEM, EPDM, OVER 6" MIN. POLYISO, TAPERED RIGID INSULATION, STEEL DECKING, K-JOISTS, AS PER STRUCTURAL 3 A6.20
1'-4".
3 A6.30
3 A6.20
1'-4".
PRINTED ON: 30/11/2016 16:32:04 KURZMAN ARCHITECTURE
1'-4".
PRINTED ON: 30/11/2016 16:31:36 KURZMAN ARCHITECTURE
SEE SECTIONS FOR HEIGHT
POLYISO SPRAYED INSULATION FILLER WITHIN CAVITY AREA
KA
B.O. ROOF DECK
3 A6.11
SEE SECTIONS FOR HEIGHT
SEE SECTIONS FOR HEIGHT
STOREFRONT CURTAIN WALL SYSTEMS, 2 1/2" X 6"
KURZMAN ARCHITECTURE, LLC
PREFORMED EXPANDED POLYSTYRENE INSUL. BOARD SILL
FIXED EXTERIOR SUNSHADE HOLLOW EXTRUDED ALUMINUM AIRFOIL, 6" X 1 1/2" WITH OUTRIGGER SUPPORTS. INSTALL PER MAN'F INSTRUCTIONS AND SEE DETAILS
8" X 8" X 16" CMU - 2 CORE, S.S.D. 3 A6.30
3 A6.30
STOREFRONT CURTAIN WALL SYSTEMS, 2 1/2" X 6"
4 A6.30
PREFORMED EXPANDED POLYSTYRENE INSUL. BOARD SILL
STOREFRONT CURTAIN WALL SYSTEMS, 2 1/2" X 6"
3 A6.00
PREFORMED EXPANDED POLYSTYRENE INSUL. BOARD SILL
3 A6.00
FINISH FLOORING, SEE FINISH SCHEDULE
FINISH FLOORING, SEE FINISH SCHEDULE
BRACKET HEIGT 10'-2 1/2''
FLOOR ASSEMBLIES: CONCRETE TOPPING OVER PRECAST PLANK CONCRETE PANELS AS PER STRUCTURAL
FLOOR ASSEMBLIES: CONCRETE TOPPING OVER PRECAST PLANK CONCRETE PANELS AS PER STRUCTURAL
T.O. FND WALL/ TOPPING
T.O. FND WALL/ TOPPING
SEE S.S,D, & SECTIONS
SEE S.S,D, & SECTIONS
8'' X 800 X 16'' CMU- 2 CORE, SSD
STAINLESS STEEL FLASHING TO RECEIVE SHEET METAL ROOF
4 A6.30 PREFORMED EXPANDED POLYSTYRENE INSUL. BOARD SILL
PERFORATED 4" DIA. DRAIN PIPE IN FREE DRAINAGE GRAVEL WRAPPED IN FILTER FABRIC WHERE REQUIRED BY GEOTECH
B.O. FTG SEE S.S,D, & SECTIONS
2
WALL SECTION - STUCCO - WINDOW - AWNING TYPE 2 3/4" = 1'-0"
A5.01
WALL SECTION - STUCCO - BASEMENT - AWNING TYPE 3 3/4" = 1'-0"
1
WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT.
© Kurzman Architecture
A6.12b
THESE DRAWINGS ARE THE ORIGINAL UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED OR USED
© Kurzman Architecture
1
A5.01
W SHAPE, STRUCTURAL STEEL FRAMING
AWNING 1 CONSTRUCTION 1 1/2" = 1'-0"
3
A5.01
WALL SECTION - STUCCO - BASEMENT - WINDOW - AWNING TYPE 3 3/4" = 1'-0"
SEE
SEE S.S,D, & SECTIONS
S.S.D.
L SHAPE, STRUCTURAL STEEL FRAMING, S.S.D.
FND PLANS
S.S.D.
B.O. FTG SEE S.S,D, & SECTIONS
SLAB ON GRADE OR COMPACTED GRAVEL SUB-BASE, FOR SLAB SIZING, REINFOREMENT AND BEARING CONDITIONS SEE STRUCTURAL T.O. FTG SEE
SEE S.S,D, & SECTIONS
FND PLANS
T.O. FTG
S.S.D.
2016.08.16
BASEMENT EXPANSION
2016.11.04
CONSTRUCTION ISSUE
REVISIONS:
PERFORATED 4" DIA. DRAIN PIPE IN FREE DRAINAGE GRAVEL WRAPPED IN FILTER FABRIC WHERE REQUIRED BY GEOTECH
SLAB ON GRADE OR COMPACTED GRAVEL SUB-BASE, FOR SLAB SIZING, REINFOREMENT AND BEARING CONDITIONS SEE STRUCTURAL S.S.D.
B.O. FTG SEE S.S,D, & SECTIONS
SEE
S.S.D.
SEE S.S,D, & SECTIONS
FND PLANS
T.O. FTG
S.S.D.
SEE SECTIONS & FND PLANS
PERFORATED 4" DIA. DRAIN PIPE IN FREE DRAINAGE GRAVEL WRAPPED IN FILTER FABRIC WHERE REQUIRED BY GEOTECH
CRAWL SPACE/ COMPACTED FILL
FOUNDATION ASSEMBLY: WATERPROOFING OVER CONCRETE STEM WALL WITH SPREAD FOOTING ON SOIL BASE PER STRUCT WITH 2" XPS RIGID INSULATION
ISSUED: FULL BASEMENT
SEE S.S,D, & SECTIONS
SEE SECTIONS & FND PLANS
T.O. FND WALL
FOUNDATION ASSEMBLY: 2" XPS RIGID INSULATION, WATERPROOFING, CONCRETE STEM WALL WITH SPREAD FOOTING ON SOIL BASE PER STRUCT, 3/16" AIR SPACE, STEEL STUDS PER STRUCT., INTERIOR FINISH-SEE FINISH SCHEDULE
FULL BASEMENT
SLAB ON GRADE OR COMPACTED GRAVEL SUB-BASE, FOR SLAB SIZING, REINFOREMENT AND BEARING CONDITIONS SEE STRUCTURAL
SEE SECTIONS & FND PLANS
FOUNDATION ASSEMBLY: 2" XPS RIGID INSULATION, WATERPROOFING, CONCRETE STEM WALL WITH SPREAD FOOTING ON SOIL BASE PER STRUCT, 3/16" AIR SPACE, STEEL STUDS PER STRUCT., INTERIOR FINISH-SEE FINISH SCHEDULE
FINISH FLOORING, SEE FINISH SCHEDULE
2 A6.00
WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT.
WALL ASSEMBLY: EXTERIOR INSULATED FINISH SYSTEM: 2-COAT SYNTHETIC STUCCO COATING OVER REINFORCEMENT MESH OVER 2 1/2" XPS RIGID INSULATION WITH VERTICAL NOTCHED TROWEL ADHESIVE DRAINAGE SYSTEM, CLASS 1 VAPOR BARRIER, CMU PER STRUCT., 3/16" AIR SPACE, STEEL STUDS PER STRUCT., INTERIOR FINISH-SEE FINISH SCHEDULE
SEE SECTIONS FOR WALL HEIGHT
SEE SECTIONS FOR WALL HEIGHT
WALL ASSEMBLY: EXTERIOR INSULATED FINISH SYSTEM: 2-COAT SYNTHETIC STUCCO COATING OVER REINFORCEMENT MESH OVER 2 1/2" XPS RIGID INSULATION WITH VERTICAL NOTCHED TROWEL ADHESIVE DRAINAGE SYSTEM, CLASS 1 VAPOR BARRIER, CMU PER STRUCT., 3/16" AIR SPACE, STEEL STUDS PER STRUCT., INTERIOR FINISH-SEE FINISH SCHEDULE
SEE SECTIONS FOR WALL HEIGHT
WALL ASSEMBLY: EXTERIOR INSULATED FINISH SYSTEM: 2-COAT SYNTHETIC STUCCO COATING OVER REINFORCEMENT MESH OVER 2 1/2" XPS RIGID INSULATION WITH VERTICAL NOTCHED TROWEL ADHESIVE DRAINAGE SYSTEM, CLASS 1 VAPOR BARRIER, CMU PER STRUCT., 3/16" AIR SPACE, STEEL STUDS PER STRUCT., INTERIOR FINISH-SEE FINISH SCHEDULE
EIFS ON 2" INSULATION BOARD
55 EAST IRVING PARK ROAD ROSELLE, IL 60172
SIM
743 W. Brompton, 2N Chicago, IL 60657 p (312) 286.0901 f (773) 472-0521 eM: rkurzman@comcast.net
ITALIAN PIZZA KITCHEN ROSELLE
2 A6.11
FIXED EXTERIOR SUNSHADE HOLLOW EXTRUDED ALUMINUM AIRFOIL, 6" X 1 1/2" WITH OUTRIGGER SUPPORTS. INSTALL PER MAN'F INSTRUCTIONS AND SEE DETAILS
FIXED EXTERIOR SUNSHADE HOLLOW EXTRUDED ALUMINUM AIRFOIL, 6" X 1 1/2" WITH OUTRIGGER SUPPORTS. INSTALL PER MAN'F INSTRUCTIONS AND SEE DETAILS
4 A6.30
THESE DRAWINGS ARE THE ORIGINAL UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED OR USED
YEAR LOCATION PROGRAME SIZE DESCRIPTION
Release Date: 11.04.2016 Exp. Date: 11.30.2016 Stamp
WALL SECTIONS
A5.01 Drawing No.
Monarch Hotel and Casino. -------------------------------------------------------PCL Construction Services - ESTUDIO ESE. YEAR LOCATION PROGRAME SIZE DESCRIPTION
2017 Colorado, USA. Hotel and Casino 32.110 m² Hotel and casino, 23 floors above grade and the structure is primarily cast in place concrete. There are several metal construction also, specially for roofs. Design development documents were received in dwg format. We modeled in revit structure concrete areas in LOD 300 and metal areas in LOD 400 to send to manufacturers.
Carter Hotel -------------------------------------------------------Spivak Architecture / SJC Engineering - ESTUDIO ESE. YEAR LOCATION PROGRAME SIZE DESCRIPTION
2017 New York, USA. Hotel 28.080 m² This project is an existing hotel of 30 levels that will be renovated. Changes were made to common spaces and rooms. WSP worked on the existing structure, made changes to support the new loads and design. The plumbing and HVAC system was completely designed again.who developed their model in LOD 300. Clashes and issues were analyzed.
SHEET NOTES:
SHEET NOTES:
TX 3
TX 2
TX 9
TX B1
ACCU-1 & ACCU-2 12 TON EACH (STACKED)
TG 9,200 c
150 c
SMOKE PURGE/CS 38x24 UP
26x14 CR 2,300 c
KX 1 GENERAL EXHAUST-24x18
10x26 UP&DN (3)FSD/AD TYP. TG
10x26 UP&DN
10x26 UP&DN 36x10 TRASH ROOM EXHAUST
L
L 1A
3A
P 3
EF-1 PROVIDE 50 CFM EXHAUST AIR IN CORRIDOR CLG. AND DOOR UNDERCUT FOR IT CLOSET.
24x60 STAIR PRESSURIZATION
G E1
P 2
P 5A
PENDING RESOLUTION
UP
L 3
26x52 STAIR PRESSURIZATION
P 9
P 11
10x26 UP&DN
6x4
P 10
TX 10
10x26 UP&DN
@4TH & 7TH FL. ONLY
L 3B
10x32 UP&DN
TX 13
3"CD UP
DATE
GEOTECHNICAL CONSULTANT
35 6x4 c
6x4
BIM 360://SA_Carter Hotel/SA_CH_PLBG COMPLETE.rvt
GENERAL NOTE: 1. PROVIDE CONSTANT AIR FLOW REGULATOR SIMILAR TO AMERICAN ALDES MODEL CAR-II FOR ALL GUEST ROOM TOILET EXHAUST DUCT SYSTEMS. 2. SEE CAR-II SIZE ON DRAWING M-300-00 AND INSTALLATION DETAIL ON DRAWING M-401-00.
GRAL_PREGUNTA REALIZADA
REVISION
02/
D
GEOTECHNICAL CONSULTANT
LANGAN
21 Penn Plaza, 360 West 31St Street, 8th Floor, New York, NY, 10001 Tel: 212 479-5444 Fax: 212 479-5444
L 5A
MECHANICAL CONSULTANT:
P 18 SJC
5
NO
8th Floor, New York, NY, 10001 Tel: 212 479-5444 Fax: 212 479-5444
MECHANICAL CONSULTANT:
ENGINEERING
SJC ENGINEERING
60 East 42nd Street, Suite 96 New York, NY, 10165 Tel: 212 687-3050
P 15
P 15A
14
STRUCTURAL CONSULTANT:
P STRUCTURAL CONSULTANT: 17
WSP GROUP
228 East 45th Street, 3rd Floor New York, NY, 10017 Tel: 212 370-8914
WSP GROUP
228 East 45th Street, 3rd Floor New York, NY, 10017 Tel: 212 370-8914
TX 11
P LANGAN 19 21 Penn Plaza, 360 West 31St Street,
8x4
6x4
REVISION
60 East 42nd Street, Suite 96 New York, NY, 10165 Tel: 212 687-3050
TX 12
10x6
8x4
UP
NO
36x16 UP&DN
10x6
3"CD UP TG 150 c FD/AD OFFSET @ 7TH FL CEILING
50x14 UP&DN
8x4
8x4
12x6
TG 2,660 c
TG 2,660 c
TX 14
P 5
26x10 UP&DN
3"CD UP
@4TH & 7TH FL. ONLY
10x16 UP&DN
P 6
KX EXHAUST 36 X 24
26x10 UP&DN
7x24 DN
10x26 UP&DN
10x26 UP&DN
6x4
3"CD UP TX-14x18 10"∅ CWS&R
L 1
6x4
22x10
7x24 UP&DN
CR 35 c TYP.
TX 15
P 7 P E1
TX 1
FUEL OIL SUPPLY/RET GENERATOR IN 2HR RATED ENCLOSURE
L 2
2'x2' RA GRILLE @ HUNG CLG. TYP.
10x26 UP&DN
L 2A
TX 8
TX 7
TX 6
03/08/2017 19:12:57
ACU-C-1 0.6 TON 280 c TYP.
TX 5
c Copyright Spivak Architects P.C. 2016
BRS-1 SINGLE PORT BRENCH SELECTOR. TYP.
TRX 1
TX 4
L 5
P 16
SPIVAK ARCHITECTS P.C.
152 Madison Avenue, 15th Floor New York, New York 10016 Tel 212 343-1166 Fax 212 343-0225
PROJECT:
43RD STREET HOTEL 250 WEST 43RD STREET FLOORS 3 -13 NEW YORK, NY 10036
P
L 4
P 13
L 4A
P 12
SPIVAK ARCHITECTS
PROJECT:
43RD STREET HOTE 250 WEST 43RD STREET FLOORS 3 -13 NEW YORK, NY 10036 JOB NO:15020 BIS JOB NO: DRAWING TITLE:
18TH FLOOR (19TH TENANT) PLAN
JOB NO:15020 BIS JOB NO:
DATE: 04/27/ SCALE: 3/16 DRAWN BY: CHECKED B
DRAWING TITLE:
3 TO 6TH FLOOR PLAN
DRAWING NO
P1
DATE: 04/27/2017 SCALE: 3/16" = 1'-0" DRAWN BY: L.S. CHECKED BY: Checker DRAWING NO:
M104 of 24
785 Residence. -------------------------------------------------------Korejko Design - ESTUDIO ESE. YEAR LOCATION PROGRAME SIZE DESCRIPTION
2018 New York, USA. Hotel 478 m² New apartment built in New York, 1 bedroom, guest room, library room and facilities. There were produced three models, one with the architecture, the MEP and the structure. The coordination was realized with point clouds obteneid on site and updated weekly to produce an ass-built model ready for facilyty management and clash detection.
SOLAR DECATHLON EXPERIENCE ---------------------------------------PROJECTS
La Casa Uruguaya. -------------------------------------------------------Solar Decathlon Latin America and Caribbean 2015 winner. YEAR LOCATION PROGRAME SIZE AWARDS
2015 Santiago de Cali, Colombia. Family House 80 sqm 1st Innovation 2nd Sustainability 2nd Comfort Conditions CALI SITUATION 2nd House Functioning The proposal proposes a high density of houses that are developed in four blocks grouped in pairs of two. The main objective of the urban design is to encourage the user to be outdoors, which is why large corridors were created for a good, fluid and comfortable circulation in order to be places not only transit, but also recreation. The house works like a house inside another. This is achieved by generating external skin which allows the house to be thermally MONTEVIDEOan SITUATION isolated from the outside environment, creating a microclimate between the external walls of the house and the skin that covers it, such as between the roof and the roof. Practical, minimalist and efficient. We created a space between the vertical per-
DESCRIPTION
gola and the house, avoiding that the direct sunlight hit the walls, generating a microcli-
mate that protect the huose. The same happens with the upper roof which stops the direct sunlight of midday and generates a ventilation area to take away from the house, the heat pro
duced by the sun.
IIn this case the vertical pergola as the outsider
roof wont be as efficient as in the previous
case, so we created rain flaps that, apart from
CALI SITUATION HOT WEATHER PASSIVE STRATEGIES
MONTEVIDEO SITUATION COLD WEATHER PASSIVE STRATEGIES
protecting the house from the rain, they gener-
ate a air chamber which separates the house’s roof from the outsider cold wether.
ROOF COOLING SYSTEM
CALI SITU
It functions with nocturnal radiation. The radia-
We crea
tion exchange occurs when two separate ob-
gola and
jects have different temperatures and the hot-
sunlight
test one transfer’s heat to the other one, level-
mate tha
ling both objects original temperatures.
pens wit sunlight
Horizontal ceilings radiation aims to outer
area to ta
space which is at a very low temperature,
duced by
making a difference of 4 to 5 degrees lower
MONTEVI
than the temperature of the vertical surfaces. to work properly there must be few clouds, low
IIn this c
humidity and light wind. The system will store
roof won
“cold” produced by night radiation in an inner
case, so
deposit incorporated on the roof, where has in-
DAY ROOF COOLING SYSTEM
NIGHT ROOF COOLING SYSTEM
CALI SITUATION HOT WEATHER PASSIVE STRATEGIES
corporated an Economic Phase Change Materials strategically distributed.
MONTEVIDEO SITUATION COLD WEATHER PASSIVE STRATEGIES
protectin ate a air
roof from
ROOF CO
BA - 002
Bioclimatic drawings (passive design strategies)
It functio
tion exch
jects hav test one
ling both
Horizont
space w making than the
work pro
humidity
“cold” pr
deposit i
DAY ROOF COOLING SYSTEM
BA - 002
Bioclimatic drawings (passive design strategies)
NIGHT ROOF COOLING SYSTEM
corporat
rials stra
SymbCity House. -------------------------------------------------------Solar Decathlon Europe 2014 contestant. YEAR LOCATION PROGRAME SIZE AWARDS
DESCRIPTION
2014 Versalles, France Family House 160 sqm 4th Communication and Social Awareness 4th Comfort Conditions 3rd Energy Efficiency Intervention in a residential zone of Madrid with a deficient level of construction. The sale of the additional urban land from the roofs of the buildings helps to finance a global rehabilitation operation of the building, thus creating a mutual benefit between (existing) “Host” dwellings and “new” Guest houses. The new homes will be buildings of almost zero energy consumption, while the houses of the host buildings will get at least an energy certification B. The SymbCity House project proposes an independent wooden structure to the existing building on the outside. The generated structural system expands the existing houses by growing them 1 meter towards the exterior, increasing the surface of the house and creating an air chamber thanks to the new facade, where it can store heat, reducing the consumption of heating in winter.
MASTER THESIS PROJECT ---------------------------------------PROJECTS
Ecovillage in Torrecuadradilla (Guadalajara). -------------------------------------------------------Final Degree Project - University of Alcalá YEAR LOCATION PROGRAME CALIFICATION DESCRIPTION
2014 Torrecuadradilla, Guadalajara, Spain. Ecovillage 9/10 The transformation of a town almost unhabitated in Guadalajara (Spain), in a self-sufficient ecovillage with the capacity to generate sufficient resources to maintain a constant population over time, thus avoiding the total disappearance of the population. This intervention will be carried out through 9 different interventions, 6 of which are ‘‘plug-in devices’’ and three types of housing. The plug-in devices are designed to achieve self-sufficiency of ecovillagers, each of them is specialized in the production of a resource. The three new types of housing are designed to meet the housing needs of the new ecovillagers and provide new spaces to process honey inside the town. The proposal will be carried out in different stages, each stage has a duration of 15 years, a sufficient but necessary time to fully acquire the knowledge, experience and skills necessary to move on to the next stage. Each stage will be marked by a specific program and by a specific constructive system and responds to the social and demographic characteristics of the ecovillage at that precise moment.
GRAPHIC DESIGN ---------------------------------------WORKS
Book: ‘‘La Puebla de Laredo’’ -------------------------------------------------------Town Hall of Laredo, Spain - University of Alcalá (2012) 134
EL ARQUITECTO, CÓMO HIZO NUESTRO SE PAPEL
nostil ute teremnit inte a cris.
Bunte vit, cons nota Serfecon vit. Gra L. Popotiqua pature nosupio, sinculis me menam perum il vesideliur hosterv idepotemus in nonvernius, P. Dec teliam perions usquodi pat omne patandam qui pecto publiam rem PABLO AYUSO OLLERO occhilicae hacerec ulabemure nent. Peri tum arquitecto ETSAG Alcalá de Henares erri, pulervivive, Catus hil consi periocta vivis prpmoción 2010 averene siculto ditiam nos et? Occidiur quam entifec ulocupero estrides vemquam in die vivigno ratimulicae tem nonentebus acipimi DANIELuratus RUIZ ignostionc LOLO tus con venit; noveres estudianteidiensu ETSAG pimunum de Alcalá depulegitiam Henares rei puliusquodis adhuc omnius ad rei iam ublibem, eteres meribuscerdi incus vis re avervic veri iamdiena mus facibus consulto vivirmiu morescerit fat ego mulius, con verce notilium tam. Mari consis senam ne achi, dit consultoreo, Catquiu quo vent. Verficaecre novius cluderf econdem entebest ve, nostoravena, quonium Omnit ac rebernirit. O tum licepotidit ad huis hoc, tio is, num demunties esse nonsid patiendum priam nonessum dentiam in te int. Son innumerables las veces que delante un ma, ommorbem iacideese fatuusde sulos proceso,auderum una obra,unihiliam o un producto nos asalta Irit, Cupio, Pate et auder in desic tanum st? Que nem pro,elvis M. interrogante se et hizo? Es conventem ese mismo deseo locrendem publicibus loc, quidernit, Graci¿Cómo ficultus vocret P. Pimum innato decupiem,Ala conocer y ne comprender lo que nostorsum ella ne cota consuliursum testri estime iamnos aucertia rodea lo que justifica este capítulo. deffressum Pate et; neque conteme nihilia editusa ne noc o adhuistin iam actodit, nsulessedes? Nortissum hucit vertum us, Cat L. Ed audetrescio pertum maximus ortus Tuve la suerte hace algunos años de recibir en contiam medeo, nius ia quam senterudem, la carrerahorume una asignatura llamada Documentales uteatrisquam publia teriost grae et; it voludam Arquitectónicos, impulsada y coordinada por iptiam octus iam med pro, qui potionsum Isabel Ordieres Díez. En ella, junto a unos publis conclabem dit consimo venampesim es compañeros nos enfrentamos al reto de grabar huis dem auctam sedetio, quod comnondam un documental sin tener ningún conocimiento am menatilin ingulis sentur iamenatrum atum previo. menduc te comnostilium terum terora nostium oculocurbem ommortus, nu ine mul viviris bon tium novensu licerente acips, mo iaediu vivehemula dit.
EN EL FUTURO
POR AMOR AL ARTE ...
El resultado largo y complejo, produjo en su desarrollo un material en principio de descarte, minutos de grabación y tomas que finalmente no tenían cabida en el montaje final. Este material en apariencia de menor importancia adquiría toda su relevancia cuando cuidadosamente montado relataba otra historia, el making-of o relato de cómo se realizó. De igual modo la realización de este libro y de la exposición generó una gran cantidad de experiencias, vivencias y subhistorias que lamentablemente no serían incluidos en la historia principal. Sin embargo hemos considerado conveniente no perderlas y usarlas como testimonio de un proceso lo suficientemente complejo y elaborado como para tener identidad por sí solo. En el cine, la experiencia del making-of tiene un largo recorrido llegando a constituir un genero propio y en ocasiones alcanzando más importancia que la película en sí misma. Esto es así que son muchos los directores que desde la concepción de la película tienen en mente su realización, y forma parte intrínseca e indisoluble de la grabación del film. De igual modo este pensamiento fue tenido en cuenta por todos desde un principio, la necesidad no solo de explicar la Puebla Vieja si no de mostrar a todo aquel interesado en ello, como evoluciono y se formo este proceso. Con la esperanza, de que nuestra experiencia sirviera a otros para realizar procesos similares u homónimos en otros enclaves.Sin embargo en nuestro caso al tener un soporte bidimensional como un libro nos enfrentábamos a un desafío diferente. Era
evidente que no resultaría tan fácil plasmar un proceso usando únicamente medios gráficos. Este capítulo pretende humildemente responder a esa ambición, quedando a juicio del lector el determinar si la cumple. Aunque mis compañeros me han concedido el privilegio de ser el narrador de su historia, ésta no me pertenece, pertenece a todos y cada una de la personas, alumnos, habitantes de Laredo, amigos y profesores que la han hecho posible. A todos aquellos lo suficientemente soñadores o comprometidos como para iniciar una aventura a ciegas, sin obtener por el camino ninguna recompensa académica o económica por la simple razón de querer ayudar a mejorar la realidad que nos rodea. Este ¿Cómo se hizo? pretender ser una ventana, una grabación en imágenes a un proceso arduo y complejo de unos estudiantes que se embarcaron cargados con más ilusiones que certezas y con más dificultades que recompensas a realizar una exposición y un libro … por amor al arte
Nos, ferissi milium, quam obunum nostidet, deferistis suam ignaris, pliciam dius invem viricon simoruror untre, P. Condienihi, quit? Avocciendem in deliusque dii pulin Etraelabute no. Nos, culi siternis ses nessimuliu spiocchus inatus poris. Lem omniamdina nonsulicibus bonfex ne nonclegere consupicaet C. An rescriurori,
Enseñame Tu Eñe -------------------------------------------------------Online spanish lessons academy (2015-2018)
Te mola Europa -------------------------------------------------------Red Equo Joven - Equo (Spanish Green Party)_2014
Daniel Ruiz Lolo ---------------------------------------ruizlolo.daniel@gmail.com